Laserfiche WebLink
' Bidder No. 1 Bidder No. 2 <br /> , <br /> ` VInco Inc Jay Brothers Inc <br /> � Item <br /> Num Item Units Qt Unit Price Total Unit Price Total <br /> Alternate No. 1 <br /> fnstall storm sewer catch basin over <br /> existing pipe <br /> 25 4' diameter storm CBMH EA 1 $5,590.20 $5,590.20 $1,850.00 $1,850.00 <br /> Totaf instail storm sewer catch basin over <br /> existing pipe: $5,590.20 $1,850.00 <br /> Total Part 1 - Electrical: $55,605.56 $66,712.60 <br /> Total Pa�t 2- Skate Park: $75,284.53 $77,378.00 <br /> 'fota) Alternate No. 1 $5,590.20 $1,850.00 <br /> Total Base Bid Plus Alternate No. 1 $136,48�.29 $145,940.60 <br /> Contractor Name and Address: Vinco Inc Jay Brothers Inc <br /> 18995 N Forest Blvd 9218 Lake Dr NE <br /> Forest Lake, MN 55025 Forest Lake, MN 55025 <br /> Phone:(651)982-4642 (651)464-6400 <br /> Fax (651) 982-4621 (651) 464-1704 <br /> Signed 8y: Steve Anderson Ronald G. Orfei <br /> Title: Secretary Vice President <br /> Bid Security: Bid Bond Bid Bond <br /> Addenda Acknowledged: None None <br /> � <br /> 61601118BT BT-2 <br />