Laserfiche WebLink
, Northeast Metro Trail Plan (Draft) <br /> October 4, 2000 <br /> Centerville Park and Recreation, 651429 -3232, <br /> Wayne LeBlanc, 651426 -0168 <br /> Centerville, Lino Lakes, Hugo, Anoka Parks, Anoka County, Washington County, Ramsey County, and the <br /> surrounding Metro area benefit from the trail plan in Figure 1. The trails connect the Hugo trail that will eventually <br /> go to Duluth to other trails connected to the Chain of Lakes Park and south to Otter Lake Park including a future <br /> recreational park at Birch Street and Centerville Road. The trails in and around Centerville are designed to promote <br /> safe pedestrian and bicycle routes to parks, commercial areas, other trails, homes, and places of interest. In addition, <br /> loops in the design enhance flexibility and appeal. <br /> '� r The purpose of this plan is to <br /> '" #' 1 ` coordinate the participating <br /> organizations. Please contact <br /> h ;- �, ; F� " ' � � � Centerville or Wayne LeBlanc to <br /> coordinate actions. <br /> e r , -4 4, <br /> �� �" � _erg , , On Sep 25, 2000, people <br /> _ 1 - representing Centerville, Hugo, Lino <br /> '' t t , '' In ® Lakes, Anoka County Parks, St Paul <br /> , TM fi � „ r "°' ,� � 4) � ��, :',"'s Water, and Washington County <br /> t ; 4.1 _ 1 s � m P Parks met and agreed to pursue this <br /> I. plan <br /> kt i 0 Considerations for particular areas <br /> ..e t4; : Rvi LL are identified with large letters L. A °ma �' an d escr ibed be low. -f i m <br /> ' Area A: Hugo to Pedestrian <br /> ' r Bri at 35E <br /> s <br /> ,,� „� 1 � ; � ®' Hugo, Washington County, Lino <br /> _ Lakes, and Anoka County plan to <br /> I' ; 10° I, t " 1 coordinate the route of a trail from <br /> A t k - > `. the existing Hugo trail to a proposed <br /> ' � _ t" ,� j <br /> �� � . " pedestrian bridge at Area B, where <br /> e t , 1 s s J in id 35E and Clearwater Creek intersect. <br /> r1 .,F With Hugo's planned reconstruction <br /> of the road from Area A to Hugo in <br /> Figure 1. Trail Plan the next couple years, the inclusion <br /> of the trail follows naturally. The <br /> urgency here is to include the trail in the forthcoming reconstruction. Hugo is also looking at the potential of <br /> providing an attractive trail along Clearwater Creek all the way to Bald Eagle Lake. <br /> Area B: Pedestrian Bridge at 35E <br /> Area B was chosen for a pedestrian bridge to cross 35E because there are plans in Hugo to provide a trail along <br /> Clearwater Creek and because it would more easily accommodate pedestrian traffic than at the automobile intensive <br /> freeway interchange at 35E and County Road 14 (Frenchman Road). The urgency here is to control development in <br /> th e3wrounding area on both sides of the freeway now to provide a route for the pedestrian bri dge At the meeting <br /> everyone thought this appears feasible. There may also be a possibility to request funds for a pedestrian bridge in <br /> 2002. A small section of land west of 35E to 20` Ave needs to be coordinated by Lino Lakes, Centerville, and <br /> Anoka County. <br /> 1 <br />