1. Continuation of Assessment Hearing
i �I11. APPEARANCES
� .1 Randy Hagerty - 1998 Recycling Budget
Carolyn Drude - (Ehlers & Associates) Financial Advisor
- Regarding Bond Issuances
YIV. CONSIDERATION OF MINUTES
/ VI April 29, 1998 Public Hearing Meeting Minutes
1.
PAYMENT OF CLAIMS
The City of Centerville April 22 - 30
The City of Centerville May 1 - 13
The Centennial Fire District April 22, 1998
The Centennial Fire District May 6, 1998
SET AGENDA
t/VII. PETITIONS AND COMPLAINTS
Lake Area Utility Request for Improvements
esolution 98 -09 Declaring Adequacy of Petition and Ordering
Preparation of Feasibility Report
l� Centerville Business Park Request for Improvements
Resolution 98 -10 Declaring Adequacy of Petition and Ordering
reparation of Feasibility Report
Residential Signage Petition
VIII. UNF ISHED BUSINESS
Action on Assessor at�Hearing
Resolutio 98 -08 Awarding the 20th Avenue Project
Resolutio 98 -11 Adopting Assessment Roll
�J 20th Avenue
Petition from Roger Kolsted
- Vacate Clearwater Road
- Rezone Property from Residential to Commercial
IN- NEW BUSINESS
Kelly's Korner Variance Request �S `
SRO -SO Watermain Extension
X. COMMITTEE REPORTS J
Planning and Zoning Member Resignation
XI. ADMINISTRATORS REPORT
XII. CONSENT AGENDA
1. Step 5, Grade 9 - Annual Performance Revieiv Public Works
Director/Building Inspector
XIII. ADJOURNMENT
WEEK SN RFsVSEW
Edition # 58 5 -1 -98 through 5 -08 -98
-----------------------------------------------------------------
------------------------------------------------------------------
Building permits issued this period = 6
Building permits issued YTD = 68
* The DaBruzzi's have decided that they want to continue to own
and lease their building. I was able to find a company that
would have appraised their building for $800. They had
recalculated their options and decided they would be further
ahead to continue to lease their current buildings.
* The Lessard's (owners of Lake Area Utilities) have petitioned
the City to provide municipal improvements to their property.
If the 20th Avenue project is awarded, they would like to
develop their property right away.
* Reminder! We will be meeting at the Chauncey Barett Gardens
for a tour at 5:00 prior to the next Council meeting.
* The public works department will be flushing hydrants next
week.
* Reminder! A workshop has been scheduled for May 20th to
discuss the engineering proposals. I am going to post this as
a special meeting. I have some recommendations for summer
staffing needs. I asked the office staff to log the following
information. The information was gathered over one weeks
time. We had also logged at the same time last year.
The following is presented for informational purposes.
CITY HALL '
142 1998
Incoming Calls 202 235
Outgoing Calls 85 94
Calls rolled to voicemail 16 29
Customers at Window 58 67
Date: ��✓�
Ce n terville 18 Main Street • Centemi(&, MN 55038
Established 1857 (612) 429 -3232 • jax (612) 429 -8629
1
d rti i� r� /J �Ytq`Sc ��
�N ✓
Nc7'r►��c/ //c d�.s.��cs /z.�yH�e
4 e
?
- IPP�
APPRAISAL OF PERFORMANCE
0, Kles
f
Position: 1
. /�Gl��ll'� -t 5I7cfc'L
Date:
Eight A;iryjor Areas of Responsibility
I. 'Organizational Management
II. FisrallMusizess Management
M. Program Development and Follow - Through
IV. Relationship with the Council
V. Long -Range Planning
VI. Relationship with Public and Private Sector Organizations
VII. Interagency Relations
VIII. Professional /Personal Development
Rating Responsibility Performance Standard
E I. Organizational Management Organizational Management
will be considered effective when
M a majority of the conditions have
been succesaWy fulfilled:
B
Plans and organizes the work a. Well qualified, promising persons
that goes into providing services are recnuted and employed,
established by past and current b. Employees are appropriately
decisions of the Council. placed, contributing to a high
retention rate.
PIans and orrnizes work that c. Supervisory techniques .
carries out policies adopted motivate high performance.
by the Council and developed d. Complaints to the Council air
by staff, not common.
e. The organization is aware
Evaluation and keeping up with of new trends in technology.
technology.
Selecting, leading, directing and
developing staff members.
Comments: Observations of Evaluators:
(Use this space :iso to indicate the impact upon the teamwork factor
Suggestions for Improvement- (Specific area($) that need strengthening)
Commendations: (Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator
Rating Responsibility Performance Standard
^ E II. Fiscal/Business Management Fiscal/Business Management
will be considered effective
_M when a majority of the
conditions have been success -
_B fully fulfilled:
Plans and organizes the prep- a. Budget preparation and
aration of an annual budget with management are thorough and
documentation, etc. that effective.
conforms to guidelines adopted b. Cost - effective measures are
by the Council. persistently pursued.
c. Financial reporting is timely
Plans, organizes and supervises and readily understandable.
most economic utilization of d. Physical facilities management
staff /materials /machinery. is efficient.
e. An adequate data base is established
Plans and organizes a system of and maintained.
reports for the Council that
provide most up -to -date data
available concerning expenditures
and revenue.
Plans and organizes maintenance of
facilities/buildings /equipment.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suggestions for Improvement (Specific area(s) that need strengthening)
Commendations: (Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator,
Rating Resoonsibility Performance Standard
_E III. Program Development Program planning techniques
and procedures will be
M considered effective when a
majority of the conditions have
_$ been successfully fulfilled:
Plans and organizes ongoing a. Ongoing programs and services
programs and services to the are fully responsive to the
organization. organization's needs.
b. Monitoring procedures are in
Plans and organizes work involved place and functioning well.
in researching program c. Measurable outcomes (to the
suggestions by Council and extent possible) are used to
staff and the reporting determine success in program
of the results of analysis, planning.
d. The Cleric Administrator can be depended upon
Maintains knowledge of current to follow through.
and innovative trends in the e. Makes most effective use of availacle,
area of services being provided Staff talent.
and incorporates that knowledge
in program suggestions and research.
Plans and organizes work assigned by
the Council so that it is completed with
dispatch and efficiency.
Plans, organizes and supervises implementation
of programs adopted or approved by the Council"
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suggestions for Improvement (Specific area(s) that need strengthening)
Commendations: (Area(s) of performance calling for praiselcommendation)
Comments from the Clerk Administrator-
Ratu Responsibility Performance Standard
_E N. Relationship with Council Relations with the Council will be
considered effective when a majority of the
conditions have been fulfilled
M
a. Materials, reports, presentations and
_B recommendations are clearly and
convincingly made.
Maintains effective communi- b. Communications are made in a timely,
cations, both verbal and forthright, and open manner.
written, with the Council. c. Responses to requests are made promptly
_ and completely.
Maintains availability to the s Recommendations appear to be thoroughly
Council either personally or researched.
through designated subordinates. e. Adequate information is provided to the
Council to make decisions.
Plans and organizes materials f. A system is in place to report to the
for presentations to the Council, Council current plans, activities, and events.
either verbally or written, in
the most concise. clear and
comprehensive manner possible.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suggestions for Improvement: (Specific area(s) that need strengthening)
Commendations: ( Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator-
Rahn¢ Responsibility Performance Standard
i E V. Long Range Planning Strategic planning will be considered
effective when a majority of the conditions
-M have been successfully fulfilled:
—B a. A well constructed long -range (strategic)
Plan is currently in operation.
b. Annual operational plans are carried out _
Maintains a knowledge of new technologies c. An on -going monitoring process is m
systcvs, methods, etc. in relation to operation to attain quality sssmance
services offered. in program and project implementation.
d. Program evaluation Pod personnel
Keeps the Council advised of new and evaluation are inter - related with the
impending legislation and developments strategic planning process.
in the area of public policy. e. A marketing strategy is developed and
monitored.
Plans and organizes a process of program
planning in anticipation of future needs
and problems.
Establishes and maintains an awareness of
developments occurring within other testing
centers or other jurisdictions that may
have cn impact on City activities.
Plans, organizes and maintains a process
for establishing goals to be approved
or adopted by the Council and monitoring
and status reporting.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Sucgestions for Improveme= (Specific area(s) that peed strengthening)
Commendations: (Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator:
Rating Resoonsibility Performance Standard
_E V1. Relationship with Public/ Communication services will be considered
Public Relations effective when a majority of the conditions
__M have been successfully fulfilled.
_B a. Contacts with the media are timely and
credible.
b. Publications are varied and consistently
well- received by the citizens. -
Plans, organizes and maintains training of
employees in contact with the public, either c. Feedback from the public and the
-by pbone or in person. - community leadership is positive.
Establishes and maintains an image
to the comma ty that represents
service, vitality and professionalism. d The City has a good image with comparable
organizations.
Establishes and maintains a liaison with private
non - governmental agencies, organizations and
groups involved in areas of concern that relate
to services or activities of the City.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suggestions for Imnrovemenr (Specific area(s) that need strengthening)
Commendations: (Atea(s) of performance calling for praise /commendation)
� L
Comments from the Clerk Administrator:
Rating Responsibility Performance Standard
E VII. Interagency Relations Intergovernmental relations will be
considered effective when a majority
of the conditions have been successfully
B fulfilled:
Maintains awareness of developments and a. Sufficient activity with professional
plans in other jurisdictions that may relate organizations.
to or affect the City. b. Regarded as leader by agency officials.
Establishes and maintains a liaison with c. Provides examples of good ideas from
other agencies in those areas of service other jurisdictions. -
that improve or enhance the City's programs. d. Positive relationship with other
agencies.
Maintains communications with govem- e. Good cooperation with cities,
mental jurisdictions with which the City counties, and state agencies.
is involved or interfaces. f. Good relationship with universities
and colleges.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suegestions for Improvement (Specific area(s) that need strengthening)
Commendations: (Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator:
Ra Responsibility Performance standard
E VIII. Professional/Personal Professional and personal
Development competencies will be considered
M effective when a majority of the
conditions have been successfully
B fulfilled.
Maintains awareness and value of a. Managemen techniques show evidences
broadening professional and personal of innovation, imagination and decisiveness.
development. b. Synergetic techniques are fostered.
c. Verbal communication is commendable.
Demonstrates imaginative leadership
initiatives.
Ability to build cohesiveness in Staff.
Decisiveness in leadership performance.
Effectiveness in verbal communications.
