Loading...
HomeMy WebLinkAbout2013-01-09 Set Agenda & Handouts CITY OF CENTERVILLE COUNCIL MEETING AGENDA Wednesday, January 9, 2013 eryiCCe 6:30 p.m. or shortly thereafter &WT,tabhAai857 Set Agenda = Italics OPEN FORUM 6:30 p.m.: An opportunity for members of the public to address the City Council on items not on the current agenda. Items requiring Council action may be deferred to staff or Boards and Commissions for research and future Council Agendas if appropriate. You will be limited to two (2) minutes and we ask that you conduct yourself in a professional, courteous manner, and refrain from the use of profanity. Failure to abide by this policy may result in the loss of your privilege to speak. Persons wishing to speak will be required to complete a sign -up sheet and give it to the Mayor or a Staff person by 6:15 p.m. COUNCIL MEETING I. CALL TO ORDER 1. Roll Call H. PUBLIC BEARINGS III. APPROVAL OF AGENDA IV. APPROVAL OF MINUTES 1. December 12, 2012 City Council Meeting Minutes (Pages 1 -7) 2. December 12, 2012 City Council Work Session Meeting Minutes ( Pages 8 -9) 3. January 2, 2013 Special City Council Meeting Minutes (Pages 9a -9d) V. CONSENT AGENDA 1. City of Centerville December 13, 2012 through January 9, 2013 Claims (Check #27718 - 27738) w/Voided Checks # 277728 & 27732 -27736 (Pages 10- 11) & (Check #27743 - 27747) (Page I I a) 2. Parks and Recreation Committee Recommendation for Approval of Goetz Landscaping for Construction of (1) 50' x 80' Sand Volleyball Court at Laurie LaMotte Memorial Park w/ Construction Commencing Immediately After Spring Weight Restrictions Being Removed — Not to Exceed $18,154.93 (Pages 12 -13) VI. AWARDS /PRESENTATIONS /APPEARANCES 1. Mr. Greg Kieselhorst — Centerville Lions Annual Ice Fishing Contest VII. OLD BUSINESS 1. Ord. #XX, Second Series, Rezoning Certain Property in Order to Make the Official Zoning Map Conform to the 2030 Comprehensive Plan (7087 — 20 Avenue South) (Page 14) VIII. NEW BUSINESS 1. Centerville Lions Ice Fishing Contest — Waiving of Fees (Page 15) a. Special Event Permit Application/DNR Application for Contest/EEA Young Eagles Airplane Rides (Pages 16 -30) b. Noise Permit C. Raffle (Pages 31 -33) d. Temporary/Event On -Sale Liquor License (Pages 34 -35) 2. Res. #13 -OOX — Authorizing Appointing Acting Mayor & Order of Succession (Page 36) 33. Res. #13 -OOX — Assigning Duties as they Relate to Handling Banking Transactions (Page 37) 34. Res. #13 -OOX — Authorizing Appointments for 2013 (Pages 38 -41) 45. Res. #13 -OXX - Schedule Public Hearing Special Reassessments — Backage Road Pages (42 -43) 56. Planning & Zoning Commission Report & Recommendation to Issue A Conditional Use Permit to Mr. Steve Vermeersch, 7137 — 20 Avenue North (Pages 44 -46) & (Pages 46a -46c) 67. Storm Water System Maintenance — Olson Sewer Low Bidder - $20,811 (South of Houle Circle, End of Houle Circle, West of Peterson Trail & South of Prairie Drive) (Pages 47 -51) -78. Ord. #XX, Second Series, Amending Chapter 51, Section 51.08 Relating to Municipal Water Service (Page 52) 89. Res. #13 -OOX - Authorize Grant Application for Watermain & Service Line Project in Royal Oaks Subdivision (Pages 53 -54) & (Pages 55 -64) IX. ANNOUNCEMENTS/UPDATES 1. City Administrator Dallas Larson XI. ADJOURNMENT *REMINDERS ** City Council Meeting — January 23, 2013, 6:30 p.m. Council Chambers /(WS) Parks & Recreation Committee Meeting — February 6, 2013, 6:30 p.m. Council Chambers Planning & Zoning Commission Meeting — February 5, 2013, 6:30 p.m. Council Chambers City Council Meeting — February 13, 2013, 6:30 p.m. Council Chambers *PARK USAGE* Parks & Recreation Committee Skate & Cross Country Skiing Party — January 12, 2013, 6:00 P.M. — 9:00 P.M. Pleasure & Hockey Rinks are Open — Monday — Thursday, 4:00 — 9:00 p.m. Friday — 4:00 —10:00 p.m. Saturday —10:00 a.m. —10:00 p.m. Sunday — Noon — 8:00 p.m. CITY OF CENTERVILLE SPECIAL CITY COUNCIL MEETING January 2, 2013 6:30 p.m. Pursuant to due call and notice thereof, the City of Centerville held their regularly scheduled meeting of January 2, 2013, at City Hall, 1880 Main Street. PRESENT: Mayor Tom Wilharber Council Member Ben Fehrenbacher Council Member Steve King pled Council Member D. Love'' ABSENT: Council Member Jeff