Laserfiche WebLink
<br />Downtown Improvements <br />City of Centerville <br />West Ponding Area- South of Sorel Street <br />Cost Estimate <br />File No. 616-05000-0 <br />December 30, 2005 <br /> <br />Pond Construction <br /> <br />ITEM DESCRIPTION <br />Pond Excavation <br />StOlID sewer pipe and manholes <br />Pond Outlet SllucturelSkimmer <br />Street RepairlPatching <br />Seeding <br />Landscaping- trees, plants, boulders, etc. <br />Rain Garden <br />Retaining wall <br /> <br />.!llilI <br />CY <br />LF <br />LS <br />SY <br />LS <br />LS <br />LS <br />SF <br /> <br />QIY <br />3,500 <br />400 <br />I <br />1000 <br />I <br />I <br />I <br />1000 <br /> <br />ESTIMATED <br />UNlTPRICE TOTALPRlCE <br />$6.00 $21,000.00 <br />$60.00 $24,000.00 <br />$10,000.00 $10,000.00 <br />$25.00 $25,000.00 <br />$2,000.00 $2,000.00 <br />$15,000.00 $15,000.00 <br />$20,000.00 $20,000.00 <br />$20.00 $20,000.00 <br /> <br />Total Construction Cost <br /> <br />$137,000.00 <br />$47,950.011 <br /> <br />35% Cant, En&> Admin, ete. <br /> <br />Total Project Cost <br /> <br />$184,950.00 <br /> <br />Note: pond .rea consislS artoIS 7. 8, 13 and 14, Blk7. 100' wide by 300' long. Pond outlets to ..isting stann sewer in <br />Serel Slr.et and overflows to Heritage Street. <br /> <br />L__ _ _ <br />