Laserfiche WebLink
No. Item <br />PART 1 - BASE QUOTATION - POND DREDGING: <br />1 MOBILIZATION <br />2 TRAFFIC CONTROL <br />3 POND EXCAVATION (P) - WINTER <br />4 DITCH EXCAVATION - WINTER <br />5 TEMPORARY SEEDING - INCL. SEED MIXTURE BWSR W4 <br />AND MULCH <br />6 FINAL SEEDING - INCL. SEED MIXTURE BWSR W4 AND <br />EROSION CONTROL BLANKET, CATEGORY 3 <br />TOTAL PART 1 - BASE QUOTATION - POND DREDGING: <br />CHANGE ORDER NO. 1 <br />1 DITCH EXCAVATION <br />TOTAL CHANGE ORDER NO. 1 <br />TOTAL PART 1 - BASE QUOTATION - POND DREDGING: <br />TOTAL CHANGE ORDER NO. 1 <br />TOTAL WORK COMPLETED TO DATE <br />$77,550.00 <br />$2,700.00 <br />$80,250.00 <br />61609168RE03FINAL ALM <br />Contract <br />Unit <br />Current Quantity <br />Amount <br />Unit <br />Quantity <br />Price <br />Quantity to Date <br />to Date <br />LS <br />1 <br />3500.00 <br />1 <br />$3,500.00 <br />LS <br />1 <br />2500.00 <br />0.5 <br />$1,250.00 <br />CY <br />2275 <br />21.00 <br />2540 <br />$53,340.00 <br />LF <br />825 <br />18.00 <br />880 <br />$15,840.00 <br />SY <br />950 <br />2.00 <br />650 <br />$1,300.00 <br />SY <br />1500 <br />2.00 <br />1160 1160 <br />$2,320.00 <br />$77,550.00 <br />LF <br />150 <br />18.00 <br />150 <br />$2,700.00 <br />$2,700.00 <br />$77,550.00 <br />$2,700.00 <br />$80,250.00 <br />61609168RE03FINAL ALM <br />