Laserfiche WebLink
Contract <br />Unit Current <br />Quantity <br />Amount <br />No. <br />Item <br />Unit <br />Quantity <br />Price Quantity <br />to Date <br />to Date <br />53 <br />TYPE LV 3 NON WEARING COURSE MIXTURE (B) <br />TN <br />3975 <br />47.50 <br />3081 <br />$146,347.50 <br />54 <br />TYPE LV 3 WEARING COURSE MIXTURE (B) - 2009 <br />TN <br />2850 <br />48.00 <br />3126.81 <br />$150,086.88 <br />55 <br />BITUMINOUS MATERIAL FOR TACK COAT - 2009 <br />GAL <br />1850 <br />1.75 <br />1650 <br />$2,887.50 <br />56 <br />SAW AND SEAL TRANSVERSE JOINTS IN BITUMINOUS <br />WEAR COURSE - 2009 <br />LF <br />6700 <br />1.70 <br />5229 <br />$8,889.30 <br />57 <br />CONCRETE CURB AND GUTTER <br />LF <br />2250 <br />14.00 <br />3000 <br />$42,000.00 <br />58 <br />CURB REINFORCEMENT BARS, NO. 4 <br />LF <br />1120 <br />0.50 <br />540 <br />$270.00 <br />59 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SY <br />55 <br />40.00 <br />112 <br />$4,480.00 <br />60 <br />TOPSOIL BORROW (LV) <br />CY <br />400 <br />12.00 <br />192 <br />$2,304.00 <br />61 <br />SODDING, LAWN TYPE <br />SY <br />2300 <br />4.00 <br />1770 <br />$7,080.00 <br />62 <br />TURF REINFORCEMENT MAT <br />SY <br />50 <br />12.50 <br />40 <br />$500.00 <br />63 <br />TRANSPLANT TREE - PINE <br />EA <br />7 <br />150.00 <br />$0.00 <br />64 <br />TRANSPLANT TREE - DECIDUOUS <br />EA <br />1 <br />150.00 <br />1 <br />$150.00 <br />65 <br />SEGMENTAL RETAINING WALL <br />SF <br />1750 <br />17.00 <br />$0.00 <br />66 <br />CONSTRUCT RAIN GARDEN <br />SF <br />8500 <br />3.75 <br />7478 <br />$26,042.50 <br />67 <br />SEEDING, INCL. MNDOT SEED MIX 270 AND EROSION <br />CONTROL BLANKET, CATERGORY 3, BIODEGRADABLE <br />NETTING <br />SY <br />950 <br />1.90 606 <br />1437 <br />$2,730.30 <br />68 <br />DITCH EXCAVATION - 73RD STREET, NORTH OF <br />EXISTING FLARED END SECTION <br />LF <br />50 <br />33.00 <br />61 <br />$2,013.00 <br />69 <br />CATCH BASIN PROTECTION <br />EA <br />18 <br />50.00 <br />18 <br />$900.00 <br />70 <br />STREET SWEEPER (PICKUP BROOM W /OPERATOR) <br />HR <br />35 <br />80.00 <br />26 <br />$2,080.00 <br />TOTAL PART 2 - TYPE III & IV IMPROVEMENTS: <br />$926,933.83 <br />PART 3 - TYPE V IMPROVEMENTS - CLEAR RIDGE, GRANGE <br />VIEW, BRIAN WAY, BRIAN DRIVE, <br />AND <br />FOX RUN AREAS: <br />71 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />1975 <br />3.00 <br />3365 <br />$10,095.00 <br />72 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />750 <br />4.00 <br />1494 <br />$5,976.00 <br />73 <br />REMOVE BITUMINOUS DRIVEWAY <br />SY <br />150 <br />4.00 <br />288 <br />$1,152.00 <br />74 <br />REMOVE BITUMINOUS PATH <br />SY <br />20 <br />4.00 <br />9.8 <br />$39.20 <br />75 <br />REMOVE STORM SEWER PIPE <br />LF <br />80 <br />8.00 <br />$0.00 <br />76 <br />SALVAGE AND REINSTALL IRRIGATION LINES <br />LF <br />100 <br />3.00 <br />$0.00 <br />77 <br />SALVAGE AND REINSTALL IRRIGATION HEADS <br />EA <br />5 <br />80.00 <br />1 <br />$80.00 <br />78 <br />BOLT REPLACEMENT - HYDRANT AND GATE VALVE <br />EA <br />9 <br />1100.00 <br />8 <br />$8,800.00 <br />79 <br />BOLT REPLACEMENT - GATE VALVE <br />EA <br />9 <br />500.00 <br />10 <br />$5,000.00 <br />80 <br />SALVAGE AND REINSTALL MAILBOX <br />EA <br />5 <br />100.00 <br />$0.00 <br />81 <br />ADJUST EXISTING VALVE BOX <br />EA <br />9 <br />400.00 <br />8 <br />$3,200.00 <br />82 <br />ADJUST EXISTING SANITARY SEWER MANHOLE FRAME <br />AND RING CASTING <br />EA <br />13 <br />500.00 <br />14 <br />$7,000.00 <br />83 <br />ADJUST EXISTING STORM SEWER CATCHBASIN FRAME <br />AND RING CASTING <br />EA <br />3 <br />300.00 <br />6 <br />$1,800.00 <br />84 <br />ADJUST EXISTING STORM SEWER CATCHBASIN <br />MANHOLE FRAME AND RING CASTING <br />EA <br />6 <br />600.00 <br />6 <br />$3,600.00 <br />85 <br />GROUT EXISTING STRUCTURE, INCL. DOGHOUSES, <br />INVERTS, BENCHES <br />EA <br />5 <br />300.00 <br />9 <br />$2,700.00 <br />86 <br />SAWING BITUMINOUS PAVEMENT <br />LF <br />1500 <br />3.00 <br />2720 <br />$8,160.00 <br />87 <br />MILL BITUMINOUS CONSTRUCTION JOINT <br />LF <br />185 <br />3.00 <br />132 <br />$396.00 <br />88 <br />EDGE MILL BITUMINOUS 6' WIDE <br />LF <br />7850 <br />0.80 <br />6707 <br />$5,365.60 <br />89 <br />CLEAN EXISTING STORM PIPE <br />LF <br />200 <br />5.00 <br />136 <br />$680.00 <br />90 <br />CONNECT DRAINTILE TO EXISTING STORM STRUCTURE <br />EA <br />14 <br />160.00 <br />8 <br />$1,280.00 <br />91 <br />4" PERFORATED POLYETHYLENE DRAINTILE PIPE WITH <br />SOCK WRAP <br />LF <br />300 <br />3.00 <br />180 <br />$540.00 <br />92 <br />COMMON EXCAVATION (EV) - STORM SEWER CROSSINGS <br />CY <br />5500 <br />0.01 <br />1156 <br />$11.56 <br />93 <br />SUBGRADE EXCAVATION (EV) <br />CY <br />1200 <br />7.00 <br />297.69 <br />$2,083.83 <br />94 <br />GEOTEXTILE FABRIC, TYPE V <br />SY <br />1750 <br />1.40 <br />1979 <br />$2,770.60 <br />95 <br />SELECT GRANULAR BORROW (CV) <br />CY <br />350 <br />18.00 <br />901 <br />$16,218.00 <br />96 <br />AGGREGATE BASE, CLASS 5 <br />TN <br />950 <br />15.00 <br />978 <br />$14,670.00 <br />97 <br />AGGREGATE BASE, CLASS 5 - SIDEWALKS AND <br />DRIVEWAYS <br />TN <br />75 <br />22.00 <br />970 <br />$21,340.00 <br />98 <br />TYPE LV4 WEARING COURSE MIXTURE (B) - DRIVEWAYS <br />TN <br />30 <br />82.00 <br />37 <br />$3,034.00 <br />99 <br />BITUMINOUS PATCHING - STREET, TYPE LV 3 NON <br />WEARING COURSE MIXTURE (B) <br />TN <br />575 <br />61.00 <br />520.39 <br />$31,743.79 <br />100 <br />TYPE LV 3 WEARING COURSE MIXTURE (B) - 2009 <br />TN <br />1475 <br />48.00 <br />593.39 <br />$28,482.72 <br />101 <br />BITUMINOUS MATERIAL FOR TACK COAT - 2009 <br />GAL <br />875 <br />1.75 <br />500 <br />$875.00 <br />102 <br />CONCRETE CURB AND GUTTER <br />LF <br />750 <br />14.00 <br />1494 <br />$20,916.00 <br />103 <br />CURB REINFORCEMENT BARS, NO. 4 <br />LF <br />300 <br />0.50 <br />180 <br />$90.00 <br />104 <br />6" CONCRETE PEDESTRIAN RAMP <br />SY <br />10 <br />41.00 <br />19 <br />$779.00 <br />61609170RE09.xlsm <br />26 <br />