My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27 Additional Handouts @ Meeting
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-10-27 Additional Handouts @ Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2013 12:53:51 PM
Creation date
10/28/2010 3:00:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2335 Highway 36 W <br />St. Paul, MN 55113 <br />Tel 651-636-4600 <br />Fax 651-636 -1311 <br />www.bonestroo,com <br />October 27, 2010 <br />Honorable Mayor and City Council <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038-9794 <br />Re. Downtown Storm Water Reclamation Project — Phase I <br />Contract C — Irrigation System Project <br />Project No. 000616-08167-3 <br />Bid Results <br />Dear Honorable Mayor and City Council: <br />Bids were opened for the Project stated above on Tuesday, October 26, 2010. For this Contract, the <br />base bid was simply for mobilization and erosion control. Alternate No. I was for the gun style irrigation <br />system and Alternate No. 2 was for the traditional irrigation system. The intent was to award the base <br />bid plus only one of the alternates. <br />Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also be <br />distributed to each Bidder once the Project has been awarded. There were a total of five Bids, The <br />attached table summarizes the results of the Bids received. <br />On the basis of the Base Bid plus Alternate No. 1 (Gun Style System), the low Bidder on the Project was <br />Albrecht Irrigation with a Total Base Bid Amount plus Alternate I of $52,500. On the basis of the Base <br />Bid plus Alternate 2 (Traditional System), the low bidder on the Project was also Albrecht Irrigation with a <br />Total Base Bid Amount plus Alternate 2 of $128,700. <br />The low bidder did not enclose with the bid a bid bond or other surety as required by the Contract. This <br />may or may not disqualify them from the bid. The City Attorney has been asked to review the situation <br />and can provide more detail to the Council. <br />If the City Council wishes to award the Project to the low Bidder, then Albrecht Irrigation should be <br />awarded the Project on the Total Base Bid Amount plus Alternate No. 1 (Gun Style System) of <br />$52,500 or on the Total Base Bid Amount plus Alternate No. 2 (Traditional System) of <br />$128,700. <br />Should you have any questions, please feel free to contact me at (651) 604-4709. <br />Sincerely, <br /># �e 0 <br />Mark R. Statz, P.E. <br />City Engineer <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.