Paar STAFF: City Administrator Dallas Larson Legal Counsel Kurt Glaser I. CALL TO ORDER Mayor Wilharber called the meeting to order at 6:30 p.m. Ms. Tammy Omdal, Northland Securities, Inc., Representative, was present and gave a brief overview of the needed modifications to the current Development District No. 1 Program which was first approved on September 29, 1987. Ms. Omdal stated that to address the proposed TIF District 7 which would encompass the proposed development of Lots 2 and 3, Block 1 of the Royal Oaks Industrial Park for construction of a 15,000- 20,000 square footage manufacturing company which will house an existing Centerville business. Ms. Omdal stated that the required 30 day notice for public hearing was waived by both Anoka County and Independent School District #12 who were able to schedule meetings with their respective boards and provide the City with written comments and their support. Ms. Omdal stated that a revised economic development plan including District No. 7 had been placed before them which incorporated desired modifications by the business owner which would be discussed more in depth during the public hearing. Ms. Omdal also stated that the revised document addressed the above stated modification, its corresponding assumptions for funding, tax ramifications, market values of the property, timing of the district's certification to the County for property tax values, etc. Ms. Omdal stated that the TIF District would be for a period of 9 years with an estimated $185,000 in tax increment. Ms. Omdal also stated that a public hearing is still needed to commit economic assistance to HAF Equipment to construct a new manufacturing facility within the City. Administrator Larson stated that his discussions with the business owner have included the potential for hiring additional staff and entering into a minimum assessment agreement. City of Centerville Council Meeting Minutes January 2, 2013 Mayor Wilharber opened the public hearing at 6:57 p.m. II. PUBLIC HEARING(S) 1. Amendment of Development District No. 1 & Tax Increment Financing (Economic Development) District No. 7 — Lots 2 & 3, Block 1 Royal Industrial Park Ms. Omdal reassured Council that the plan before them this evening is a plan which outlines the proposed project; however, a development agreement that would be entered into by the business owner and the City, at a later date, would refine all detailed requirements. No one present wished to comment on the project or the TIF Plan. Motion was made by Council Member Fehrenbacher and seconded by Council Member Love to close the public hearing at 7:00 p.m. All in favor. Motion passed unanimously. 2. Res. #13 -001 — Amending the Development District No. 1 & Establishing a Tax Increment Financing (Economic Development) District No. 7 — Lots 2 & 3, Block 1 Royal Industrial Park Ms. Omdal stated that Council had previously been provided with a resolution in their packets; however, she suggested minor changes to reflect information recently provided by the business owner and his architect. The most recent plan suggests initial construction of less than the originally proposed 15,000 square foot building and to also construct the project in phases. Phase one (1) would take place in 2013 with the construction of a 12,000- 15,000 square foot building and phase two (2) would take place within the following five (5) years of approximately 5,000 - 18,000 additional square feet being added to the building. Ms. Omdal recommended that language on page 3 of the approving resolution, (ii) be modified to include the new request of the owner and to read "The project will be completed in phases, with the first phase of 12,000 to 15,000 square feet constructed in 2013 and an additional 5,000 to 18,000 square feet estimated to be constructed within the next five (5) years." Ms. Omdal also stated that the Economic Development plan Figure 3 -3 had been modified to incorporate the appropriate funding for the reduction in building size. Administrator Larson stated that the project tax increment can only support $50,000 in assistance in Site Improvements /preparation costs for a 12,000 square foot building; Page 2 of 4 9� City of Centerville Council Meeting Minutes January 2, 2013 however, if the building is enlarged to 15,000 square feet the assistance could be up to $60,000. Motion was made by Council Member Love, seconded by Council Member Fehrenbacher to Adopt Res. #13 -001 - Amending the Development District No. 1 & Establishing a Tax Increment Financing (Economic Development) District No. 7 Lots 2 & 3, Block 1 Royal Industrial Park with the recommended modified language. All in favor. Motion passed unanimously. 