My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-07-01 Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
1997
>
1997-07-01 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2010 12:03:20 PM
Creation date
4/15/2010 12:03:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> ! <br /> Haward R, Green Company � <br /> CONSULTING ENGINEERS Formerly MSA <br /> Consulting Engineers <br /> June 27, 1997 <br /> File: 260-094-90 <br /> Mr. Jim March, Administrator <br /> City of Centerville <br /> 188Q Main Street <br /> Centerville, MN <br /> RE: PRELIMINARY GRADING PLAN - LAMOTTE PARK PROPERTY <br /> Dear Mr. March: <br /> Enclosed please find copies of the preliminary grading plan for the Lamotte Park property in <br /> Centerville. As you have requested, we have completed a preliminary earthwork calculation <br /> as well as some preliminary cost estimates on the improvement. <br /> We understand the Centerviile Park and Recreation Committee will be meeting next week ' <br /> to discuss this issue. The size and layout of the playing fields should be considered at their <br /> meeting. Soccer fields tend to have different sizes depending on the leagues and ages of <br /> participants that will use the fields. Please let us know if the sizes of all the playing surfaces <br /> are appropriate for the needs of the appropriate leagues and the City of Centerville. The <br /> current drawing shows a configuration and field size according to sketches originally provided <br /> to us by the City of Centerville. <br /> Below is a brief summary of costs for several items on the project that may be completed at <br /> some time. Other items, such as the sub-cut in the playing field areas and the drain tile, are <br /> oniy estimates at this time and would need further verification and design should you chose <br /> to proceed with this project. <br /> Earthwork (10,000 CY total cut @$2.50 per CY) $25,000 <br /> Sand (2500 CY @ 5.00 per CY) $12,�00 <br /> Gravel (2500 CY @ 5.00 per CY) $12,500 <br /> Pavement (2" - 12,500 SY @$1.00 per SY) $12,500 <br /> Seed and Mulch (17 acres @$1000 per acre) $17,000 <br /> Drain Tile (3000 If @$3.00 per I� $9,000 <br /> Silt Fence (3000 If silt fence @$2.00 per Ifl $6,000 <br /> Wood Fiber Blanket (5000 SY @$1.00 per SY) $5,000 <br /> TOTAL ESTIMATE ABOVE ITEMS $99,500 <br /> We understand the City of Centerviile is in the process of having a wetland delineation <br /> completed for this project. Please iet us know when this is complete and we will survey the <br /> wetland boundary and add this to the drawing. At that time, we can begin working with the <br /> City of Centerville to obtain a permit from the Rice Creek Watershed District. <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br />
The URL can be used to link to this page
Your browser does not support the video tag.