Loading...
HomeMy WebLinkAbout1997-10-08 - CC Work Shop Packet - (Admin.) CITY COUNCIL MEETING AGENDA OCTOBER 8, 1997 xxxxxxxxxxxxxxxx .00 PM WORKSHOP*xxxxxxxxxxxxxxwxxxxxxxxxx I. C ALL TO ORDER V / Roll Call H. CONSIDERATION OF MINUTES August 27, 1997 Council Meeting Minutes September 4, 1997 Budget Meeting Minutes HI. MENT OF CLAIMS City of Centerville September 25 - 30 City of Centerville October 1 - 8 C. Centennial Fire District Yl v SET AGENDA �(V PETITIONS AND COMPLAINTS APPEARANCES VII. UNFINISHED BUSINESS K busing V Utility plans / Resolution 97 -21 - Consideration to approve issuingGO bonds Odyssey Lures Development Agreement Eagle Pass Construction Issues Engineering Review Lakeland Hills Pro' ct Review VIII. NEW BUSINESS / Public Works Staffing United Waste Billing Consider Liquor License approval for Waterworks This is a late addition to the agenda - information will be distributed at the Council eeting. G r d; (1 COMMITTEE REPORTS X. CONSENT AGENDA XI. ADJOURNMENT CITY OF CENTERVILLE CITY COUNCIL MEETING Thursday, September 4, 1997 Pursuant to due call and notice thereof, the City Council of the City of Centerville held a workshop on September 4, 1997 at City Hall. Mayor Wilharber called the workshop to order at 5:00 p.m. PRESENT: Tom Wilharber, Mayor Mary Jo Helmbrecht, Councilmember Theresa Brenner, Councilmember ABSENT: Sanna Buckbee, Councilmember Laura Powers, Councilmember STAFF: Jim March, City Administrator Paul Palzer, Public Works Director Troy Bonkowske, Intern WORKSHOP: Budget Proposal City Administrator March pointed out this workshop was a preliminary discussion of next year's operating budget. Mr. March then gave a summary of the budgeted line items. Councilmember Helmbrecht asked Staff the amounts the City directly pays for engineering fees. Mr. March responded most of the engineering costs are paid by the developer. Non - development and related items such as maintain extensions and exploring a new water tower are city initiated expenses. Also, Mr. March explained the slow progress of the water interconnection plans with Lino Lakes. Councilmember Brenner asked Staff the status of the engineering review process. Mayor Wilharber commented the review process is going to be lengthy and challenging due to several development projects recently occurring within the City. Councilmember Helmbrecht questioned Staff what items fall under capital outlays and the usage of the municipal tanker. Mr. March and Palzer explained smaller equipment expenditures are included in the capital outlays and not covered as a major capital improvement. Mr. Palzer further suggested the City might want to sell the tanker before deteriorations accelerate. Mayor Wilharber asked Mr. Palzer how he determined the estimated land acquisition and construction costs for a future public works building. Mr. Palzer replied the land acquisition figure depended on the location. Mayor Wilharber questioned whether current municipal water and sewer rates are adequate and asked Staff to investigate charges. Mayor Wilharber asked for an explanation of Council/Staff conference fees. Mr. March responded that the fees were based on the previous year's expenditures. Also, Wilharber questioned the quality of legal service the City receives. Staff also questioned the service and agreed the accuracy of legal fees should be investigated. Mayor Wilharber suggested funding for the 1987 Street and Municipal Building bonds be increased $10,000 each to further reduce balances. Councilmember Helmbrecht agreed. Mr. March stated that he would talk to the auditors about the impacts of such increases. Councilmember Brenner asked Staff about costs for long term maintenance to the City's roads. Mr. Bonkowske explained city engineers have scheduled sealcoating for certain roads in 1999. Mayor Wilharber questioned the budget increases to the Economic Development Commission and the Downtown Revitalization effort. Mr. March explained that certifying the downtown into a redevelopment district would help restoring businesses and revitalizing the whole area. Councilmember Brenner agreed. An informal prioritization of the items in the Capital Improvements Plan was completed. Mayor Wilharber and Councilmember Helmbrecht again suggested the need to increase the 1987 Street and Municipal Building bonds and questioned what effect the increase would have on the City's tax rate compared to other Anoka County cities. Mr. March responded he would add the additional amounts as discussed in the preliminary budget for the initial certification