Loading...
HomeMy WebLinkAbout1998-03-11 Packet CITY COUNCIL MEETING AGENDA MARCH 11, 1998 6:00 p.m. VI. CALL TO ORDER Roll Call III. PUBLIC HEARING (S) 11. APPEARANCES IV. ONSIDERATION OF MINUTES 1 N/V. AYMENT OF CLAIMS The City of Centerville February 25 - 28 The City of Centerville March 1 - 11 The Centennial Fire District V<r AGENDA 1. PETITIONS AND COMPLAINTS III. UNFINISHED BUSINESS 20th Avenue Corridor Issues \Y. 21st Avenue Corridor Update and Issues Parkview Addition Draft Feasiblity Study - Assessment H - Watermain Exte! 4on LaMotte Park Revised Plans - Update Cost Estimate ( -,,4 C6�Z 44 IX. N W BUSINESS Clearwater Meadows Credit to Developer X. COMMITTEE REPORTS XI. ADMINISTRATORS REPORT XII. CONSENT AGENDA 1. Resolution 98 -05 St. Genevieve - Lawful Gambling XIII. ADJOURNMENT *Newsletter articles due Tuesday, March 10, 1998. WEE K =N REV = EW Edition # 50 2 -21 -98 through 3 -6 -98 ----------------------------------------------------------------- ----------------------------------------------------------------- Building permits issued this period = Building permits issued YTD = 8 An expanded "Week in Review" to commemorate the 50th Edition Development gradates Senior Housing - Five units have been sheet - rocked. Attached is a schematic of the design for the entrance sign for this project. The application has been sent in to the M.S. Society for charitable gambling funds for ADA reimbursable items. Lakeland Hills - I spoke to Mike Black on Tuesday to receive an update on this development. They had over 200 people pass through their model home on Sunday. The model home is listed for $249,000. He indicated they have commitments on 8 -10 lots. We received our second permit application for this development. There are three additional lots staked for homes at this time. He indicated that one of the homes being proposed on the Creek would be over a $300,000 total package. They will be bringing in a copy of their entrance monument design this spring. Willow Glen - There are 38 units that have had final inspections in this development. They plan to request building permit # 8 in the near future. Eagle Pass - This project continues on a slow, but steady pace. The development is turning out to be a unique, attractive subdivision. Acorn Creek II - This project should be finaled out this year. Clearwater Meadows - This project should be finaled out this year. * Ken Cook returned to work on Tuesday. Welcome back Ken! * I had an interesting meeting with the school board superintendent on Tuesday. Mr. McClellan indicated that the school board was considering finding sites for two buildings that would be constructed as locations for Kindergarten classrooms. Mr. McClellan would like to build one building on the west edge of the district and build one building in Centerville. The district could construct the buildings themselves, or enter into a long term lease, if someone else wanted to construct the building. Mr. McClellan indicated that the buildings would probably not be needed in 10 to 12 years. He would like to see the buildings constructed in a manner so that the buildings could be converted to a commercial usage in the future. He estimated a building need of approximately 15,000 to 20,000 square feet. I suggested several sites that may be appropriate in Centerville. He was going to take this information back to the school board. One location that I suggested was the old City Hall site. * Visu -Sewer was in the community this week jetting and televising approximately 5,000 lineal feet of sanitary sewer. The sewer lines looked to be in good condition. There were some areas that were suspect for sump pumps discharging into the sanitary sewer. Approximately thirty new leakproof sewer manhole lids have been ordered and installed in areas where we have had inflow into the sanitary sewer. * Paul, Tim and Robert completed defensive driving classes. * The Rice Creek Watershed District is planning to have a public meeting at 7 :00 on March 18th at City Hall to discuss their plans to treat Centerville Lake this fall with alum to improve the water quality. They have mailed notices of this meeting to property owners surrounding Centerville and Peltier Lakes. * The Request for Proposals for Engineering Services have been sent to the following firms : Bonestroo, Rosene, Anderlik & Assocs., Inc., Short Elliot Hendrickson Inc., TKDA, H.R. Green, BRW, Bolton and Menk, Hakanson Anderson Associates, Inc.., OSM, Rieke Carroll Muller Associates, Inc., Mccombs Frank Roos Assocs. Inc., and RLK. The deadline is April 6, 1998 at 4:OOPM. * Training continued on the Banyon Accounting software. The payroll component has been installed and is operational. The training for the Fund Accounting component is scheduled for March 11th. * The date for the MN Design Team screening visit has been set for April 17. * A meeting was held with representatives from Lino Lakes in regards to the water interconnect, the 21st Avenue Joint Powers Agreement and the rates they will charge businesses for utility services located outside of their corporate boundaries. Substantial progress was made on each item. Complete details will be discussed at the next Council meeting. * Well monitoring in connection with the wellhead protection program is being conducted this weekend. DATE: March 4, 1998 TO: City Council City of Circle Pines City Council City of Centerville City Council City of Lino Lakes FROM: Milo Bennett SUBJECT: Ratification of expenditures and approval for payment of March expenses. Your approval of February expenses as listed on the attached copy of the check register, checks #9422 - 9443 and # 11678 in the amount of $ 14,780.20 is hereby requested. MB /al cc: 7 Circle Pines City Council 7 Centerville City Council 7 Lino Lakes City Council 2 File ` 03/03/98 at 06:57PM CENTENNIAL FIRE DISTRICT PAGE L BANK CHECK REGISTER Checking account 03/04/98 TO 03/04/98 C ;K NO DATE TYPE PAID TO / DESCRIPTION CHECK AMOUNT ---`-`-- -------- ---` ----------`-`~---------------- ------------- 9422 03/04/98 AP-D FIRSTAR BANK 79.64 9423 03/04/98 AP-D MINNESOTA DEPT OF REVENUE 4^32 9424 03/04/99 AP-D AT&T 20.65 9425 03/04/98 AP-1) CnMPUSA DIRECT 1,424"64 9426 03/04/98 AP-D IKON OFFICE SOLUTIONS 47.38 9427 03/04/98 AP-D NATIONAL SAFETY COUNCIL 403.44 9428 03/04/98 AP-D TIERNEY BROTHERS INC 6,713.56 9429 03/04/98 AP-D ANOKA-HENNEPIN TECH COLLEGE 450"00 � 9430 03/04/98 AP-D AT&T 12.01 � 9431 03/04/98 AP-D CIRCLE PINES UTILITIES 359.64 � 9432 03/04/98 AP-D CITY OF CENTERVILLE 1,328"70 9 03/04/98 AP-D LIGHTNING PRINTING 64,06 9434 03/04/98 AP-D BRIAN D. GRUDEM, O.D. 129"26 9435 03/04/98 AP-D INTERNATIONAL ASSOCIATION OF 25.00 9436 03/04/98 AP-D MINNFGASCO 467.08 9437 03/04/98 AP-D MN COUNTY ATTORNEYS ASSOC7ATN 46,85 9438 03/04/98 AP-D POLAR CHEVROLET 693.21 9439 03/04/98 AP-D TOM THUMB 66.77 9440 03/04/98 AP-D C.P. OFFICE-PRODUCTS 55.34 9441 03/04/98 AP-D PHYSlO-CONTROL CORPORATION 716^97 9442 03/04/98 AP-D EBROC 108.00 9443 03/04/98 AP-D MED-COMPASS, INC. 1,338.19 TOTAL MANUAL CHECKS (M); 0.00 TOTAL COMPUTER CHECKS (C): 0.00 TOTAL DIRECT DISBURSEMENTS (D): 14,554"71 TOTAL CHECKS: 14,554"71 Mar 04, 1998 2:28 PM CENTENNIAL FIRE DISTRICT Page 1 PAYROLL COMPUTER CHECK REGISTER CHECK,# EMP NUM EMPLOYEE NAME DEPT SOC- SEC -NUM CHECHOORIACCT GROSS PAY DEDUCTIONS NET PAY 2360 MISCHKE, KATHY FIR 470 -86 -7273 255.00 19.51 235.49 TOTALS 1255.00 119.51 5235.49 PAYROLL SUMMARY FICA Social Security FICA Medicare Federal Tax Withheld Withheld Evployer Owed Withheld Esplayer Owed Advanced EIC Paysents Made $.00 $15.81 $15.81 $3.70 $3.70 $.00 TOTAL TAX LIABILITY $39.02 20th Avenue Corridor Issues March 11, 1998 Centerville Council Meeting A. Petition for Improvements 1. Received letter from Gerald Rehbein B. Feasibility Study 1. Completed September 24, 1997 2. Revisions to be completed for future public hearing C. Plans and Specifications Approved 1. Approved at City Council meeting, February 25, 1998 2. Open Bids March 31, 1998 D. Easement Acquisition 1. Lake Area Utilities 2. Gerald Rehbein E. Interconnection Agreement 1. Lino Lakes Council reviewed agreement March 4, 1998 2. Revision requested March 5, 1998 F. Assessment Options * 1. Several Options a. Front footage b. Area C. Reduction for floodplain area d. Reduction for wetland area 2. MUSA issues 3. Met Council issues G. Public Hearing/Assessment Hearing /Award of Project 1. Possible hearing date: April 8, 1998 2. Possible award date: May 13, 1998 H. Begin Construction 1. May 18, 1998 2. Construction will occur on 21st Avenue utilities during 1998* NOTE: Items with ( *) indicate additional materials attached for review 0:\proj \260085 \085-0303.=r DRAFT MARCH 6, 1998 INTERCONNECT AGREEMENT CONTRACT FOR JOINT USAGE OF WATER FACILITIES BY AND BETWEEN THE CITY OF LINO LAKES AND THE CITY OF CENTERVILLE, ANOKA COUNTY, MINNESOTA THIS AGREEMENT, made and entered into this _ day of 1998, by and between the City of Lino Lakes, a municipal corporation, situated in Anoka County, Minnesota, hereinafter called `Lino Lakes ", and the City of Centerville, a municipal corporation, situated in Anoka County, Minnesota, hereinafter called `Centerville ". Both Lino Lakes and Centerville have the authority to enter into this agreement pursuant to Minnesota Statute 471.59. WHEREAS, Lino Lakes has constructed a water system capable of providing emergency and peak demand water supply service to Centerville, and Centerville is considering water system improvements including the construction of an elevated water storage tank and trunk watermains. WHEREAS, until this water system in Centerville is fully developed with source, distribution, and storage capacity, this area can be more effectively served by interconnection with the Lino Lakes water system. WHEREAS, after the completion of the Centerville water system a more reliable water supply in both Lino Lakes and Centerville would result from the interconnection between the two communities; water systems. 0: \proj\260085 \085- 2303.feb.joint usage Page 1 DRAFT MARCH 6, 1998 SECTION 1 . J QENERAL CONDITIONS 1. fn consideration of the covenants and agreements herein set forth, Centerville shall construct a water system connection to the public water system of Lino Lakes subject to all terms, conditions, and provisions of this Agreement as hereinafter expressed. 2. Water flow recording meters shall be installed at the interconnection line for the purpose of measuring the flow from the Lino Lakes water system into the Centerville water system and the flow from the Centerville water system into the Lino Lakes water system. 3. Lino Lakes shall have ownership and be responsible for operation and maintenance of the water line located within the corporate boundaries of Lino Lakes. Centerville shall have ownership and be responsible for operation and maintenance of the interconnection line, metering manhole, and appurtenances of the water lines located within the corporate boundaries of Centerville. 4. Centerville shall commence with the design of the metering manhole within 60 days of the date of agreement. Centerville shall, within nine (9) months from the date of this agreement, construct and have operational the metering manhole. 