61609169REQB.& l /
<br />Contract
<br />Unit
<br />Current
<br />Quantity
<br />Amount
<br />No.
<br />Item
<br />Unit
<br />Quantity
<br />ty
<br />rice
<br />Quantity
<br />to Date
<br />to Date
<br />52
<br />1" WATER SERVICE DIRECTIONAL DRILLED - CURB STOP TO
<br />HOME
<br />LF
<br />1250
<br />14.00
<br />838
<br />$11,732.00
<br />53
<br />INSULATION, 4" THICK
<br />SY
<br />150
<br />20.00
<br />3.6
<br />$72.00
<br />54
<br />IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - WATER
<br />MAIN
<br />LF
<br />1500
<br />4.00
<br />1054
<br />$4,216.00
<br />55
<br />CLOSED CIRCUIT TV INSPECTION
<br />LF
<br />3800
<br />1.50
<br />4793
<br />$7,189.50
<br />56
<br />CONNECT TO EXISTING SANITARY SEWER VCP
<br />EA
<br />12
<br />400.00
<br />9
<br />$3,600.00
<br />57
<br />CONNECT TO EXISTING SANITARY SEWER MANHOLE
<br />EA
<br />6
<br />800.00
<br />6
<br />$4,800.00
<br />58
<br />8" PVC SANITARY SEWER, SDR 26, 0' -13' DEEP
<br />LF
<br />450
<br />38.00
<br />303
<br />$11,514.00
<br />59
<br />8" PVC SANITARY SEWER, SDR 26, 13' AND DEEPER
<br />LF
<br />350
<br />55.00
<br />258
<br />$14,190.00
<br />60
<br />RECONNECT 4" SANITARY SEWER SERVICE
<br />EA
<br />20
<br />150.00
<br />18
<br />$2,700.00
<br />61
<br />4" PVC, SCH. 40 SERVICE PIPE
<br />LF
<br />400
<br />35.00
<br />5
<br />105
<br />$3,675.00
<br />62
<br />4" PVC, SCH. 80 RISER PIPE
<br />LF
<br />250
<br />25.00
<br />$0.00
<br />63
<br />8" X 4" PVC WYE, SDR 26
<br />EA
<br />20
<br />150.00
<br />8
<br />$1,200.00
<br />64
<br />IMPROVED PIPE FOUNDATION, PER 6" INCREMENT - SANITARY
<br />SEWER
<br />LF
<br />1500
<br />4.00
<br />748
<br />$2,992.00
<br />TOTAL PART 2A- TYPE I, II, AND III IMPROVEMENTS - PELTIER LAKE
<br />DR &
<br />CENTERVILLE RD AREAS:
<br />$329,402.11
<br />PART 28- TYPE I, II, AND III IMPROVEMENTS - PELTIER LAKE DR & CENTERVILLE RD AREAS:
<br />65
<br />CLEAN EXISTING STORM PIPE
<br />LF
<br />400
<br />5.00
<br />$0.00
<br />66
<br />CONNECT TO EXISTING RCP STORM SEWER
<br />EA
<br />2
<br />600.00
<br />2
<br />$1,200.00
<br />67
<br />12" RCP FLARED END SECTION, INCL, TRASH GUARD
<br />EA
<br />1
<br />700.00
<br />1
<br />$700.00
<br />68
<br />18" RCP FLARED END SECTION, INCL. TRASH GUARD
<br />EA
<br />4
<br />700.00
<br />4
<br />$2,800.00
<br />69
<br />12" RCP STORM SEWER, CLASS 5
<br />LF
<br />466
<br />25.00
<br />457
<br />$11,425.00
<br />70
<br />15" RCP STORM SEWER, CLASS 5
<br />LF
<br />279
<br />28.00
<br />268
<br />$7,504.00
<br />71
<br />18" RCP STORM SEWER, CLASS 5
<br />LF
<br />762
<br />30.00
<br />725
<br />$21,750.00
<br />72
<br />21" RCP STORM SEWER, CLASS 4
<br />LF
<br />32
<br />32.00
<br />32
<br />$1,024.00
<br />73
<br />CLASS III RANDOM RIPRAP
<br />CY
<br />114
<br />70.00
<br />35.7
<br />120.7
<br />$8,449.00
<br />74
<br />2'X 3' CB, INCL. R- 3067 -V CSTG AND CONC ADJ RINGS