process. Councilmember Brenner asked that $3,500.00 be added to the Economic Development Commission budget to compensate for the Minnesota Design Team. Councilmember Helmbrecht and Mayor Wilharber agreed. Councilmember Brenner moved to adjourn workshop. Seconded by Helmbrecht. Motion carried unanimously. Meeting adjourned 7:25 p.m. Respectfully submitted, Troy Bonkowske Intern MEMO DATE October 2, 1997 TO Honorable Mayor and Council FROM Jim March RE Senior Housing In your packets is a schedule for the utility bidding for the Chauncey Barett Gardens senior housing project. We need to have a motion to authorize the project for advertisement. Also included in your packet is a copy of Resolution 97 -21. This resolution pledges the City General Obligation backing for the bonds to be issued for the project. o 0 Howard R, Green Company AS(tT FE$6VMSI CONSULTING ENGINEERS Formerly MSA .' consulting Englnaers October 3, 1997 File: 260096m Mr. Jim March, Administrator City of Centerville 1680 Main street Centerville, MN 55038 RE: SENIOR HOUSING SCHEDULE FOR BIDDING Dear Mr. March: We understand that the sanitary sewer and watermain for the proposed senior housincl project may have to be advertised for bids, separate from the of the aotuai senior 'lousing facility. Our estimate of the construction cost is $35,000. As you know, projects above S25,000 must be publicly advertised in the local newspaper. A proposed schedule is as follows: October 8th Council authorizes project for advertisement October 10th First publication in Construction Bulletin October 14th Publication in local newspaper October 17th Second publication in Construction Bulletin October 23rd Open bids (10 days after local advertisement) We will be in attendance at the October 8th Council in to discuss the project and the above schedule should the Council have any questions- Sincerely, Howard R. Green Company D a)o'L v nv � David E. Nyberg, P.E. Project Manager DEN:tw cc' Ms. Rebekah Padilla, MHWB, Inc. Mr. Paul Palzer, Centerville Public Works Mr. Paul Kauppi, Howard R. Green Company U'.PROA2<+0096m�096 •U303.UC[. dnc [�L��L •d ,�- ,«._._.,,_.,. ,,_..... ,,_..�..,., ...... - » �FFT-20 -iDO Memorandum To: RY -CHEL GAUST CC: FILE From: CHIEF VANBURKL Date: 09/25/97 Re: ANOKA COUNTY SENIOR HOUSING PROJECT Dear Ry -Chel; Thank you for the opportunity to review the Anoka County Senior Housing plans. Following a review of the blue prints, I am providing you with several observations and /or concerns. Some of these may already be addressed and I just missed them in my review- 1 would strongly suggest that Centerville Road be modified in such a manner to provide a right turn lane into the project for northbound traffic, and a passing lane for southbound traffic. Vehicles stopping in the roadw y present a hazard of rear end collision to those attempting to turn into the housing project. This would be an Anoka County responsibility. Having dealt with senior housing in the past, it has been my experience that folks tend to fall when walking up sidewalks to enter the facility. I did not see a handrail provision for either the main entrance or the garage entrance. Both areas would likely become slippery during inclimate weather. I sincerely hope that consideration is given in this area. 1 noticed that the plan calls for exterior lighting to be mounted on the building exterior. I did not see lighting locations depicted in the plans and would want to review placement to ensure adequate lighting. I also did not see a provision for lighting in the front parking lot or the enclosed garage area. Both areas should be illuminated for safety. In reviewing the living space, the plan seems to call for interior doors having a maximum width of 2' 6 ". 1 may have misread this but it caused me concern with reference to taking an ambulance stretcher down a narrow interior hallway and attempting to reach a resident within a bedroom. Exterior sliding patio doors are nice but are not conducive to security. I would recommend that sliding patio doors be afforded appropriate securing devices, locks, track bars, pins or similar. • Can I assume that each living space will have a panic alarm for medical emergencies? • 1 am also assuming that entrance to the facility will be restricted through appropriate security devices, i.e. intercom and electronic entry, etc. t September 25, 1997 I hope that my review has proved beneficial. Please feel free to call on me should there be further need for my assistance. 