Comments: Observations of Evaluators:
(use this space also to indicate the impact upon the teamwork factor)
Suggestions for Improvement• (Specific area(s) that need strengthening)
Commendations: (Area(s) of performance calling for praise /commendation)
Comments from the Clerk Administrator-
05/13/98 11:33 FAX 612 571 9142 MINCO f�001
5112 /9 a
To: Centerville City Council
From: Russell Strehlow on behalf of Herman Strehlow
Begardlne: Assessments for proposed 20th Avenue water main and sanitary sewer
extension.
The purpose of thle lanor is to express opposition to assessments based on "From Footage ", "Area" end
"Area minus Wetlands" as discussed at the April 29th City Councll meeting.
It is my feeling that assessments, as mentioned above, would unfairly burden Herman Strehlow due to the
minimal benefit to him. Herman Strehlow has no Intention of hooking -up to the city sewer or water. City
sewer and water would not be of benefit for his intended use, which is farming. It is my understanding that
one cannot build on property that is designated as floodplain. Even if he, at some date, wanted to build
an his property there Is no guarantee that the various government agencies would allow it. Also the cast
of raising the property out of the floodplain, which 97% of it is considered, would be extremely high.
Should one of the above assessments be accepted, further action will be pursued.
TOTAL ASSESSMENTS
. TOTAL ASSESSMENTS '.TOTAL ASSESSMENTS TOTAL ASSESSMENTS...
TOTAL ASSESSMENTS
FRONT FOOTAGE AREA AREA minus WETLANDS AREA minus FLOODPLAIN
Front
Total Total
Total Total
Property - TYpa Footage
Assessment Area Assessment Area Assessment Area Assessment
OTHER PROPERTIES
Lake Area Utilities Commercial 650 $66,799.86 756,630 $73_361.53 737 ,730 , _$95,869 eq 480 460 $95,8%.59
__. _.---- - - - - -- 0 $5,792.35 0 $5,968.P 0 $4,916.25
_Kenka_ "A•• Commercial 0 —_ $16_672.09 - - -- - --
- Commer =al 0 32 _ 9 3,452.750 $1,2 63_56
Kenko "B° - - - - -_110.605- $3,485.14 0
_ - -- 142,287 0
320 =
-- - - -- Commerci 216,000 _ — --
__ Car penter — — _
Reel Manufacturing Commercial _ 340 $34,94 i 222,600 _ $21,582.91 139,553 $18,135.26 17,453 $3.480.2
Herman Strehlow Industrial 675
908,602 - - 458,041 $5 30,744
REHBEIN PROPERTIES
Clearwater Mdws OaBOI Commer 690 ________$70,910,62 1 96,04 2 _$19,007.89 1 96,04 2 $2 5,476.14_ 14,726 $293.
R ehbein Inc. "A" _ Commero 380 — — __ $39,052.23 276,624 _ _$ 26,820.98 121,592 __ 575,801.18 177,938 $35,482
Rehbein Inc. "B_' _Commercial 100 $70,276.90 286,175 $27,747 2 68794 ___53493045 _— 40 ,_145 $6,
—_.
— _ _ — —
- -- - - - 160 $16443.04 51,20 — _$4.964.4fi 5 1,202 __$6,65383__ 51202
Rehbein Inc. "C" - — Commercial_ — —
Industrial
Sheehy 350 $35969.15 850,390 $82,452.34 667925 _ - $8679851 _ 266,971 $53,23fi. 6
- $69 369.08 861 619 _ __ , -_ $85,480.25 673,706 _ _$67,549_76 3 89,209 _ $77,627.36
Joy Steve _ _ _ _ _ -_, _ -
�- -�— Gerald Rehbein Industrial 1360 $138,738.17 1,572,829 $152498.77 1,181,838 $153,582.51 1,570,334 $313,137.23
Total Assessments 5690 It. $612,233.10 6,218,713 sq, R. $612,233.10 4,638.708 sq. It. $612,233.10 3,039,262 sq. it. $612,233.10
ASSESSMENTS SUMMARY
$89,898.00 $89,898 00 / $89,898.00
Total City Contribution $88'898'00 p �( qqqq o Q �'� /,q� .
$ .90 /ZQ / Z(8, 95� _ .61.38 /Q GO �. /_ $20 .2 �(i " / / ' ,98.27
Total Assessments - Other Properties y Q D' * 6
Total Assessments • Rehbein $380,759.19
$398,971,71 $410,792.37 $500,634.83
TOTAL ESTIMATED PROJECT COST
31.10 $702,131.10 $702,131.10 5702,131.10
Ehlers & Associates, Inc.
LEADERS IN PUBLIC FINANCE
May 13, 1998
The City Council
Centerville, MN 55038
Re: 20th Avenue North Sanitary Sewer and Watermain Improvements
Attached are schedules indicating the following:
Exhibit 1.00: An estimated capitalization schedule for the issuance of $720,000 general
obligation bonds to finance the improvements on 20th Avenue North;
Exhibit 2.00: A proposed debt service schedule for maturing the bonds over a ten year
period, coordinating with the receipt of the special assessments over the same period of
time;
Exhibit 3.00: A spreadsheet reflecting the requirements of the principal and interest of
the bond issue, the 5% excess which is required by law to protect against delinquencies in
collection of assessments; the receipt of special assessments to be collected at 8% interest
on the unpaid balances from year to year, and the remaining non - assessed portion which
is expected to be paid from utility revenues.
We understand the City has received construction bids and has held an assessment hearing on
this project. If the Council feels the project is at an appropriate stage at tonight's meeting, we
would suggest that action be taken "to authorize City staff to work with Ehlers and Associates,
Inc. to solicit proposals for the sale of $720,000 General Obligation Bonds and report the results
to the Council for consideration on June I0, 1998."
Parkview Addition improvements: Our understanding is that the Parkview development
project is not quite at a stage where bonds could be issued based upon construction bids. This
makes it difficult to sell bonds for the Parkview project at the same time as the improvements on
20th Avenue North are financed. This could be accomplished if the Council was interested in
selling bonds based upon estimated costs rather than final construction bids.
We look forward to discussing the financing of these improvements this evening.
Si ly,
Carolyn Drude Kristin Hanson
3060 Centre Pointe Drive • Roseville, Minnesota 55113 -1105
(612) 697 -8500 • FAX (612) 697 -8555 • www.ehiers- ine.com
Affirmative Action /Equal Opportunity Employer
Charter Member of the National Association of Independent Public Finance Advisors
EXHIBIT 1.00
City of Centerville, Minnesota
Capitalization of 1998 G.O. Bonds May 13, 1998
Capitalization Schedule
Possible
$720,000
_ Total Bond Is sue _
Watermain Jnterconnection Costsl
Sitework, Street, and Storm Sewer $15,914
Trunk Watermain - including services 211,266
Engineering and Overhead Costs 74,970 i
Total Watermain Project Costs $302,150
Sanitary Sewer Costs:
Sitework, Street, and Storm Sewer $15,912
Trunk Sanitary Sewer including services 265,698
Engineering and Overhead Costs 92,9201
Total Sanitary Sewer Project Costs $374,530!
Legal, Fiscal,Administrative Costs 15,000
Cap Interest Est 19,385
Funds Needed — — $711,065
Plus Allowance for Discount Bidding
L_ (an interest cost - approximately $12.50 per 1000)_ _ 8,935
i
Total Bond Issue $720,0001
Prepared by Ehlers & Associates,lnc. cap98a.123
EXHIBIT 2.00
City of Centerville, Minnesota
$720,000 General Obligation Bonds of 1998
Proposed New Issue
DEBT SERVICE SCHEDULE
Date Principal Coupon Interest Total P +I FISCAL TOTAL
7/01/1998
2/01/1999 - - 19,385.63 19,385.63 19,385.63
8/01/1999 - - 16,616.25 16,616.25
2/01/2000 60,000.00 4.200% 16,616.25 76,616.25 93,232.50
8/01/2000 - - 15,356.25 15,356.25 -
2/01/2001 60,000.00 4.300% 15,356.25 75,356.25 90,712.50
8/01/2001 - - 14,066.25 14,066.25 -
2/01/2002 65,000.00 4.400% 14,066.25 79,066.25 93,132.50
8/01/2002 - - 12,636.25 12,636.25 -
2/01/2003 65,000.00 4.450% 12,636.25 77,636.25 90,272.50
8/01/2003 - - 11,190.00 11,190.00 -
2/01/2004 70,000.00 4.500% 11,190.00 81,190.00 92,380.00
8/0112004 - - 9,615.00 9,615.00
2/07/2005 75,000.00 4.600% 9,615.00 84,615.00 94,230.00
8/0172005 - - 7,890.00 7,890.00 -
2/01/2006 75,000.00 4.700% 7,890.00 62,890.00 90,780.00
8/01/2006 - - 6,127.50 6,127.50
2/01/2007 80,000.00 4.800% 6,127.50 86,127.50 92,255.00
8/01/2007 - - 4,207.50 4,207.50
2/01/2008 85,000.00 4.900% 4,207.50 89,207.50 93,415.00
8/01/2008 - - 2,125.00 2,125.00 -
4 2/01/2009 85,000.00 5.000% 2,125.00 87,125.00 89,250.00
I TOTAL 720,000.00 _ 219,045.63 939,045.63 -
YIELD STATISTICS
Bond Year Dollars ................................................. ............................... $4,635.00
AverageLife .......................................................... ............................... 6.438 Years
Average Coupon ................................................. ............................... 4.7259036%
Net Interest Cost ( NIC) ........................................ ............................... 4.9123113%
True Interest Cost (TIC) ........................................ ............................... 4.9381994%
Bond Yield for Arbitrage Purposes .................... ............................... 4.7129079%
All Inclusive Cost ( AIC) ........................................ ............................... 5.3114036%
IRS FORM 8038
Net Interest Cost ................................................... ............................... 4.7259
Weighted Average Maturity .............................. ............................... 6.438 Years
Ehlers & Associates FILE = CENTERVL -98 $720k go- SINGLE PURPOSE
Public Finance 5/12/1998 5:30 PM
City of Centerville, Minnesota EXHIBIT 3.00
$720,OOD G.O. Bonds, Series 1998
Bonds Dated: July 1, 1998
Less:
$612,233.10
Collect Maturity Total Capitalized P & I @ 8.00% Special
Year Year Principal Interest P &I Interest x 105% Assessments Non - Assessed
1998 /1999 19,385.63 19,386 19,386
1999 /2000 60,000 33,232.50 93,233 97,894,13 91,241 6,653.34
2000 /2001 60,000 30,712.50 90,713 95,248.13 91,241 4,007.34
2001 12002 65,000 28,132.50 93,133 97,789,13 91,241 6,548.34
2002 /2003 65,000 25,272.50 90,273 94,786.13 91,241 3,545.34
2003 /2004 70,000 22,380.00 92,380 96,999.00 91,241 5,758.21
2004 /2005 75,000 19,230.00 94,230 98,941.50 91,241 7,700.71
2005 /2006 75,000 15,780.DD 90,780 95,319.00 91,241 4,078.21
2006 /2007 80,000 12,255.00 92,255 96,867.75 91,241 5,626.96
2007 /2008 85,000 8,415.00 93,415 98,085.75 91,241 6,844.96
2008 /2009 85,000 4,250.00 89,250 93,712.50 91,241 2,471.71
Total $720,000 $939,046 $19,386 $965,643 $912,408 $53,235
Assumptions:
(1) Interest rates received week of May 11, 1998.
