My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-05-06 Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
1998
>
1998-05-06 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 11:28:30 AM
Creation date
4/15/2010 11:26:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ,,, <br /> • l�i � 6� t� ,� ���� <br /> —, <br /> 1� <br /> � <br /> � <br /> � <br /> Howard R, Green Company � " <br /> r����a��a,�s �rr,i:r►�s <br /> CONSULTING ENGINEERS Formerly MSA <br /> Consulting Fngineers <br /> Memorandum Aprii 20, 1998 <br /> TO: Jim March, Administrator, City of Centerviile <br /> FROM: David E. Nyberg, P.E., Project Manager .� <br /> SUBJECT: PROPOSED TRAIL EXTENStON — EAGLE PASS <br /> DEVELOPMENT TO BR1AN DRIVE SIDEWALK <br /> File: 260078m-0071 <br /> As we have previously discussed, the sub-contractor responsible for constructing the <br /> bituminous trails through the Eagle Pass development has been contacted regarding extending � <br /> the bituminous trail to the existing sidewalk along Srian Drive. ' <br /> i <br /> Mr. Paul Palzer and I met with the sub-contractor, Mr. Urban Schmidtbauer of Diversified � <br /> Paving, Inc., on April 16�' to discuss the proposed project. We reviewed the proposed � <br /> alignment from Brian Drive to Dupre Road through the Eagle Pass and Clearwater Meadows � <br /> development. �� <br /> It appears the trai� alignment through Eagle Pass may need some soil correction work through I ' <br /> some soft areas as well as possibly grading areas in the vicinity of the trai! to final grade prior to �, <br /> trail construction. We wi(I be contacting Midwest Land Surveying and Engineering, the <br /> developers engineer, to inquire about this work. The schedule for trail construction may need to <br /> be delayed to accommodate this necessary work. We wiU keep you updated on this issue. <br /> The contractor for the project, C.W. Houle, (nc, indicated last year that they could complete this <br /> work for $2000. Mr. Schmidtbauer indicated that this was acceptable to him. Please let us <br /> know if you would like us to direct the contractor to proceed with thjs work once the preparation <br /> work is complete. <br /> Cc: Mr. Urban Schmidtbauer, Diversified Paving, Inc. <br /> Mr. Paul Palzer, Centerville Public Works <br /> Mr. Clyde Chase, Howard R. Green Company <br /> Mr. Larry Olson, Midwest Land Surveying and Engineering, Inc. <br /> Mr. Mike Quigley, Gor-Em Deve(opment, (nc. <br /> O:\proj�260078 m\078m-2009. ap r <br /> 1326 Energy Park Drive • St. Paui, MN 55i08 • 612/644-4389 fax 612/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.