My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27 Additional Handouts @ Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-10-27 Additional Handouts @ Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 12:53:51 PM
Creation date
10/28/2010 3:00:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2335mghWav36w <br />St, mw. PIN ssos <br />Tel 651-636~4600 <br />Fax 651-636-1311 <br />wwmbonestru .c <br />October 27, 2010 <br />Honorable Mayor and City Council <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038-9794 <br />Re: Downtown Storm Water Reclamation Project— Phase <br />Contract A— Storm Water Supply Line <br />Project No. O00G16-O8167'1 <br />Bid Results <br />Dear Honorable Mayor and City Council: <br />Bids were opened for the Project stated above onTuesday, October Z5,ZO1O, The Base Bid for this <br />contract consists of installing the pipe between the pond and the wet well, The Alternate is to install an <br />additional culvert under the trail Uo help prevent springtime flooding, which has been a recurring problem. <br />Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also ba <br />distributed to each Bidder once the Project has been awarded. <br />There were a total of six Bids. The following summarizes the results of the Bids received: <br />Total <br />C017traCtO,r <br />Low/ #2 <br />Ellingson Drainage, Inc. <br />Low/#2 <br />GM Contracting, Inc. <br />#3 <br />Peterson Companies <br />#4 <br />Veit &Company, Inc. <br />#5 <br />Penn Contracting, Inc, <br />#6 <br />Bur»chviUe Construction, Inc. <br />Total <br />Alternate <br />Total Base Bid Plus <br />Base Bid <br />- NO. I <br />Alternate No. 1 <br />$124 <br />$13,742.00 <br />$138,453.65 <br />$125,545.20 <br />$12,280.12 <br />$137,825.32 <br />$138,401.47 <br />$12,107.50 <br />$140 <br />$13I,580.00 <br />$11,838.00 <br />$144,418,D0 <br />$138,572.00 <br />$10,828.00 <br />$140,600.00 <br />$134,389.00 <br />$15,933.00 <br />$150,322.00 <br />Based on the Base Bid only, the low Bidder nnthe Project was Ellingson Drainage, Inc. with a Total Base <br />Bid Amount of$124 721.65. Based on the Boea Bid plus Alternate No. 1, the low Bidder on the Project <br />was GM Contracting, Inc. with a Total Base Bid plus Alternate No. 1 Amount of $137,825.32. <br />This compares bothe Engineer's Estimate of $120,00($135,OOU with Alternate No. 1). These Bids have <br />been reviewed and found tobeinorder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.