(2) Bonds dated July 1, 1998.
(3) Capitalized interest will be used to make first interest payment on February 1, 1999 (before assessments can be collected).
(4) Special assessments have been run as equal principal and interest payments at a rate of 8.00% over 10 years.
(5) Remaining non- assessed amounts would be paid from utility revenues.
Prepared by Ehlers and Associates 05/13/98 levycalc.123
RO -SO CONTRRCT?NG, INC TEL No.612- 429 -0471 May 13,98 14:21 No.004 P.01
PROPOSAL
R0 "SO Contracting, Inc.
Undaryround UU11t y Contractors
7137 20TH AVENUE NORTH • CENTERVILLE, MN 55038 • TELEPHONEt (612) 429 -2669 • FAX 429-0471
City or Centerville DATE 5 -13 -98 JOB No.
1860 main Street JOB NAMS DaBruzzi Properties
,
Centerville, mN 55038 LOCATION 7137 20th Avenue, Center
Attn: Paul
QUANTt7 Y
DESCRIPTION LNrr EXTE ION
Extend 6" water service to proRerty li e
1 A Live taR 10" x 6
1 EA 6" gate valve & box
40 FT 6" PVC watermain
85 LB Fittings
Sod Blvd. as needed
TOTAL A14OUNT OF WORK PROPOSED $5,100.00
RO -SO CONTRACTING, INC TEL No.612 -429 -0471 May 13,98 14:21 No.004 P.01
PROPOSAL
R 0 • SO contracNny, Inc.
Undorgmund Conlrmclom
7137 20TH AVENUE NORTH • CENTERVILLE, MN 55038 • TELEPHONE: (612) 428 -2889 • PAX 428.0471
City of Centerville DATE 5 -13 -98 JOB No.
1860 Main Street JOB NAME Daeruzzi Properties
,
Centerville, MN 55038 LACATION 7137 20th Avenue, Center
Attn= Paul
QOANPIN DESCRIPTION UNIT EXTENSION
Extend 6 water service to proj2erty li e
1 EA Live tap 10" x 6°
1 EA 6° gate valve & box
40 FT 6^ PVC watermain
85 LE Fittings
Sod Blvd. as needed
TOTAL AMOUNT OF WORK PROPOSED $5,100.00
f
Howard R. Green Company
CONSULTING ENGINEERS t67"U2LLB
$ N1fi.fJ ,gs7
CITY OF CENTERVILLE
PUBLIC HEARING
AND
ASSESSMENT HEARING
20th Avenue North
Sanitary Sewer
and
Watermain Improvements
April 29, 1998
6:00 p.m.
Centerville Council Chambers
Tom Wilharber, Mayor
Sanna Buckbee, Council Member
Mary Jo Helmbrecht, Council Member
Theresa Brenner, Council Member
Laura Powers, Council Member
Jim March, Administrator
Ry -Chel Gaustad, City Clerk
David Nyberg, City Engineer
260/085- 1803.sept
o
Howard R, Green Company _
CONSULTING ENGINEERS ' terville
s.wet�.e rest
AGENDA
I. CALL T O O RDER
II. PROPOSED IMPROVEMENTS
III. PROJECT COST
IV. PROJECT SCHEDULE
V. PROPOSED ASSESSMENTS
VI. PROPERTY OWNER QUESTIONS AND
COMMENTS
VII. ADJOURN
2601085- 1803.sept
Howard R, Green Company
CONSULTING ENGINEERS (At
�
PROPOSEDIMPROVEMENTS
• Hydrants
• Trunk Sanitary Sewer & Watermain
• Indivdual Services
• Lift Station
• Future Connection Points
• Erosion Control
• Turf Restoration
• Sodding
• Seeding
• Alternates
• East Watermain Extension
• SCADA/Telemetry System
• Directional Bore Forecmain
2601085- 1803.sept
0 600
w
0
' amore I / Z
Q
. - - - MAIN STREET .-- - C.S.A.u. NU. 14 3
x
r c�
x
w
PA K <
U RfA�
P I Z
u F
0 I I V
max SHEEHY I Y
O
Q
J
° 2
M °
Fi� N � 1 Z
HERMAN STREHLOW J
KENCO I I >
A JOYCE STEVENS
aAKS KENCO °
„
CARPE TER
REEL
ANUFAdTURIN Z J
Z GERALD REHBEIN J
REHBEIN
INC.
— A o
REN�EIN
° B „ "C CEDAR STREET
C I T Y O F L I N 0 L A K E S
mi
cwoasoc
7/97 20TH AVENUE IMPRaAMENTS 1
auw+: aic
PK seaoes -M �. a te aW lle ioranori MAP
ivv,rvm ,p8 nU.
® LEGEND:
0 600 — — EXISTING WATERMAIN
PROPOSED WATERMAIN
FUTURE LINO LAKES WATERMAIN w
n
o
I
0'. Ip•. C.S.A.H. NO. 14 c7 a
U 5 IAA
cr
(A
10'
° I a EXISTING 10 "WATERMAINv
a Y
` w
n 6 a I <
J
a Z
J
12" I z
� I �
5 I V
pP „
EAST WATERMAIN EXTENSION - ALTERNATE
Z
w
12" 16"
_ a POSSIBLE
METER VAULT
LOCATION
o
/ N
CEDAR STREET
C I T Y O F L I N 0 L A K E S
EXISTING 16" WATERMAIN
MJ 4/98
mi a1c 20TH AVENEUE NPROVEMENTS �]
PK 280 -085 -N HmW R Gmw Gnpary t2T7J'Lld¢ PROPOSED WATERMNN G
w+�o: aoe a0. w era
LEGEND:
{��►/� -- EXISTING FORCEMAIN
0 600 EXISTING SANITARY SEWER
-0-0- PROPOSED SANITARY SEWER
■ - - - • PROPOSED FORCEMAIN
ci
i
MAIN STREET ? C.S.A,H. NO. ?d
Z
2
p a
s ° US RIpL
e
vi
N
EXISTING
SANITARY a \ y
MANHOLE
J
O
PROPOSED FORCEMAIN r z
IT "d J
O
Z
■
■ o w
■ O O
r PROPOSED FORCEMAIIN
LS. / a9 r
■ z
O/ ,e � ■ o r
PROPOSED UFT STATION
PROPOSED SANITARY
i SEWER i
w
a
� o
N
— CEDAR STREET
C I T Y O F L I N 0 L A K E S
cmavx
20TH AVENEUE I
MJ 2
o• aeiF: r PK Z 2TU2 PROPOSED SWTARY SEWER
isvao.m: .ce rw. F17N9d� R7■■flG�N
I OP
Howard R, Green Company
CONSULTING ENGINEERS Llle
res�
TRUNK WATERMAIN CONSTRUCTION COSTS
Project Costs
20 Avenue $211
Sitework, Street, and Storm Sewer $ 15.913.12
TOTAL $227
Alternate A — East Watermain $ 45,620.00
Extension
TRUNK SANITARY SEWER CONSTRUCTION COSTS
Project Costs
20th Avenue $187,538.20
Forcemain and Lift Station $ 78
Sitework, Street, and Storm Sewer $ 15.913.13
TOTAL $281,611.33
TOTAL CONSTRUCTION COST $508,790.65
250 1085- M3.sept
Howard R. Green Company
CONSULTING ENGINEERS t2T"112L18
case
TOTAL PROJECT COSTS
WATERMAIN
20 TH Avenue $227,180.00
Overhead (38 %) $ 86,330.00
Sub -Total $313
SANITARY SEWER
20 Avenue $281,610.00
Overhead (38 %) $107,000.00
Sub -Total $388,610.00
TOTAL PROJECT COST $702,120.00
ALTERNATES
Alternate A — East Watermain Extension $45,620.00
Overhead (38 %) $17,335.00
Total Project Cost — Alternate A $62,955.00
Alternate B — SCADA/Telemetry System $ 86,456.00
Overhead (38 %) $ 32,855.00
Total Project Cost — Alternate B $119,311.00
Alternate C — Directional Bore Forcemain $ 27,390.00
Overhead (38 %) $ 10,400.00
Total — Project Cost Alternate C $37,790.00
2601085- 1803.sept
Howard R. Green Company
CONSULTING ENGINEERS t8?'T12Z12
... elobli 1467
PROJECT SCHEDULE
Public Informational Meeting February 26, 1998
Public Informational Meeting August 13, 1997
Public Hearing September 24, 1997
- "Ian Approval and Order Advertisement February 11, 1998
for Bids
Bid Opening April 21, 1998
Public Hearing and Assessment Hearing April 29, 1998
Council Awards Project May 13, 1998
Begin Construction May 1998
Complete Construction August 1998
260 /085- 1803.sept
WATERMAIN ASSESSMENTS
WATERMAIN ASSESSMENTS WA7ERMAINASSFSSMENTS '.WATERMAIN':ASSESSMENTS WATERMAIN ASSESSMENTS
(FRONT FOOTAGE) )AREA) (AREA minus WETLANDS) )AREA mines FLoODPLAIN)
Assessment rate' $48.21 Xronl toot $6.04703 /sq R $0.06102 is R 59.99726 (sit R
Front Watemlaln Watermam
Waterman : Watermaur
Property Type Footage Assesament Area Assessment Area Assessmenk Area Assessment
OTHER PROPERTIES
Lake Area Utflilies_ _ Commercial 650 _$31, 756,630 _ $35.587.46 737,730 $46,49 --- $ 46,728,1 1 2
Kenko "A " _ _Commercial 350 _$15,B72.09 123,152 i $5,792.35 94, $5,96 8.77 50,549 $4,916.25
_. Kenko "B__ Commercial _. _ 220 $10,605.32 _. 74,098 $3,4 85.14 54,7 $3,452.7 12,992 $1,263,56
_Carpenter C ommercial 320 _ $iS,425.92 216,00 $10,159.38 142,287 $8,967.44 0 $0,00
_ —_
Reel M anufacturing Commercial _ 340_ _ $18,390.04 222,600 $ 70,469.81 139,553 $11,795.13 17,453 $107.43
Herman Strehlow Industrial 675 $32,539.04 908,602 $42,735.34 458,041 $28,867.38 30,744 $2,990.07
REHBEIN PROPERTIES
Clearwater Mdws Outlot Co mmercial 690 $33,262.13 196,042 $9,220.67 196,042 $12,355.27 14,726 $1,432.2
Rehbein Inc. "A" Commercial 380 _ ._ _ $18,318.27 276.624 $73,010.78 727,592 _$7,663.16 177,938 $17,305.73
—.
