My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-26 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-05-26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:26:36 PM
Creation date
5/21/2010 3:40:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.10 Coordinate periodic field tests during the course of construction. <br />3.11 Conduct an inspection to determine if the work is substantially complete. On the basis of its on -site <br />observations, the Consultant shall prepare a "punch list" for the Contractor, listing work left to be <br />completed by the Contractor. <br />3.12 Conduct, in the presence of the City's Representative, a final inspection of the Project as <br />constructed to determine whether it: <br />1) Generally conforms with the Engineer's design concept of the Project as contained in the <br />Contract Documents, and <br />2) Appears to be constructed in accordance with the Contract Documents. <br />The Consultant shall certify a recommendation for aooeptance of the work to the City and then <br />shall forward to the City a written approval of the Contractor's Request for Final Payment which <br />shall be signed by the Contractor. <br />3.13 Arrange for the City to receive detailed instructions regarding the operation and maintenance of any <br />equipment, machinery or apparatus installed as part of the Project. Such instructions shall be <br />supplied by the Contractor and manufacturers' representatives. <br />3.14 Collect field measurements required to produce "Record Plans." <br />The Engineer's review of the Contractor's work (including reviewing the Contractor's shop drawings and <br />samples, work product and requests for payments) do not increase the responsibility or duties of the <br />Consultant beyond those explicitly described elsewhere in this Agreement. By making these review <br />efforts, the Consultant does not guarantee the performance of the Contractor or assume responsibility for <br />any acts or omissions of the Contractor, including any failure of the Contractor to properly perform its <br />work or comply with its obligations, and the City's sole remedy for the Contractor's acts or omissions is <br />from the Contractor and not the Engineer. <br />Centerville city Engineer Master Agreement 10 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.