2 MEMO DATE : October 2, 1997 TO Honorable Mayor and Council FROM : Jim March RE Odyssey Lures Developers Agreement Mr. Steve Bubul of Kennedy and Graven has prepared a developer's agreement between the City of Centerville and Esox Holdings, LLC. The building will be approximately 12,000 square feet. The assessed valuation of the building will be at least $796,200. There was significantly more eligible expenses than could be reimbursed through the use of tax increment. As Council earlier agreed, the City will be offering 90% of the tax increment generated. This building and business will be a great asset for the City. Through our strategic planning session, business retention and expansion was a top priority. This project will denote a great stride towards working to this goal. This project would not have occurred without the assistance of tax increment. The financing available for the building construction hinged on the City's participation in this project. The use of tax increment allows the City to invest into our own future. As indicated by Mr. Tuomi, Odyssey Lures looked outside of Centerville for possible expansion. I believe the Council's pro business attitude helped retain this business in the community. I would recommend approving the developer's agreement with ESOX Holdings. fjg! Howard R. Green Company - -- CONSULTING ENGINEERS 15 NBINIA1 401�q Msn :OnsWting Enginaar, October 3, 1997 File: 8014901 Mr. Jim March, Administrator City of Centerville 1880 Main Street Centerville, MN 55038 RE: ODYSSEY LURES SITE PLAN REVIEW Dear Mr. March: We have been reviewing the site plan of the proposed Odyssey Lures building with the owner and his representative, Mr. Jeff Hensel of Greystone Construntion. As you know, the proposed building is within the setbacks required under the City Ordinance. We understand, however, that the City has Indicated a variance will be granted for the proposed building. We requested from Mr. Hensel a survey showing how the proposed curb and gutter w! I match into the existing topography_ This was completed, according to Mr. Hensel, and the curb and gutter matched the existing topography to within 6 inches. As of the date of this have not reviewed a plan showing these elevations- We determined this check was necessary to Insure that the grading work could be completed entirely on the Odyssey Lures site without encroaching onto private property either north or south of the proposed site. We would like to offer the following additions! comments on the plan,: • Driving lanes are shown to be less than the standard 24' width The plan shows the driving lanes at approximately 20 feet in width. • A steep slope is shown off the front curb toward Main Street. if the ditch war: nam)wed in front of the building, this slope could be improved. Sincerely, Howard R. Green Company :)--I Q "- A �'/ David E. Nyberg, P.E. v Project Manager DEN.tw cc: Mr. Paul Palzer, Centerville Public Works Mr. Rich Toumi, Odyssey Lures Mr, Jeff Hensel, Crreystone Construction O:'PROI\801490't490- 030d.oct. dnt _ 0T,20*d QS TI G66T- 2n -1D0 MEMO DATE : October 2, 1997 TO Honorable Mayor and Council FROM : Jim March RE Eagle Pass Construction Issues City Engineer Dave Nyberg will present the Council with a full report on the Eagle Pass road construction as requested at the September 24, 1997 City Council meeting. Included in your packet is the Engineer's written response to the drain tile problem, as well as a letter from the contractor responsible for the road construction in this development. o ' IS Howard R. Green Gompar�y� CONSULTING ENGINEERS Formerly MSA COnsufMng Engmeer September 30, 1997 File: 260078m Mr. Mike Quigley Gor -Em Development, Inc_ 14732 Hanson Boulevard Coon Rapids, MN 55433 RE: CONSTRUCTION ISSUES — EAGLE PASS PROJECT, CEf.TERVJLLE Dear Mr. Quigley: This correspondence is to provide a summary of some construct =on issues on the Eagle Pass project that will need to be addressed in the near future. The issues include the pavement problems along Eagle Trail, grading issues along a drainage s ile at the northeast rcrner of the project, and a more recent development with tha drain tile system along Dupre Roac EAGLE TR-A,II Earlier this year, we met on site at the Eagle Pass project with you and your contractc: for the improvements, C.W. Houle, Inc. At that meeting, we discussed settlement or sub -base problems along Eagle Trail, where the pavement and curb and autter had developec several deflections. The problem developed during the 1296 -1991' winter. A follow -up letter dated May 5, 1997, was sent to those at the meeting. At that meeting, we discussed the need to