Rehbein Inc. "B" Commercial _. _ 700 _. _ $4,820.60 _ 2416,175 $13,460.00 _ 268,794 $16 ,940.36 40,145 $3,90428
Rehbein Inc. "C" Commercial 160 $7,712.96 51,202 $2,408.24 51, 202 $3,226.93 51,202 $4,979.76
Sheehy _. _Industrial _. _ 350 _ $16,872.09 _ ._850,390 _ _ $39597.38 667,92S_ $42,095.02 2 66,971 _ $25,964.81
Joyce Stevens _ Induseial _ 675 _ $32539_04 _ _ 881 _ $41 ,4 66.21 _ _ 673,7 06__ $42,459. 389,289 _ $37,861.10
Gerald Rehbein Industrial 1350 $65,078.08 1,572,829 $73,976.70 1,181,836 $74,483.53 1,570,334 $152,726.05
Total Assessments 6260 R. $301,769.47 6,415,963 sq. R. $301,769.47 4,788,200 sq, R. $301,769.47 3,102,803 sq, ft $301,769.47
ASSESSMENTS SUMMARY
Total City Contribution $11,738.00 $11,738.00 $11,738.00 $11,738.00
Total Assessments - Other Properties $123,166.29 $108,229.47 $102,545.84 $57,595.43
Total Assessments - Rehbein $178,603.18 $193,540.00 $199,223.63 $244,174.04
TOTAL ESTIMATED PROJECT COST $313,507.47 $313,507.47 $313,507.47 $313,507,47
SANITARY SEWER ASSESSMENTS
SANITARY SEINER ASSE$$MENTS SANITARY SEWER ASSESSMENTS SANITARY SEWERASSE$SMENTS SANITARY SEWER ASSESSMENTS
- FRONT FOOTAGE AREA AREA minus WETLANDS AREAmfous FLOOOPLAIN
Assessment rate' $54.56 d'rontfoot $0.049921sgb 50.96693 /sq R; $014215 lsgR
front Sanitary SewerSanitary Sewa[ $an+tary Sewer Sanitary Sewer
Ptpperty Type Footage Assessment Arse•. Assessment Area Assessment i Area
Assessment
OTHER PROPERTIES
Lake Area Utili Commercial 650 $35,465.97_ 75 6,630 $37,774,07 737,730_ $49,375.48 450,_ $49,079.47
Kenko_'A" Commercial 0 $0.00 0 $0.00 0 $0.00 � 0 $0.00
Kenko "B" C ommercial 0 $0.00 _ 0 _ _ $0_00 0 $0.00 0 $0.00
Carpenter Commemial 320 $17,460.17 216,000 $10,783.60 142,287 $9,523.11 0 $000
- Reel Manufacturi - Commercial _ ___ 340 _ $18,551.43 2 22,600 _ $11,113.10 139,553 _ $9,340.13 _ 17,453 _ $1
Herman 51rehlow Industrial 675 $36,830.04 908,602 $45,361.13 458,041 $30,656.18 30,744 $3,140.53
REHSEIN PROPERTIES
Clearwater Maws Ou0ot C ommercial 6 $37_648.49__ 196,042 $ 9,787.22 196,042 _ $.13,120. 14,726 $1,504.2
Rehbein Inc. "A _Commercial 380_ $20,733.95 276,624 $13,810.20 121,592 $8,136.02 177,93 $18.176.54
Rehbein lnc "B" Commercial 100 $5,456.30 286 $14,28703 268,794 $17.990.09 40,145 $4,100.85
Rehbein Inc "C" Commercial ,. __ 160 $8,730.06 _ 51,202 _ $2,555. 21 51, $3,426.89 51,202 $5,230.34
. Sheehy _. Industrial 350 _ $19,097.06 _ 850,390 $42,454.95 667,925 $44_703.49 26 6,971 $27,2
Joyce S tevens Industrial 6 75 _ $36,830.04 _ 881,619 _ $44.014.03 _ _ 6 $45,090.40 389,289 __$39_766.26
Gerald Rehbein Industrial 1350 $73,66009 1,572,829 $78,522.07 1,181836 $79,098.98 1,570,334 $160,411.16
Total Assessments 5690 ft. $310,463.63 6,218,713 sq. ft. $310,463.63 4,638,708 sq. ft. $310,463.63 3,039,262 sq. ft. $310,463.63
ASSESSMENTS SUMMARY
Total City Contribution $78,160.00 $78,160.00 $78,160.00 $78,160.00
Total Assessments - Other Properties $108,307.61 $105,031.91 $98,894.86 $54,002.84
Total Assessments - Rehbein $202,156.02 $205,431.72 $211,568.75 $256,46079
TOTAL ESTIMATED PROJECT COST $366,623.63 $388,623.63 $388,623.63 $388,623.63
TOTAL ASSESSMENTS
TOTAL ASSESSMENTS :TOTALASSE$SMENTS TOTAL ASSESSMENTS TOTAL ASSESSMENTS
( FRONT FOOTAGE AREA AREAminus WETLANDS AREA rtlfnr7s FLOOOPLAIN
Front S TOW ! Total Total Total
Properly Type Footage Assessment Area Assessment Area Assessment Area Assessment
OTHER PROPERTIES
Lake Area Utilities Commercial 650 $66,799.86 756,630 $73,361.53 737,73 $95, 869.84 4 80,460 $95,807.59
Kenko "A" Commercial 0 $15,872.09 0 $5.792.35 0 $5,968.77 0 $4,916.25
_ Kenko =B" Commercial 0 $10,605.32 0 $3,485.14 0
_ $3,45275 0 $1,263.56
Carpenter Commercial 320 $32,686.08 216,000 $20,94298 142,287 $1 8,490.5 5 0 $0.00
Reel Manufacturing Commercial 340 $34_947_46 _ 222,600 $ 21,582,91 139,553 $18,135.26 17,453 §3,480.27
Haman Strehlow Industrial 675 $69,369.08 908,602 $88,09647 458,041 $59.523.56 30,744 $6,130.60
REHSEIN PROPERTIES
Clearwater Mdws OUeol Commercial 690 ` $70,910.62 _ 196,0 _ $1 9,007.89 196 $25,47814 14,726
Rehhein Inc A" Commercial 380 $39,052.23 276,624 $26,820.98 121,592 $15,801.18 177,938 $35,482.27
Rehbein Inc. B Commercial 100 $10,276.90 286,175 $27,747.03 288,794 $34,930_45 _ _40,145 $8,00505 ^ 24
Rehbein Inc 'C" Commercial 160 __ ` $ 16,443.04 _ 51,202 $4,964.46 51,202 $6,653.83 51,202 $10,210.09
Sheehy Industrial 350 $35,96915 850,390 $82,452.34 667,925 $86,798.51 266,971 $53,236.16
Joyce Stevens Industrial 675 $0%369.0B 881 619 $65,480.25 673,706 $67,54 389,289 $77,627.36
Gerald Rehbein Industrial 1350 $138,738.17 1,572,829 $152,498.77 1,181,836 $153,582.51 1,570,334 $313,13723
Total Assessments 5690 fl. $612,233.10 6,218,713 sq. g. $612,233.10 4,638,706 sq. ft. $612,233.10 3,039,262 sq. k. $612,233.10
ASSESSMENTS SUMMARY
Total City Contribution $89,898.00 $89,898.00 $B9,898.00 $89,898.00
Total Assessments - Other Properties $231,473.90 $213,261.36 $201,440.72 $111,598.27
Total Assessments - Rehbein $380,759.19 $398,971.71 $410,792.37 $500,634.83
TOTAL ESTIMATED PROJECT COST $702,131.10 $702,131.10 $702,131.10 $702,131.10
o
Howard R, Green Company
CONSULTING ENGINEERS (ate rville
rm r,5ee ras>
OTHER (NONASSESSMENT) COSTS
Water Availability Charge (WAC):
Water availability charges are the costs to connect to and become a
part of the Centerville water system. This charge pays for the costs
associated with water systems such as elevated storage, water
treatment facilities, and maintenance. The WAC charge is $2800 per
SAC unit.
Sewer Availability Charge (SAC):
Sewer availability charges are the costs to connect to and become a
)art of the Centerville sewer system. This charge pays for the costs
associated with the sewer system, such as lift station rehabilitation and
operation costs, sewer cleaning, and system maintenance. The SAC
charge is $1750 per SAC unit for the City of Centerville. The
Metropolitan Council of Environmental Services also issues a SAC
charge. This charge is $1000 per SAC unit.
Property Owner Costs:
The individual property owner will be responsible for the connection
between the property line and the individual building. Because of the
many different configurations, this cost varies considerably, and is
difficult to estimate. Property owners may also have costs associated
with taking individual well systems and septic systems out of service.
The current City Ordinance requires property owners to connect to the
sewer once sewer service is available. Property owners must connect
o the water system once a private well system is in need of repair.
2601085- 1803.sept
MEMORANDUM
DATE: May 1, 1998
TO: Honorable Mayor and Council
FROM: Ry -Chel Gaustad
RE: Randy Hagerty - 1998 Recycling Budget
Randy Hagerty will be present to discuss the proposed 1998 budget for recycling. The Council
has approved the Earth Day portion of the budget. Randy has added a line item
"Training/Seminars" in the amount of $3%
1998 CITY OF CENTERVILLE SCORE FUNDING PROPOSAL / REVIEW 4/7/98
1 st half = 7165.30 2nd half preliminary = 7165.30 total = 14330.60 RPH
1) NEWSLETTERS APROX. 3 PRINT 1900
POSTAGE 525
2) GARAGE SALE DAYS ADVERTIZING 1200
FLYERS PRINT 500
POSTAGE 175
SUPPLIES 150
3) EARTH DAY MINI RECYCLE BINS 675
SUPPLIES 150
4) CITY STAFF 1560
5) RECYCLING COORDINATOR 3640
TRAINING / SEMINARS 350
6) HAULER INCENTIVE (MINUMUM RECO MENDED BY COUNTY) 1000
7) OUSING (INCLUDES EDUCATION, CONTAINERS,
INCENTIVES). ��' �° "3
1000
12825
OTHER PROPOSED OR POSSI13LE ITEMS
1) RECYCLE AMERICAS DAY INCENTIVE
2) RECYCLED PARK BENCHES OR PLAYGROUND EQUIPMENT
3) COMMUNITY CONTAINER FOR ALUMINUM CANS
CITY OF CENTERVILLE
ASSESSMENT HEARING/WORKSHOP
WEDNESDAY, APRIL 29, 1998
Pursuant to due call and notice thereof, the City Council of the City of Centerville held an
assessment hearing and workshop on Wednesday, April 29, 1998 in the Council Chambers of City
Hall, 1880 Main Street.