5. The meter shall operate automatically according to an agreed upon telemetry system to provide each City with water during an emergency condition. SECTION 2, CHARGES Each of the meters installed pursuant to this Agreement shall be read at the end of each calendar quarter. The city with the greatest net flow will bill the other city, by the 10th of the month following the end of the calendar quarter, for the amount due based upon such excess flow. Payments for water usage shall be at the current respective City residential water rate at the time of billing, including any flat rate that shall be calculated by dividing the total water 0;1proj1260085 \085- 2303.feb.joint usage Page 2 DRAFT MARCH 6, 1998 used by the average water consumed per household. Payments shall be made on or before the 20th day of the month following the end of the quarter, and shall be administered by current city ordinance. Centerville shall pay for project costs, including construction costs, pre - engineering, and construction engineering, for the Centerville meter vault systems. Lino Lakes shall pay for the cost of the Lino Lakes control systems. SECTION 3 WATER STANDARDS AND CONSTRUCTIO N 1. Lino Lakes and Centerville agree that they shall exercise reasonable care to prevent toxic or harmful substances from contaminating the water supply of either party. Each city's water supply shall provide clean, safe, potable water. On a yearly basis, each city shall supply the other city with copies of yearly analytical test data from the Minnesota Department of Health, Division of Environmental health. In addition, on a yearly basis, each city shall supply test results from a recognized testing lab, whose analyses were performed by EPA or other recognized standard procedures. There shall be results provided for hardness, manganese, iron, and volatile organics. If either city allows volatile organics to be discharged into the water system, such items shall be eliminated by the responsible city. Failure to comply with this section shall be ground for immediate termination of the water exchange system. 2. The designated place of connection of the water system of Centerville with the water system of Lino Lakes is designated as the intersection of 20th Avenue and Cedar Street. In the event either party feels the expansion of the water system within the city's boundaries will adversely impact its ability to supply water to its residents, it may elect to terminate this Agreement upon three (3) years written notice. Lino Lakes shall waive any permit application or fee for work in utility easements or connection. 0: \proj \260085 \085- 2303.feb.joint usage Page 3 DRAFT MARCH 6, 1998 3. All watermain construction within Centerville or Lino Lakes shall meet the most recent City Engineers Association of Minnesota "Standard Utilities Specifications for Watermain and Service Line Installation and Sanitary Sewer and Storm Installation." Neither party shall substantially change the specifications for any parts of the water system which would be interconnected between the cities without the notification of the other. SECTION 4 INDEMNIFICATION Each parry agrees to indemnify the other and save the other harmless from any and all claims or demands for damages arising out of or which may result from the water supply pursuant to this Agreement, and from the use, installation, maintenance, and repair of its facilities as set forth in this Agreement. SECTION 5 TERMINATION In addition to the termination provisions in Section 3, either city shall have the right to cancel this Agreement on account of any violation of the terms and conditions of this Agreement by the other city by first giving thirty (30) days written notice to the other party of such violation and a failure to correct the violation within said thirty (30) day period of time. Either city shall have the right to cancel and annul this Agreement, without cause, by first giving three (3) years written notice to the other party of such intent to cancel this Agreement, no further payments shall be due hereunder, except obligations arising prior to the effective date of termination. Upon such effective date of termination, the connection between the water system of Lino Lakes and the water system of Centerville shall immediately be disconnected. 0: \proj \2600851085- 2303.feb.joint usage Page 4 DRAFT MARCH 6, 1998 SECTION 6 INSPECTION 1. The City Engineer of Lino Lakes or any employee authorized by the City Council of Lino Lakes shall be permitted, at the expense of Lino Lakes, to inspect the construction, as well as the operation, of the water system in Centerville at any reasonable time to see that same is being constructed and operated according to the plans and specifications and operated in compliance with acceptable municipal practice and that the Agreement herein contained is being complied with insofar as reasonably necessary to protect the City of Centerville. SECTION 7 EFFECTIVE DATE OF THIS AGREEMENT This Agreement shall take effect and be in force after the date of execution of the same by the proper officers of Centerville and Lino Lakes, pursuant to a resolution of the governing bodies of the municipalities, accepting and agreeing to abide and be bound by the terms, provisions, and conditions hereof and authorizing such execution. CITY OF CENTERVILLE CITY OF LINO LAKES By: By: Mayor Mayor By: By City Clerk City Clerk 0: \proj\260085 \085-2303.feb.join[ usage Rage 5 Centerville/Lino Lakes Water Interconnect Agreement recommended addition(s): The City of Centerville shall complete the construction of a water storage reservoir within 3 years when the average daily water use of Lino Lakes plus the average daily water use of Centerville, as measured by the water system interconnect meter, measured over any continuous 30 -day period, exceeds x% of the City of Lino Lakes firm pumping capacity. 10ee'v2,� k" Goo e�.6-'r 20th AVENUE WATERMAIN AND TRUNK SANITARY SEWER ASSESSMENTS FOR WATERMAIN AND SANITARY SEWER SUMMARY TOTAL WATERMAIN CITY CONTRIBUTION $53,000.00 35.3% TOTAL WATERMAIN ASSESSMENTS $229,816.00 TOTAL WATERMAIN ESTIMATED PROJECT COSTS $282,816.00 TOTAL SANITARY SEWER CITY CONTRIBUTION $97,000.00 64.7% TOTAL SANITARY SEWER ASSESSMENTS $422,141.00 TOTAL SANITARY SEWER ESTIMATED PROJECT COSTS $519,141.00 TOTAL ESTIMATED CITY CONTRIBUTION $150,000.00 Notes:- 1. Site, street and storm construction costs have been prorated to watermain and sanitary sewer project costs for assessment purposes. Estimated costs - Site work $42,600 Street const. $14,420 Storm const. $6,660 $63,680 2. City contribution has been prorated to watermain and sanitary sewer segments in proportion to estimated construction costs. 3. The Kenko properties have existing sanitary sewer service from Center Street and therefore are not assessed for sewer construction as part of this project. 20th Avenue Assessments 3/6198 WATERMAIN ASSESSMENTS BASED ON FRONT FOOTAGE $36.71 /front foot Front Total Property Type Footage Assessment OTHER PROPERTIES Lake Area Utilities Commercial 650 $23,862.68 Kenko "A" Commercial 350 $12,849.14 Kenko "B" Commercial 220 $8,076.60 Carpenter Commercial 320 $11,747.78 Reel Manufacturing Commercial 340 $12,482.02 Herman Strehlow Industrial 675 $24,780.48 REHBEIN PROPERTIES Clearwater Mdws Outlot Commercial 690 $25,331.16 Rehbein Inc. "A" Commercial 380 $13,950.49 Rehbein Inc. "B" Commercial 100 $3,671.18 Rehbein Inc. "C" Commercial 160 $5,873.89 Sheehy Industrial 350 $12,849.14 Joyce Stevens Industrial 675 $24,780.48 Gerald Rehbein Industrial 1350 $49,560,96 Total Assessments 6260 ft. $229,816.00 ASSESSMENTS SUMMARY Total City Contribution $53,000.00 Total Assessments - Other Properties $93,798,70 Total Assessments - Rehbein $136,017.30 TOTAL ESTIMATED PROJECT COST $282,816.00 20th Avenue Assessments 3/6/98 SANITARY SEWER ASSESSMENTS BASED ON FRONT FOOTAGE $74.19 /front foot Front Total Property Type Footage Assessment OTHER PROPERTIES Lake Area Utilities Commercial 650 $48,223.49 Kenko "A" Commercial 0 $0.00 Kenko "B" Commercial 0 $0.00 Carpenter Commercial 320 $23,740.79 Reel Manufacturing Commercial 340 $25,224.59 Herman Strehlow Industrial 675 $50,078.24 REHBEIN PROPERTIES Clearwater Mdws Outlot Commercial 690 $51,191.09 Rehbein Inc. "A" Commercial 380 $28,19219 Rebbein Inc. "B" Commercial 100 $7,419.00 Rehbein Inc. "C" Commercial 160 $11,870.40 Sheehy Industrial 350 $25,966.49 Joyce Stevens Industrial 675 $50,078.24 Gerald Rehbein Industrial 1350 $100,156.48 Total Assessments 5690 ft. $422,141.00 ASSESSMENTS SUMMARY Total City Contribution $97,000.00 Total Assessments - Other Properties $147,267.12 Total Assessments - Rehbein $274,873.88 TOTAL ESTIMATED PROJECT COST $519,141.00 20th Avenue Assessments 316/98 SANITARY SEWER ASSESSMENTS BASED ON AREA $0.06788 /sq. ft. Total Property Type Area Assessment OTHER PROPERTIES Lake Area Utilities Commercial 756,630 $51,361.84 Kenko "A" Commercial 0 $0.00 Kenko "B" Commercial 0 $0.00 Carpenter Commercial 216,000 $14,682.59 Reel Manufacturing Commercial 222,600 $15,110.62 Herman Strehlow Industrial 908,602 $61,878.06 REHBEIN PROPERTIES Clearwater Mdws Outlot Commercial 196,042 $13,307.80 Rehbein Inc. "A" Commercial 276,624 $18,777.89 Rehbein Inc. "B" Commercial 286,175 $19,426.24 Rehbein Inc. "C" Commercial 51,202 $3,475.71 Sheehy Industrial 850,390 $57,726.49 Joyce Stevens Industrial 881,619 $59,846.39 Gerald Rehbein Industrial 1,572,829 $108,767.37 Total Assessments Total 6,218,713 sq. ft. $422,141.00 ASSESSMENTS SUMMARY Total City Contribution $97,000.00 Total Assessments - Other Properties $142,813.11 Total Assessments - Rehbein $279,327.89 TOTAL ESTIMATED PROJECT COST $519,141.00 20th Avenue Assessments 3/6/98 WATERMAIN ASSESSMENTS BASED ON AREA $0.03582 /sq. ft. Total Property Type Area Assessment OTHER PROPERTIES Lake Area Utilities Commercial 756,630 $27,102.04 Kenko "A" Commercial 123,152 $4,411.23 Kenko "B" Commercial 74,098 $2,654.15 Carpenter Commercial 216,000 $7,736.99 Reel Manufacturing Commercial 222,600 $7,973.40 Herman Strehlow Industrial 908,602 $32,545.59 REHBEIN PROPERTIES Clearwater Mdws Outiot Commercial 196,042 $7,022.11 Rehbein Inc. "A" Commercial 276,624 $9,908.51 Rehbein Inc. "B" Commercial 286,175 $10,250.62 Rehbein Inc. "C" Commercial 51,202 $1,834.03 Sheehy Industrial 650,390 $30,460.47 Joyce Stevens Industrial 881,619 $31,579.07 Gerald Rehbein Industrial 1,572,829 $56,337.80 Total Assessments 6,415,963 sq. ft. $229,816.00 ASSESSMENTS SUMMARY Total City Contribution $53,000.00 Total Assessments - Other Properties $82,423.40 Total Assessments - Rehbein $147,392.60 TOTAL ESTIMATED PROJECT COST $282,816.00 20th Avenue Assessments 3/6198 It p B B 10 I1 12 IJ PMN nl nt nJ y z N. ROBIN LANE z p0 °] °> r 20 Q 2 0 " WZOT A 0 400 Izm� ]2 > 4 s O t Q 0 LE GEND s yZ s CARDINAL DRIVE G s v , u 1 29 I �� E ND 1 B 2 n ] a nv M y 28 FLOODPLAIN , N z p 1 B Y zo PArtN 5. ROBIN LANE r WETLANDS , m 9 3 9 ° y t J GL EN n N O B 5 10 � Z yQ Q ~ 11 W 4 11 3 12 1B N l 0 U f Z B 2 tJ 1y W1LOi B I Q 2 9 4 r _ MAIN STREET C.S.A.H. NO. 14 = 0 /FPx1o, /- 21 — ° 2 CEDAR STREET C I T Y O F L I N 0 L A K E S 802690 — WL WETLANDS AND FLOODPLAIN EXHIBIT e teMlle 20TH AVENUE, 21ST AVENUE AND CEDAR STREET CORRIDORS Established 1857 tette A66ftditY' f15l 21st Avenue Corridor Issues March 11, 1998 Centerville Council Meeting A. Right -of -way Acquisition 1. Easement/ROW plan complete 2. ROW required from three property owners a. Sheehy Construction b. Herman Strehlow C. Gerald Rehbein 3. ROW also required through City Park property 4. ROW costs * B. Joint Powers Agreement 1. 