Laserfiche WebLink
Page 3 of 3 <br /> **Please advise if you think this will work as good as the drainage system indicated in the PRD. <br /> 9. What pitch to the courts are acceptabJe? <br /> **Seems like 0 pitch is best for play Advise what can be done at the proposed location. <br /> 10. Where is the location of the parking lot and to what standards should this being built? <br /> The is critical to the dram tile depth. <br /> parking lots to. Let me known the standard and | will include it in the PRD. <br /> Thank, Paul <br /> This email has been scanned by the Message Labs Email Security System. <br /> For more ioformatioop}eascvioit}ttp://www.memoage7abo'uom/email <br />