repair these problem areas and to also monih)r these areas through the 1997 -1993 winter for additional defler„ ions. At a meeting with C.W Houle, Inc. last Friday, September 26 we discussed the need to make these repairs this fal so that we can monitor the situation over the coming winter season. The plant for repair includes paving a leveling course over the deflection areas, and either replacing the curb and gutter or jackin up the curb and gutter where deflections have occurred. This will be a satisfactory repa r in our option, however, should the deflections occur again over the winter season, more sirr,ife3nt repairs may be necessary, possibly including excavation of the sub -grade and reconstruction of the street. DRAINAGE SWALE GRADING At the east side of the project, a drainage swale is proposed on the grading plan to pro ride for an overflow route for stormwater from the pond at the southeast end of the site northward to Clearwater Creek. As of the date of this letter, the swale has been c instructed to direct runoff toward a low area along the back of lots 24 and 25. We recommend the Swale be constructed to drain stormwater to Clearwater Creek, according to the final grading p'an. This work should be completed this fall 1326 Enerav Park Drive • St. Pail mN grim F +aa1 +. -ooa •,•. a +vc•+ ,_.._ OT%b0'd 9G :TT -GET- 20-17n September 30, 1997 Mr. Mike Quigley Page Two 011P-RE ROAD DRAIN TILE At our meeting on September 26"'' with C.W. Houle, Inc, we also discussed an issue with drain tile along Dupre Road. Last week, on Wednesday, September 2 representatives fr:)m U.S. West were boring a utility crossing under Dupre Road. While excavating behind the c,arb, the workers were unable to locate drain the on one side of the road. Representatives from C.W. Houle are taking action on this matter this week. A. utility locate was scheduled, and s!me test digging will be completed in attempt to determiine what may have happened here. Please let us know if you have any questions about the above issues. Please give us ;a call in the next few days to let us know your schedule for completing the grading work at the east end of the site. Sincerely, HOWARD �R. GREEN COMPANY 31 wu p� David E. Nyberg, P.E. Project Manager cc: Mr. Jim March, Centerville Administrator Mr. Paul Palzer, Centerville Public Works Mc Larry Olson, Midwest Land Surveying Mr. Bryan Houle, C. W. Houle, Inc DEN /et 0: prn)\280078\078- 301 E.sept Howard R. Green Company CONSULTING ENGINEERS 0 T S0'd TT .66T - ZO -1 iO y, OP Howard R. Green Company s,9SH.tMMIKE CONSULTING ENGINEERS Formarly M5A Consulting En9 , ,,! : s October 3, 1997 Fife: 280078m Mr. Jim March, Administrator City of Centerville 1880 Main street Centerville, MN 55038 RE: EAGLE PASS -DRAIN TILE INSPECTION Dear Mr. March: At the September 24th council meeting, Couneilmerr,ber Brenner requested a written 'espouse to an issue that developed during that same afternoon. During the boring of an undrarground utility crossing under Dupre Read, water was found in the boring pits either side of the road, and the drain tile was not visible on one side of the read. Workers digging in the area also did not find the geotextile fabric. We met with the Contractor to discuss this is ue on Friday, September 25th. On Wednesday, October 1st, the Contractor completed some test digging to try and locate the drair the and fabric and determine if the system was working. Below is a list of the questions Councilmember Brenner asked us to address: Question: What is the current situation? The current situation is as follows: • Test digging was completed last week at the identified area with ;potential problems. • The geotextile fabric and drain tale was obserded under t e curb and guff -r. • The digging showed the water isvels are normal, the the and sand is funAicning, however, when water was introduced by a hose into the the line, the line appeared plugged on one side of the road. After additional exploration, the contractor located and repaired the tile in two different segments. At one segment, a length of life was missing. The contractor referenced this in his letter dated October 1997. At another segment. the file was collapsed. Each problem area was repaired. • The Contractor has agreed to perform additional testing and corrective rri >asures to the the system. CtT -'99'd L :TT L56T- 20 -iDO vVl I V I i i 1i t.i LINU11ILLnO I nn IYV u1GU4404'i� N� October 3, 1997 Mr. Jim March, Administrator Page Two Question: How did this problem occur? As the contractor indicated in his letter, the problem