3. Authorize City Attorney to Prepare Development/Subsidy Agreement Administrator Larson suggested that Legal Counsel be authorized to prepare the Development/Subsidy Agreement. Motion was made by Council Member Fehrenbacher seconded, by Council Member King to Authorize City Attorney Glaser to Prepare Development/Subsidy Agreement. Discussion: Council Member Fehrenbacher requested that Attorney Glaser project the amount of time that he would incur on this item. Attorney Glaser responded that he anticipated no longer than one half of a day's time. All in favor. Motion passed unanimously. 4. Schedule Public Hearing to Amend Business Subsidy Policy I Administrator Larson felt that Staff would be able to notice a public hearing for January 23, 2013 for both the Business Subsidy Policy and consideration of awarding a Business Subsidy for the proposed project. Motion was made by Council Member Love, seconded by Council Member Fehrenbacher to Schedule a Public Hearing to Amend the Business Subsidy Policy January 23, 2013. All in favor. Motion passed unanimously. III. CONSENT AGENDA 1. City of Centerville December 13, 2012 through January 2, 2013 Claims (Check #27682 - 27617) 2. Centennial Police Department Claims through December 27, 2012 (Check #9225- 9258) 3. Centennial Fire District Claims through December 21, 2012 (Check #5615 -5631) Page 3 of 4 City of Centerville Council Meeting Minutes January 2, 2013 Council Member King requested clarification of several expenditures relating to copy write music, annual dues for the Building Inspector, union dues and annual memberships of Public Works staff. Motion was made by Council Member Fehrenbacher, seconded by Council Member King to approve the Consent Agenda as presented. All in favor. Motion passed unanimously. VI. ADJOURNMENT Motion was made by Council Member Love, seconded by Council Member Fehrenbacher to adiourn the Special Meeting of City Council at 7:10 p.m. All in favor. Motion passed unanimously. Transcribed by City Staff Member Teresa Bender, City Clerk I Page 4 of 4 9� CITY OF CENTERVILLE 01/09/13 10:27 AM Page 1 Check Detail — JANUARY 9, 2013 Check Date Check # Vender Name Comments Amount 1/9/2013 027743 ACR, INC. 05 CHEV PLOW TRUCK - PLOW WIRING Check Nbr 027743 ACR. INC. $90.00 1/9/2013 027744 AVENET, LLC ANNUAL SERVICE PACKAGE $275.00 1/9/2013 027744 AVENET, LLC ANNUAL SERVICE PACKAGE $275.00 Check Nbr 027744 AVENET. LLC $550.00 1/9/2013 027745 ELECTION SOURCE VOTE HERE SIGNS Check Nbr 027745 ELECTION SOURCE $128.18 1/9/2013 027746 INSTRUMENTAL RESEARCH INC DEC. 2012 WATER TEST Check Nbr 027746 INSTRUMENTAL RESEARCH INC $38.00 1/9/2013 027747 LEXISNEXIS OCC. HEALTH SOLUTIO DRUG TEST Check Nbr 027747 LEXISNEXIS OCC. HEALTH SOLUTIO $32.00 TOTAL CHECKS $838.18 Planning & Zoning Commission Report and Recommendation. The Planning & Zoning Commission met on January 8, 2013, to consider a request of Steven J. Vermeersch on behalf of TBD Company, for a Conditional Use Permit (CUP) to operate a vehicle repair business at 7137 - 20 Avenue, City of Centerville. Findings: 1) The Planning and Zoning Commission heard and considered all testimony of interested persons submitted in writing prior to and in person during the public hearing. 2) The proposed use may be operated in the B -1 zoning district subject to a Conditional Use Permit with reasonable conditions. 3) The proposed use is consistent with the Comprehensive Plan. 4) The applicant is willing to conform to conditions in the draft Conditional Use Permit attached hereto. RECOMMENDATION. The Planning Commission finds that the standards for granting a Conditional Use Permit have been met and recommends that the City Council approve the Conditional Use Permit, subject to the conditions contained in the draft CUP attached hereto. January 8, 2013 Planning and Zoning Commission Dallas Larson, Administrator 4a CITY OF CENTERVILLE ANOKA COUNTY, MINNESOTA APPROVAL OF CONDITIONAL USE PERMIT 1. Permit. Subject to the terms and conditions set forth herein, the City of Centerville hereby grants approval of a conditional use permit for: Steven J. Vermeersch and TBD Company, 7137 - 20 Avenue to operate an auto repair business and subject the conditions of this permit. 