My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-24 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-02-24 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:13:32 PM
Creation date
2/19/2010 2:30:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Supply Plan Review Checklist <br />All sections of the plan must be completed in order for the plan to be approved. <br />If an item is not needed or applicable, check "Compliant". May 2006 Version <br />NAME OF WATER SUPPLIER: City of Centerville j <br />DATE PLAN RECEIVED BY DNR: January 9, 2009 1 DATE OF REVIEW: I January 15, 2009 <br />NAME OF REVIEWERS: Kate Drewry <br />PLAN DUE DATE: J October 15, 2008 <br />Part I. Water Supply System Description and Evaluation <br />I Compliant <br />I Changes <br />Needed <br />I Section <br />' Description <br />I Comments / Changes Needed in Bold <br />I Analysis of Water Demand <br />® <br />❑ <br />Introduction <br />DNR Permit # Listed <br />1991- 6246:authorizes 108 MGY and 2 wells / <br />® <br />❑ <br />Introduction <br />Utility Contact Info. <br />I <br />/ <br />® <br />❑ <br />I Part 1, A <br />Table lHistoric Water <br />/ <br />Demand (table completed ?) <br />® <br />I ❑ <br />I Part I, A <br />I Water Use Trends (discussion) <br />City has goal to connect all existing housing units <br />by 2012/ <br />® <br />I El <br />I <br />I Table 2. Large Volume Users <br />6 of the top 10 are irrigation users i <br />(are top 10 large users listed ?) <br />Treatment <br />and Storage Capacity <br />® <br />❑ <br />Part I, B <br />Table 3 (A) Water Treatment <br />/ <br />(capacity of system listed ?) <br />Part I, B <br />Table 3 (B) Storage capacity <br />/ <br />® <br />❑ <br />and structures <br />(is table completed ?) <br />Water Sources <br />® <br />❑ <br />I Part I, C <br />Table 4 (A) Total Water <br />/ <br />Source Capacity for System <br />Part 1, C <br />Table 4 (B) Groundwater <br />2 active wells (1 PDC -J and 1PDC), / <br />® <br />F_1 <br />Sources (all wells & info. on <br />them is listed ?) <br />Part I, C <br />Water Well Records and <br />Not included... does City have them with their copy <br />® <br />I ❑ <br />Maintenance Records <br />I <br />of Plan? / <br />(included as attachment?) <br />Part 1, C <br />Table 4 (C) Surface Water <br />N/A/ <br />® <br />❑ <br />Sources (source and capacity <br />I <br />listed ?) <br />Part I, C <br />Table 4 (D) Wholesale or <br />None/ <br />® <br />I ❑ <br />Retail Interconnection Sources <br />I <br />(are they listed or explained ?) <br />Part 1, C <br />Table 4 (E) Emergency <br />Lino Lakes. / <br />® <br />❑ <br />Interconnection Sources <br />I <br />(are they listed or explained ?) <br />Demand Projections <br />® <br />❑ <br />I Part I, D <br />Table 5 Demand Projections <br />Volume is projected to increase from 96 MGY to <br />(is 10 year table complete ?) <br />191 MGY by 2017. / <br />® <br />❑ <br />Part 1, D <br />Projection Method <br />Based on current Comp Plan forecasts and historical <br />I <br />(is it descri bed ?) <br />per capita average. / <br />Resource Sustainabilit� <br />Part I, E <br />+ Monitoring Plan <br />/ Based upon current appropriation amounts, a <br />(as attachment, if needed) <br />more robust monitoring plan is required.' <br />❑ <br />❑ <br />City should take weekly readings of both <br />production wells at a minimum, and should <br />transition to daily reading once the 100 mgv <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.