Laserfiche WebLink
. <br /> ITEM 4 — COST BREA�DOWN <br /> For Projects Involving Development Activities <br /> Identify each recreational facility being proposed for funding. Pravide a quantitative description <br /> of th� facility (linear feet, dimension of structures, number of components, etc.) and the total <br /> estimated cost for each <br /> uan ' Descrintion Unit Price Total Cost <br /> (1) Playground Structure $ 24,57Q.00 $ 24,570.00 <br /> (34} Piaycurbs W/Color Option $ 57.00 $ 1,938.00 <br /> (1) Accessible Playcurb C/� $ 479.00 $ 479.00 <br /> (1) FIBAR 3I2 System �a 12" depth w/drain $ 4,200.00 $ 4,200.00 , <br /> (8) Bleachers $ 769.00 $ 6,152.00 ' <br /> (4) Redwood Benches w/armrests $ 650.00 $ 2,600.00 <br /> (1) Vertical Style Bike Rack $ 614.00 $ 614.00 <br /> (1) Anchor Set (for Bike Rack) $ 20.00 $ 20.00 <br /> Sub Total $ 40,573.00 <br /> Tax $ 2.637.25 , <br /> Tota1 $ 43,210.25 I <br /> � <br /> Concession 5tand ! Picnic Sheiter <br /> Masonry (Blocks and Mortar) $ 910.00 <br /> (20) Shingles $ 80.00 $ 1,600.00 <br /> Cabinets and Counter Top $ 8,2Q0.00 <br /> (2) Doors $ 250.00 $ 500.00 <br /> Rall-ups @ Windows $ 2,504.40 <br /> Bearns, Posts, Roof Deck $ 11,000.00 <br /> Foundation $ 10;000.00 <br /> Concrete Slab $ 5,000.00 <br /> Electrical and Plumbing $ 3,000.00 <br /> Labor $ 25,200.00 <br /> Sub Tota1 $67,910.00 <br /> Contingency Sa1es T� & Freight $12,900.00 <br /> Total $80,810.00 <br /> GRAND TOTAL $124,020.25 <br />