My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-06-06 Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2001
>
2001-06-06 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2010 11:24:28 AM
Creation date
4/27/2010 11:24:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Cify of Cent�rville Goals <br /> '� Adopted n✓lay 23, 2001 <br /> EC+�N4MIG �E�/ELOPMENT AiVD PLANiV�NG <br /> Economic Llevelopment and Planning <br /> Item 1. Design Plans <br /> Comrraerciai and Industrial Concept ancd Streetscape Plans: <br /> Council wants professional advice on design criteria for the commercial and industrial <br /> properties east of 20 Avenue towards the freeway and help with old town renovations. <br /> We want to ge# ahead o# the developmen# curve that Councit viev�rs as accelerating. <br /> Councif will use the existing Boonestro streetscape plan as a guide during water <br /> renovations in the downfown area. The architect for the Cvunty Bank project wilf <br /> provide architectural guidelines €or the commercial development east of 20�' Avenue. <br /> The plan wiil be referenced as part of the planning and zoning requirements for the ; <br /> commercial area near the freeway. , <br /> Responsibte Leaders: Council with input and review from Economic Development I I <br /> Comrr�ittee, Planning and Zoning Committee, and Jim March � <br /> Produ�ts: Concept Ptans for Commercial and Industrial Property ! <br /> Streetscape Plans for Main Street, 20�' Avenue, Downtown � <br /> � Design Criteria Options for Developers � <br /> Time6ine: Upon completion and revievv I� <br /> Comrroents: As commercial and industrial properties are developed and i <br /> Streetscapes phased in to complete � <br /> Accomplishments to date: � <br /> Bor�estroo Engineers selected for downtown streetscape using existing plan. Plan to be ' <br /> discussed in May at Business Appreciation Dinner. <br /> Shea Architects to develop design guidelines that compliment County Bank design. <br /> 1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.