My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-09-06 Agenda
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2000
>
2000-09-06 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2010 2:53:47 PM
Creation date
1/8/2010 2:47:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
atilt-. 1 Iry 111111 L Jr Vail vu-u c v [(NU <br /> Date March 2/, 200 • No. <br /> Lovegren Electric Company <br /> 5905 Lexington Ave. No. Customer a - - • - <br /> Shoreview, MN 55126 1880 Main Street <br /> Address - . ., 1 4 <br /> 651 - 780 -5841 <br /> CONTRACTOR Location of Job Tie x r Ea l l F i e l A <br /> SPECIFICATIONS OF JOB <br /> ATTENTION: Paul Palzer <br /> Move six poles, one laying on the ground, five in the ground <br /> from the Hwy. 14 location to the city park location. <br /> Move sign board from Hwy. 14 to the city park location. <br /> Install six poles around the baseball diamond. <br /> Wire six poles to the new 480 volt service. <br /> Rewire the lights from 240 volt to 277 volt taps. <br /> Run wire inside of the pipe over to new service. <br /> Furnish and install 480 volt, 200 amp service at the location in the <br /> middle of the ballfield. <br /> Reinstall scoreboard next to the ballfield. <br /> No wiring of scoreboard at this point, but will run pipe over to it <br /> for future wiring. <br /> $12,772.00 <br /> Plus permit fee <br /> Addtional charges: <br /> If NSP would have any charges. <br /> Problems, if NSP will allow us to put service where we want to. <br /> Vie hereby offer tc furnish all labor and materials necessary to complete the above described electrical wiring installations in a good and workmanlike manner. <br /> Icr the sum of See above Dollars ($ SPP A hnip ) or on a time and material basis, it no sum is indicated <br /> payable as follows :- Upon Completion <br /> The materials and workmanship furnished under this proposal shall comply with the rules and regulations set forth in the National Electrical Code and all state and <br /> le :al regulations governing such work. The price quoted includes required insurance, and permit and inspection fees. Any changes in the above specifications shall <br /> to made in writing, and as evidence of agreement, shall be signed by both parties. The contractor shall not be held responsible or liable for any loss, damage or delay <br /> C .:e to causes beyond his control. If the purchaser disposes of the property by sale or otherwise before this contract has been fulfilled. the full unpaid amount of the <br /> c..-.tract shall become due and payable at once. All equipment and devices installed as a part of this proposal shall be guaranteed for a period of one year from date <br /> el completion except as otherwise noted, or in accordance with the manufacturer's warranty. Contractor's liability shall be limited to the replacement of defective parts. <br /> T. 5 proposal may be withdrawn by us if not accepted within _days from above date. Work to start AS A P <br /> ACCEPTANCE: <br /> The above proposal and terms of payment are hereby accepted and you are <br /> Ftspectfully submitted. authorized to do the work as specified. <br /> C. 7 • - • - - W. I Customer <br /> Sgnatu re <br /> E .. .t(e ' %.!r 17-2 = [' Date Signed <br /> urtis Lovegren <br /> Fo /0 58 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.