21st Avenue a. Last updated agreement presented to City on February 25, 1998 * b. Items for consideration 2. Cedar Street a. Draft for review C. Assessments — Phase I (Main Street to Exception) 1. Centerville cost — Phase 1 - $157,500 2. Proposed assessment roll * 3. Request for Lino Lakes plans 4. Order feasibility study 5. Schedule public hearing D. Utility Connections 1. Lino Lakes presented policy March 5, 1998 2. Includes 10% premium, connection, and usage charges E. Project Schedule (from feasibility study, revised February 23, 1998)* 1. Lino Lakes plan approval March 23, 1998 2. Lino Lakes opens bids April 23, 1998 3. City Council awards contract April 27, 1998 4. Construction begins May 4, 1998 NOTE: Items with ( *) indicate additional materials attached for review 0ApmX60085\W- C303.m Memorandum March 6, 1998 TO: Mr. Jim March, Administrator, City of Centerville Mr. Paul Palzer, Public Works Director, City of Centerville FROM: David E. Nyberg, P.E. SUBJECT: SHEENY CONSTRUCTION PROPERTY PROPOSED RIGHT -OF -WAY 21ST AVENUE CORRIDOR As requested, we called Mr. Mike Sheehy of Sheehy Construction to discuss the possibility of acquiring right -of -way along the Sheehy property, for the proposed 21st Avenue road along the Lino Lakes /Centerville corporate Boundary. According to Mike, he was not aware of any plans to construct a road along the 21st Avenue corridor. I explained the plans to him, with the road proposed to be constructed approximately 1/3 of the distance through his property from the north property line. Mike said that they are not in favor of the road continuing along his property. He is not opposed to the project altogether, but said Sheehy Construction constructed their building as far back from 20th Avenue as possible to minimize potential complaints on the use of the building and property for storage. The facility is currently used for storage of equipment and materials. Mike said they have no plans to develop the property for at least 10 years. I asked Mike about acquiring right -of -way along the property boundary. Mike said they would accept this and know that the road will eventually extend through their property. He said they would expect fair compensation and requested that the negotiation include salvaging and installing the chain link fence along the facility. 0 Apraj\802690 \690 -0602.mar OP Howard R. Green Company CONSULTING ENGINEERS 1326 Energy Park Drive • St. Paul, Minnesota 55108 Phone: 612/644 -4389 • Fax: 612/644 -9446 • Toll Free 1- 8001888- 368 -4389 Right of Way Summary 21st Avenue Corridor Automotive Driveline Length 200 ft. Width 7 ft. Area 1,400 sq. ft. Cost per square foot $3.00 Total R/W Cost $4,200.00 Noble Welding Length 200 ft. Width 7 ft. Area 1,400 sq. ft. Cost per square foot $3.00 Total R/W Cost $4,200.00 Arcade Asphalt Length 200 ft. Width 7 ft. Area 1,400 sq. ft. Cost per square foot $100 Total R/W Cost $4,200.00 Sheehy Construction Length 670 ft. Width 40 ft, Area 26,800 sq. ft. Cost per square foot $3.00 Total R/W Cast $80,400.00 Herman Strehlow Length 676 ft. Width 40 ft, Area 27,040 sq. ft. Cost per square foot $3.00 Total R/W Cost $81,120.00 Joyce Stevens Length 667 ft. Width 40 ft. Area 26,680 sq. ft. Cost per square foot $3.00 Total R/W Cost $80,040.00 Gerald Rehbein Length 1097 ft. Width 40 ft. Area 43,880 sq. ft. Cost per square foot $3.00 Total R/W Cost $131,640.00 City of Centerville Length 205 ft. Width 40 ft. Area 8,200 sq. ft, Cost per square foot $3.00 Total R/W Cost $24,600.00 Total R/W Cost - 21st Ave Corridor $410,400.00 Right of Way Summary 3/6/98 Assessment Roll 21st Avenue Corridor Construction Estimate $225,000 Contingencies (10 %) $22,500 Overhead (30 %) $67,500 Total Project Cost $315,000 Cost Share Lino Lakes (50 %) $157,500 Centerville (50 %) $157,500 Total Project Cost $315,000 ASSESSMENTS Front (100% of total project cost) Footage Area $393.75 /ft. $0.72917 /sq. R. Automotive Driveline Frontage 200 feet Depth 311 feet Area 62,200 sq. feet Total Assessment $78,750.00 $45,354.17 Noble Welding Frontage 200 feet Depth 310 feet Area 62,000 sq. feet Total Assessment $78,750.00 $45,208.33 Arcade Asphalt Frontage 200 feet Depth 310 feet Area 62,000 sq. feet Total Assessment $78,750.00 $45,208.33 Sheehy Construction Frontage - 670 ft. total, use 200 feet Depth 1,229 feet Area (new road frontage only) 245,800 sq. feet Total Assessment $78,750.00 $179,229.17 PROJECT TOTAL $315,000.00 $315,000.00 Total front footage 800 feet Total area 432,000 sq. feet Assessment schedule 3/6/98 DRAFT MARCH 6, 1998 CEDAR STREET AGREEMENT JOINT POWERS AGREEMENT BETWEEN THE CITY OF LINO LAKES AND THE CITY OF CENTERVILLE, ANOKA COUNTY, MINNESOTA REGARDING CEDAR STREET ROADWAY IMPROVEMENTS AND MAINTENANCE THIS AGREEMENT, made and entered into this _ day of 1998, by and between the City of Lino Lakes, a municipal corporation, situated in Anoka County, Minnesota, hereinafter called "Lino Lakes ", and the City of Centerville, a municipal corporation, situated in Anoka County, Minnesota, hereinafter called "Centerville ". Both Lino Lakes and Centerville have the authority to enter into this agreement pursuant to Minnesota Statute 471.59. RECITALS a. Lino Lakes and Centerville desire to improve Cedar Street by constructing street curb and gutter and storm sewer between 20th Avenue North and the Lino Lakes corporate boundary. b. The street shall be constructed to a mutually agreeable street section that will be approved with the initiation of a feasibility study by the City. C. A portion of the Project is to be constructed within the corporate limits of Lino Lakes and a portion is to be constructed within the corporate limits of Centerville. d. Subject to the terms hereof, Centerville is assuming full responsibility for the design and construction of the Project to be built both within the corporate limits of Lino Lakes and Centerville. e. Lino Lakes and Centerville recognize and acknowledge that the Project will benefit both Lino Lakes and Centerville. 0: \prof \260085 \085 -0306. mr.joint usage Page 1 DRAFT MARCH 6, 1998 f. Lino Lakes and Centerville will both assess the benefited properties within their jurisdictions for a portion of the costs of the Project, all as is more fully set forth below. PURPOSE The purpose of this Agreement is to set forth the terms of the agreement Lino Lakes and Centerville have reached regarding the design and construction, maintenance, and financing of the Project both within the corporate limits of Lino Lakes and Centerville, in accordance with Minnesota Statutes, Section 471.59. AGREEMENT NOW, THEREFORE, in consideration of the mutual undertakings herein expressed, Lino Lakes and Centerville agree as follows: 1. Centerville is responsible for the design and construction of both the portion of the Project located within Lino Lakes and the portion of the Project located within Centerville. a. Centerville shall design the Project, administer the construction of the Project, and conduct inspections of the construction process. Lino Lakes shall have the right to inspect, review, and comment upon construction of the Project. Lino Lakes shall have the right to review and approve the final plans and specifications prior to advertisement for bids. Both cities shall have the right to approve the final plans and specifications on future phases constructed south of the project. b. For purposes of performing its obligations under this Agreement, Lino Lakes hereby grants to Centerville the rights to use the streets and public ways of Lino Lakes for purposes of constructing the Project, including any excavations necessary to perform work incidental to the performance of this Agreement; and Lino Lakes hereby agrees, through its departmental agencies, to cooperate to the fullest extent in the protection of any excavations or barricades that may be necessary for the work performed by Centerville. 0: \proj \260085 \08"306.mar.joint usage Page 2 DRAFT MARCH 6, 1998 2. The total cost (except those associated with the sale of bonds and special assessments) of the Project, including, without limitation, construction costs, legal, administrative, and engineering fees, shall be allocated between Lino Lakes and Centerville proportionately, 50% to Lino Lakes and 50% to Centerville. 3. Each city has the right to terminate Agreement prior to award of construction contract. 4. Each municipality shall be solely responsible for their share of the costs of the Project. Each municipality shall be responsible for the sale of bonds, if any, and levy of special assessments against properties within their city boundaries. 5. Lino Lakes shall pay to Centerville monthly, as certain portions of the construction are completed, the Project amounts then due and payable for work completed. Upon completion of the entire Project, Lino Lakes will make the final payment after receiving the final cost statements from Centerville for the ompleted Project. 6. Each municipality shall obtain property or right -of -way easements within their municipal boundaries prior to award of contract that are needed for the Project and the costs shall be paid separately by each city. 7. Before this Agreement shall become binding and effective it shall be approved by an appropriate resolution of the City Council of Lino Lakes and of the City Council of Centerville, which shall be attached hereto as Exhibits B and C, respectively. 8. Watermain services may be extended to serve property within the City of Centerville upon Centerville's request. Fees for connection to such services will be subject to separate agreement. 0:lproiU60085 \085 -0306.mar.joinr usage Page 3 DRAFT MARCH 6, 1998 10. The City of Lino Lakes shall maintain Cedar Street by performing annual street sweeping, crack sealing, and pothole filling. The City of Centerville shall maintain Cedar Street by plowing snow and winter sanding /de- icing. 11. The City of Lino Lakes and the City of Centerville will seal coat the roadway on a 5 -7 year interval by separate cost share agreement. 12. Each city shall have the right to review and agree with driveway curb cut locations in the other city. 13. Other projects, such as reconstruction and overlays, shall be completed by separate agreement between the City of Lino Lakes and the City of Centerville. IN WITNESS WHEREOF, Lino Lakes and Centerville have caused this Agreement to be executed on behalf of their proper officers. CITY OF CENTERVILLE CITY OF LINO LAKES By: By: Mayor Mayor By: By: City Clerk City Clerk 0;lproj1260085%085 -0M6.mar.joint usage Page 4 POLICY FOR UTILITY CONNECTIONS OUTSIDE OF LINO LAKES 1. The City Council of the city the subject property is located shall pass a resolution stating that the property can connect to the City of Lino Lakes utilities. The resolution shall state that any delinquent utility bills shall be paid by the city of the subject property. 2. The City of Lino Lakes shall bill the property owner directly. I All maintenance of the utility service shall be the property owners starting at the point of connection to the utility main. 4. There shall be a 10 percent premium above all current connection charges and rates incurred according to the Lino Lakes code, as determined by City Council motion. 5. There shall be a 10 percent premium above all ongoing use charges according to Lino Lakes code, as determined by City Council motion. 