My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-05-03 Agenda
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2000
>
2000-05-03 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2010 3:52:12 PM
Creation date
1/8/2010 3:51:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMO <br /> Date: April 27, 2000 <br /> To: Chairperson Michael Navin <br /> Park and Recreation Committee <br /> From: Jill Lien <br /> Re: Concrete in Ice Rink <br /> I have made several calls this week to obtain quotes for installing concrete in the <br /> hockey rink. The quotes I have received are from Dennis Shudy of Centerville <br /> Redi -Mix and Chris Dropps from Classic Construction. Dennis Shudy quoted me <br /> a fee of $70.00 per yard. Per Paul Palzer, we will need 260 yards which totals <br /> $18,200. This does NOT include installation - Mr. Shudy doesn't install. A copy <br /> of the quote from Classic Construction is included for you to review. The fees for <br /> the concrete itself are comparable. What does the committee want to as far as <br /> the installation? We need to determine what type of concrete is needed - it will <br /> help me when trying to obtain bids. I am waiting on bids from two other vendors. <br /> I will update you at the June meeting. <br /> Thank You! <br />
The URL can be used to link to this page
Your browser does not support the video tag.