Laserfiche WebLink
� Bonestroo <br /> Mem o ° ���e <br /> Anderlik & <br /> � Assoaates <br /> � Englneers 6 Archltects <br /> Project IVame: Lamotte Park Client: Centervilie <br /> To; Tom Peterson File No: 616-98-804 <br /> Frorrr: Eric A. Johnson Date: October 2, 1998 <br /> Reo Project Status Update <br /> Remarks: <br /> ■ Site Grading-estimated compietion is the end of next week. <br /> • Storm sewer is being installed today. The storm sewer will pick up drainage from the parking lof and <br /> also along the East Side of the hockey rink. The storm sewer outlet is in 4he pond at the southwest <br /> corner of the project. <br /> � The hockey rink has been excavated and the sand sub-grade and drain ti(e have been placed. Paul has <br /> asked that the contractor also set the posts for the hockey rink boards. This was bid, as an alternate <br /> originally, however will be incorporated into a change order. I won't have a schedule for this work until <br /> Monday the 5tn <br /> ■ Restoration. I will have a plan and schedule next week from the contractor as to the status. <br /> � Kilmer electric will be performing the electrical reconstruction of the panel board location and rewiring <br /> the hockey and free skating rink lights. The contracter indicated that they will have a schedule next <br /> week, <br /> @ We have received quotes for abandoning the well located on this site. The low quote is from Barott <br /> Driflin� Services for $465.00, <br /> Bonesgroa, Rosene, AndeNik and Associafes <br /> 2335 West Highway 36 ■ St. Paul, MN 55113 ■ Phone: 6�2-636-4600 ■ Fax: 612-636-1311 <br />