PRESENT: Mayor Tom Wilharber
Council Members: Theresa Brenner
Mary Jo Helmbrecht
Sanna Buckbee
ABSENT: Councilmember Laura Powers
STAFF /CONSULTANT: Jim March, Administrator
Ry -Chel Gaustad, City Clerk
David Nyberg, City Engineer
Mayor Wilharber opened the executive session at 5:30 p.m.
Ms. Julie Wolfe (Minnesota Human Rights Department) gave an overview on a pending claim
against the City of Centerville. Ms. Wolfe requested authority to negotiate the best offer for the
City. In addition, the proceedings are confidential. However, the settlement is public.
Councilmember Buckbee moved and it was seconded to close the executive session at 5:55
p.m. Motion carried unanimously.
Mayor Wilharber opened the assessment public hearing at 6:05 p.m. Mayor Wilharber noted the
assessment public hearing will adjourn by 7:00 p.m because the Metropolitan Council has
scheduled a public hearing on the Centerville interceptor at 7:00 p.m.
Mr. Nyberg gave a brief overview of the proposed improvements on the 20th Avenue north
sanitary sewer and watermain improvements. The proposed sewer will operate by gravity to the
lift station. There will be turf restoration by way of seed and sod. Erosion control measures will
be implemented.
Mr. Nyberg noted the project bid was held on April 21, 1998. Bonine Excavating bid
$508,790.65. The bid process included an east watermain extension, SCADA/Telemetry System
and a directional bore forcemain. Mr. Nyberg addressed three exhibits for the 20th Avenue
improvements, first an overall proposed project area, the proposed watermain improvement and
last the proposed sanitary sewer improvement.
Mr. Nyberg added, the truck watermain construction cost project total is $227,179.32. However,
if alternate A "East Watermain Extension" is included in the project there will be an additional
$45,620.00 cost. The 20th Avenue trunk sanitary sewer construction costs will be $281,611.33
which includes the forcemain, lift station, sitework, street and storm sewer. Therefore, the total
construction cost will be $508.790.65. Furthermore, the total project costs including overhead,
without alternates will be $702.120.00.
Mr. Nyberg explained the proposed project schedule. Two public informational meetings were
held on both February 26, 1998 and August 13, 1997. A public hearing was held on September
24, 1997. The plans were approved and a petition to order advertisement bids was completed on
February 11, 1998. The City held the bid opening on April 21, 1998. Currently, the Council is
holding a public assessment hearing. The City Council is scheduled to award the project on May
13, 1998. The City will begin construction in May 1998 and the project should be complete by
August 1998.
Mr. Nyberg presented a synopsis of four watermain and sanitary sewer assessment scenarios: one
by property front footage, one by total area, one by area minus wetlands and one by area minus
floodplain. Mr. Nyberg informed the property owners the water availability charges (WAC) and
sewer availabity charges (SAC) are the costs to connect to and become a part of the Centerville
water system. The WAC charge pays for the cost associated with water systems such as elevated
storage, water treatment facilities and maintenance. The WAC charge is $2800 per unit. In
addition, the SAC charge pays for the costs associated with the system, such as lift station
rehabilitation, operation cost, sewer cleaning, and system maintenance. The SAC charge is $1750
per unit. Also, the Metropolitan Council (Environmental Services) issues a $1000 SAC charge,
per SAC unit. Finally, The individual property owner will be responsible for the connection
between the property line and the individual building. Because of the many different
configurations, this cost varies considerably, and is difficult to estimate. Mr. Nyberg added, the
property owners may have costs associated with taking individual well systems and septic systems
out of service.
Mr. Kenny & Ms. Colleen Carpenter (6885 -20th Avenue) stressed concerns about the assessment
and hook ups. Mr. Carpenter questioned, "Why is this project taking place ?" Mr. Nyberg
responded that Mr. Gerald Rehbein petitioned the City for improvements to his property east of
20th Avenue. Mr. Carpenter commented since Mr. Rehbein petitioned the City, he should pay the
cost for the improvements. Mr. Carpenter added, he invested $30,000 for his current well and
septic and both are in good condition. In addition, he is paying taxes on the installed
improvements. Therefore, "Why should he have to hook up when the sewer is installed ?"
Mr. March noted the current City Ordinance requires property owners to connect to the City
sewer, once sewer service is available. Property owners must connect to the water system once a
private well system is in need of repair. Also, the City can only assess what the improvements will
increase the value of the land. However, if a property owner disagrees with the city's estimated
2
valued increase, the property owner can have the property appraised and then contest the
assessment cost.
Mr_ Carpenter questioned, "Why does the property owner have the burden of proof?' Mr.
March explained the burden of proof lays on the Council and the engineer, to fairly distribute the
assessment cost.
Mr. Jack & Ms. Joyce Green (7007 20th Avenue) expressed concern about saving the treeline and
shrubs along their south property line. Mr. Nyberg noted one of the alternate bids (Bore
Forcemain) cost $18,000 more to redirect the forcemain, which is cost prohibited. However,
H.R. Green plans to explore other options to preserve the trees.
Councilmember Buckbee clarified letters contesting the assessments and letters of appeal are to be
submitted by the end of the public hearing. Mr. March suggested the Council consider continuing
the public hearing until the next Council meeting, May 13, 1998. Mr. Nyberg emphasized H.R.
Green tried to produce several alternatives to accommodate all parties involved.
Councilmember Buckbee noted if the City elected to assess the area minus floodplain and a hook
up was not available to 6885 -20th Avenue, then the Carpenters would not be assessed. Mr.
Nyberg agreed, because the property is considered in a floodplain.
Mr. Carpenter felt a stub should be put in place for future property use. Mayor Wilharber
confirmed fill can be brought to the floodplain properties and then the land could be taken out of
the floodplain. Therefore, the property value would increase and potentially be completely
developed. Mr. Nyberg agreed.
Moreover, Councilmember Buckbee stated if the Carpenters elected not to hook up now and in
the future they bring in fill, they could be assessed then for the stated improvements. Mr. Nyberg
agreed. Councilmember Buckbee concluded this would place the assessment burden on the larger
property owners.
Mr. Carpenter suggested the city place a connection to his property for future improvements.
Then the cost would be off set when the property is brought up to code.
Mr. Russel Strehlow (property legally identified as 24- 31 -22 -32 -0003) clarified the four
assessment options and the Council's time line to elect an assessment option. Mayor Wilharber
replied an appeal must be received by the City no later than 4:00 p.m. on Wednesday, May 13,
1998.
Mr. Strehlow questioned, "Does the area minus floodpWn include wetlands ?' Mr. Nyberg
replied no, the city has copies of the wetlands and they would not be included in the floodplain.
Councilmember Brenner moved and it was seconded to continue the 20th Avenue
3
assessment hearing until Wednesday. May 13 199$ Motion carried unanimously.
The Council elected to meet at 5:00 p.m. on Wednesday, May 13, 1998 to tour the Senior
Housing Facility.
Mr. March reported Anoka County requested Parkview Development allocate a sixty -foot
easement onto the properties west of Centerville Road. The Council concluded the sixty -foot
easement would hinder the property value in the Parkview Development.
Councilmember Buckbee moved and it was seconded to adjourn the meeting at 6:50 p.m. Motion
carried unanimously.
Respectfully Submitted,
Ry -Chel Gaustad, CMC
City Clerk
4
DATE: April 22, 1998
TO: City Council
City of Circle Pines
City Council
City of Centerville
City Council
City of Lino Lakes
FROM: Milo Bennett
SUBJECT: Ratification of expenditures
and approval for payment of
April expenses.
Your approval of April expenses as listed
on the attached copy of the check register,
checks #9498 - 9515, in the amount of
$ 4,233.56, is hereby requested.
MB /al
CC: 7 Circle Pines City Council
7 Centerville City Council
7 Lino Lakes City Council
2 File
04/22/98 at 11:31AM CENTENNIAL FIRE DISTRICT PAGE 1
BANK CHECK REGISTER
Checking account
04/22/98 TO 04/22/98
CK NO DATE TYPE PAID TO / DESCRIPTION CHECK, AMOUNT
-- - - - - -- -- - - - - -- - --- ----------- -------------- - - ---- ------ - - - - --
9498 04/22/98 AP -D AT &T 11.3?
9499 04/22/98 AP -D NATIONAL FIRE PROTECTION ASSOC 115.00
9500 04/22/98 AP -D CIRCLE PINF_S UTILITIES 206.66
9501 04/22/98 AP -D MINNESOTA U/C FUND 123.24
9502 04/22/98 AP -D IKON OFFICE SOLUTIONS 52.51
9503 04/22/98 AP -D B & S INDUSTRIES, INC. 465.16
9504 04/22/98 AP -D ANOKA ELECTRIC COOPERATIVE 124.49
9505 04/22/98 AP -D REMINGTON ELECTRIC 196.00
950E 04/22/98 AP -D FOOD -N -FUEL, INC. 4.40
9507 04/22/98 AP -D US WEST COMMUNICATIONS 309.42
9508 04/22/98 AP -D US WEST COMMUNICATIONS 82.04
9"19 04/22/98 AP -D US WEST COMMUNICATIONS 64.93
9010 04/22:/98 AP -D CCP INDUSTRIES 115.30
9511 04/22/98 AP -D EMERGENCY APPARATUS MAINT. 347.79
9512 04/22/98 AP -D NORTHERN STATES POWER COMPANY 400.45
9513 0412:2/98 AP -D BRIAN D. GRUDEM, O.D. 86.28
9514 04/22/98 AP -D DISTRICT MEMORIAL HOSPITAL 1,060.00
9515 04/22/98 AP -D POLAR CHEVROLET 468.57
TOTAL MANUAL CHECKS (M): 0.00
TOTAL COMPUTER CHECKS (C): 0.0
TOTAL DIRECT DISBURSEMENTS (D): 4,233.56
-------- - - - - --
--------------
TOTAL CHECKS: 4,233.56
DATE: May 6, 1998
TO: City Council
City of Circle Pines
City Council
City of Centerville
City Council
City of Lino Lakes
FROM: Milo Bennett
SUBJECT: Ratification of expenditures
and approval for payment of
May expenses.