6. Any connection to the Lino Lakes system shall be subject to a review by the Lino Lakes Public Works Director of the projected water use for the proposed connection site. The Lino Lakes Public Works Director shall find that adequate capacity and/or pressure is available within the Lino Lakes system or the connection shall not be considered. d �e�iwa3 Project Timetable Z3 /9r8 21 st Avenue Road and Utility Improvements City of Lino Lakes, Minnesota Commission No. 11473 The proposed timetable is as follows: 1. City Council Orders Feasibility Report November 10, 1997 2. City Council Receives Feasibility Report January 26, 1998 3. City Council Orders Public Hearing January 26, 1998 4. Council Holds Public Hearing February 23, 1998 5. City Council Orders the Improvement, Preparation of Plans and Specifications, and Declares Intent to Bond February 23, 1998 6. Engineer Submits Plans for Council Approval and Receives Authorization to Advertise for Bids March 23, 1998 7. Advertise in Official Newspaper (Quad Cities) March 24, 1998 & March 31, 1998 8. Advertise in Construction Bulletin March 27, 1998 & April 3, 1998 9. Open Bids April 23, 1998 10. City Council Awards Contract April 27, 1998 11. Contractor Begins Construction May 4, 1998 12. Contractor Completes Construction August 7, 1998 13. Assessment Hearing October 12, 1998 s 7 11473 J vOrn L y o L i�o lQfz� JOINT POWERS AGREEMENT �1e` � ' yQ�=b�uarr Z�� /y 5g BETWEEN THE CITY OF LINO LAKES AND THE CITY OF CENTERVILLE REGARDING 21 ST AVENUE ROADWAY IMPROVEMENTS AND MAINTENANCE THIS AGREEMENT, made and entered into on the day and year hereinafter set forth by and between the City of Lino Lakes and the City of Centerville; both of which are governmental subdivisions of the State of Minnesota located in the County of Anoka. RECITALS a. The City of Lino Lakes and the City of Centerville desire to improve 21 st Avenue by constructing street curb and gutter and storm sewer between Main Street and approximately 800 feet south of Main Street. b. The City of Lino Lakes has prepared a feasibility study of the Project and both cities agree to construct the Project as described in the feasibility study. C. A portion of the Project is to be constructed within the corporate limits of the City of Lino Lakes and a portion is to be constructed within the corporate limits of the City of Centerville. The Project is located along the 21st Avenue alignment between Main Street, and approximately 800 feet south of Main Street. (Exhibit A) d. Subject to the terms hereof, Lino Lakes is assuming full responsibility for the design and construction of the Project to be built both within the corporate limits of Lino Lakes and Centerville. e. Lino Lakes and Centerville recognize and acknowledge that the Project will benefit both Lino Lakes and Centerville. f. Lino Lakes and Centerville will both assess the benefited properties within their jurisdictions for a portion of the costs of the Project, all as is more fully set forth below. e PURPOSE The purpose of this Agreement is to set forth the terms of the agreement Lino Lakes and Centerville have reached regarding the design and construction, maintenance and financing of the Project both within the corporate limits of Lino Lakes and Centerville, in accordance with Minnesota Statutes, Section 471.59. AGREEMENT NOW, THEREFORE, in consideration of the mutual undertakings herein expressed, Lino Lakes and Centerville agree as follows: I. Lino Lakes is responsible for the design and construction of both the portion of the Project located within Lino Lakes and the portion of the Project located within Centerville. Future improvements to 21 st Avenue south of the project may be administered by either the City of Lino Lakes or the City of Centerville. Therefore, the parties agree that: a. Lino Lakes shall design the Project, administer the construction of the Project, and conduct inspections of the construction process. Centerville shall have the right to inspect, review and comment upon construction of the Project. Centerville shall have the right to review and approve the final plans and specifications prior to advertisement for bids. Both cities shall have the right to approve the final plans and specifications on future phases constructed south of the project. S b. For purposes of performing its obligations under this Agreement, Centerville hereby grants to Lino Lakes the rights to use the streets and public ways of Centerville for purposes of constructing the Project, including any excavations necessary to perform work incidental to the performance of this Agreement; and Centerville hereby agrees; through its departmental agencies, to cooperate to the fullest extent in the protection of any excavations or barricades that may be necessary for the work performed by Lino Lakes. 2. The total cost (except those associated with the sale of bonds and special assessments) of the Project, including, without limitation, construction costs, legal, administrative and engineering fees, shall be allocated between Lino Lakes and Centerville proportionately, 50% to Lino Lakes and 50% to Centerville. I Each city has the right to terminate Agreement prior to award of construction contract. 4. Each municipality shall be solely responsible for their share of the costs of the Project. Each municipality shall be responsible for the sale of bonds, if any, and levy of special assessments against properties within their cities boundaries. 5. Centerville shall pay to Lino Lakes monthly, as certain portions of the construction are completed, the Project amounts then due and payable for work completed. Upon completion of the entire Project, Centerville will make the final payment after receiving the final cost statements from Lino Lakes for the completed Project. 6. Each municipality shall obtain property or right of way easements within their municipal boundaries prior to award of contract that are needed for the Project and the costs shall be paid separately by each city. 9 f , 7. Before this Agreement shall become binding and effective it shall be approved by an appropriate resolution of the City Council of Lino Lakes and of the City Council of Centerville, which shall be attached hereto as Exhibits B and C, respectively. 8. The sanitary sewer and watermain -shall be constructed within the corporate boundaries of Lino Lakes and shall be owned and maintained by the City of Lino Lakes. 9. Sanitary sewer and watermain services may be extended to serve property within the City of Centerville upon Centerville's request. Fees for connection to such services will be subject to separate agreement. 1 0. The City of Lino Lakes shall maintain 21 st Avenue by performing annual street sweeping, crack sealing and pothole filling. The City of Centerville shall maintain 21 st Avenue by plowing snow and winter sanding/de- icing. IL The City of Lino Lakes and the City of Centerville will sealcoat the roadway on a 5 -7 year interval by separate cost share agreement. 12. Each city shall have the right to review and agree with driveway curb cut locations in the other city. 13. Other projects, such as reconstruction and overlays, shall be completed by separate agreement between the City of Lino Lakes and the City of Centerville. F e IN WITNESS WHEREOF, Lino Lakes and Centerville have caused this Agreement to be executed on behalf of their proper officers. Dated: CITY OF LINO LAKES Mayor City Clerk Dated: CITY OF CENTERVILLE Mayor City Clerk ;oim, W 12' TURN LANE 1 / CITY OF CIENTERVILLE PAINTED TMEfl. SECTION LINE 96 RCP 15 RCP 4 R p m i OUI 13, E.'�'CEPTION CLEARWArm CREEK BL:)Slf CENTER �-t 12' TORN �N;— 4 3 j � ;� 2 I��I OUTLOT A 3 REWSED 212319a 21st AVENUE ROAD AND UTILITY IMPROVEMENTS STREET ANO STORM SEWER COMM. NO. 11473-01 LINO LAKES. MINNESOTA > A S 10 li II 13 PARk 6I 6\ I 6 i N. ROBIN LANE � co s s I I z0 Q 2 _ 1 1 ounc\ A w 0 400 e s f 6 e o� gAO',E I I CARDINAL DRIVE LEGEND a N e 6 7 1 6 10 N ep 0v ° r5 +5 : 1 2 2. I ' PROPOSED 1998 e ' 1 + STREET CONSTRUCTION < S. ROBIN LANE 1 I PROPOSED R -O -W e > m q `a U;' ' "`" 6 _ _ PROPOSED EASEMENTS - - - - - - N EXISTING EASEMENTS — — — ° . a -o I w 3 171 a e I I o Eli ti I I y 6 I I curloJ s a y ,L � MAIN STREET C.S.A.H. NO. 14 = H ?. = _— J F 1 — — — — — U I F PROP D 7 0 -W I EXIS NG 33' 0 -W .�'�� z G s . I< E I o — II I ` - - - -_ D �I —J I -� � sG `. bUTLOT - -- r - - -- '42 11 26 SHEEHY CONSTRUCTION OUROT A 3' 7 ExCEPPON 2] / / PROPOSED 10' CONSTRUCTION EASEMENT r� 6 TEVENS - - - - - - - - - - - - - PROPOSED 35' UTILITY EASEMENT �— U) a PROPOSED 20' UTILITY EASEMENT - - r � � Mc. �' ""e' a _ � LAKE AREA UTILITIES Na, I i HERMAN STREHLOW J I ' I 0 1 n e ,s ,6 20 z, ° a Z 9 sm�T KENKO I�a IL q a JOYCE STEVENS i ,0 U I J 1T'i 1 Q j no, 12 KENKO i PROPOSED 20' UTILITY EASEMENT 0 A 5 6 IJ CARPENYEI i I I U I I PROPOSED 80' R -O-W I I REEL MFG. I GERALD REHBEIN ' - - ` - - - 1 Z r' REHBEIN INC. PROPOSED 21ST AVENUE- / / �' CENTERVILLE PARK — _ — — r c / — — �_ — zfi z — � CEDAR STREET C I T Y O F L I N 0 L A K E S pROPOSED 60 UTILITY EASEMENT PROPOSED 40' R -O-W 802690 -ROW = PoGHT -OF-WAY AND EASEMENTS EXHIBIT "- 20TH AVENUE, 21ST AVENUE AND CEDAR STREET CORRIDORS _- - ry i l l e E s t ablished 7857 CITY OF CENTERVILLE E Y' ns 13 L. � .. f 9 I rz] Pa i2 12 PAR. P 6 z N. ROBIN LANE 30 �: K2 O 5 j J IROi p O 400 2 T41 < 4 LEGEND Q �I 3 CARDINAL DRIVE } h 6 O I 6 REE] EXISTING WATERMAIN PROPOSED WATERMAIN I 3 so S. ROBIN LANE e " _T LEN rc! C anew i= F V 2 s m �[ j 12 6 Ul , z U Z J. E 3 13 15 CL B a a � ... to ao _ II I tl i�A 4� Z Z c L---- - - � I �� /E /�, \\ N ir ��. "L__J L - - _ — J 6 l SHEEHY CONSTRUCTION — ze 37 3 1 ..,. I [xccvnol+ ouRO1 p 1 I I I" ' TEVENS ------------- - - - - -- I. — Lµ f w LAKE AREA I =q�l OI I Q UTILITIES I HERMAN STREHLOW I I O n 6 s Z 16 4G 2, I E 1 4 J Q srneE KENKO r b L 2 ` g 23 Z I e 1 10 JOYCE STEVENS — 23 6 U- 5 ALTERNATE I O Q OUzo, 4 7 KENKO METER VAULT A 6 6 \ LOCATION — — 6� CARPENTE — ' PROPOSED ALTERNATE WATERMAIN v REEL MFG. GERALD REHBEIN REHBEIN, INC. PROPOSED 21ST AVENUE— / CENTERVILLE PARK - - - �� is ;, _.. ........... 16 ......... . ....... I .............. ....CEDAR STREET ..... I C I T Y O F L I N O L A K E S ALTERNATE EXISTING LINO LAKES j METER VAULT 16" WATERMAIN 802690 —WM LOCATION PROPOSED WATERMAIN e > t e ry ti l l e 20TH 21ST AVENUE AND CEDAR STREET CORRIDORS rn. MY OF CENTERVILLE Established 1857 -- - -- -- -u— �t — 400 1^ 6 9 1 10 1 12 12 a` 06 1 1 V' PAflN 61 6l .Lr 6 0 Q 2 O cuno* LEGEND 0 8 B 3 g J` EXISTING SANITARY SEWER <e L O 3 98 I ( PROPOSED SANITARY SEWER ----40-- I PROPOSED FORCEMAIN --------- 6 B9 v, 6 PROPOSED STORM -SEWER --�— ] 6 0 .9 q91 2 G LEN 6 9 aa N � Q �•] I I W 4Q < 11 I N M E tE - r Z 2 13 R07 B Ir } _ � 1 14 Z MAIN STREET G N0. 14 = r _ _ < C (~ _ __j s 1 r - -� L- -_� L _II J L _ _ — bUTLO I i 21 C 23 SHEENY CONSTRUCTION 0 26 C� J ' r. I ' OViLOi q 1 ExCEPiION :] Zi 26 TEVENS ' ry �M¢n I IN i W LAKE Y AREA _ WN0.3 a UTILITIES N �I HERMAN STREHLOW J I I I O v Is 19 < Z 6 C 21 0 T 22 G� KENKO I� 2 9 23 16 I 10 ° I JOYCE STEVENS 23 9 S I � ' I 4 ] 12 KENKO I 0 4 5 6 CARPENTE i f— I +' U 1 REEL MFG. 1 L GERALD REHBEIN ' Z I REHBEIN, INC. PROPOSED 21ST AVENUE—" VENUE - - / CENTERMLLE PARK zc z CEDAR STREET 1 C I T Y O F L I N 0 L A K E S 602690 -5 ;:; PROPOSED SANITARY AND STORM SEWER SEWER _R e t e ry ti l l e 20TH 21ST AVENUE AND CEDAR STREET CORRIDORS Established 1857 CITY OF CENTERVILLE DRAFT - MARCH 6, 1998 PARKVIEW ADDITION AND CENTERVILLE ROAD WATERMAIN EXTENSION FEASIBILITY STUDY Prepared for the City of Centerville, Minnesota tervt &e March 1998 Prepared By: Howard R. Green Company Consulting Engineers 1326 Energy Park Drive St. Paul, Minnesota 55108 Phone: 612/644 -4389 Fax: 612/644 -9446 DRAFT - MARCH 6, 1998 CERTIFICATION FEASIBILITY STUDY FOR PARKVIEW ADDITION STREET AND UTILITY IMPROVEMENTS AND CENTERVILLE ROAD WATERMAIN EXTENSION CENTERVILLE, MINNESOTA MARCH 1998 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. David E. Nyberg, P.E. Date Registration No. 23801 Howard R. Green Company Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 Phone: 612/644 -4389 Fax: 612/644 -9446 FEAS- 260.089 260089m M0 DRAFT - MARCH 6, 1998 TABLE OF CONTENTS P_gg 1.0 INTRODUCTION .................................................. ..............................1 2.0 FEASIBILITY, COST - EFFECTIVENESS, AND NECESSITY ..........................1 3.0 EXISTING CONDITIONS ........................................ ..............................1 4.0 PROPOSED IMPROVEMENTS ................................ ............................... 2 4.1 SANITARY SEWER ...................................... ..............................2 4.2 WATERMAIN ............................................. ..............................2 4.3 STORM SEWER/STORM DRAINAGE/MITIGATION .......................... 3 4.4 STREET CONSTRUCTION WITHIN DEVELOPMENT ........................ 4 4.5 SIDEWALK AND PATH CONSTRUCTION WITHIN DEVELOPMENT ...................................... ............................... 4 4.6 STREET, SIDEWALK AND PATH CONSTRUCTION OUTSIDE OF DEVELOPMENT ................................. ............................... 4 5.0 IMPLEMENTATION CONSIDERATIONS .................. ............................... 4 5.1 EASEMENTS AND PERMITS ........................ ............................... 4 5.2 ESTIMATED COSTS ..................................... ..............................5 5.3 FINANCING .............................................. ............................... 6 5.4 PROJECT SCHEDULE .................................. ............................... 6 6.0 CONCLUSION .................................................... ............................... 7 APPENDIX EXHIBIT 1 - PROJECT LOCATION EXHIBIT 2 - PROPOSED SANITARY SEWER EXHIBIT 3 - PROPOSED WATERMAIN EXHIBIT 4 - PROPOSED STORM SEWER EXHIBIT 5 - PROPOSED WATERMAIN ALTERNATTVES EXHIBIT 6 - PATH LOCATIONS EXHIBIT 7 - TYPICAL STREET SECTION FINANCING FOR PARKVIEW ADDITION FINANCING OPTIONS FOR PARKVIEW ADDITION ALTERNATIVES FEAS- 260.089 1 260089m DRAFT - MARCH 6, 1998 1.0 INTRODUCTION On February 25, 1998, the Centerville City Council adopted Resolution 98-04, authorizing a feasibility study to examine proposed street and utility improvements for Parkview Addition, a development located east of Centerville Road and west of Eagle Pass. The developer of the project, Mr. Rick Carlson, petitioned for the improvements. The project location is shown on Exhibit 1. In conjunction with this project, several watermain alternatives are being considered. Each alternative would provide benefits to the existing and proposed system, either by looping an existing dead end line or providing a connecting point for future watermain construction. This study will summarize the existing conditions, proposed improvements, estimated construction costs, and proposed financing options for the project. Overhead costs include administration, engineering, fiscal, and legal expenses, as well as project contingencies. 2.0 FEASIBILITY, COST - EFFECTIVENESS, AND NECESSITY City sanitary sewer and watermain fa ilities are located on streets adjacent to Parkview Addition. It is therefore feasible and cost - effective to connect sanitary sewer and watermain to these utilities and provide sanitary sewer and water services to the proposed 42 lots in the development. It is also feasible to provide a looped watermain system to Chauncy Barrett Gardens (a senior housing facility), which was constructed in 1997, and to provide watermain for a future loop to the west on Center Street and future watermain south of Center Street. The watermain would be extended from Parkview Addition to this area. Completing these improvements in conjunction with the Parkview Addition development would also be cost- effective and would prevent future disruption to lots once the property is sold and built upon. Based on information contained within this study, the proposed improvements are necessary, cost- effective, and feasible from an engineering point -of -view. 3.0 EXISTING CONDITIONS The area which will be developed as Parkview Addition is currently undeveloped, and is proposed to be rezoned to R2A — Single Family Residential. This area is entirely within the Municipal Urban Service Area (MUSA) boundary. There is a wetland located on the east end of the property. This wetland was delineated in the summer of 1996 by the Anoka Conservation District. FEAS- 260.089 1 260089M DRAFT - MARCH 6, 1998 The site drains generally from northwest to southeast. Runoff then drains to the drainage easement along the south side of the plat, then west to the ditch system on Centerville Road. Approximately 10 percent of the site currently drains to the wetland. Centerville Road, an Anoka County highway, runs along the west end of the plat. Twelve -inch sanitary sewer exists along this road corridor. The Eagle Pass development is north and east of Parkview Addition. Dupre Road, which is northeast of the proposed Parkview Addition, was constructed as part of the Eagle Pass development, and has 8 -inch sanitary sewer and 12 -inch watermain under the road. Chauncy Barrett Gardens, which was constructed in 1997, has an existing 8 -inch watermain which ends with a hydrant located just east of Centerville Road. 4.0 PROPOSED EMMOVEMENTS Parkview Addition is proposed as a 42 -lot, single family residential development. The proposed improvements within the plat include sanitary sewer, watermain, storm sewer, and street construction. Other potential improvements outside of the plat include the looping of the watermain to Chauncy Barrett Gardens, the extension of the watermain along Centerville Road, and the construction of a bituminous path along the west side of Centerville Road to Laurie Lamotte Park, located west of the plat. 4.1 Sanitary Sewer The proposed sanitary sewer is shown on Exhibit 2. The proposed sanitary sewer includes 8 -inch PVC pipe to serve the 42 lots. The sanitary sewer will connect to the existing 12 -inch sanitary sewer on Centerville Road. A sanitary sewer service will also be provided to the proposed east Tourville property lot, located in the northwest corner of Parkview Addition. The existing sanitary sewer on Centerville Road is approximately 19 feet deep. If sanitary sewer were constructed at minimum grade to the existing sewer, the sewer would be 16 feet deep at the most shallow point. Therefore, there will be adequate depth to serve the homes by gravity sewer. All homes will be constructed as split -entry homes. After development is complete, the increase in flow to the existing sanitary sewer will be approximately .0147 MGD. 4.2 Watermain The proposed watermain is shown on Exhibit 3. The proposed watermain includes 8 -inch PVC pipe to serve the 42 lots. The watermain will connect to the existing 12 -inch watermain on Dupre Road. FEAS- 260.089 2 260089M DRAFT - MARCH 6, 1998 Watermain services will also be provided to the two proposed Tourville properties, located in the northwest corner of Parkview Addition. There are two alternatives for construction and extension of the watermain through Parkview Addition. The alternatives are as follows: 4.2.1 Alternative 1 -Loop Watermain With Dead End At Senior Housing and Loop the Watermain Within the Development Alternative 1 is shown in Exhibit 5. The watermain within the development would be the same as described above, but the watermain would not dead end at a hydrant east of Centerville Road or a hydrant at Park Terrace. Instead, the 8 -inch PVC watermain on Park Terrace would be extended to the west then 12 -inch PVC watermain would run north on Centerville Road. This watermain would connect to the watermain on Parkview Road with a tee, and extend north to connect to the existing watermain constructed with Chauncy Barrett Gardens. 4.2.3 Alternative 2- Extend the Watermain South On Centerville Road To Center Street Alternative 2 is shown in Exhibit 5. This alternative must be constructed in conjunction with Alternative 1. Therefore, the watermain would be as described in Alternative 1, with one exception. The watermain west of Park Terrace would end at a tee on Centerville Road, and the 12 -inch PCV watermain would extend also south to Center Street. 4.3 Storm Sewer /Storm Water Drainage/Wetland Mitigation The proposed storm sewer is shown on Exhibit 4. Preliminary sizing of the storm sewer has a range of 15 -inch RCP to 24 -inch RCP. These sizes are subject to change depending on review of drainage calculations. Catch basins will be located at low points in the streets to collect stormwater. The storm sewer will be designed for a 5 -year storm, per City Ordinance requirements. A 36,400 square foot (.84 acre) stormwater pond is proposed to be located at the northeast corner of the plat. The overflow from the pond will run along the south end of the plat (within a 20 -foot drainage easement) to the ditch system along Centerville Road. Approximately 10,900 square feet of the existing wetland are proposed to be filled, and approximately 12,150 square feet are proposed to be mitigated. FEAS- 260.089 3 260089m DRAFT - MARCH 6, 1998 4.4 Street Construction Within Development Exhibit 6 shows the standard street cross - section for residential streets in the City of Centerville. Geotextile fabric will be placed under the road with 20 inches of modified select granular borrow and 6 inches of Class 5 aggregate base. Drain file will also be installed along the length of the road. 4.5 Sidewalk and Path Construction Within Development The sidewalk and path locations are shown on Exhibit 7. Five -foot wide concrete sidewalk will be constructed on the north side of Parkview Road. The sidewalk will run from Centerville Road on the west to the plat boundary on the east. A 10 -foot wide bituminous path will be constructed from Park Circle to the park located within Eagle Pass. 4.6 Street, Sidewalk and Path Construction Outside Of Development There is approximately 170 feet between Dupre Road and the north plat boundary of the proposed Parkview Addition. Therefore, Parkview Road will be extended from the plat bo ndary to Dupre Road through Outlot B of the Eagle Pass development. The Centerville standard street for residential streets will be used for this extension. The 5 -foot sidewalk on the north side of Parkview Road will also be extended from the plat boundary to Dupre Road. A 10 -foot wide bituminous path will also be constructed along the west side of Centerville Road. This path will extend south from Parkview Road approximately 250 feet, then extend west to an existing park. 5.0 IMPLEMENTATION CONSIDERATIONS 5.1 Easements and Permits Permits from the MPCA and the Department of Health will be required for the sanitary sewer and watermain systems, respectively. Mattke Engineering has applied for a Rice Creek Watershed District permit for impacts to the wetland and for storm drainage and grading plan issues. Temporary construction easements may be required for the proposed watermain construction along Centerville Road. FEAS- 260.089 4 260089m DRAFT - MARCH 6, 1998 All additional work will be within the proposed Parkview Addition or within City right -of -way. 5.2 Estimated Costs Construction Costs Sanitary Sewer Construction $ 69,085.00 Watermain Construction 66,460.00 Storm Sewer Construction 40,220.00 Street Construction Within Development 148,837.50 Sidewalk and Path Construction Within Development 26,050.00 Street and Sidewalk Construction Outside of Development 14,052.50 Path Construction Outside of Development 6,450.00 Tourville service construction 1.175.00 Total estimated Base Construction Cost $372 Overhead costs (38 %) Engineering 8.0% Legal 1.0% Construction Administration 3.0% Inspection and Staking 7.0% Bonding and Finance 5.0% Plan/Plat Review 2.0% Easements 1.0% Assessments 1.0% Contingencies 10.0% Total Estimated Overhead Costs $141,485.40 Total Estimated Project Cost $513,815.40 Watermain Alternative 1 $38,176.25 Overhead costs (38%) $14.506.98 Alt 1 Project Cost $52,683.23 Watermain Alternative 2 $11,187.50 Overhead costs (38 %) $4.251.25 Alt 2 Project Cost $15,438.75 FEAS- 260.089 5 260089m DRAFT - MARCH 6, 1998 5.3 Financing See schedules in Appendix. A fee of $1,741.23 was used as the standard watermain fee for existing properties that will be connected to City watermain. This fee represents the fee of $1,644.91 that was adopted in 1996, increased by 5.86%, based on the Engineering News Record (ENR) construction cost index increase for the period April 1996 - March 1998. 