Re: CSAH 21 (Centerville Road) Reconstruction
City of Centerville
Temp. File No.: 193801639
Dear Dallas:
At the request of the City Council, we have reviewed the county's preliminary design for the reconstruction of
CSAH 21 (Centerville Road) from Main Street to the southern city limits. The following are our comments:
Main Street to Heritage Street
The county's current plan shows this area proposed as:
Two -lane urban section roadway
Right turn lanes /Parking lanes
Mill and overlay
Existing concrete curb and gutter would remain in place
This segment is part of the City's Downtown Redevelopment Area. With this in mind, the City has a few
options for this portion of the roadway:
1. Allow the overlay
a. This would make it difficult to gain
participation from the County if the road were to be reconstructed as part of a downtown
redevelopment in the next 15 years.
2. Ask County to leave this section out of the proposed improvements
a. This allows us to ask for participation from
the County-if we decide to reconstruct this segment in the next 15 years.
b. The one drawback here is that there may be
some questions from the public as to why the whole road was reconstructed and just these
two blocks were left untouched. Hopefully, a little communication can explain our reasoning.
3. Go forward with the full reconstruction at this time.
a. One version of this option would be to just
reconstruct the street between the curbs. Then, at a later date (with redevelopment), we
would remove the curb and add on parking lanes, new curb and streetscaping.
Page 2 of 5
b. Alternatively, you could undertake the full
reconstruction with streetscaping at this time. However, that would involve property
acquisition and building demolition (on the block between Main and Sorel).
We recommend Option 2 —No Improvements. The roadway is Inadequate condition and is not in need of
immediate repair. Choosing this option leaves us the most flexibility in the future. There would be no cost to
the city for this section, if Option 2 is chosen.
Heritage Street to Meadow Lane
The county's current plan shows this area proposed as:
• Two -lane urban section roadway
• Right turn lanes
• Ditch on the west side (even though there is curb and gutter)
• Full reconstruction
• Existing concrete walk on the east side would remain in place (or be replaced in -kind)
We encourage the city to support the current design in this segment. The city maybe responsible for the
cost of curb and gutter and its share of storm sewer in this area.
Meadow Lane to Center Street
The county's current plan shows this area proposed as:
• Two -lane rural section roadway
• Right turn lanes
• 4' paved shoulders where there are no turn lanes
Full reconstruction
• No trails or sidewalks
A previous version of the county's draft plan showed this area as urban section. We would still like to have
the county explore this option for a number of reasons.
• Minimizes impacts to adjacent properties
• Allows the addition of trails /sidewalks in the future without property acquisition or re- grading.
• Provides an urban, in -city environment which promotes traffic calming
• Is more aesthetically pleasing (allows mowing)
Our examination of making this area an urban section, without ditches, shows that the road must be lowered
by about five (5) feet throughout this segment in order to eliminate the need for ditches. The county's plan
already shows this area being lowered by I — 2 feet. Lowering the road by 5 feet causes driveways on the
west side to become fairly steep and necessitates cutting the intersection at Center Street back about 80 feet
or so. It appears that this area could be made into an urban section, without ditches. However, further,
more detailed design is necessary to make sure this is the best alternative.
We recommend asking the county to consider making this segment an urban section. Making this segment
an urban section could add costs to the city for curb and gutter and storm sewer
Stantec
Page 3 of 5
Center Street to Hunters Trail
The county's current plan shows this area proposed as:
• Two -lane rural section roadway
• Right turn lanes
• 4' paved shoulders where there are no turn lanes
• Full reconstruction
• No trails or sidewalks
A previous version of the county's draft plan showed this area as urban section. Our examination of making
this area an urban section, without ditches, shows that the road must be lowered by about seven (7) feet
throughout this segment in order to eliminate the need for ditches. There is only one affected driveway on
the west side which may become fairly steep. The new elevation would also necessitate cutting the
intersection at Hunters Trail back about 100 feet or so.
While this area could be made into an urban section, without ditches, it is probably not cost effective to do
so. The county's plan shows only minimal grade change here, so lowering the existing grade by 7 feet would
be a drastic difference in the amount of excavation, making it prohibitively expensive.