likely occurred when some gravel was excavated and replaced prior to curb construction. Because the work was below grade, the tile damage was not known. Question: How can the problem be fixed? The entire drain tile system on the project will be verified to be in working order and any additional problem areas will bo repaired and corrected by the Contractor. Repairs will include replacement of drain tile or installation of additional tile behind the curb. Questions: Who is responsible and who pays for the correction? The Contractor is responsible for installing the improvements to the requirements of the plans and speclficat!or,s. `JVith this in mind, the Contractor will complete verification of the drain tile system and correct any additional problems that are encountered. This work will be completed at the cost of the Contractor. We will be continuing to work with the Contractor on this issue until assurance is provided that the entire subgrade dra;nage system is in good working order. We will keep Councilmembers Brenner and He!mbrecht and Public Works Director Paul Palzer informed o` the Contractor's activities until completicn of the testing work. Please let us know if you have any questions about the abova issues. We will be in attendance at the October 8th CoLinc:il meeting to further d',scuss this matter. Sincerely pV�p R. Green Company vid E. Nyberg, P. Project Manager DEN:tw M Mr. Paul Palzer, Centerville Public Works Mr. Bryan Houle, C.W. Houle, Inc. 0:lproj`260076 \0780 C&oct Howard R. Green Company CONSULTING ENGINEERS .. fravatMg Ssaa• CanaWCiun ,M}IY � lwVru'• 1300 WEST COUNTY ROAD I SHOR"EW, MINNESOTA SSM TELEPHONE: 45s•e077 October 3, 1997 Howard Green Co. (M5R7 1326 Energy Park Drive St paul, Mn 55109 At David Nyberg, P.6_ RE2 Centerville - Eagle pass Gear David, This correspondence is a follow up to the on -cite explara+:aon that took plane Wednesday, October 1, 1997. :ie repaired ':he damaged draintile that was holding back water. T believe this draintile was damaged when we ware correcting soft spots in the road. Unfortunately, we did not know it happened. The :auction of the draintile is where it should be. The fxhric soparoting the clay and sand was also observed to be in the proper pace. I believe the settlements in the road were caused by the watermoin break that happened late last fall. Wa plan to repair all curb and blacktop as a result of this, As you are aware, the material on -site was very difficult to work with. I believe by letting the second hall` of the road s;t through the spring and summer before curbing was a real hrlp. In eons usion we will do whate4ar you or the city suggest. I? there are any puestions about the draintile in any area, we will be glad t0 explore the area again. Sincerely, C. W_ HOULE, INC. 1�1 LWA� Bryan W. Houle, president BWH:ds cc: Mr. Jim March, City of Centerville Administrator Mr. Mike tluigley, QOR-EM Development, Inc. AN EQUAL OPPORTUNITY EMPLOYE.i +a< TOTHL PAGE. 02 »� OT/80'd BS:TT L66T- '1O -iDO MEMO DATE : October 2, 1997 TO Honorable Mayor and Council FROM : Jim March RE Engineer Review This item is being placed on the agenda to discuss the evaluation of engineering services. If this issue is addressed during the workshop prior to the meeting, it may not be necessary to take any official action at the Council meeting. If any official direction is given at the regular Council meeting, it would be appropriate to make any motions at this time. I FS Howard R, Green Company cilnysesretis CONSULTiNG ENGINEERS wm*M/ MSA o sulfing Ergineors October 3, 1997 File: 260083m Mr. Jim March, Administrator City of Centerville 1880 Main Street Centerville, MN 55038 RE: LAKELAND HILLS - DEVELOPER REQUEST TO CHANGE STREET SECTION Dear Mr. March: This correspondence shall provide an update to the Council from cur discussion on the above referenced issue with the developer on Wednesday, October 1, 1997- At that meet ng, the developer requested a change from the approved plans and specifications. The change includes deleting a portion of the geotextile fabric under the road subgrade and elimination of drain the along certain sections of the road profile. According to the bids provided by the developer, the deduction would amount to a savings of approximately $17,000 for the developer, or about 3.5°1 of the total construction cost of $490,000. The developer requested that this change be made and implemented without Council a�)proval. However, we believe it is necessary to bring this issue to the Council for approval of the requested change, due to the fact that the Council has approved the plans and specifications for this project. We also believe the change is a significant dev atio.r from what has been :jone on past projects in Centerville. It is our understanding that the Council desires the standard road section for the Lakeland Hills project, including dram file and geotextile fabric on this entire length of street. We feel that the significant issue here is whether the City C ;ncil lS WIliing to negotlate with the developer or "hold the line" on the standard road section. The• developer maintains that the City ordinance only requires a 7 -tan road section, with no language indi.