<br />EA
<br />8
<br />1500.00
<br />-1
<br />7
<br />$10,500.00
<br />75
<br />4' DIA STORM SEWER CBMH, INCL. R3067 -V CSTG AND CONC
<br />AD) RINGS
<br />EA
<br />14
<br />1700.00
<br />14
<br />$23,800.00
<br />76
<br />4' DIA STORM SEWER MH, INCL. R- 1642 -B CSTG AND CONC ADl
<br />RINGS
<br />EA
<br />1
<br />1700.00
<br />1
<br />$1,700.00
<br />77
<br />5' DIA STORM MH, INCL R- 1642 -B CSTG AND CONC ADJ RINGS
<br />EA
<br />1
<br />1700.00
<br />1
<br />$1,700.00
<br />78
<br />TX 3' CB WITH 2' SUMP, INCL. R- 3067 -V CSTG AND CONC ADJ
<br />RINGS
<br />EA
<br />1
<br />1800.00
<br />1
<br />$1,800.00
<br />79
<br />4' DIA CBMH WITH 2' SUMP, INCL. R- 3067 -V CSTG AND CONC
<br />ADJ RINGS
<br />EA
<br />1
<br />2300.00
<br />1
<br />$2,300.00
<br />80
<br />WOOD WEIR
<br />EA
<br />2
<br />1600.00
<br />2
<br />$3,200.00
<br />81
<br />4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH SOCK
<br />WRAP
<br />LF
<br />10050
<br />2.00
<br />7473
<br />$14,946.00
<br />82
<br />IMPROVED PIPE FOUNDATION, PER 6 " INCREMENT -STORM
<br />SEWER
<br />LF
<br />400
<br />5.00
<br />154
<br />$770.00
<br />83
<br />COMMON EXCAVATION (EV)
<br />CY
<br />12500
<br />8.00
<br />1308
<br />11682
<br />$93,456.00
<br />84
<br />SUBGRADE EXCAVATION (EV)
<br />CY
<br />5750
<br />1.00
<br />146
<br />320
<br />$320.00
<br />85
<br />SUBGRADE PREPARATION - STREET
<br />SY
<br />16500
<br />0.01
<br />122
<br />15140
<br />$151.40
<br />86
<br />GEOTEXTILE FABRIC, TYPE V
<br />SY
<br />16500
<br />1.30
<br />15140
<br />$19,682.00
<br />87
<br />SELECT GRANULAR BORROW (CV)
<br />CY
<br />9750
<br />14.00
<br />7692
<br />$107,688.00
<br />88
<br />AGGREGATE BASE, CLASS 5
<br />TN
<br />8100
<br />8.00
<br />6752.7
<br />$54,021.60
<br />89
<br />AGGREGATE BASE, CLASS 5 - SIDEWALKS AND DRIVEWAYS
<br />TN
<br />1000
<br />13.00
<br />683
<br />1137
<br />$14,781.00
<br />90
<br />TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS
<br />TN
<br />375
<br />92.00
<br />220.72
<br />$20,306.24
<br />91
<br />TYPE LV 3 NON WEARING COURSE MIXTURE (B)
<br />TN
<br />1625
<br />55.15
<br />1465.17
<br />$80,804.13
<br />92
<br />TYPE LV 3 WEARING COURSE MIXTURE (8) - 2010
<br />TN
<br />1125
<br />61.70
<br />$0.00
<br />93
<br />BITUMINOUS MATERIAL FOR TACK COAT - 2010
<br />GAL
<br />825
<br />2.35
<br />250
<br />$587.50
<br />94
<br />SAW AND SEAL TRANSVERSE JOINTS IN BITUMINOUS WEAR
<br />COURSE -2010
<br />LF
<br />3750
<br />1.65
<br />$0.00
<br />95
<br />8618 CONCRETE CURB AND GUTTER
<br />LF
<br />7800
<br />8.84
<br />7572
<br />$66,936.48
<br />96
<br />SURMOUNTABLE CONCRETE CURB AND GUTTER
<br />LF
<br />220
<br />9.83
<br />470
<br />$4,620.10
<br />97
<br />SURMOUNTABLE CONCRETE CURB AND GUTTER - HANDWORK
<br />LF
<br />100
<br />15.30
<br />24
<br />$367.20
<br />61609169REQB.& l /
<br />
|