Laserfiche WebLink
en to r viffe <br />Italics = Mew information. <br />Normal = No change from last report. <br />CITY OF CENTERVILLE <br />MONTHL YENGINEERS REPORT <br />For the August 11, 2010 City Council Meeting <br />1. 21 st Avenue /Backage Road (000616 - 05143 -0). Mylars have been printed and are being signed <br />by the necessary officials as well as the Sheehys. Once the signatures are obtained and all taxes are <br />made current, the plat can be recorded. The court date to resolve the assessment to the Sheehy parcel <br />has been pushed back to October. <br />2. Old Mill Road Improvements (000616- 06147 -0). We received the signed final pay request from <br />the bonding company. However, they have not provided all IC -134s or Lien Waivers and have stated <br />that he will not be able to produce them. The City Attorney is reviewing the situation. <br />3. TE Grant Trail Project (000616- 08165 -0). The project was bid on July 13 Unfortunately, we <br />only received 2 bids, both of which were significantly higher than the engineer's estimate. The project <br />plans and specifications are being modified to allow completion of the project in 2011. Additionally, <br />several elements of the park work are being packaged into alternates. Mark Statz attended the August <br />4 th Parks and Rec Committee meeting to discuss this scenario and gain the committee's input. With <br />these revisions, we are hopeful that we will be able to re -bid the project with results that allow the <br />Council to award the project and move forward with construction. If the Council is ready to do so, they <br />could authorize the re- bidding at their upcoming meeting. <br />City and Bonestroo staffs are working out arrangements for the inspection of the project. The federal <br />funding will require specialized documentation as well as advanced MNDOT certifications. Proper <br />inspection and documentation will be imperative to ensure our funding is secured. <br />4. 2008 Downtown Storm Water Improvements (000616- 08167 -0). Design of the project is <br />underway. A preliminary design of the irrigation system was presented to staff and the Parks <br />Committee for their input. We will be taking their comments and revising the layout accordingly. We <br />have also been working with City staff to investigate the possibility of using a pump, motor and control <br />panel which the City owns. Using this equipment may save a substantial amount of money. <br />5. Peltier Lake Drive Area Street & Utility Improvements (2009.01) (000616- 09169 -0), 2009 <br />Street Improvements (2009.02) (000616- 09170 -0). A final pay request for each project is being <br />prepared. <br />6. Community Development Block Grant Water Services Project (000616- 10171 -0). Bids were <br />taken on July 8, 2010. Bids came in higher than expected. A number of different options are being <br />considered and will be presented to the Council at an upcoming meeting. We have sixty days to make a <br />decision on the bids. City staff is also investigating the possibility of procuring additional funding. <br />7. 2010 Seal Coat (000616 - 10172 -0). Bids were received on July IY". The bids were in line with the <br />engineer's estimate and the project was awarded to Asphalt Surface Technologies, Inc. City staff held a <br />pre construction meeting with the contractor and work will begin soon. <br />