Loading...
HomeMy WebLinkAbout2015-09-01 P & Z Packet PLANNING AND ZONING COMMISSION teryilfe MEETING AGENDA craflcta,WL,WIS��7 Tuesday, September 1, 2015 6:30 p.m. IF YOU ARE UNABLE TO I. CALL TO ORDER MAKE THIS MEETING, 1. Roll Call PLEASE LET US KNOW AS SOON AS POSSIBLE. THANK II. APPEARANCES/PRESENTATION(S) YOU! 1. Mr. Lou Suski, Gaughan Companies, Inc.—City Code, Chapter 156, Subdivision, 156.166— Parking Requirements (Other Industrial or Warehouse) III. PUBLIC HEARING(S) IV. OLD BUSINESS 1. Discussion on Downtown Master Plan & Development Guidelines V. NEW BUSINESS 1. Meeting with Ruffridge/Johnson General Contractor Jay Thorson, Dailey Companies 2. MnPASS Express 2. Reschedule Regularly Scheduled Meeting of November 3,2015 due to School District Elections, (November 10, 2015)? VI. DISCUSSION ITEMS VII. CONSIDERATION OF MINUTES 1. August 11, 2015 Planning & Zoning Commission Meeting Minutes VIII. ADJOURNMENT Planning&Zoning Commission Meeting— September 1, 2015, 6:30 p.m. (Council Chambers) Parks &Recreation Committee Meeting—August 5, 2015, 6:30 p.m. (Council Chambers) City Council Meeting— August 12, 2015, 6:30 p.m. (Council Chambers) City Council Meeting— August 26, 2015, 6:30 p.m. (Council Chambers) USE OF PARK(S) Out Run Homelessness, 5, 8K's& Kids Run/Walk—September 19, 2015 (Around Centerville Lake and Out and Back) CHS Diamond in the Rough 5K & l OK Run/Walk—September 26, 2015 (Around Centerville Lake and Out and Back) Centennial Flag Football— LaMotte Park Fields 1, 2 & 11 —August 1 —October 30, 2015 (Tuesdays, Thursdays & Saturdays from 5:00 p.m. — Sunset& 8:00 a.m. —2:00 p.m. Centennial Soccer—Acorn Creek Park Field 1 —April 1 —October 30, 2015 (5:00 p.m.—Sunset) Centennial Soccer—LaMotte Park, Fields 1, 2 & 11 —August 1 —October 30, 2015 (Mondays, Wednesdays & Fridays from 5:00 p.m. —Sunset B-Day Party—Laurie LaMotte Memorial Park—August 30, 2015 (1:00— 5:00 p.m.) Cub Scout Rocket Launch—Laurie LaMotte Memorial Park—October 3, 2015 w/Alternative Date October 10, 2015 (8:00 a.m. —5:00 p.m.) (e) Temporary storage of materials and equipment during construction and landscaping; and (f) Lakeshore properties can store the following items of personal property within 50 feet of the shoreline during the months from September to May: docks,boat lifts, swim rafts, slides and other swimming equipment. (2) Commercial/industrial districts. Storage of products, materials and equipment, excluding rubbish or junk, which is necessary to an approved business operation in a commercial or industrial district, and which is completely screened from adjoining properties and rights-of-way. The site plan review process is required to determine the appropriateness for storage permitted in the section, surfacing required for the storage area and the screening required. §§ 156.145 THROUGH 156.154 RESERVED FOR FUTURE USE. § 156.155 WOODLANDS PRESERVATION. In residential areas, structures shall be located in a manner that the maximum number of woodlands shall be preserved. If large numbers of trees are cut in residential areas, trees shall be replanted in a density and manner satisfactory to the City Council. Clear cutting of woodlands for nonagricultural purposes is prohibited, unless the action involves a utility or roadway, required by the public, and includes a reforestation plan required by the City Council. §§ 156.156 THROUGH 156.165 RESERVED FOR FUTURE USE. § 156.166 PARKING REQUIREMENTS. (A)Requirements in general. The following table illustrates the minimum number of parking spaces required for various uses permitted in the city. The city may modify minimum parking requirements in the M-1 District, as part of the planned unit development approval process, if it is determined that the use is consistent with the purpose of the district and that parking is determined by the City to be sufficient to accommodate the use. Uses Minimum Parking Required Residential 2/dwelling unit Churches 1/3 seats in largest assembly room Schools 1/classroom plus 1/3 seats in largest assembly Theaters 1/3 seats Restaurants 1/3 seats Offices 5/1,000 sq.ft. gross floor space 364 1 Page Retail 6/1,000 sq. ft. gross floor area Convenience stores 7/1,000 sq. ft. gross floor area General services 4/1,000 sq. ft. gross floor area Trade businesses 3/1,000 sq. ft. gross floor area Manufacturing 3/1,000 sq. ft. gross floor area Other industrial or warehousing 2/1,000 sq. ft. gross floor area Car washes 5/stacking per bay Drive-up restaurants 5 stacking plus 1/3 seats (B)Off-street parking. When a building or structure is enlarged, additional off-street parking shall be required only with respect to the additional usable floor area. (C)Change in the U.se of a Building or Structure. An off-street parking area shall not be changed to any other use until equal off-street parking is provided elsewhere. No parking area used or designated in connection with a building or structure in existence on the effective