%dting drain tile or ge:otextile fabric is required. It is true that a road can be constructed to a 7 -tor strength design without the fabric and drain tile. However, it has always been our understanding that the City can request any street section that the City Council deems appropriate, regardless of the exact we ding of the City Ordinance. Should the City Council decide to allow the developer to delete pof ,ions of the geotexti:e fabric and drain tile from the project, we recommend the Council require a longAr guarantee porod on the road. The developer has offered to guarantee the road for 2 years. We recommend at least a period of d years, after the final lift of wear course has been constructed. of /60*,J RS: Tr 2,66i -20 -00 OT •d -lUiOl - October 3, 1997 Mr. Jim March, Administrator Page Two At the meeting on October 1 we indicated that from an engineering perspectivt�, these changes would be acceptable for providing a 7-on road section. However, we question whether the City should allow this change, given the fact that the standard section has been used for several years on all other projects in the City of Centarville. This allows the City to maintain consistency between projects. We will be in attendance at the Octobercth meeting tr, discuss this matter In more detail and to answer any questions. Sincerely, Howard R. Green Company 2 )aV1AVA W David E. Nyberg, P.E. Project Manager DEN:tw cc: Mr. Paul Palzer, Centerville Public Works Mr. Marcel Eibensteiner, Royal Oaks Realty O.lprotl260083t083-0305.0et Howard R. Green Company CONSULTING ENGINEERS OT/01'd G'S :TT 155T -Z0 -170 MEMO DATE : October 2, 1997 TO Honorable Mayor and Council FROM : Jim March RE Public Works Staffing Included in your packet is a letter that has been reviewed by the City Attorney and the Local #49 Union Agent. A revised version of this letter has been sent to our two current part -time public works employees. The City has the ability to determine work schedules and staff levels. Based upon the number of two person jobs that the public works department faces, it is my recommendation as well as the Public Works Director that the City elect to eliminate the two current part -time positions and replace with a full -time position. This position would first be posted internally as required by Union contract. _'e teryiffe 1880 Main Street • Centeruilfe, MN 55038 Esta6Cuhed 1857 (612) 429 -3232 • fax (612) 429 -8629 October 3, 1997 Mr. Jim Hansen Area Business Representative Local #49 2829 Anthony Lane South Minneapolis, MN 55418 Dear Jim, As requested in a fax from you, I hereby submit the Seniority List in regards to the public works employees represented by Local #49. 1) Dale Larson 2) Robert Barron 3) Tim Danielson I also would like to follow -up in writing the City of Centerville's concern with the present staffing coverage in the public works department. The City is interested in eliminating both part -time positions and replacing those positions with a full -time position. If the position is not filled internally, then the City maybe interested in keeping a current part -time employee on as a seasonal worker. The City intends to carry out the above specified actions on October 8, 1997. Please feel free to call me at 429 -3232 if you have any questions or if I can provide you with any additional information. Sincerely, Jim March City Administrator CC. City Attorney City Council 1 MEMO DATE : October 2, 1997 TO Honorable Mayor and Council FROM : Jim March RE United Waste Billing Request Included in your packet is a request from United Waste in regards to implementing a new billing system to avoid the certification process through the City. The language in the existing contract is vague in regards to the process of who is responsible for various steps when certifying unpaid balances to the County. I have discussed this issue with Danell and we both agree that it would be a better situation for the City as outlined in the proposal by United Waste. Instead of certifying unpaid amounts, the hauler would be responsible for collecting their unpaid balances. It does not make sense to have the City involved with collecting the haulers unpaid balances when we do not have access to their utility billing software. I would recommend that we accept the proposal as presented by United Waste. 