5.4 Project Schedule The following project schedule for the Parkview Addition Street and Utility Improvements project is based upon guidelines established in Minnesota State Statues, Chapter 429, Local Improvements, Special Assessments. These dates may be revised as the project continues to progress through City Council review. Review Draft Feasibility Study and Discuss Funding March 11, 1998 Options Receive Final Feasibility Study and Schedule Public March 25, 1998 Hearing Hold Public Hearing and Order Plans and April pril 22, 1998 Approve Plans and Specifications and Authorize May 27, 1998 Advertisement for Bids Receive Bids June 30, 1998 Hold Assessment Hearing and Award Contract July 8, 1998 Begin Construction July 1998 Complete Construction October 1998 FEAS- 260.089 6 260099M DRAFT - MARCH 6, 1998 6.0 CONCLUSION The proposed project would provide City streets and utilities for the lots in Parkview Addition. Watermain alternatives 1 and 2 would also improve the City system by looping existing dead end lines and by providing watermain for future extension or looping of the watermain. The estimated total cost of the project including all alternatives is $581,937.38, with costs within the development assessed to the developer, and some of the costs outside of the development assessed to adjacent property owners. Based on the information gathered and the analyses presented, the proposed improvements are feasible from an engineering point -of -view. FEAS•260.089 7 260089m is ' i HAYFlFIO ROAD ' R ] B L. ra t3 L 5 6 ;n3 n is 3 C£ MR ELENENTAP �(L CFOCI HODIE ORCE B WESw STREET Ly Lrt +_ 22 W ' 5 3 + I, tz u z 13 1 9 ill Ada 0� r — STRE£ — J e s toe e J ° e rc p S to 1 1 � Hw rc Iz � 7 SpHiE1 STREET 1 > e e � tyy a B . � ♦ � � e etJ 1 _ HEPoTACE I SIAEET 6 . � i a a +B z z CIAUHCY 1 A I a+ • 73 ;�,; w 3 B tz u � p \ 15 ARNDID DREAlO BARRETT 4 `l 3 X. t9 Ee 3I }0 =8 p 19 O R 1 6 � DARNS GCE 3 1.13 I „ 0 ST. CIIIEWENE CHURCH Rill TH0I1i'ROH r' B 'fi,. F OREER will X�T .:4L'6: z • " a H & p " DT " : PARKVIEW ADDITION? s DEAn AHlOERSCN •• o� �' I , -9 ROBERT BAR RETT e IORIE LATRGTTE MEW PARK H WRNARD AERRICH 1 = N IS +R q Y rcLL CENTER STREET s DALE & JUDY GRE WART u w p r O I ] Q + 0 L a e •e w y e F7 1 a :- PROJECT LOCATION 0 500 CV089 -L PROJECT LOCATION EXHIBIT terville PAR"EW ADDITION 1 Established 1857 i l __ i - i I j LI j - -Ji z' f I L J - S ANOKA CO. HRA w Eagle Pass \ r LOCK 1` e L 2 3 4 5 8 7 7 I 8 1 PA VIEW AD ° 5 3 4 I 5 21 22 4 23 ;o 20 9 8 7 6 m 3 0 1s BLOCK 2 24 0 BLOCK 3 ��— r --- - v 25 • Q� -- 18 1 n P CE - 12 13 14 ig 16 17 27 I -, - i 7 Q�'nter Oaks a " ( t i 0 200 i CV089 —S PROPOSED SANITARY SEWER EXHIBIT terville PARKVIEW ADDmON 2 Established 1857 0 I —� —J s ANOKA CO. HRA ` i ; \ i -- Eagle Pass Ld unq . r� 2 3 BLOCK 1 4 6 7 6� 7 - - - - - -- 5 G 6 1 PA CVIEW AD "° 5 3 a ' S 27 22 4 � I 23 A 20 3 g 8 7 6 M J 19 BLOCK 2 24 8 rr BLOCK 3 i o n I 25 - C7 8 1 n P CE 17 26 12 13 14 15 16 i i I _ I — i — — i I Gopher Oaks 1 7i 0� 0 200 CV0s9 -W PROPOSED WATERIMIN EXHIBIT aw t o rvi l l e PARIWIEW ADDITION 3 Established 1857 ANOKA CO. HRA z Eoq)e Pass uj -16 BLOCK I L --- 4 5 7 7 0 Ec� 6 PA VIE IROAD 3 4 5 21 22 23 20 3 7 6 19 BLOCK 2 24 10 2 BLOCK 3 25 ag 78 1 11 P Rf CE 17 12 13 14 16 26 27 — Utnter yaks I 200 CV089—ST PROPOSED STORM SEWER EXHIBIT terville PARKMEW ADMON 4 (4 Es tablished 1857 U�NLW 1U LMS11NU WAILMAIN 0 ANOKA CO. HRA TMINATIVE I Eagle p ass z 12 1 Lu BLOCK I S T 6 475 6 2 3 7\ 7 O ---------- 6 2 P VIE ROADJ� > 3 21 22 4 - 1 I i 23 i 20 7 6 m 3 9 8 19 BLOCK 2 24 BLOCK 3 25 18 11 P R CE 17 26 12 13 14 15 16 I A LTERNATIVE 2 Center Oaks 0 200 CV089—WA WATERMAIN ALTERNATIVES EXHIBIT terville PAR"EW ADDITION 5 Established 1857 LL -- I -j )o ANOKA CO. HRA S F z Eagle Pass CONCRETE SIDEWALK BLOCK 1 4 5 6 7 7 0 n PA VIE RC4oAD - 0 5 3 5 21 22 4 23 Al 20 �; 3 7 10 BLOCK 2 24 2 BLOCK 3 25 11 p CE 12 13 14 is 16 17 26 27 BITUMIN PATH --4 q BITUMINOUS PATH r- Coehter POP5 I 200 6;;2!m5miW!m CV08a-SW EXHIBIT PATH L OCATIONS L-%J%.# terville PARIWIEW AMMON 6 a Established 1857 R/W R/W 30' 30' 13.5' 16.5' 16,5' 13.5 SURMOUNTABLE CONCRETE CURB & GUTTER 4' 5' 4,5' i 1 /4 " /FT. 0 .02' /F1' 1 4" FT. i 4" CONC. WALK 4" COMPACTED SAND NOTE- SIDEWALK TO BE 4" DRAIN TILE CONSTRUCTED AS SHOWN ON PLANS. 1 1/2" 2340 TYPE 41A BITUMINOUS WEAR COURSE TACK COAT 1 1/2" 2340 TYPE 31B BITUMINOUS BASE COURSE 6" CLASS 5 AGGREGATE BASE 20" MODIFIED SELECT GRANULAR BORROW GEOTEXTILE FABRIC i TYPICAL STREET SECTION (7 TON RESIDENTIAL) CV089 -TYP i TYPICAL STREET SECTION EXHIBIT t o rvi l l e PARKVIEW ADDITION 7 Established 1857 Parkview Addition Estimated Construction Costs Costs Parkview Addition Street Construction $148,837.50 Watermain $66,460.00 Sanitary Sewer $69,085.00 Storm Sewer $40,220.00 Sidewalk and Path Constr. $26,050.0 subtotal $350,652.50 Extension of Parkview to Dupre Street Construction $11,202.50 Sidewalk $2 Sub -total $14,052.50 10 -foot Bituminous Trail along Centerville Road $6,450.00 Tourville Property Services West property water service $462.50 East property water service $462.50 East property sanitary service $250.00 Sub-total $1,175.00 Total Construction Cost $372,330.00 Total Overhead (38 %) $141.485.40 Total Project Cost $513,815.40 Financing (costs shown with overhead) Parkview Addition $483,900.45 Number of lots 42 Assessment per lot $11,521.44 Parkview Road Extension $19,392.45 Paid by Eagle Pass developer 10 -foot Bituminous Trail $8,901.00 Developer Trail Fee ($150 X 42) ($6,300,00 City cost $2,601.00 Tourville property services $1,621.50 2 water, 1 sewer Total Project Cost $513,815.40 c:Vraje W260089m1aasesa Parkview Addition Alternative 1 Loop the watermain to the hydrant at Senior Housing and Loop the watermain within the development Estimated Costs Constructio coo $38,176.25 Overhead Costa (38 %) 514.506.98 Total Project Cost $52,683,23 n0 Costs $3.240.00 Total assessable Project Cwt 549.44323 Total Project Cost $52,883.23 Assessments Total Owner Address Assessment Arnold Drswlo 7029 Centerville Road $1,741.23 St. Genevieve Church 1664 Homage Strwt $16,015.46 Chauncy Barrett Gardena 7024 Centerville Road 50.00 Richard Thompson 7008 Centerville Road 51,741.23 John and andy Rieder 6977 Centerville Road $1,741.23 Dean Anderson 6961 Centerville Road $1,741.23 Robert BarreH 6953 Centerville Road - 57,741.23 Rick Carlson 50 %of cost,Parkview Addition 524 ,721.61 Total Assessment $49,443.23 Total Assessable Project Cost $49,443.23 Front Footage Assessment Comparison Total Assessment Assessment Assessment Total Owner Address Front footage perfoot Fee Assessment Arnold Drewlo 7029 Centerville Road 130 $13.39 51,741.23 $1741.23 St. Genevieve Church 1884 Nerila Street 281 $56.99 $16,015.46 516,015.46 Chauncy Barrett Gardens 7024 Centerville Road 277 $0.00 $000 Richard Thompson 7008 CentemOe Road 100 $17. $1,741.23 $1,741.23 John and Cindy Rieder 6977 Centerville Road 149 $11.69 $1,741.23 $1,74123 Dean Anderson 6961 Centem Road 93 518.72 $1,741.23 $1,741.23 Robert Barred 6953 Centerville Road 103 $16.91 51,741.23 $1,741.23 Rick Carlson (50% of project cwt) IParlalFwArldifion $24,721.61 Total Assessment $49,443.23 Total Assessable Project Cost U9,443.23 Area Assessment Comparison Assessment Total per square Assessment Assessment Total Owner Address Area foot s Fee Assessment Arnold Drewb 7029 Centerville Road 26002 50,07 $1,741.23 $1,741.23 St. Genevieve Church 1664 Heritage Street 426372 $0.04 516,015.48 $16,015.46 Chauncy Barrett Gardens 7024 Centerville Road 172809 $0,00 Richard Thompson 7008 Centerville Road 61643 $0.03 51,74123 $1,741.23 John and Cindy Rieder 6977 Centerville Road 16225 $0.11 $1,741.23 $1,741.23 Own Anderson 6961 Centerville Road 30918 14860 $0.12 57,741.23 $1,741.23 Robert Barrett 6953 Centerv8le Road $0.06 $1,74123 $1,741.23 Rick Carlson (50% of project cost) I Parkview Addition $2d,721.61 Total Assessment $49,443.23 Total Assessable Project Cost $49,443.23 e:4MOJ 1250089m1aaaeas Parkview Addition Alternative 2 Extend watermain south on Centerville Road to Center Street Estimated Costs Can Coat $11,187.50 Overtmad Costs (38X) $4.251.25 Total Project Cost $15,438.75 Ong Costs $1,200.00 Total assessable Project Coat $14.238.75 Total Project Cost $15,438.75 Assessments otal Owner Address Assessment Bernard Henrich 8845 Centerville Road $1,741.23 Dais and Judy Greenaadt 6937Centerville Road $1,741.23 Gary Will 1705Centerville Road $1,741.23 Total Assessment $5,223.69 Total Assessable Project Cost $14,238.75 Front Footage Assessment Comparison Tote Assessment Assessment Assessment Total Owner Address Front foots e fo ot Fee r Assessment Bernard Henrich 6945 Centerville Road 100 $17.47 51,741.23 $1,741.23 Dale and Judy Greemvadt 6937 Centerville Road 100 $17.41 $1,741.23 $1,741.23 Gary Will 1705 Certavdle Road 171 $10.18 $ 1,741.23 51,741.23 Total Assessment $5,223.69 Total Assessable Project Cost $14,238.75 Area Assessment Comparison Assessment Tote per square Assessment Assessment Total Owner Address Area foot s Fee Assessment Bernard Henrich 6945 Carterville Road 29931 $0.06 $1,741.23 $1,741.23 We and Judy Greenwadt 6937 Centerville Road 14931 $0.12 $1,741.23 51,741.23 Gary Will 1705 Centervilk Road 18125 $0.10 $1,741.23 31,741.23 Total Assessment $5,223.89 Total Assessable Project Cost $14,238.75 o:lprojec 2<mO89miassass MEMO DATE March 6, 1998 TO Honorable Mayor and Council FROM Jim March RE LaMotte Park Revision A revised plan for LaMotte Park was unveiled at the last meeting of the Park and Recreation committee. The new plan received overwhelming support from the committee. The plan will be viewed and discussed at the next Council meeting. The sketch plan was created by a landscape architect from the firm of Hoisington Koegler. The new plan reduces wetland impacts, incorporates three ball fields, playground equipment, a larger pleasure skating rink, two soccer fields and an expanded parking area. There are many advantages of thi new concept over the old design. The new plan will result in a significant cost savings over the old design. If the Council supports this revised sketch plan concept, a proposed budget and potential timeline for development