2. Property. The permit is for the following described property: 713 7 - 2e Aven ue (PIN #23- 31 -22 -11 -0009) THE N 178.75 FT OF S 544.50 FT OF E1/2 OF NE1 /4 OF NE1 /4 OF SEC 23 TWP 31 RGE 22, EX RD, SUBJ TO EASE OF REC 3. Conditions. This permit is issued subject to the following conditions: a) No more than seven (7) vehicles awaiting repairs shall be stored on the site at any one time and shall be parked only on a paved surface. Inoperable vehicles shall not be stored outside a building for more than 72 hours. b) Vehicles with damaged or missing body parts shall be stored only inside a building. c) No more than two (2) vehicles offered for sale shall be parked on the property at any time. d) Bulk gasoline or other fuels shall not be stored on site and there shall be no exterior storage of containers of lubricants or other chemicals. e) Limits on the noise emitted at the property line shall conform to the noise regulations contained in City Code Section 91.09 and other nuisance regulations contained in Chapter 91. f) Testing of gasoline engines and other noise producing equipment shall be limited to the hours of 7:30 a.m. to 7:00 p.m., Monday through Saturday. g) Landowner and the business operator shall jointly and individually be responsible for the continuing conformance with the permit and that if the proposed use is not initiated within six (6) months of this date, the permit shall be void. h) Grantee will follow the applicable standards and requirements of the City of Centerville, Rice Creek Watershed District, Anoka County, Army Corp of Engineers, FEMA, Minnesota DNR and any other agency having jurisdiction over the property and shall secure and file with the City, any permits required by outside agencies. i) The City reserves the right to annually review this permit for compliance with the conditions and may impose additional conditions to mitigate unforeseen problems. 4. Criminal Penalty. Violation of the terms of this permit is a criminal misdemeanor. Dated: CITY OF CENTERVILLE BY: Tom Wilharber, Mayor Attest: Teresa Bender, City Clerk STATE OF MINNESOTA ) ) ss. COUNTY OF ANOKA ) The foregoing was acknowledged before me this _ day of 2013. by Tom Wilharber, Mayor and Teresa Bender, Clerk of the City of Centerville, a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted by its City Council. I Community Development Block ITTV t € An Application Guide is available with directions on completing the application, submission details, and contact information for questions. i a_. 7: 777 ... _. Project Title: water main and Residential hookup Applicant: City of Centerville Type of Organization Q Local Government ❑ Faith -Based Organization ❑ Non - Profit Organization ❑ Institution of Higher Education ❑ For - Profit Organization ❑ Anoka County Department: Contact Person: Mike Jeziorski Title: Finance Director Address: 1880 Main Street City: Centerville State: MN Zip: 55038 Phone: 651 -429 -3232 Fax: 651 -429 -8629 Email* mjeziorski@centervillemn.com *Meeting notices will be sent by email only. Project Address: Various - See Map Project Service Area: Robin Lane Neighborhood This project will be completed in: ❑ 6 months 012 months ❑ 18 months Project Activity 03J (Select the HUD activity listed in the Application Guide that best fits this project; example: 030 Fire Station) Anoka County CDBG Application x l r 4 max' 3 Amount ($) of CDBG Request 372,000.00 Amount ($) of Agency's Resources 70,000.00 Amount ($) from other loan /grant Sources Total Program Costs ($) 442,000.00 Does the total project cost account for federal prevailing wages if applicable? (Reference the Application Guide for information on federal wages) ❑ Yes ❑ No Is there a fiscal financial agent other than the applicant? 