My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-06-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:29:05 PM
Creation date
6/18/2010 1:14:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Small MS4 Annual Report Form (cont) <br />7. Long -term (Post- Construction) Stormwater Measures <br />A. Do you have an ordinance or other regulatory mechanism to require: <br />Site plan reviews for stormwater /water quality of all new and re- development projects? ® Yes ❑ No <br />Long -term operation and maintenance of stormwater management controls? ® Yes ❑ No <br />Retrofitting to incorporate long -term stormwater management controls? ❑ Yes ® No <br />B. If you have retrofit requirements, what are the circumstances /criteria? <br />C. What are your criteria for determining which new /re- development stormwater plans you will review (e.g., all projects, <br />projects disturbing greater than one acre, etc.) all <br />D. Do you require water quality or quantity design standards or performance standards, either <br />directly or by reference to a state or other standard, be met for new development and ® Yes ❑ No <br />re- development? <br />E. Do these performance or design standards require that pre - development hydrology be met for: <br />Flow volumes ® Yes ❑ No <br />Peak discharge rates ® Yes ❑ No <br />Discharge frequency ® Yes ❑ No <br />Flow duration ® Yes ❑ No <br />F. Please provide the URL /reference where all post - construction stormwater management standards can be found, or e-mail <br />to MS4 Perm itProgram.PCA @state.mn.us an electronic copy of the ordinance or other regulatory mechanism as specified <br />in Part V.G.5 of the permit. <br />www.centervillemn.com <br />G. How many development and redevelopment project plans were reviewed during the reporting period to assess impacts to <br />water quality and receiving stream protection? 1 <br />H. How many of the plans identified in 7.G were approved? 1 <br />I. How many privately owned permanent stormwater management practices /facilities were inspected during the reporting <br />period? 1 <br />J. How many of the practices /facilities identified in I were found to have inadequate maintenance? 0 <br />K. How long do you give operators to remedy any operation and maintenance deficiencies identified during inspections? <br />1 -10 days <br />L. Do you have authority to take enforcement action for failure to properly operate and maintain ® Yes ❑ No <br />stormwater practices /facilities? <br />M. How many formal enforcement actions (i.e., more than a verbal or written warning) were taken for failure to adequately <br />operate and/or maintain stormwater management practices? 0 <br />N. Do you use an electronic tool (e.g., GIS, database, spreadsheet) to track post - construction ❑ Yes ® No <br />BMPs, inspections and maintenance? <br />O. Do all municipal departments and/or staff (as relevant) have access to this tracking system? ❑ Yes ® No <br />P. How often do municipal employees receive training on the post - construction program? in progress <br />4 <br />8. Program Resources <br />A. What was the annual expenditure to implement MS4 permit requirements this reporting period? unbudgeted <br />B. What is next year's budget for implementing the requirements of your MS4 NPDES permit? unbudgeted <br />
The URL can be used to link to this page
Your browser does not support the video tag.