date of this chapter shall be reduced to provide fewer than the minimum number of parking spaces required under this chapter. (D)Off-street parking and loading zones. No building or structure shall be hereafter erected,substantially altered or its use changed unless off-street parking and loading spaces have been provided in accordance with the provisions of this chapter. The number of off-street parking spaces provided shall be at least the minimum number provided in the schedule contained in this section. (E)Notwithstanding the minimum number of parking spaces as defined by this section, a conditional use permit may be granted to provide fewer parking spaces when it is clearly demonstrated by the applicant that the use will not require the number of spaces indicated. In the event a conditional use permit is granted, a condition may be imposed to require that the land normally dedicated to parking shall be held in a landscaped reserve that can be used for parking in the event the use or parking needs should change. A landscape reserve should equal the amount of land necessary to support the number of parking spaces required to serve any more restrictive parking use of the building or structure permitted by the applicable zoning district and building codes. (F) Parking spaces may be located on a lot other than that containing the principal use, subject to issuance of a conditional use permit. (G)Off-street loading. A loading space shall have minimum dimensions of not less than 12 feet in width, 50 feet in length, exclusive of driveways, aisles and other circulation areas. One off-street loading space shall be provided and maintained on the same lot for each commercial and industrial use requiring regular delivery of goods and having a modified gross floor area of more than 10,000 square feet. One loading space shall be provided for each additional 25,000 square feet or fraction thereof. No off-street loading space shall be located in any required yard adjoining any residential use. Required off-street loading space shall not be included as off-street parking space in computing required off-street parking space. Vehicles utilizing this loading space shall not project into the public right-of-way. 365 1 Page 4780 Regents Walk R - C Shorewood,MN 55331 952.250.9783 hulvestad@rocklandreadvisors.com June 29, 2015 Meeting With Mike Ericson, City Administrator, City of Centerville and Lou Suski, Gaughan Companies o Offer to purchase Lot 2, Block 1, Clearwater Business Park o Buyer: Jon and Sophie Pederson o Tenant: Ruffridge Johnson Equipment Company, Inc. o Sale of existing Ruffridge Johnson property 0 1031 Exchange Contingency o Due diligence timeline o Site and building plans o Next step RUFFRIDGE JOHNSON EQUIPMENT COMPANY, INC.* Projected Timellne for Sale of Exchange Property And Acquisition of Centerville Business Park Site 6/2015 6/2015 12/31/2015 6/2015—4/01/2016 4/01/2016 4/10/2016 Cente CI J &S Pederson * J &S Pederson *sign a Deadline for Aeon to J &S Pederson Specified Closing Date for closing on Construc submit offer to purchase agreement to satisfy and/or waive all complete due diligence Date in purchase purchase of RJE facilit purchase Lot 2, Block sell the Ruffridge contingencies. If Aeon on Centerville site and agreement with Centerville site or 10 Centervil 1,Clearwater Johnson business does not terminate the contract for materials Aeon. days after the close commern Business Park from property to Aeon PA,Aeon becomes and construction of of the sale to Aeon, close on City of Centerville contingent on obligated to close April new facility. All whichever occurs Centervil completing a 1031 1, 2016 contingent on close of later. exchange for a the sale to Aeon. replacement property in Centerville. *Ruffridge Johnson Equipment Company, Inc. =Tenant of both Exchange Property and proposed Centerville Business Park site. Jon and Sophie Pederson = Current owners of Exchange Property and prospective owner of Centerville Business Park site. RUFFRIDGE JOHNSON EQUIPMENT COMPANY, INC.* Projected Timeline for Sale of Exchange Property And Acquisition of Centerville Business Park Site 12015 12/31/2015 6/2015—4/01/2016 4/01/2016 4/10/2016 Centerville Site 1031 Exchange Closing Executed !rson * sign a Deadline for Aeon to J &S Pederson Specified Closing Date for closing on Construction of new 180 days after agreement to satisfy and/or waive all complete due diligence Date in purchase purchase of RJE facility on closing on iffridge contingencies. If Aeon on Centerville site and agreement with Centerville site or 10 Centerville site to purchase of lusiness does not terminate the contract for materials Aeon. days after the close commence after Centerville site :o Aeon PA,Aeon becomes and construction of of the sale to Aeon, close on purchase of ton obligated to close April new facility. All whichever occurs Centerville site. ig a 1031 1, 2016 contingent on close of later. for a the sale to Aeon. mt property rille. Company, Inc. =Tenant of both Exchange Property and proposed Centerville Business Park site. rrent owners of Exchange Property and prospective owner of Centerville Business Park site. _J ----------------- ROAN SWET 14 P too CAR ► cl wimimmmWE < i i S i I 1 ! ALA ` Ilk •� �� 1 � i �t .