could be further investigated. MEMORANDUM DATE: March 6, 1998 TO: Honorable Mayor and Council FROM: Ry -Chet Gaustad, CMC City Clerk RE: Clearwater Meadows Credit to Developer The City is considering refunding $12,766.49 to Clearwater Meadows development due to the tally of actual expenditures and revenues. The City is waiting for final recommendation from Carolyn Drude to release the funds. This is the final action required on the Clearwater Meadows development. CLEARWATER MEADOWS Engineering Cost Analysis per Howard R. Green Company letter dated January 21, 1998 Clearwater Meadows Lots 32 lots @ $13,310.72 each $425,943.04 Developer Financed Project Costs $417,751.44 ----------------------------------------------------------------- ----------------------------------------------------------------- Assessment Credit $ 8,191.60 Administrative Cost Analysis of Receipts and Disbursements Ledger Escrows Received from K -G Development, Inc. $ 7,800.00 Miscellaneous Expenses Mr. Sign 328.80 Silver Bullet 23.00 Legal /Bond Review 2,455.68 Publishing 417.63 Assessment Credit $ 4,574.89 TOTAL ASSESSMENT CREDIT $ 12,766.49 i b r` • LJMS Howard R. Green Company Formerly CONSULTING ENGINEERS MSA Formerly MSA January 21, 1998 consulting Englneere File: 260077m Mr. Jim March City Administrator City of Centerville 1880 Main Street Centerville, MN 55038 RE: CLEARWATER MEADOWS COST ANALYSIS Dear Mr. March: In response to your request, we are providing you information on a cost analysis for the Clearwater Meadows project. We understand that the Developer has requested an analysis of the total project cost to request an adjustment of his assessment as necessary to reimburse him for any cost due at this time, now that the development is complete. PROJECT COST The total cost of the project is listed below, not including any City administration or legal fees. The project has been finalized. We have a signed final pay estimate from the Contractor. Grading Plan and Plat Review $ 4,617.44 Feasibility Study 4,415.87 Plans and Specifications 20,001.24 Assessments 1,693.62 Construction Administration 15,520.31 Grading Plan Issues 2856.19 Field Services (inspection and staking) 31.677.90 Sub -total (actual overhead, 22.15 %) $80,782.57 Construction $364,705.48 Total Project Cost $445,488.05 CITY IMPROVEMENTS Below is a summary of the costs that could be itemized as a separate City expense from the Developer's cost for Clearwater Meadows. The overhead totals shown are in direct proportion to the total overhead based on a percentage of the total construction cost. 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644 -4389 fax 6121644 -9446 toll free 888/368 -4389 Mr. Jim March January 21, 1998 Page Two Item cost Overhead Tota Oversize Watermain $ 2,010.00 $ 445.22 $ 2,455,22 Oversize Sanitary Sewer 2,680.00 593.62 3,273.62 Stevens Property Sewer and Water Services 10,406.00 2,304.93 12,710.93 Brian Drive Water Services 7,611.00 1685.84 9.296 84 Totals $22,707.00 $5,029.61 $27,736.61 Using the above numbers as City costs, the revised developer- financed project cost is $417,751.44. This results in an assessment credit to the City of $8,191.60. ASSESSMENTS Several assessments were levied to finance this project. The Developer was assessed $13,310.72 for each of the 32 lots platted with the subdivision. Eight Brian Drive residents were assessed $1,644.91 for water services. One Brian Drive resident (Edgett property) was assessed $2,500.00 for a water service. The Stevens property was assessed $1,644.91 for a water service and $3,500.00 for a sewer service. Below is a summary of the total assessments on the project. Clearwater Meadows Lots 32 lots @ $13,310.72 each $425,943.04 Brian Drive Water Services 8 lots @ $1,644.91 each 13,159.28 Edgett Water Service 1 lot @ $2,500 each 2,500.00 Stevens Property Services 1 lot (water and sewer) 8,876.02 Total Assessments $450,478.34 We hope the above information is useful to you as you try and resolve issues with the Developer on this project. Please let us know if you need any additional assistance. Sincerely, Howard R. Green Company David E. Nyberg, P.E. Project Manager DEN:tw 0Aproj126007A077- 21 11.jan Howard R. Green Company CONSULTING ENGINEERS tern/ fe 18 Main Street • Ce MN 55 038 Estaffished 1857 (612) 429 -3232 • Fax (612) 429 -8629 CITY OF CENTERVILLE RESOLUTION 98 -05 APPROVING SAINT GENEVIEVE'S APPLICATION FOR AUTHORIZED EXEMPTION OF LAWFUL GAMBLING LICENSE WITHIN THE CITY OF CENTERVILLE WHEREAS, the Church of Saint Genevieve is scheduled for an event on April 21, and August 16, 1998; and WHEREAS, the Church of Saint Genevieve has applied for authorization for exemption from lawful gambling license for the above mentioned days. NOW THEREFORE, be it resolved by the Centerville City Council of the City of Centerville that the Church of Saint Genevieve be granted approval for a lawful gambling license application for April 21, and August 16, 1998, and that the 30 day waiting period has been considered and that the fee be waived. ADOPTED AND PASSED BY CENTERVILLE CITY COUNCIL ON THIS 11 TH DAY OF MARCH, 1998. Mayor Tom Wilharber ATTEST. Ry -Chel Gaustad, CMC City Clerk Re os ss Minnesota Lawful Gambling For Board Use Only Fee Paid Application forAuthorization for an Exemption from Lawful Gambling License Check # Initals Date Recd Organization Information Organization Nam Previous lawful gambling exemption number Street City State Zip Code County 7UfS'7 �OrFi'CJ �C -rk� G till =rC✓;L ,� r lP✓ _33 - 3 A" - KPc Name of Chief Executive Officer of organization (CEO) Daytime Phone number of CEO First Name Last Name f ev 2 I 6,l-t 1, ? 'T. W , CI- ((ice) N ��l'- �1 � 7 N ame of rganization Treasurer First Name Last Name Daytime Phone Number of Treasurer 6 ce/ Type ofNonprogt Organization Check the box below which best describes Check the box that indicates the type of proof attached to this application your organization by your organization: 0 IRS letter indicating income tax exempt status 0 Fraternal [� Veterans 0 Certificate of good standing from the Minnesota Secretary of States office ( Religious E3 A charter showing you're an affiliate of a parent nonprofit organization Q Other nonprofit Proof previously submitted and on file with the Gambling Control Board Gambling Premises Information Name of Establishment where gambling activity will be conducted quaL./ - f J 57 �tL �; '' E4�G Street City State Zip Code County 765 CCCrrt�cClj (ZDR -D LJ i- 1 Ili 53 /k� - +� Date(s) of activity (for raffles, indicate the date of the drawing) Ar' /Z IL- '-si /CKr Check the box or boxes which indicate the type of gambling activity your organization will be conducting F 'Bingo Co Raffles F 'Padd(ewheels [:] 'Pull -tabs () 'Tipboards *Equipment for these activities must be obtained from a licensed distributor le sure the Local Unit of Government and the CEO of your organization sign For Board Use Only the reverse side of this application. Date & Initials of Specialist Local' Unit of Government Jurisdiction Is this gambling premises located within city limits ?o Yes 0 No If Yes, write the name of the City: City Name GL2,, L �t� r 4G If No, write the name of the County and the Township: County Name Township Name Check the appropriate status of the Township: organized unorganized Q unincorporated Local Unit Of Government Acknowledgment 1. The city must sign this application if the gambling 3. DO NOT submit this application to the Gambling Control premises is within city limits. Board if it is denied by the local unit of government. 2. The county and township must sign this applica- 4. NOTE: A Township may not deny an application. tion if the gambling premises is not within city limits. Upon submission of this application to the Gambling Control Board, the exemption will be issued not more than 30 days (60 days for cities of the 1st class) from the date the local unit of government signed the application, provided the application is complete and all necessary information has been received, unless the local unit of government passes a resolution to specifically prohibit the activity. A copy of that resolution must be received by the Gambling Control Board within 30 days of the date filled in below. Cities of the first class have 60 days in which to disallow the activity. City or County Acknowledgment of Receipt of Township Acknowledgment of Awareness of Application Application Signature of person receiving application Signature of person acknowledging application Date Received: Date Signe Title of person receiving application Title of person acknowledging application Oath of Chief Executive Officer I have read this application and all information is true, accurate and complete. /S ubmit the application at least 45 days prior to your scheduled date of activity. Be sure to attach the $25 application fee and a copy of your proof of nonprofit status. Mail the complete application and attachments to: Gambling Control Board 1711 W. County Rd B Suite 300S Roseville, MN 55113 This publication will be made available in alternative format (i.e. large print, braille) upon request. Questions on this -form should -be directed to the Licensing Section of the-Gambling Control Board at (612)639 -4000. Hearing impaired individuals using a TDD may call the Minnesota Relay Service at 1- 800 -627 -3529 in the Greater Minnesota Area or 297 -5353 in the Metro Area. The information requested on this form will be used by the Gambling Control Board (GCB) to determine your compliance with Minnesota Statues and rules governing lawful gambling activities. All of the information that you supply on this form will become public information when received by the GCB. Re os�s Minnesota Lawful Gambling For Board Use Only Fee Paid Application for Authorization for an Check # ,Exemption from Lawful Gambling License Initals Date Recd Organization Information' Organization Name Previous- iawfui gambling exemption number Church of St. Genevieve X g,`Gbg7 Street City State Zip Code County 7087 Goiffon Road, Centerville MN 55038 Anoka Name of Chief Executive Officer of organization (CEO) Daytime Phone number of CEO First Name Last Name Rev. Richard J. Wolter (614 429 -7937 N ame of Organization Treasurer Daytime Phone Number of Treasurer First Name Last Name y Diane Kieffer (612) 429 -5069 Type of Nonprofit Organization Check the box below which best describes Check the box that indicates the type of proof attached to this application your organization by your organization: IRS letter indicating income tax exempt status � Fraternal Veterans Certificate of good standing from the Minnesota Secretary of State's office � ® Religious 0 A charter showing you're an affiliate of a parent nonprofit organization Q Other nonprofit Proof previously submitted and on file with the Gambling Control Board Gambling Premises Information Name of Establishment where gambling activity will be conducted Church of St. Genevieve Street City State Zip Code County 7087 Goiffon Road, Centerville M:d 55038 Anoka Date(s) of activity (for raffles, indicate the date of the drawing) August 16, 1998 Check the box or boxes which indicate the type of gambling activity your organization will be conducting ® *Bingo 0 Raffles 0 "Paddlewheels W" `Pull- tabs 0 *Tipboards *Equipment for these activities must be obtained from a licensed distributor e sure the Local Unit of Government and the CEO of your organization sign For Board Use Only the reverse side of this application. Date & Initials of Specialist Local Unit a Government Jurisdiction Is this gambling premises located within city limits ?0 Yes E:] No If Yes, write the name of the City: City Name Centerville If No, write the name of the County and the Township: County Name Township Name Check the appropriate status of the Township: organized unorganized unincorporated Local unit W Government Acknowlec gmen# 1. The city must sign this application if the gambling 3. DO NOT submit this application to the Gambling Control premises is within city limits. Board if it is denied by the local unit of government. 