0 United Waste Systems Minnesota, Inc. United 8678 78 North 75th Street Stillwater, MN 55082 Waste Bus. Tel: 612 - 429 -6766 • Fax: 612- 653 -0818 October 1, 1997 Jim March, City Administrator City of Centerville 1880 Main Street Centerville, MN 55038 RE: Certifications Dear Mr. March: During our conversation on Friday, September 26, 1997 we discussed the issue of certifications in the City of Centerville. The refuse contract is erroneously ambiguous as it relates to the certification of past due accounts. Therefor, I respectfully request the cities approval to handle the past due collections in the same manner our company handles our subscription customers in the Twin City metropolitan area. As you know, each resident in your community is billed on a quarterly basis. The billing procedures will remain the same. After the billing is mailed, A cordial reminder letter is mailed to the resident indicating the past due amount. The letter has the service dollar amount, coupled with our phone number if there should be any questions. After the first reminder letter is sent, our office will send a second letter one month later requesting the past due amount be sent at once. If payment it not sent in by this time the customer will be temporarily suspended until the customer pays the bill current and /or calls our office to set up a payment plan for their bill. I have been working with this procedure for over three years and have found it to be remarkably effective. The majority of our customers never get past the first reminder letter of the collection process. I have found that most our customers, whether they live in a contract community or in one of our subscription cities refuse to pay a bill for one of two reasons. Either they did not receive a bill or the bill they received was incorrect. In either case, we are able to keep the line of communication open with the customers and resolve issues they may have. United Waste Systems of Minnesota, Inc., (UWSMN) does not have an administration fee added to the residents bill for the collection process. The amount that is collected is the amount originally billed to the customer. 0 United Waste Systems Minnesota, Inc. United 8678 78 North 75th Str Stillwater, MN 55082 Waste Bus. Tel: 612- 429 -6766 • Fax: 612 - 653 -0818 Page 2 I have enclosed, for your review, copy of a letter we are currently using for reminders to our customers. In addition, a tentative schedule for the new year for the billing and collection process. If you have any questions regarding my proposal, please do not hesitate to call me at 429 -6766. Respectfully Submitted, Ronald P. Gersdorf Customer Service Manager United Waste Systems of Minnesota, Inc. rpg cc Jeffrey T. Glewwe Enc. United United Waste Systems of Minnesota, Inc. 8678 North 75t1t Street W aste S tillwater, MN 55082 -- — — BUS. Tel: 612- 429 -6766 • Fax: 612- 653 -0818 AUM JST 20, 1997 '446994 Tear ANDERSON, MARY This is a friendly reminder that our records reflect a past due amount on ur account. If you have recently mailed a payment please disregard this notice.. Our records indicate your current account status is as follows; your 60 day halance is $0.00, your 90 day balance is, $45.13, your total balance is 26 and your last payment of $45.13, was made on 2/14/97. 1'llere are no finance charges on your pas due amount. Please pay your 'I colint in full. Payment is due upon receipt of this letter. If you feel your account is in error, or have any other concerns, please contact our customer 1�ervue department at 429 -6766. Thank you for your understanding in resolving this matter. Sincerely, i `nited Waste Systems of MN, Inc. City of Centerville Jan - Jan 1st billing sent, due on the 15th Feb - Feb 15th, 1st reminder letter sent Mar - Mar 15th, 2nd reminder letter sent. All non paid customers canceled end of month. Apr - May - Jun - Jul - Aug - Sep - Oct - Nov- Dec - ACCAP ANOKA COUNTY -COMMUNITY ACTION PROGRAM, INC. TTY 1201 89th Avenue NE • Suite 345 • Blaine, MN 55434 • Phone 783 -4747 • FAX 783 -4700 • 783- 4724 r A U,nled Way Agency TO: CITY COUNCIL/ ATTTN RYCHEL GAUSTAD FROM: CATHEY WEIDMANN(- ��� Coordinator of Seni r Programs and Volunteer Services ?. 