My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-14 CC Meeting Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2010
>
2010-07-14 CC Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2010 4:42:04 PM
Creation date
7/9/2010 3:52:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . e <br />ntervifle <br />✓� - ' aalJ'isheil IN;, <br />Italics = New information. <br />Normal = No change from last report. <br />CITY OF CENTERVILLE <br />For the July 14, 2010 City Council Meeting <br />1. 21 Avenue /Backage Road (000616 - 05143 -0). Mylars have been printed and are being signed <br />by the necessary officials as well as the Sheehys. Once the signatures are obtained and all taxes are <br />made current, the plat can be recorded. The court date to resolve the assessment to the Sheehy parcel <br />is set for July 26 & 27. <br />2. Old Mill Road Improvements (000616- 06147 -0). We received the signed final pay request from <br />the bonding company. However, they have not provided all IC -134s or Lien Waivers and have stated <br />- that he will not be able to produce them. The£ity Attorney is reviewing the situation. <br />3. TE Grant Trail Project (000616- 08165 -0). The project is currently out for bid. Bids will be opened <br />on July 13"' at 3.•00. Once bids are received, we will need to wait for authorization to award the <br />contract from MNDOT and the federal government. This can take 2 -4 weeks. As soon as we get this <br />approval, we will ask the Anoka County Board to award the contract. The City Council will also have to <br />concur with this decision to award. When all the dust has settled, we anticipate beginning construction <br />in mid August and having the project completed before Thanksgiving. <br />A public Open House was held on July 7"' from 5.•00 to 7.•00. About half a dozen people attended. <br />City and Bonestroo staffs are working out arrangements for the inspection of the project. The federal <br />funding will require specialized documentation as well as advanced MNDOT certifications. Proper <br />inspection and documentation will be imperative to ensure our funding is secured. <br />4. 2008 Downtown Storm Water Improvements (000616- 08167 -0). At the last City Council <br />meeting, we were authorized to move forward with the design of the project. Mark Statz attended the <br />July / Parks Committee meeting to review the project scope and discuss the irrigation system and <br />project schedule. We hope to have a plan to the council soon for approval and authorization to bid. <br />5. Peltier Lake Drive Area Street & Utility Improvements (2009.01) (000616- 09169 -0), 2009 <br />Street Improvements (2009.02) (000616- 09170 -0). The project is now complete. The <br />contractor complied with the Work Change Directive and paved the overlay on Clearwater Drive as well <br />as the wear course on the rest of the Peltier Lake Drive project. A final pay request for each project is <br />being prepared. <br />6. Community Development Block Grant Water Services Project (000616 - 10171 -0). Bids were <br />taken on July 8, 2010. Bids came in higher than expected. A number of different options are being <br />considered and will be presented to the Council at an upcoming meeting. We have sixty days to make a <br />decision on the bids. <br />7. 2010 Seal Coat (000616- 10172 -0). Bids will be received on July 1.3' <br />8. Miscellaneous <br />• We have been assisting the city in reviewing the infrastructure costs for Block 8 of the Downtown <br />Redevelopment, <br />
The URL can be used to link to this page
Your browser does not support the video tag.