10 No ❑ Yes: who Will CDBG funding be used to leverage additional funding? ❑ Yes No Can this project be partially funded? ❑ Yes Q■ No If application is requesting funds for multiple items, prioritize items and amounts needed: Priority 1: Priority 2: Priority 3: Consult the Application Guide for requirements on this section. The budget proposal is in an Excel document available on our Web site: a hard copy of the budget in that form must be submitted with this proposal. The scope of this work would be to construct a water main in the rear of the back yards and then run service lines to each of the homes in the neighborhood. The grant would essentially cover the costs associated with the watermain and the installation of water services (and other associated costs: engineering, water access charge, permits and water meters) to those that income qualify. The neighborhood consists of 37 homes. Based upon income surveys returned to date it is projected that 26 homes will qualify as low and moderate income, which is 70% of the 37 homes. Anoka County CDBG Application 'Aw Budget Worksheet Identify the federal, state and local leveraging resources used for this prorgram. This information is provided directly to HUD Use of Funds 26 11 Line items Requested CDBG Funds Applicant Funds Other Federal Funds State of MN Funds City Funds Private Funds Total Watermain 210,000 210,000 Service Line and Inside hookup 65,000 27,500 92,500 Seal Existing Well 10,400 4,400 14,800 Engineering 13,000 5,500 18,500 Water Access Charge 46,800 19,800 66,600 Permits 16,900 7,150 24,050 Water Meter 10,088 4,268 14,356 * Costs for non - income q ualified properties I V w m 3 Program Description Reference the Application Guide for required information for this section Many homes in Centerville are currently served by shallow wells that are subject to contamination. Residents in these homes do not have the benefit of a safe public water system. They do not receive the benefits of a fluoridated water supply and the attendant prevention of tooth decay that is a proven benefit of public water supplies in Minnesota. This project would pay the costs for low and moderate income residents in the City of Centerville to hook up to the City watermain in order to get onto City water in advance of the deadline. Again, this is a relatively high expense for a resident that does not have the means in which to pay for it. Non income qualified residents affected would be given the opportunity to connect at their own cost. Describe the need and urgency for the proposed project. Include the consequences if the project is not funded. As earlier stated, many homes are currently served by shallow wells that are subject to contamination. This project will provide the means for low and moderate income families to connect to city water. Also, homes with wells do not benefit from the fluoride added to the City water supply and are not privy to the benefits that fluoride provides teeth. "Over a lifetime, fluoride treated water costs less than the cost of one dental filling to repair on decayed tooth." (Today -Odom) Also, given the DNR's mandated change to conservation and conservation rates it would benefit the community to have everyone on City water in order to manage the amount of water used or at the very least the ability to track water consumption. Describe the organization's fiscal management including financial reporting and recording keeping. The City of Centerville utilizes a fund accounting system consisting of a General Fund, Debt Service Funds, Other Governmental Funds and Enterprise Funds. All accounts are reconciled on a monthly basis with financial reporting submitted to respective management in order to monitor line activity to budgeted amounts. The City goes through an annual audit and submits applicable financial and budget reports to the OSA annually. Anoka County CDBG Application �lJ Does this project involve infrastructure? 0 Yes ❑ No If the project application is requesting assistance for water /sewer improvements, street improvements, or other infrastructure, answer the following questions: 1. Identify the urgency of the improvement. City of Centerville currently has a policy to have all residents connected to the public water supply by 2017. This project allows for low and moderate income residents in the City to hook up to a newly constructed City watermain in order to get onto City water before that deadline. 