Your approval of May expenses as listed
on the attached copy of the check register,
checks # 9516 - 9529, and check # 11727, in
the amount of $ 2,521.34, is hereby requested.
MB /al
cc: 7 Circle Pines City Council
7 Centerville City Council
7 Lino Lakes City Council
2 File
05/06/98 at 09:22AM CENTENNIAL FIRE DISTRICT PAGE 1
HANK CHECK REGISTER
Checking account
05/06/98 TO 05/06/98
C K NO DATE TYPE_ PAID TO / DESCRIPT.ION CHECK AMOUNT
9516 05/06/98 AP -D AIRTOUCH CELLULAR 8.10
5517 05/06/98 AP -D AIRTOUCH CELLULAR 123.02
:518 05/06/98 AP -D C.R. OFFICE PRODUCTS 21.30
509 05/06/98 AG --D KRISS PREMIUM PRODUCTS, INC. 270.00
9520 05/06/58 AP -D ANOKA- HENNEPIN TECH COLLEGE 240.00
9521 05/06/98 AP -D FOOD -N- FUEL, INC. 31.21
S522 05/06/98 AP -D TOM THUMB 28.44
5523 05/06/98 AP -D TWIN CITY GARAGE DOOR CO 145.12
9524 05/06/9.8 AP -D MINNEGASCO 202.5e
9 525 05/06/96 AP -D PARING; NETWORK OF MINNESOTA 72.6
9526 05/06/98 AP -D PEHL, HINSCHBERGER ASSOCIATES 27:.50
9527 05/06/98 AP -D OXYGEN SERVICE COMPANY, INC. 299.87
05/06/98 AP -D EMERGENCY APPARATUS MAINT. 445.19
9529 OS/06/98 AP -D ARTHUR E MOHLER 33.86
TOTAL MANUAL CHECKS (M): 0.00
TOTAL COMPUTER CHECKS (C) : 0.00
TOTAL DIRECT DISBURSEMENTS (D): 6,195.82
TOTAL. CHECKS: _ 2,195.02
May 01, 1998 12:57 PM CENTN41AL FIRE DISTRICT Page 1
PAYROLL COMPUTER CHECK REGISTER
# EMP NUM EMPLOYEE NAME DEPT SGC-SEC -NUM CHECKBOOK /ACCT GROSS PAY DEDUCTIONS NET PAY
11727 2360 MISCHY,E, KATHY FIR 470-86 -7213 x57.00 31.48 3325.52
--- ---- --- - - - - -- -- ---- --- - - -- --------------- -
TOTALS 3357.02 $31.48 $3"25.52'
PAYROLL SUMSIARY
FICA Social Security FICA Medicare
Federal Tax Withheld Withheld Eiployer Owed Withheld Enployer Owed Advanced EIC Gay®ents Made
$.00 $22.1'3 $22.13 $5.18 $5.18 $.00
TOTAL TAX LIABILITY $54.62
MEMORANDUM
DATE: May 8, 1998
TO: Honorable Mayor and Council
FROM: Ry -Chel Gaustad
RE: Lake Area Utility Request for Improvements
Mr. W.J. Lessard petitioned the city to provide improvements to Lake Area Utilities twenty acre
parcel on the west side of 20th Avenue north. Mr. Lessard is interested in developing the
property. Resolution 98 -09 supports ordering the preparation of a feasibility report.
Council action is desired.
CITY OF CENTERVILLE
Petition for Local Improvement
( 100% of property owners)
Centerville, Minnesota 19
To the City Council of the City of Centerville, Minnesota:
I, owner of real property abutting on Ste, between
line of Street and the
line of Street hereby petit n
that such streets and improvements be implemented by ajj e Q U4j 1]1(� ('DYr fYLI
pursuant to Minnesota Statutes, Chapter 429, and that the city assess the entir st
of the improvements against the property described below, and I hereby agreed to
pay the entire cost as apportioned by the city.
Signature of Owner Description of Property
fZ3 - 31- Za --P -0Q0 3
Examined, checked, and found to be in proper form and to be signed by the required
number of owners of property affected by the making of the improvement petitioned
for.
City Clerk
CITY OF CENTERVILLE
COUNTY OF ANOKA
STATE OF MINNESOTA
RESOLUTION 98 -09 DECLARING ADEQUACY OF PETITION AND ORDERING
PREPARATION OF FEASIBILITY REPORT
WHEREAS, a local improvement project has been initiated with a petition by 100% of the
affected property owners, and
WHEREAS, 100% of the benefited properties, legally described as the N 330 FT OF THE E 1/2
OF THE N1/2 OF THE NI/2 OF THE SE1 /4 OF SECTION 23 TWP 31 N AND THAT PRT
OF THE El /2 OF THE NI/2 OF THE N112 OF THE SE 1/4 OF SEC 23 TWP 31 RGE 22, have
requested sanitary sewer, storm sewer, streets and sidewalk - trailway improvements, and
WHEREAS, the petition for local improvement has been examined, checked and found to be in
proper form, and
WHEREAS, the petition has been determined to conform with the guidelines of M.S. 429.035,
and
WHEREAS, the Centerville City Council instructs the City Engineer to prepare a preliminary
report on the proposed improvements, and
WHEREAS, the report will indicate feasibility of proceeding with the improvement and
estimated cost, and
WHEREAS, the City Engineer will submit the feasibility report to the Centerville City Council
within a reasonable time.
NOW THEREFORE BE IT RESOLVED the Centerville City Council declares adequacy of the
submitted petition and now order preparation of the feasibility report.
Adopted this 13 day of May, 1998, by the Centerville City Council.
Thomas Wilharber, Mayor
ATTEST:
Ry -Chel Gaustad, CMC City Clerk
CITY OF CENTERVILLE
Petition for Local Improvement
(more than 100% of property owners)
Centerville, Minnesota 5- % , 199g
To the City Council of the City of Centerville, Minnesota:
We, all owners of real property abutting on co. 21 & co. 14 Street, between
line of Street and the
line of Street hereby petition
that such street be improved by R &R Leasing, inc. pursuant to Minnesota
Statutes, Chapter 429, and that the city assess the entire cost of the improvement
against our property described below, and we hereby agreed to pay the entire cost
as apportioned by the city.
Signature of Owner Description of Property
N W 1/4 of NW 1/4 of Sec. 24, T 31N,R22W
2. except Willow Glen
3.
4.
5.
6.
7.
Examined, checked, and found to be in proper form and to be signed by the required
number of owners of property affected by the making of the improvement petitioned
for.
City'Clerk
MAY -07 -1998 1736 - P.02/03
Howard R, Green Company
'1
s t
CONSULTING EN ^uINEERS y ImewcttteE+ras
Frrn:aAY bl6A
May 7, "998 cansurr,�g E grnee c
File: 26009im -0240
Mr. Jim March, Administrator
City of Centerville
1880 Main Street
Centerville, MN 55038
RE; CENTERVILLE BUSINESS PARK
PLANS AND SPECIFICATIONS FOR CITY UTILITIES
Dear Mr March:
As you requested, we are providing a cost estimate for preparation of plans and specifications
for watermain and sanitary sewer extensions Into the proposed Centerville Business Park.
We understand that this plat wilt be reviewed at the May Planning and Zoning meeting, If so
dlrected by the City Council, preparation of plans and specifications could begin immediately
after this meeting. If the developer of the parcel petitions for the improvements, we could also
begin wo-k on a feasibility study for the project at the direction of the City Council,
Sanitary sewer is available in the vicinity of the Business Park along Main Street and 20"
Avenue. Watermain is also available along the same corridors. Once the preliminary plat has
been approved, we can configure a proposed sanitary sewer and watermain alignment through
the Business Park that will provide sewer service and domestic and fire flow water supply to
each proposed lot and building.
We recommend that the sanitary and sewer trunk lines follow along Interior road corridors to the
greatest extent possible. We further recommend that the water and sewer system be Installed
and operated as City improvements, Interior streets can be maintained as private streets, much
like the Willow Glen development.
Our cost estimate for preparation of the plans and specifications for this project is $11,000-
$16,000, depending on revisions based on grading plan and plat changes. If the developer
petitions for the improvements under the 429 rules for public improvement projects, we would
complete a feasibility study for this work and have a public hearing prior to beginning work on
the plant
With your authorization, we will proceed with this work in the direction you provide to us. We
es0'mate that we could have plans and specifications for approval by the Centerville City Council
in about *our to sex weeks, depend! on on action by the developer. A feasibility study could be
ready for your review by the June 10t City Council meeting.
1326 Enar6y Park Drive - St. Pau., PAN 66108 • 612/644 -4389 fekx 6.2/644.9446 tall free 888.0368.4389
MAY -07 -1999 17:39 P.03
Mr. Jim March, Administrator
May 7, 1998
Page Two
We hope the above Information is helpful to the City of Centerville as the Business Park area is
planned for future development. As always, please do not hesitate to give us a call If you have
any questions.
Sincere y,
oward P, Green Company
1 A'�- 0 11 Y
David E. Nyberg, P.E.
Project Manager
DEN:tw
cc: Mr. Paul Palzer, Centerville Public Works
VproR60's1 m1091- 0711."y
i
Howard R. Green Company
CONSULTING ENGINEERS
TOTAL P.03
CITY OF CENTERVILLE
COUNTY OF ANOKA
STATE OF MINNESOTA
RESOLUTION 98 -10 DECLARING ADEQUACY OF PETITION AND ORDERING
PREPARATION OF FEASIBILITY REPORT
WHEREAS, a local improvement project has been initiated with a petition by 100% of the
affected property owners, and
WHEREAS, 100% of the benefited properties, legally described as the NW1 /4 OF SEC. 24,
T31 N, R22W except Willow Glen, have requested sanitary sewer, storm sewer, streets and
sidewalk - trailway improvements, and
WHEREAS, the petition for local improvement has been examined, checked and found to be in
proper form, and
WHEREAS, the petition has been determined to conform with the guidelines of M.S. 429.035,
and
WHEREAS, the Centerville City Council instructs the City Engineer to prepare a preliminary
report on the proposed improvements, and
WHEREAS, the report will indicate feasibility of proceeding with the improvement and
estimated cost, and
WHEREAS, the City Engineer will submit the feasibility report to the Centerville City Council
within a reasonable time.
