My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-10 WS CC - Approved
Centerville
>
City Council
>
Minutes
>
2010-2023
>
2010
>
2010-02-10 WS CC - Approved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2010 12:23:21 PM
Creation date
3/16/2010 12:23:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City Council 2010-02-10 6:50 p.m. <br />Minutes of Work Session <br /> <br />Present were Mayor Capra, Council members Jeff Paar, D Love, Linda Broussard- <br />Vickers, and Ben Fehrenbacher. Also present were City Attorney Kurt Glaser, Engineer <br />Mark Statz, Public Works Director Paul Palzer and Finance Director Mike Jeziorski. <br /> <br /> <br />1)Downtown Drainage Project. <br /> Mark Statz, Engineer, reviewed the status <br />of the downtown drainage project. Anoka County has agreed to permit use <br />of a pond in the County park to collect stormwater from downtown, which <br />would then be pumped onto LaMotte Park through a lawn irrigation <br />system. The project cost estimate is about $1 million. The City would <br />receive about $350,000 in grants and would need to fund the balance of <br />about $625,000 through bonds. A financing schedule was provided which <br />would pay debt service from stormwater user fees. Some members of the <br />council expressed reluctance to proceed with the project if the city share is <br />that large. Staff will find out if the granting agencies will still participate if <br />the project is phased with a significant portion of the costs delayed until <br />downtown redevelopment begins. <br /> <br /> <br />2)Trail Project. <br />Mark Statz reviewed the trail project. City Attorney, Kurt <br />Glaser reported that easements have been secured from all but three <br />parcels. The eminent domain proceedings are in the works and the court <br />should grant possession of the remaining easements by the end of March. <br />The Council will, very soon, be asked to approve resolutions that would <br />authorize final design and bidding as well as providing financing <br />arrangements. <br /> <br /> <br />3)Nonconforming uses. <br /> The Council discussed the restrictions on <br />expansion of nonconforming uses, particularly those in the downtown <br />redevelopment area. Since the redevelopment has not happened as <br />planned, some are concerned that the property owners are unfairly <br />prevented from making certain additions and improvements. The Council <br />requested that staff and P&Z solicit comments from affected property <br />owners and report back to council with a recommendation. <br /> <br /> <br />4)Sidewalks. <br /> The Council considered snow removal on sidewalks adjoining <br />streets. Many sidewalks have not been kept clear of snow and ice. Due to <br />the large amount of snow, there are areas that have inadequate snow <br />storage on the boulevard between the curb and sidewalks. Staff suggested <br />the possibility of the city clearing sidewalks when snow amounts require <br />plowing the streets. Additional equipment may be needed. The consensus <br />is to look at the possibility of changing its policies so that the city would <br />do some of the snow removal next year. In the meantime, staff will work <br />with property owners to do a reasonable job of clearing sidewalks. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.