2. Is the improvement included in the city /town improvement plan? Yes 3. What circumstances led to the need for federal assistance? Low and moderate income residents need assistance in order to comply with the 2017 deadline. The project is not affordable or feasible without assitance �i , ��.Y� ., .. ¢,a, .a`k:t`tr :.....,.; `# , v�a:e'.'s? .,.✓.� .0 _ r'` ti ...,, .f: Does this project meet the Slum /Blight Removal national objective? ❑ Yes Q No If this project is for slum /blight removal, verification must be made in orderto assure that a CDBG- funded activity meets the national objective regarding slums and blight. Verification for this project falls within one of the following categories: ❑ Elimination of Slums and Blight Area Basis (SBA) ❑ Elimination of Slums and Blight Spot Basis (SBS) Describe /identify the site location or boundaries. Include map attachment. Indicate the percent of building or public improvements that were deteriorated when the project was designated as slum /blight, and the year of designation: designated in (year) Public Improvement /Type of Condition: Describe the conditions that qualify the project as slum or blight. Anoka County CDBG Application t4 Does this project meet the Benefit to Low and Moderate Income People national objective? Q Yes ❑ No Identify how the project will meet the Low /Moderate Income national objective. Carefully review the following activity definitions in the Application Guide before selecting an option. ❑ Low /Moderate Income Employment (LME) ❑■ Low /Moderate Income Clientele (LMC) ❑ Low /Moderate Income Area Benefit (LMA) - Required: project /service area map ❑ Low /Moderate Income Housing (LMH) ❑ Single - family housing ❑ Multi- family housing 6 ' - M .� �, . �� � ors r a .�[ `� S ,� .`' < 6 Is this project for a housing activity? ❑ Yes ❑■ No *All housing activities will be considered for HOME funds before the use of CDBG Type of Housing: ❑ Single- family ❑ Townhome ❑ 2 or 4 - plex ❑ Single -Room Occupancy ❑ Multi- family ❑ Other: Tenancy: ❑ Owner- occupied ❑ Renter - occupied Income Level of Clients ❑ 0 -30% Area Median Income ❑ 31 -50% Area Median Income ❑ 51 -80% Area Median Income ❑ Above 80% Area Median Income Benefit to Homeless ❑ Not applicable ❑ Homeless individuals ❑ Homeless families Non - Homeless Special Need Population Served: ❑ Elderly (62 years +) ❑ Alcohol /drug abuse ❑ Developmentally disabled ❑ Physical disability ❑ Severe mental illness ❑ Victims of domestic violence ❑ HIV /AIDS Total Number of Units Overall in Project Number Occupied: Number Vacant: Anoka County CDBG Application I►cqui l ±an, R+ l ii tat can, dew ni + t�aneo a�� l K Type of project ❑ Single- or Multi- Family Housing ❑ Farm land and structures ❑ Vacant land; free from any structures ❑ Business, commercial, or industrial Site Control Indicate the status of the project site and attach documentation: ❑ Applicant owns property: Date acquired ❑ Lease: Expiration date ❑ Option to purchase: Expiration date ❑ Other: Describe Zoning Is the site zoned for the proposed activity? ❑ Yes ❑ No If no, provide an explanation and timetable to change zoning or obtain variance: Appraisal If request is for property acquisition, has an appraisal been completed within the last 12 months? ❑ Yes; copy of appraisal attached. ❑ No; if appraised value not known, what is the fair market value determination? Relocation Does the project require relocation (moving) of occupants of a structure? ❑ Temporary ❑ Permanent ❑ No relocation necessary General Information Notice Has a General Information Notice to sellers and /or tenants of Relocation or No Relocation benefits been completed? ❑ Yes; provided to occupants on MM /dd /yyyy ❑ No; will be completed on MM /dd /yyyy �t :xjf s.. Is the project currently underway? ❑ Yes; and a federally- accepted environmental review has been completed. ❑ Yes; but there has not been an environmental review. 