NOW THEREFORE BE IT RESOLVED the Centerville City Council declares adequacy of the
submitted petition and now order preparation of the feasibility report.
Adopted this 13 day of May, 1998, by the Centerville City Council.
Thomas Wilharber, Mayor
ATTEST:
Ry -Chel Gaustad, CMC City Clerk
City of Centerville, 04/24/98
The residents of south Brian Dr, specifically south of the creek,
are concerned about the increasing speed and traffic on our
street.
As soon as the street widens south of the creek, the speed of
traffic increases proportionately. There are no signs to control
traffic on this part of the street
We would ask that;
1.) A speed limit 30mph be placed at the area where the road
widens, and
2.) A "Slow, Children Playing" sign also be placed in the same
general area.
The following residents of south Brian Drive ask for these signs
Lo be erected.
NAMES) ADDRESS PHONE #
1. CRT { I AZcN �uiFiw�li✓ rG J/ ljN'i 7i� �/t.
2. Z>�c:1- -w
3. 1 1 n�Y -f ��� �'l'1cti��n
- 7 0�1 3 6 � 1 � 7 �/
4.
5. M iK� G k:�ru •� ,ti:x `7c r3tz,
13. Ij
t�
7.
8.
MEMORANDUM
DATE: May 8, 1998
TO: Honorable Mayor and Council
FROM: Ry -Chel Gaustad
RE: Centerville Business Park Request for Improvements
Mr. Gerald Rehbein petitioned the city to provide improvements to the Centerville Business Park.
The proposed area is located north of Main Street and south of the Willow Glen development.
Resolution 98 -10 supports ordering the preparation of a feasibility report.
Council action is desired.
CITY OF CENTERVILLE
COUNTY OF ANOKA
STATE OF MINNESOTA
RESOLUTION 98 -08 ADOPTING 20TH AVENUE NORTH ASSESSMENT ROLL
WHEREAS, pursuant to proper notice duly given as required by law, the council has met and
heard and passed upon all objections to the proposed assessment for the improvement of 20th
Avenue north.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CENTERVILLE, MINNESOTA:
1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is
hereby accepted and shall constitute the special assessment against the lands named therein, and
each tract of land therein included is hereby found to be benefited by the proposed improvement
in the amount of the assessment levied against it.
2. Such assessment shall be payable in equal annual installments extending over a period of
years determined by the Council, the first of the installments to be payable on or before the first
Monday in January 1999, and shall bear interest at a rate percent per annum determined by the
Council, from the date of the adoption of this assessment resolution. To the first installment shall
be added interested on the entire assessment from he date of this resolution until December 31,
1998. To each subsequent installment when due shall be added interest for one year all unpaid
installments.
3. The owner of any property so assessed may, at any time prior to certification of the
assessment to the county auditor, pay the whole of the assessment on such property, with interest
accrued to the date of payment, to the city treasurer, except that no interest shall be charged if the
entire assessment is paid within 30 days from the adoption of this resolution; and he may at any
time thereafter, pay to the city treasurer the entire amount of the assessment remaining unpaid,
with interested accrued to December 31 of the year in which such payment is made. Such
payment must be made before November 15 or interest will be charged through December 31 of
the next succeeding year.
4. The clerk shall forthwith transmit a certified duplicate of this assessment to the county
auditor to be extended on the property tax lists of the county. Such assessments shall be collected
and paid over in the same manner as other municipal taxes.
Adopted by the council this 13 day of May, 1998.
Thomas Wilharber, Mayor
ATTEST:
Ry -Chel Gaustad, CMC City Clerk
CITY OF CENTERVILLE
COUNTY OF ANOKA
STATE OF MINNESOTA
RESOLUTION 98 -11 AWARDING THE 20TH AVENUE NORTH PROJECT
WHEREAS, the Centerville City Council authorized the preparation of the feasibility study on
December 11, 1996, and
WHEREAS, the Centerville City Council held a public informational meeting on August 13,
1997 and a public hearing on September 24, 1997, and
WHEREAS, after the public hearing plans and specifications were ordered, and
WHEREAS, the Centerville City Council approved the plans and specifications on February 11,
1998, and authorized advertisement for bids, and
WHEREAS, the bid opening occurred on April 21, 1998, and
WHEREAS, pursuant to proper notice duly given as required by law, the Council has met on
April 29, 1998 and conducted an assessment hearing, and
WHEREAS, on May 13, 1998 a continuation of hat assessment hearing has been conducted and
afforded an opportunity to all persons choosing to be heard, and
WHEREAS, the improvements as proposed by the City Engineer are ordered to be constructed,
and
WHEREAS, the plans and specifications for the improvements as prepared by the City Engineer
are approved, and
WHEREAS, the Centerville City Council declares its official intent to reimburse the costs of
improvements, now estimated to be $508,790.65, from the proceeds of tax exempt bonds to be
issued by the city.
NOW, THEREFORE BE IT RESOLVED pursuant to an advertisement for bids for the
improvement, bids were received, opened and tabulated according to law. And it appears that
Bonine Excavating of Minnesota is the lowest responsible bidder.
BE IT FURTHER RESOLVED it is authorized and directed that the city enter into a contract
with Bonine Excavating of Minnesota for the improvements of the 20th Avenue North sanitary
sewer and watermain improvements according to the plans and specifications therefore approved
by the Centerville City Council and on file in the office of the city clerk.
Adopted by the City Council of the City of Centerville this 13th day of May, 1998.
Thomas Wilharber, Mayor
ATTEST:
Ry -Chel Gaustad, CMC City Clerk
OP
Howard R. Green Company,
CONSULTING ENGINEERS F' MBA
C. nsalt#V Engnvam
May 8, 7998
File: 280085m•0077
Mr, Jim March, Administrator
City of Centerville
1880 Main Street
Centerville, MN 55038
RE- 20n' AVENUE TRUNK SANITARY SEWER
AND WATERMAIN.IMPROVEMENTS
Dear Mr. March:
This correspondence is provided to update you on the status of several issues surrounding the
above - referenced project, As you know, we opened bids for this project on April 21 Boriine
Excavating, Inc., was the low bidder on the project.
Below are summaries of our progress to date on the issues of easements and assessments.
Easements
We are ocntinuing to negotiate easements with property owners. All of the easements, with the
exception of the forcemain easement along the Lake Area Utility property, should be signed and
in hand prior to the May 19 City Council meeting. Mr, W J. Lessard will be in attendance at
the May 13' Council meeting to discuss his proposed assessment an the project. We need to
acquire an easement from Mr. Lessard to install the forcemaln according to the plan. We hope
to come to an agreement on his easement soon.
If an agreement with Mr. Lessard cannot be reached regarding his easement, an alternavve
would be to install a temporary forcemain connection with the sanitary sewer manhole at the
south end of the Industrial Park. A permanent forcemain connection to the Brian Drive sanitary
sewer would occur in the future when the Lake Area Utllky property Is developed. Another
alternative would be to install the forcemain closer to the Stevens property, resulting in
significant tree loss. We hope to avoid both of these situations and come to terms with Mr.
Lessard on the proposed easement.
We recommend that the project not be awarded until the easement issues are resolved It
would be appropriate to award the project contingent upon receiving the required easements, so
that construction can begin immediately after all the easements are acquired.
£0.c0Id 95 �LT ��866L- 80 -hF1W
£0'd '1Fl101
Mr. Jim Maroh, Administrator
May 8, 1998
Page Two
Assessments
The Assessment Hearing for the project was opened on April 29, 1998. Two property ownsrs
were in attendance at the meeting. Mr. Ken Carpenter and his wife, representing Carpenter
Auto Body, and Mrs, Joyce Green Stevens, and her husband, Jack Green, expressed their
concern about the project during the hearing. No action was taken toward adoption of an
assessment roll at the hearing. The assessment hearing was continued until the regular City
Council meeting on May 13". We recommend adoption of an assessment roll at the May '3
meeting, prior to award of the project,
Summary
In conclusion, we recommend an award of the project If an assessment roll is adopted at the
May 13 City Council meeting. if the easements are not completed prior to the May 1 e Council
meeting, we would then recommend an award or the project contingent upon receiving the
required easements for the project.
We will be in attendance at the May 13'" City Council meeting to discuss this project and me
above Issues. If you have any questions before the meeting, please give me a call.
Sincerely,
oward R. Green Company
David E. Nyberg, P.E.
Project Manager
DEN:tw
cc: Mr. Paul Palzer, Centerville Public Works
o;�proJ�sDWSmastaeo3.m�y '
Howard R, Green Company
CONSULTING ENGINEERS
20 'd 9S:Li 8665- 80 -.WW
MEMORANDUM
DATE: May 8, 1998
TO: Honorable Mayor and Council
FROM: Ry -Chel Gaustad
RE: Petition from Roger Kolsted
On Tuesday, May 5, the Planning Commission readdressed the petition from Roger Kolsted to
vacate Clearwater Road and to rezone the property from residential to commercial. The Planning
Commission heard support and opposition to the request. The Planning Commission made the
following recommendation:
Buckbee moved and it was seconded to recommend to the Council to deny the request
because of spot zoning concerns and to wait for the downtown revitalization results. Motion
carried unanimously.
Mr. Kolsted requested this item be tabled, not denied until the Design Team has an opportunity to
review the city schemes and make recommendation to the Council.
Council action is desired.
r
i
ARTIST RENDERING
DEC - 30 - 1997 14:11 CLUTS,O'BRIEN,STROTHER 941 4951 P.03/03
°l�l l I�� o�li lli Illll'IIIII IIIII L
_1
L
i
z
i
J
. �._._____- _. -_ -___
Rim
___ _____.__________--- --- ________. ______
(0),IYJYA)
TOTRL P.03
DEC - 30-1997 14:11 CLUTS.O'HRIEN,STROTHER 941 4951 P.02iO3
S
� r
I
i
�- - -- - -- - - -- ------ - - - - -- t
--------------------------------
r I I
I I I
---------- -----------
`-- --- ---- -- ------- ObDN H31HM21d37J
r
DEC - 30 -1997 14:11 CLUTS,O'BRIEN,STROTHER 941 4951 P.03 /03
������ 11� I Allllll IIIIIIIIlIIIIII � � � it
_ l
Ron
3WW
__
I ,______ ________________ „- -._�__ _ -._ ______
__ 1 1
j
I I
I - I
1 1 I I
I I 1
J
_ -_.-
-^••�_ - -••� -- -•- O1R'llf 21.31YN,NY37J
l �
I,
TOTAL P.03
r
City of Centerville
Main Street
Centerville, MN 55038
Dear P & Z and Council Members:
Together with the rezoning of the Paulsen Property, we hereby request the vacation of
that part of the Clearwater road abutting (Lots 1 through 6 block 2) and (the revised west 100' of
that part of lot 10 and Sub. 448.)
