Laserfiche WebLink
Table 1: Part l, 2002-03 Metropolitan Regional Parks Capital Improvement Program �� <br /> (Draft for Public Hearing on Apri13, 4 and 5, 2001) � <br /> Redevelopment Pt•ojects <br /> Proposed Metro. <br /> Redevelop- Regional Project State Council <br /> ment CIP Park Park/Ti Project Grant Funds Bonds <br /> Priorit A enc Name Descri tion $�00's $000's $000's <br /> 1 Mpls. Park Wirth RP Continue to replace bathhouse at beach, construct 189 189 0 <br /> & Rec. paved seating terrace next to beach, decorative <br /> Board fencing, benches, landscaping, plus interpretive <br /> boardwalk path system on a wetland west of the <br /> � beach, plus new path connections to other areas of <br /> the park that was initially funded in Part 2 of the <br /> 2000-01 CIP. <br /> ' 2 Scott Co. Cleary Lake RP Continue to reconstruct 4 miles of paved bike/hike 296 296 0 <br /> � trail built in 1979 that was initially funded in Part 1 <br /> � of the 2000-2001 CIP ($178,900 in Grant SG-00- <br /> 94). <br /> � 3 Washing- Lake Elmo PR Pai funding to replace swimming pond filtration 75 75 0 <br /> � ton Co. systerri. Grant matches $300,000 of Washington <br /> County fiinds. <br /> 4 St. Paul Como Conservatory Phase 2: Reconstruct Fern House & growing house 629 629 0 <br /> 5 St. Paul Como RP Partial fundin� to remodel 1,500 square foot office 430 430 0 <br /> � and storage space and new construction of 5,000 <br /> square foot space for park maintenance. Project is <br /> matched 50% with City of St. Paul funds because <br /> facility will serve non-regional parks as well as <br /> regional parks. <br /> � 6 Mpls. Park Minnehaha RP Relocation of Wabun picnic access drive and 800 800 0 <br /> ' & Rec. redesign of Ford Bridge/ Park Road intersecti�n. <br /> Board <br /> 7 <br />