My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-07-10 Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2001
>
2001-07-10 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2010 11:13:29 AM
Creation date
4/27/2010 11:13:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I $30,60Q <br /> � + 8 385 <br /> ' Sub Total $38,985 <br /> ' Tax (7%) + 2,729 <br /> Total $41,714 (Pius Shipping / Handlin;g) <br /> I went with the top four (4) choices from SkateWave, and the top three (3) choices from <br /> SunRamp Solutions. I included a"Spine" from bvth vendors, because I felt the one from <br /> SunRamp might be used more by the bicycles, at the same time, the one from SkateWave <br /> would be used more by the skates and skate-boards. These were the tap seven choices. <br /> Also included is a draft "Ruies and Regulations." Please take a moment ta consider any <br /> additions or items you would like removed (especially the ones pertaining to the <br /> Advisary Boazd). We will need to discuss the possibility of establishing an Advisory <br /> Board and the responsibilities of the same. It is my understanding that the Advisory <br /> Board should only be observing what is going on at the park, and calling the appropriate <br /> parties when necessary. We don't want to put the Advisory Board members in any kind <br /> ofuncomfortable position (i.e.: friends, enemies, siblings, etc.). We have had six (6) <br /> kids stap by City Hall to sign up for the Advisory Board (see attached list). <br /> Mr. Peterson has been working with someone from the League af Minnesota Cities and ' <br /> Berkley Risk Administrators regazding proper signage. I have mcluded a fax from Tom � <br /> Gross, which outlines recommendations to be placed on the sign. I will have more � <br /> inforrnation at the meeting from Mr. Peterson. We will need to get on this ASAP for the ' <br /> Grand Opening. � <br /> i <br /> What date do we want to set the Grand Opening for, and wl�t exactly do we want to do � <br /> for the opening. Calendar included. <br /> Last, included is a copy of the azticle that ran in the Quad last week. Some of the <br /> information is a little o� but far the most part it's a pretty good story. <br /> Thank you! <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.