My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-10-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 12:53:00 PM
Creation date
10/8/2010 3:46:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04) of CeIVUV1116 <br />Dojo7town Stfom I'XalerReclawkiol'i <br />Paae 3 <br />1014110 <br />S1 P F 0V V1 () [u <br />D'ESIGN <br />Prior to exploration of an alternative sprinkler system, much of the design work for the traditional <br />irrigation system had already been completed, Therefore, it is our advice that the traditional <br />system be bid as an alternate in an effort to compare pricing with the large gun style system. <br />Our irrigation consultant has agreed to work with us to complete a design of the gun style <br />system for a small additional fee. <br />A registered' engineer will be required to sign the plans for the structural elements only. This is <br />limited to the footing/standpipe assembly that will hold the sprinkler heads in the base bid <br />system. Our structural engineers will design an appropriate footing and mounting system for the <br />gun: style heads. A single typical detail this footing/mounting system will be produced rather <br />than custom designing something for each head location. <br />We will rely on our irrigation designer to produce a layout of the system piping, valves and heads <br />as well as the electrical control system. It is our understanding that the City is comfortable with <br />these elements of the system being designed without the review of a registered engineer. <br />BIDDING <br />Our proposal in June contemplated a single bid for the entire project. In the time since then, we <br />have discussed the advantages of splitting the work into three separate bids. We agree with this <br />approach, but recognize that this will take some additional effort from our administrative staff. <br />FEES <br />Item Previous I Current Total <br />Authorization Authorization <br />Preliminary, Pre-Project Work <br />$47,300 <br />$47,300 <br />Project Coordination & Design <br />$51,570 <br />$51,570 <br />3 Project Bids <br />$4,100 <br />$4,100 <br />Alternate System Investigation <br />$1,200 <br />$1,200 <br />Structural Design <br />$2,200 <br />$2,200 <br />Irrigation Designer <br />$1,500 <br />$1,500 <br />Total <br />$98,87' O $9,000 <br />$107,870 <br />This scope and budget is based on discussions with City staff regarding the general need for <br />engineering review of the proposed base bid sprinkler system. <br />msg�� <br />TOM 0 -me <br />Mark Statz <br />City Engineer <br />651-604-4709 <br />iN <br />
The URL can be used to link to this page
Your browser does not support the video tag.