0 No; project will not begin before an environmental review is completed by Anoka County. Noise Abatement and Control Distance from nearest railroad: Q More, or ❑ Less than 3,000 feet Anoka County CDBG Application Distance from nearest major roadway: 0 More, or ❑ Less than 1,000 feet Distance from nearest municipal or military airport: Q More, or ❑ Less than 5 miles Wetland Protection Is there a wetland associated with the proposed project? ❑ Yes 0 No Flood Hazard Area Is there evidence or knowledge that a portion of the proposed project is located in a 100- or 500 - year flood plain? ❑ Yes ❑■ No Other Does the project: • Include repair, rehabilitation, or conversion of existing building /facilities? ❑ Yes 0 No • Involve new construction, acquisition of undeveloped land or any construction that requires ground disturbance? 0 Yes ❑ No G ,x fig,. Wrt 10 V �E .:? ��u�$n;. q �b*c t As an applicant requesting funding, will any of your employees, agents, consultants, officers, or elected officials meet any of the following conflicts of interest: ❑ YesO No Participate in the decision making process for the approval of this application? (i.e., an Anoka County Commissioner or HRA Trustee) ❑ Yes❑M No Have a financial interest or reap a financial benefit from this activity? ❑ YesO No Have an interest in any contract, subcontract, or agreement with respect to this application either for themselves or those with whom they have family or business ties during the program year and for one year thereafter? If "Yes" to any of the above, please identify the situation: #, _'c* t " -- Select ONE type of beneficiaries this project will address and the number of expected accomplishments. ❑ Area or Spot designation ❑■ Households- Enter # households 37 households ❑ People - Enter # unduplicated people ❑ Businesses - Enter # businesses ❑ Housing Units - Enter # units ❑ Jobs - Enter # jobs ❑ Public Facilities - Enter # facilities ❑ Demolition /clearance - Enter # units Anoka County CDBG Application C�� ❑ Planning: Outline the community benefit in a brief narrative. # r r In accordance with federal regulations, CDBG funds may not be used to directly or indirectly employ, award contracts to, or otherwise engage the services or any contractor or Subrecipient during any period of debarment, suspension, or placement of ineligibility status. Will you hire a contractor or consultant? ❑■ Yes ❑ No If yes, complete the following information: 1. Name of consultant /firm and owner: Not yet determined 2. How were they selected? 3. Is the consultant /firm already under contract with your organization? ❑ Yes ❑■ No 4. Is this consultant /firm a women or minority owned business? ❑ Yes 0 No If you are unable to complete this section at the time of application, all contracts must be reviewed for debarment before a CDBG release of funds, contact Anoka County with updated information. Attach the following documents: [] Acknowledgement of receipt of Anoka County Section Plan 2010 (available at http: / /ww2.anokacounty.us /v3 cd /doing- business /Section3.aspx - download and read the Section 3 Plan, acknowledgement is last page of Plan) ❑ Section 3 Action Plan (available at http: / /ww2.anokacounty.us /v3 cd /doing- business /Section3Forms.aspx ) k4�;avRi•! fi'��! hie� AN�. .9�� �a &. .w- :.:P�,7�i:3Y " ,�•. The following documents are required to be attached, if applicable, with the application submission ❑ Resolution of governing body requesting funds or board minutes approving submission of application ❑ Supporting documentation such as, survey, Phase 1 /11 Environmental, census data, etc ❑ If Nonprofit - State and Federal Tax Exemption Determination letter - 501(c)(3) ❑ List of Board of Directors /Council or Trustees for Nonprofit applications ❑ Project Timeline or schedule ❑ Building /area information and photographs ❑ Appraisals ❑ Phase Level Environmental Report Anoka County CDBG Application ll �� ❑ Map or sketch of project area ❑ Professional certification, analysis of feasibility and /or cost estimate ❑ Letters of support/Project commitment letters ❑ Acknowledgement of receipt of Anoka County Section Plan 2010 ❑ Section 3 Action Plan ❑ Budget proposal — using the Excel document provided on the Web site A copy of the applicant's Audit, Management & Compliance Report and Certificate of Liability insurance will be required before the Subrecipient Agreement can be completed. 