My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-06-07 Agenda
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2000
>
2000-06-07 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2010 3:16:14 PM
Creation date
1/8/2010 3:15:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> Date: June 1, 2000 <br /> To: Chairperson Michael Navin <br /> Park and Recreation Committee <br /> From: Jill Lien <br /> Re: Concrete in Ice Rink <br /> I have received following quotes from three vendors for concrete /installation. <br /> Dennis Shudy of Centerville Redi -Mix quoted me $70.00 per yard. At 285 yards, <br /> this would equal $19,950. This quote is without installation - Mr. Shudy doesn't <br /> install. We would have to pay additional fees for installation (roughly $40k more). <br /> Classic Construction gave me a quote of approximately $60k for the entire project <br /> - installation included (this quote based on 260 yards of concrete - not 285). <br /> First Class Concrete gave me a quote of $56,250 or $60,250 to include saw -cuts, <br /> cure and sealer (based on 285 yards). <br /> The two written quotes I received are attached. <br /> Thank you! <br />
The URL can be used to link to this page
Your browser does not support the video tag.