We encourage the city to support the current design in this section. There should be no cost to the city for
this segment.
Hunters Trail to Dupre Road
The county's current plan shows this area proposed as:
• Two -lane rural section roadway
• Right turn lanes
• 4' paved shoulders where there are no turn lanes
• Reclaim- shape- and -pave type improvement
• No trails or sidewalks
A previous version of the county's draft plan showed this area as urban section. Beginning just south of
Hunters Trail, this area becomes more rural and probably lends itself to the type of design shown.
We encourage the city to support the current design in this section. There should be no cost to the city for
this segment.
Stantec
Page 4 of 5
Dupree Road to Southern City Limits
The county's current plan shows this area proposed as:
• Two -lane rural section roadway
• Right turn lanes
• 4' paved shoulders where there are no turn lanes
• Reclaim - shape- and -pave type improvement
• No trails or sidewalks
This area is yet to be developed and lends itself to a rural section roadway.
We encourage the city to support the current design in this section. There should be no cost to the city for
this segment.
Trunk Storm Sewer /Stormwater Treatment
As you are aware, the City's ultimate plan for the Downtown Redevelopment and for its Downtown
Stormwater Reclamation Project necessitates the construction of a 42 -inch pipe coming from the intersection
of Centerville Road (CSAH 21) and Sorel Street, south to a discharge point leading into the ditch along the
south side of LaMotte Park.
The County will need to construct a storm sewer system in areas of urban section roadway and may need to
provide stormwater treatment Best Management Practices (BMPs) for the project. Those BMPs could include
infiltration features, storm ponds and the like.
If the City wishes to construct the 42 -inch pipe now and enter into a joint powers agreement to share that
pipe with the County, it could likely handle both the County's storm water and the City's future runoff from
the Downtown Redevelopment. If not, a slightly larger pipe probably could. In either case, it would likely be
mutually beneficial to share the pipe and therefore realize savings by sharing the cost. Each party might pay
a percentage of the pipe's cost based on its contribution to the flow or the County could contribute the
equivalent cost of the system they would have needed on their own.
The pipe could be constructed under the county's contract, with the City's portion of the cost becoming part
of its share of the project costs.
Finally, a similar agreement could be reached to have the County share the City's Stormwater Reclamation
Facility to the extent in needs to provide treatment or infiltration.
Sidewalks and Trails
During the course of several design meetings, the logistics of certain trail segments has been discussed.
There are many factors which affect the viability of a trail. A few things to note are:
• The County views trails as a City cost
• If additional right -of -way is necessary because of a trail, they would view that as a City cost
• If additional wetland mitigation was necessary because of a trail, they would view that as a City cost.
There are areas of significant wetland impact between Hunter's Trail and Dupre Rd.
stan>tc
Page 5 of 5
The reimbursement program we took advantage of on CSAH 14, only covers the material cost of the
trail and does not include any grading or other ancillary costs as mentioned above. Also, it is not
certain that a trail along Centerville Road would be considered eligible for this reimbursement.
The City of Lino Lakes has stated that, for a variety of reasons, they do not plan on pursuing the
construction of a trail along their segment of this project (Birch St. to Centerville's southern City
Limits). This means that an extension of a trail along CSAH 21 in Centerville's portion of the project
would likely terminate with a dead end.
Weighing all of these factors, if a segment of trail is to be constructed, it should be one of high priority, with
a significant benefit to the safety and convenience of the public. The existing trail crossing between Hunter's
Trail and Dupre Road is one which the County does not wish to perpetuate. If a trail was constructed along
the east side of Centerville Road, between this crossing and the trail crossing at Meadow Lane, it may offer
an alternative to trail users wishing to cross at a safer, better marked location. However, forcing people to
use this alternative could be difficult. The council should weigh the pros and cons of the construction of this
segment. Other segments do not appear to offer enough benefit at this time, to justify the added expense.
Sincerely,
STANTEC CONSULTING SERVICES, INC.
Mark Statz, PE
City Engineer
651 - 604 -4709
Attachments: Marked up portions of the County's Draft Plan