0 I hereby acknowledge that by applying for CDBG funds, this activity may require compliance in the following areas: • Utilization of minority and women contractors • Labor Standards provisions (Davis -Bacon Act) • Uniform Relocation Act and Section 104(d) • Section 3 • Environmental Regulations • Flood Insurance • Lead -Based Paint Assessment and /or Remediation or Abatement • Debarred, suspended and ineligible contractors and subrecipients • Handicapped accessibility • Title VI of the Civil Rights Act of 1964 • Title VIII of the Civil Rights Act of 1969 - Fair Housing Act DUNS #: 113481704 If not disclosed on this application the DUNS number will be required upon the finalization of the Subrecipient Agreement. I certify that the information contained in this application is true and correct and that it contains no misrepresentations, falsifications, intentional omissions, or concealment of material facts and that the information given is true and complete to the best of my knowledge and belief. I further certify that no contracts have been awarded, funds committed or construction begun on the proposed program, and that none will be prior to issuance of a Release of Funds by the program Administrator. O Signature of Authorized Official Mike Jeziorski Print name of Authorized Official Finance Director Title 1/14/13 Date Anoka County CDBG Application • Cl/ 2013 INDIVIDUAL RATES City of Centerville 2008-2012 Individual Title Rates 2013 Rates Statz, Mark R Senior Project Manager $ 126.00 $ 12600 Long, Christopher W (Chris) Engineer $ 109.00 $ 112.00 Ruhl, Price B Crew Chief $ 78.00 $ 80.00 Simons, Gerard D (Jerry) Engineering Technician $ 91.00 $ 94.00 McCotter, Timothy H (Tim) Project Manager $ 126.00 $ 130.00 White, Catherine R (Cathy) Project Technician $ 65.00 $ 67.00 Lovell, Shirley R Project Technician $ 65.00 $ 67.00 Hare, Brian Engineer $ 95.00 $ 98.00 I Mark's rate will be held at the existing rate Average of 3% increase for 2013 i 2013 RATE SCHEDULE Classification 2013 Senior Principal $ 126.00 - $ 160.00 Principal $ 119.00 - $ 149.00 Specialist* $ 110.00 - $ 229.00 Project Manager $ 115.00 - $ 144.00 Senior Geologist I Environmental Health & Saftety Specialist I Hygienist $ 129.00 $ 153.00 Senior Engineer) Scientist I Architects 11-andscape Architect I Planner $ 110.00 - $ 144.00 Architect I Landscape Architect $ 100.00 - $ 119.00 Land Surveyor $ 88.00 - $ 148.00 Engineer I Planner I Scientist I Geologist I Hygienist I EH & S Specilast $ 83.00 - $ 119.00 Designer I GIS I Landscape Designer JGraphics $ 83.00 - $ 104.00 Engineering Technician I Senior Project Technician $ 65.00 - $ 99.00 Project Technician $ 44.00 - $ 67.00 Field Supervisor $ 89.00 - $ 136.00 Crew Chief $ 68.00 - $ 107.00 Environmental /ArgiculturalInspector $ 77.00 $ 144.00 Inspector $ 67.00 - $ 93.00 Survey Technician $ 46.00 - $ 67.00 GPS Survey Equipment $ 38.00 Total Station Equipment $ 28.00 GIS Workstation Equipment $ 22.00 GPS Submeter Unit (per use) $ 80.00 Flow Meter (per week) $ 200.00 Air Detection Equipment (per half day) $ 25.00 * Specialist: Experts in highly technical disciplines including Principal Planners, Market Analysts and Certified Industrial Hygienist will be quoted on a per project basis. These rates are adjusted annually in accordance with the normal review procedures of Stantec. CITY OF CENTERVILLE to �Cfe MONTHL Y ENGINEER T REPORT For the December 12, 2012 City Council Meeting , staZfied JAK, Italics = New information. Normal = No change from last report. 1. TE Grant Trail Project (000616- 08165 -0). Final payment paperwork is being processed with the County. 2. 2008 Downtown Storm Water Improvements (000616- 08167 -0). A record plan of the project is being produced. 3. 2013 Street and Utility Improvements (193801520). A preliminary draft of the plans was sent to City Staff before the Christmas break. We are now addressing comments from City staff and should have a second draft for review in a week or two, keeping us on our original schedule. 4. CSAH 21 Reconstruction (193801639). Anoka County Staff attended a City Council workshop to hear the City's thoughts on the proposed improvements. The County presented some preliminary cost estimates for several options. The City will need to let the County know which option is preferred and if there are any other requests of the designers. 5. Miscellaneous: • None �I