My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-06-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:27:46 PM
Creation date
6/4/2010 3:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2335 Highway 36 W <br />St. Paul, MN 55113 <br />Tel 651- 636 -4600 <br />Fax 651- 636 -1311 <br />www.bonestmo.com <br />June 3, 2010 <br />Dallas Larson <br />Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 -9794 <br />Re: Peltier Lake Drive Street and Utility Improvements <br />City of Centerville <br />Bonestroo File No.: 000616 - 09169 -0 <br />Dear Dallas: <br />** Bonestroo <br />On May 28 the Contractor, City Council and local residents met on site at Clearwater Drive to <br />examine the condition of the pavement. Then, at the May 12, 2010 City Council meeting, the <br />Council saw pricing on 3 different repair options. The Council was informed that the contractor <br />had offered to complete the lowest cost option ($960) with no participation from the City. This <br />option was a skin patch of the damaged areas. <br />The City Council determined that the skin patch option would not be acceptable and that they <br />would be pursuing the most costly of the 3 options; an overlay. A cost sharing proposal was <br />made which put 75% of the cost as the contractor's responsibility and 25% of the cost as the <br />City's share, with a portion of the City share potentially being assessed to the abutting property <br />owners. The total cost of the overlay is estimated at $17,000 meaning the proposal would have <br />the contractors share at $12,750 and the City share at $4,250. <br />After that meeting, this proposal was presented to the contractor. Subsequently, they have <br />reiterated, in an email, that their offer of $960 stands and could be used against the cost of the <br />overlay. <br />A resolution to this issue should be made soon. If there is to be an overlay completed, it would <br />be best to have it done in conjunction with the paving of the wear course on Peltier Lake Drive. <br />Sincerely, <br />BONESTR00 <br />100 � ' o'k <br />Mark Statz, PE <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.