Property should be divided evenly among the adjoining land owners.
Respe ly submitted
Roger Kolstad (Agent)
J.D.O,B. Inc.
Adjoining Land Owners
(1). Lots 3, 4, 5, 6 Block 2
Myra G `Mills
(2) Lots 1, 2 Block 2
(3) Revised West 100' of lot #10 J QC(n
Ric and P. & Linda L. Paulsen
J .�t ter._y * ffe 1880 Main Street • Center d[e, M-N 55038
Estabfisha1857 CITY OF CENTERVILLE (612)429 -3232 • Fax(612)429.8629
APPLICATION FOR VARIANCE OR REZONING
VARIANCE FE o z6O.Oo
x
REZONING DATE PAID
STREET LOCATION OF`PROPERTY: 1764 Main Street
LEGAL DESCRIPTION OF PROPERTY:
Aud. Sub. #48 Revised the west 100 feet of that part of lot 10 Aud. Su
#48.
SIZE OF PARCEL (S) loo' x 299.59
(Principal)
PROPERTY OWNER: J.D.O.s. Inc. John Obrien PHONE# 873 -2500
FEE OWNER: Rick & Linda Paulson
ADDRESS: 1764 Main Street Centerville
APPLICANT'S INTEREST IN PROPERTY:
FEE OWNER CONTRACT PURCHASER
LEASE HOLDER OPTION TO PURCHASE x
DESCRIPTION OF REQUEST: Rezone from resident to co
use.
REASON FOR REQUEST:
Raise existing home and build bank on sub property.
Lca Plus any additional costs
r Roger Kolsta Agent incurred for engineering,
legal fees, publication or
Signature of property OwWek Richard or Linda other requirements.
I _ _�78 Paulson
Date
MEMORANDUM
DATE: May 8, 1998
TO: Honorable Mayor and Council
FROM: Ry -Chel Gaustad
RE: Kelly's Korner Variance Request
The Planning Commission made the following recommendation to the Council on the above -
mentioned matter.
Broussard- Vickers moved and it was seconded to recommend approval of the variance as
requested due to the current ADA concerns. In addition, the Planning Commission recommended
Kelly's Korner enclose their trash container. Motion carried unanimously.
Council action is desired.
e ter v Z CCe 1880 Main Street • Centervil(e, 91191( 55038
E'staffiuhed1857 CITY OF CENTERVILLE (612) 429 -3232 • Fax(612)429 -8629
APPLICATION FOR VARIANCE OR REZONING
ov
VARIANCE FEE / 9J r
REZONING DATE PAID / Za 9 Fi
STREET LOCATION OF PROPERTY: 2Q / E -
LEGAL DESCR��I OF PROPERTY:
/ , � � f yt� . Tn
SIZE OF PARCEL (S)
PROPERTY OWNER: //(/ /! /eIm l� / 5 f /C PHONE # & -)) 4
FEE OWNER:
ADDRESS:
APPLICANT'S INTEREST IN PROPERTY:
FEE OWNER CONTRACT PURCHASER
LEASE HOLDER / OPTION TO PURCHASE
DESCRIPTION OF REQUEST:
REASON FOR REQUEST:
* Plus any additional costs
Signature of applic t incurred for engineering,
legal fees, publication or
Signat e o property owner other requirements.
L/ �d p
Da e
AFFIDAVIT OF PUBLICATION
STATE OF MINNESOTA ss MAY 5 1998
COUNTY OF WASHINGTON
A M 4 Jan C being duly sworn, on oath says the he or she is
the authorized agent and employee of the publisher of the newspaper known as The
STATE COUNTY OF N OKRA Times, and has full knowled e of the facts which are stated below:
courrrY of ANOxA 9
C R (A) The newspaper has complied with all of the requirements constituting
NOTI CE E OF F VA RIAN CE
PUBLIC HEARING BEFORE qualification as a legal newspaper, as provided by Minnesota Statue 331A.02, 331A.07
THE
PLANNING AND ZONING and other applicable laws as amended
COMMISSION
PLEASE TAKE NOTICE that the (B) The printed public notice
Centerville Planning Commission will hold
a public hearing and make a which is attached was cut from the columns of said newspaper, and published once
recommendation to the City Council on the
following matter: each week, for two
ITEM: VARIANCE successive weeks; it was first published on
PETITIONER: WILLIAM BESIK d.b.a.
Kelly's Romer _ Thursday the 23 day of
LOCATION: 7098 CENTERVILLE
ROAD
The petitioner request to const an _ April 19 98 and was thereafter printed and
addition to his building for non - conformity.
THE PROPERTY MAY BE DESCRIBED -
LEGALLY AS: Centerville — Village of, published each week to and including _ Thursday
Lot 7 & W so ft Of Lot 8 Bits 5 Centerville - -
- Village. The said hearing will take place
on Tuesday, May 5, 1998 at the Centerville the ' 30 day of April 19 98
City Hall, 1880 Main Street in the Council,
Chamber beginning at 7:00 p.m. or shortly �� ) •
ther r. The City Hall is ADA _ BY x
Ac le. Request for hearing assistance wr
devices or sign language interpreter mustbe Administrative Assistant
received before 4:00 p.m. April 30, 1998. TITLE'
All persons interested are invited attend Subscribed and sworn to before me on
and be heard. you may call the City y Clerks
Office at (612) 429 -3232 if you have any
questions or need additional information. this Thirty
April 17, 1998
/s/Ry -Chef Gaustad day of April 1 19 98
bcde CMC City Clerk
a T H E TIM rstuvwzyz
in
shed in THETIM
(Published
April 23, 30, 1998)S
Notary Public
(Notari HOWARD D. LESTRUD
NOTARY PUBLIC - MINNESOTA
- WASHINGTON COUNTY
MY COMM EXPIRES 6312000
(1) Lowest classified rate paid by commercial
users for comparable space S 6 col_ inch
(2) Maximum rate allowed by law for the above
matter S GO col. inch
(3) Rate actually charged for the above matter S �� col, inch
(4) Rate actually charged for additional
insertions S col. inch
MAY 04 1 % 1136 FR ZELLE & LARSON 1 612 336 9100 TO 94296629 P.02i02
May 4, 1998
TO; CITY OF CENTERV
ATTENTION: AWLNISTRATOR
RE; RESIGNATION FROM PLANNING & ZONING COMMISSION
Please accept this as ray resignation from the Planning and Zoning Commission. This decision is
necessary at this time because my family and work obligations are increasing and I am not able to
serve this board in the capacity that I should be. I thank all of you for all ofthe leaming experiences
I have had over the 11 years that I have served on the commission.
Thank you.
Kafiri A. Ver
TOTAL PAGE.02 MM
s�-
te ryzffe
1880 Main S treet • Centervi((e, MN 55038
f St[1bksh d 185/ (612) 429 -3232 • fax (612) 429.8629
April 24, 1998
Maple Leaf Insurance Agency
Ms. Mady Reiter
4220 Central Avenue N.E.
Columbia Heights, MN 55421
Dear Ms. Reiter:
The Centerville City Council would like to thank you for the opportunity to meet and visit with
you on April 8, 1998. During this meeting you requested to be notified of whom the City of
Centerville selected as the Tri- Cities Police Commission Task Force Representatives.
During the April 22, 1998 Council meeting the City Council selected Mr. Dale Summerhaus, 7221
Clear Ridge (426 -3822) and Mr. Robert Wright, 7137 Brian Drive (426 -5794) to fill the two
Centerville representative vacancies. Ms. Mary Jo Helmbrecht, 1745 Main Street (653 -1118) will
serve as an alternate.
On behalf of the City of Centerville it is a great pleasure to congratulate you on your recent
designation as the Tri -City Police Commission Task Force Chairperson.
The commitment which you made to the Tri- Cities Police Commission Task Force attests to the
dedication you have for your profession, local government and community. This commitment
exemplifies your desire to continually enrich and share your knowledge and skills.
I hope you continue with your professional endeavors and that you enjoy the adventure.
Best wishes for your continued success.
Sincerely,
Ry -Chel Gaustad, CMC
City Clerk
cc: Honorable Mayor Tom Wilharber and Council of the City of Centerville
Mr. James Keinath, City of Circle Pines Administrator
Mr. Alex Wikstrom, City of Lexington City Coordinator
sx'
?'3
fi eh teryiCle 1880 Main S treet • C enterviLfe, MN 5503
Established 1857 (612) 429 -3232 • FaX (612) 429 -8629
CITY OF CENTERVILLE
ANOKA COUNTY, MINNESOTA
NOTICE OF WORKSHOP TOUR
PLEASE TAKE NOTICE that the City Council of the City of Centerville will hold a
Workshop tour at the Centerville Senior Housing Facility, 7026 Centerville Road and then the
regular City Council meeting will be held at 6:00 p.m. at City Hall in the Council Chambers, 1880
Main Street. The said workshop tour will take place on May 13, 1998 beginning at 5:00 p.m. The
purpose of the workshop is to tour the senior facility and to discuss other city business. You may
call City Halt at 429 -3232 if you have any questions.
DATE: April 27, 1998
a _
Ry- het Gaustad, CMC City Clerk
CITY OF CENTERVILLE
ANOKA COUNTY, MINNESOTA
NOTICE OF WORKSHOP
PLEASE TAKE NOTICE that the City Council of the City of Centerville will hold a
Workshop at City Hall in the Council Chambers, 1880 Main Street. The said Workshop will take
place on May 20, 1998 beginning at 6:00 p.m. The purpose of the workshop is to consider
engineering proposals and to discuss other city business. City Hall is ADA accessible. Requests
for hearing assistance devices or a sign language interpreter must be received before May 1, 1998.
Such a request may be made by telephone (429 -3232) or fax (429 - 8629). All interested persons
are invited to attend and to be heard. You may call City Hall at 429 -3232 if you have any
questions.
DATE: ril ?7, 1998
Ry- hel Gaustad, CMC City Clerk
PUBLIC NOTICE
CITY OF CENTERVILLE
COUNTY OF ANOKA
STATE OF MINNESOTA
TO WHOM IT MAY CONCERN:
Notice is hereby given the Tri City Task Force Subcommittee will be meeting on
Monday, May 11, 1998, at the Lexington City Hall, 4175 Lovell Road, Suite 140, Lexington.
The purpose of the meeting is to review the funding formula.
DATE: May 7, 1998
Ry -Chel Gaustad, CMC
City Clerk