Laserfiche WebLink
P&Z, Meeting Minutes <br /> May 7, 1991 <br /> page three <br /> c_r_on_ sections as - irtit_submitted _and <br /> approved by the City Prior to commencement of any <br /> site grading. <br /> 2. Boulevards shall _P _ ' ' <br /> o two <br /> percent (2%) behind the curb. The sidewalk <br /> construction shall be in accordance with the. City <br /> and _shall reflect a <br /> consgst .nt _rade tla. fo ows the back of the <br /> curb_ <br /> 3. A. After substantial building completion and <br /> prior to the issuance of an occupancy permit, <br /> a Certificate of Survey shall be ipyided_t3:2 <br /> the City verifying that the lot grading has <br /> _een accompli_shiej_to ,In_e_approved standards. <br /> R. The Certificate jar SurveY_Kill loJaate_the <br /> foll&Eing: <br /> 1.) property iron,. <br /> 2J iliuiLkdina& <br /> easementa_ <br /> 5.) utiliti_eaaamenta, <br /> 6.) sewer service at the property line, <br /> and shut off at the <br /> proPe,rtrY <br /> CertifLate will nleo_provide the <br /> following elevations: <br /> 1.) grading at the_front_tlLae,_ <br /> grading at propertv_.2= <br /> _j__Qwest, floor elevatioi structure <br /> type, <br /> 4.) 100 year flood elevation andML2Lar <br /> flood contour on property. <br /> 38.121n2, SOIL EROSION. The Developer shall <br /> erosion insuring: <br /> 1. deve1oment shall natural <br /> • 4 • g t , 730_: A aid <br /> of the subdivision in order to create _Vest <br /> potential for preventing soil erosion,Infe <br /> Deve1oer shall suhmit an erosion control p1an <br /> • 7 7 • e*_ <br /> 'o• - il - # •-• . trti id 1an shall <br /> be approved by the City Prior to the commencement <br /> o s'te _ 7)0. • :Von. <br /> 2— ...I • g t ios (Limit neasure& shall be <br /> c.._ ' w'th tee <br /> sev 0 lel i c as <br /> re uired b ti. Citi Pri_a_r_ta <br /> development when necessary to control erosion. <br /> 3. Land shall be developed in increments of workable <br />