7 SEN CR OUTR ACT: P'2 -1; T DATE: SEPTEMBER 23, 1997 Enclosed please find your community's ANNUAL SENIOR OUTREACH REPORT for the program year September 1, 1996 through August 31, 1997. If you have any questions or comments regarding these reports, as well as any referrals for the Senior Outreach Worker, please feel free to contact me at 783 -4741. Again, thank you for your continued support of the Senior Outreach Program. AN EQUAL OPPORTUNITY EMPLOYER ACCAP ANOKA COUNTY COMMUNITY ACTION PROGRAM, INC. 1201 89th Avenue NE • Suite 345 • Blaine, MN 55434 • Phone 783 -4747 • FAX 783 -4700 • TTY 783.4724 w A Un.IW Way A,en , REPORT: SENIOR OUTREACH PROGRAM AREA: Centerville Totals MONTH: Totals for Program Year 9/1/96 -- 8/31/97 FROM: Cathey Weidmann, Coordinator - Senior Programs & Volunteer Services 1. NEW CLIENTS (not duplicated) HOUSEHOLDS: 3 INDIVIDUALS: 4 • Income Level (# of Households) * Age (# of Individuals) 135% Poverty Below: 0 Under 59: 0 70 - 74: Above: 1 60 -64: 0 75 -70: 2 HUD Section 8 Below: 0 65 -69: 0 80- +: 2 Above: 1 Income Unknown: 2 * Sex (# of Individuals) • Size of Household Female: 3 Male: 1 One: 2 Three: 0 * Race (# of Individuals) Two: 1 Four +: 0 Asian: 0 Black /Afr. American: 0 • Female Head of Household: 2 Caucasian /White: 4 Hispanic: 0 • Type of Dwellinq Native American: 0 Other: 0 Private Home: 2 Mobile Home: 0 Senior Housing: 0 * Disability (# of Individuals) Apartment: 1 Other: 0 Hearing: 0 Mental: 0 Speech: 0 Visual: 0 Emotional: 0 Other: 1 2. 014 -GOING CLIENT VISITS: 10 3. REFERRALS MADE /AGENCY CONTACTS: 15 (See Attached List) 4. GROUP CONTACTS: 491 (Duplicated) (Senior Clubs, Centers, civic groups, city leaders, service providers, etc.) 5. REQUESTS FOR OUTREACH VISITS FROM OUTSIDE SOURCE: 3 Anoka County Human Services - 2 Respite Program Coordinator - 1 AN EQUAL OPPORTUNITY EMPLOYER REFERRALS AND PROGRAM CONTACTS ON CLIENT'S BEHALF ACCAP Crisis 0 ACCAP Energy Assistance Program (EAP) 0 ACCAP Energy Related Repair Program (ERR) 0 ACCAP Furniture Warehouse 0 ACCAP Head Start 0 ACCAP Housing Rehab Program 0 ACCAP Weatherization Program 0 Adult Day Care 0 Anoka County Emergency 1 Anoka County Food Stamps 0 Anoka County Adult Foster Care (Homes Plus) 0 Anoka County Income Maintenance 0 Anoka County Human Services s Anoka County Medical Assistance 0 Anoka County Public Health Nursing 0 Anoka County Vulnerable Adult Unit 1 AlexandraHouse 0 "Are You Okay ?" Program 0 BefrienderProgram 0 BlaineJaycees 0 Christmas Basket Distribution 0 Churches 0 City Offices 0 ClothingDistribution /Closet 0 Community Emergency Assistance Program (LEAP) 0 CongregateDining 0 CourageCenter 0 Department of Rehabilitation (DRS) 0 Directory Assistance Exemption 0 Equipment Distribution Program 0 Fare Share Food Program 0 First Call for Help Crisis 0 FoodShelves 0 Foster Grandparent Program 0 Goodwill Equipment Loan Program 0 Dal ry 1 v ce —� HandyWorks /ChoreService Health Plan Information Center 0 Hearing Aid /Hearing Society 0 HeatShare 0 Hill Burton Funds 0 HomelessShelter 0 Hospital 0 HcusingAssistance 3 HRA 0 Indigent Drug Program /Lilly Insulin Project 0 Jobs and Training /Older Worker's Program 0 Legal Services /Mediation Services _0 ANOKA COUNTY COMMUNITY ACTION PROGRAM, INC. Lifeline 0 Link Up America 0 Low Cost Clinics 2 Meals on Wheels /Home Delivered Meals 0 Medicare 0 Metropolitan Center for Independent Living (MCIL) 0 MFHA — 0 MNCare 0 MN Supplemental Aid (MSA) 0 Nutrition Assistance Program for Seniors (NAPS) 0 NISCAH 0 PaintathonProgram 0 QMB /SLMBY 0 RespiteProgram i Retired Senior Volunteers Program (RSVP) 0 Salvation Army Crisis 0 Senior Centers /Clubs 0 Senior Companion Program 1 Senior Federation /Reverse Mortgage 0 Senior Information Line 0 Senior Partners Care 0 ServiceGroups 0 Share- A- HomeProgram 0 Social Security Administration 0 State Service for the 131ind C Supplemental Security Income (SSI) 0 SupportGroups 0 Telephone Assistance Plan (TAP) 0 Telephone Connection Assistance Program 0 Transportation 0 TRIAD Emergency Card Distribution 0 Utility Discount Programs 1 VeteransAdministration 0 Vision Loss Resources 2 VolunteerOpportunities 1 Other 2 TOTAL REFERRALS = 15 TO 11 AGENCIES /PROGRAMS ANOKA COUNTY COMMUNITY ACTION PROGRAM, INC. 06 Centerville Park And Recreation Board October 1, 1997 1, Kcwhi Fogarty, need to resign my seat on the Park and Recreation board. My work schedule is becoming too demanding, and I cannot devote the time needed to the Park and Recreation board to help move our city forward. Thank You, Kevin Fogarty