My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-12 Handouts for Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-05-12 Handouts for Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:24:58 PM
Creation date
5/13/2010 7:42:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estaf Cisied M 7, <br />Italics = New information. <br />Normal = No change from last report. <br />CITY OF CENTERVILLE <br />MONTHL Y ENGINEER'S REPORT <br />For the May 12, 2010 City Council Meeting <br />1. 21 Avenue /Backage Road (000616- 05143 -0). Mylars have been printed and are being signed <br />by the necessary officials as well as the Sheehys. Once the signatures are obtained and all taxes are <br />made current, the plat can be recorded. <br />The court date to resolve the assessment to the Sheehy parcel is set for July 26 & 27. <br />2. Old Mill Road Improvements (000616- 06147 -0). We received the signed final pay request from <br />the bonding company. However, they have not provided all IC -134s or Lien Waivers and have stated <br />that he will not be able to produce them. The City Attorney is reviewing the situation. <br />3. TE Grant Trail Project (000616- 08165 -0). We have obtained all the signatures necessary and <br />MNDOT has now requested authorization from the Federal authorities to let bids Once we here from <br />them we will ask the City Council for permission to advertise for bids. <br />City and Bonestroo staffs are working out arrangements for the inspection of the project. The federal <br />funding will require specialized documentation as well as advanced MNDOT certifications. Proper <br />inspection and documentation will be imperative to ensure our funding is secured. <br />A tentative schedule would have us beginning construction just after the 4 th of july. <br />4. 2008 Downtown Storm Water Improvements (000616- 08167 -0). We are in the process of <br />testing samples of the pond sediment and water as well as the ballfields'soil to determine the viability <br />of this type of project as well as to establish baseline pollutant levels prior to beginning the irrigation <br />project: <br />5. 2009 Pond Dredging (000616- 09168 -0). Seed germination has been observed. A final pay <br />request is on this agenda. <br />6. Peltier Lake Drive Area Street & Utility Improvements (2009.01) (000616- 09169 -0), 2009 <br />Street Improvements (2009.02) (000616- 09170 -0). The contractor is working on punch list <br />items. We are working with RCWD to address a few rain garden performance issues. Once these <br />issues are resolved, we can consider paving the wear course on Peltier Lake Drive. <br />We are waiting on pricing from the contractor before presenting options on a resolution to the <br />Clearwater Drive pavement issues. <br />7. Community Development Block Grant Water Services Project (000616 - 10171 =0). We are <br />producing the plans and specs for this project and will have them ready for approval at the next City <br />Council meeting. <br />8. Miscellaneous <br />• We have been assisting City staff in looking at energy efficiency grants for public facilities. <br />- End of memo — <br />
The URL can be used to link to this page
Your browser does not support the video tag.