2. The county and township must sign this applica- 4. NOTE: A Township may not deny an application. tion if the gambling premises is not within city limits. Upon submission of this application to the Gambling Control Board, the exemption will be issued not more than 30 days (60 days for cities of the 1st class) from the date the local unit of government signed the application, provided the application is complete and all necessary information has been received, unless the local unit of government passes a resolution to specifically prohibit the activity. A copy of that resolution must be received by the Gambling Control Board within 30 days of the date filled in below. Cities of the first class have 60 days in which to disallow the activity. City or County Acknowledgment of Receipt of Township Acknowledgment of Awareness of Application Application Signature of person receiving application Signature of person acknowledging application Date Received: Date Signed: Title of person receiving application Title of person acknowledging application Oath of Chief Executive Officer 1 have read this application and ill information is true, accurate and complete. ` 2° / %. i Date: February 27, 1998 Submit the application at least 45 days prior to your scheduled date of activity. Be sure to attach the $25 application fee and a copy of your proof of nonprofit status. Mail the complete application and attachments to: Gambling Control Board 1711 W. County Rd B Suite 300S Roseville, MN 55113 This publication will be made available in alternative format (i.e. large print, braille) upon request. Questions on this form should -be directed to the Licensing Section of the - Gambling Control Board at (612)6394000. Hearing impaired individuals using a TDD may call the Minnesota Relay Service at 1- 800 - 627 -3529 in the Greater Minnesota Area or 297 -5353 in the Metro Area. The information requested on this form will be used by the Gambling Control Board (GCB) to determine your compliance with Minnesota Statues and rules governing lawful gambling activities. All of the information that you supply on this form will become public information when received by the GCB. N(DT V v L CITY OF CENTERVILLE PLANNING AND ZONING COMMISSION February 3, 1998 Pursuant to due call and notice thereof, the Planning and Zoning Commission of the City of Centerville held their regular meeting and three public hearings on February 3, 1998, at City Hall. Meeting was called to order by Chairperson Kathy Welk. Present Kathy Welk John Buckbee Linda Broussard - Vickers Absent Tina Vermeulen Al LaMotte Staff Jim March MEETING CALLED TO ORDER AT 7:04 P.M. PARKVIEW DEVELOPMENT - Public Hearing Mr. Rick Carlson was in attendance to make a presentation on his proposed Parkview development. Mr. Ted Mattke of Mattke Engineering was also present with Mr. Carlson. The subdivision is proposed to consist of 42 single family lots that would consist of split - level, split -entry homes. The request is to rezone the property to R2A zoning. The minimum home values proposed would be $140,000 to $150,000. Mr. Mattke gave a presentation on the drainage of the property. The developer has been in contact with the Rice Creek Watershed District and they support the developer's concept. The proposal is to enlarge and deepen the wetland on the east edge of the property to accommodate storm water run -off. The ditch on the south boundary of the property would drain towards the west. The ditch is proposed to be located on the center of the property line between the Parkview development and the north boundary of the Center Oaks development. The Center Oaks lots that would be affected would be resodded at developer's expense approximately 10' per lot. Orville Hughes, 1793 Center Street, asked how the drainage to his property would be affected. The developer responded that the drainage plan would not adversely affect his property. Mary Jo Helmbrecht, 1745 Main Street, asked if the ditch on the south side of the development could handle the run -off from this development and asked if the Public Works Director had commented on the tear drop design cul -de -sacs. The developer responded that their calculations show that the ditch could be regraded to properly drain the development and that the Public Works Director had recommended the tear drop design be retained in the plat design. The homes in this development would have a 1,050 square foot minimum on the ground floor. The garages would be 2.5 stalls minimum. The developer would pave the trails prior to home construction if needed, but he would prefer to pave the trail the following year. Linda Broussard - Vickers asked the City Engineer for a recommendation on tree planting or a berm along Centerville Road. Mr. Carlson commented that he would like to plant some 16 to 18 Norway Pines along Centerville Road and stagger a row of these trees on a 20' basis. Mr. Carlson indicated that he would like to place a monument on the east side of Centerville Road near the entrance to this development. Discussion occurred on the need to loop the watermain for this project. The looping would be coordinated in the developer's agreement. The loop would benefit this development as well as existing developments. Motion made by Linda Broussard - Vickers to close the public hearing, seconded by John Buckbee. Motion carried. Main Street /Dupre Road Bank Proposal - Roger Kolstad Mr. Roger Kolstad was in attendance to discuss a potential bank that would like to locate to the west of the entrance of the Eagle Pass development. Mr. Kolstad also explained his request to vacate Clearwater Road. The sketch plan that was presented showed that vehicles would enter and exit off of Dupre Road. At this time the County has not commented on this sketch plan. Mary Jo Helmbrecht, 1745 Main Street, mentioned she has a concern with residential homes being blocked in by commercial. She would like to see this area zoned for mixed use, the same as the downtown area as proposed in the Centerville Comprehensive Plan. '1 4 Mr. Kolstad indicated that the bank would like to be open by October 1, 1998. Mr. Kolstad estimated the building and land to be valued at $750,000. Mr. Kolstad estimated the taxes generated to be $33,600 per year. Marcel Rivard, 7072 Progress Road, has concerns that only a portion of Clearwater Road is being asked to be vacated. Jake Shoepe, 7084 Dupre Road, has concerns that traffic would increase on Dupre Road. He estimates that lots would sell more slowly in the Eagle Pass development if this plan was approved. Mr. Shoepe also had concerns regarding the safety of school children that walk to the elementary school. Mr. Shoepe is totally against the project and believes the outcry would be huge if Eagle Pass was fully developed. Mr. Shoepe suggested that maybe the Public Works site would be a more suitable location. John Buckbee indicated he has some concerns with spot zoning. He would encourage looking at a mixed use concept, Mary Jo Helmbrecht, 1745 Main Street, mentioned she liked the idea of a nice building coming into the downtown. Motion by John Buckbee, seconded by Linda Broussard- Vickers to close the public hearing for rezoning the potential site. Motion carried. VACATION OF CLEARWATER ROAD The public hearing for vacating Clearwater Road was opened. Marcel Rivard, 7072 Progress Road, mentioned he was in favor of vacating the entire right -of -way for Clearwater Road. Discussion occurred on the need to investigate that no platted lots would be land - locked. Motion by Linda Broussard- Vickers to close the public hearing for vacating Clearwater Road, seconded by John Buckbee. Motion carried. APPROVAL OF MINUTES Motion by Linda Broussard- Vickers to accept the December minutes, seconded by John Buckbee. Motion carried. Motion by Linda Broussard - Vickers to accept the January minutes, seconded by Kathy Welk. Motion carried. r i COUNTY BANK Mr. Greg Owens (County Bank President) and Mr. Mike Kraft (Schay Architects) were present to discuss their interest in locating a bank in the commercial strip south of Willow Glen. They are representing a nearly $55,000,000 community owned banking group. They would propose to construct a 3000 -4000 square foot facility. They are primarily interested in a site at the northwest corner of the intersection of 21st Avenue and Main Street. They would propose a small scale residential style bank situated on approximately 1.7 acres. The facility would have a number of community banking amenities. The possibility could exist for including leasable space in this building to other commercial users. The total land and building cost estimate would be in the range of $750,000 to $1,000,000. Linda Broussard- Vickers would have preferred to see a common road on the north boundary of this property to serve the commercial lots. John Buckbee questioned the building materials to be used for this facility. The response was block and brick. The opening date for this facility would be sometime in 1998. A question was raised if both banks could coexist. The response was that both institutions would have to do their own studies. PERFORMANCE AUTO Ken Strantz was present to seek input on constructing a building on the property owned by Sonny DaBruzzi (RO -SO contracting). Mr. Strantz would lease the building from DaBruzzi's. J. March indicated that a water service would have to be installed for a new building. Mr. Strantz will approach the owner to see if he is interested in connecting to City utilities. PARKVIEW ADDITION The City Engineer was present to discuss his review of this development. A meeting needs to be scheduled with the Eagle Pass developer's to coordinate the connection of the roadways in this development with Dupre Road in Eagle Pass. Discussion occurred on how the determination for a 7 ton roadway would be specified. Kathy Welk mentioned that as a member of Planning and Zoning she has concerns with making sure that the road specifications are adequate. { Motion by John Buckbee to accept the preliminary plat as presented, contingent upon the items being followed in the City Engineers memo dated January 30th, the Dupre Road connection being coordinated and the watermain looping resolved, seconded by Linda Broussard - Vickers. Motion carried. Motion by Linda Broussard- Vickers to table the rezoning request and vacation of Clearwater Road from Mr. Roger Kolstad, seconded by John Buckbee. Motion carried. TOBACCO ORDINANCE Motion by John Buckbee to set a public hearing to discuss the proposed tobacco ordinance, seconded by Kathy Welk. Motion carried. Motion by John Buckbee to set the date for the March Planning and Zoning as March 12 due to precinct caucuses, seconded by Linda Broussard- Vickers. Motion carried. Motion by John Buckbee to adjourn the meeting, seconded by Kathy Welk. Motion carried. Respectfully submitted, Jim March City Administrator