� �.f•t [ 1� i�`�! 4x.'1 t WAI '1��4. '�'":.-•.:tea.. —...�. -r. •..�_.. gars� "".�.'«�`. - _��'_"``" .r-- �r �� �--..��..■rorr ii..�=�-=�--.�7.-. -,.�',.� Table of Contents A. Introduction.............................................................................3 B. Systems Guidelines................................................................. 9 C. Standards for Private Development............................................19 January 4, 2006 Page 1 of 34 Master Plan ` Downtown Redevelopment Task Force Members: Kevin Amundsen Rick Terway Bill Bisek Mike Thinesen Jenny Dosch Tom Wood Jennifer Klennert Mayor Mary Capra Tom Lee John Meyer, City Financial Dir. D. Love Dallas Larson, City Administrator Mark Pangell Consultant Team: Damon Farber Associates Benshoof&Associates KKE Architects, Inc. 923 Nicollet Mall, Suite 200 10417 Excelsior Blvd, Suite 2 300 First Avenue N. Mpls, MN 55402 Hopkins, MN 55343 Mpls, MN 55401 web: www.damonfarber.com web: www.benshoof.com web: www.kke.com ph: 612.332.7522 ph: 952.238.1667 ph: 612.332.4200 We would like to thank the Downtown Redevelopment Task Force, the many concerned citizens, business owners, City Staff, County Staff and local politicians who contributed their time and ideas to the Master Plan. It is the dedication and hard work of such individuals that make Centerville a thriving community today and will provide vision for its future. January 4, 2006 Page 2 of 34 ` Mas��lrlan A. INTRODUCTION A. 1. intent of the Master Plan & Development Guidelines The Downtown Area Master Plan & Development Guidelines propose recommendations that will reinforce and guide publiclprivate investment in a manner that will strengthen the viability of the area and recommend Downtown Centerville as a community destination of the highest quality. The Master Plan is intended to ` guide the form and character of development within downtown for the next twenty years. Traditional Mixed-Use Downtown In the summer of 2005, Damon Farber Associates was commissioned by the City Mixed-Use neighborhood and downtown of Centerville to lead a community task area. force to prepare a master plan, a set of design guidelines and zoning amendments. A framework of transportation The purpose of the Master Plan& improvements needed to support the Development Guidelines is to establish an redevelopment of the area and to create appropriate framework for future appropriate levels of parking as well as redevelopment of downtown as a vibrant vehicular, bicycle and pedestrian access to Mixed-Use destination,to incorporate: the downtown. A set of design standards to guide the _ architectural quality of new development within the downtown area. While subject to the following regulations and guidelines, the plan layout shall be flexible to respond to physical site r constraints,end users' needs, community desires and a changing market. The market analysis performed by the McCombs Group in the Fall of 2005 helped to define the overall quantity of retail, Looking South on Centerville Road at Main Street commercial and residential that could occur • An overall vision for redevelopment within the next twenty years. of the area, including the pattern, form and character of new development and open The market analysis projects that the City of space in the interest of creating a cohesive Centerville will be able to sustain a total of 230,700 square feet of merchandise and January 4, 2006 Page 3 of 34 Ma$ er-Pf a 5 services including but not limited to A Master Plan Concept and Development restaurants, specialty stores, clothing Guidelines would allow for this kind of retailers, coffee shops, physicians offices, creative flexibility. The Guidelines set insurance offices, bank, daycare and standards for urban design relationships personal services. The Market Analysis that ensure the scale and character of also predicts that the City of Centerville will redevelopment that the community expects, be well served by the addition of while still allowing the developer to arrive at approximately 450 additional higher density creative solutions that meet their financial residential units. requirements and the needs of the end users. The uses and square footages shown on the Master Plan are based on this analysis with consideration of the appropriate uses to occur within the downtown area and transitions into the surrounding neighborhoods. The Master plan directs the design of the street and open space network and provides flexibility with the individual block layout and dispersion of housing types to meet City statutes, regulations and guidelines within. A.II Master Plan improved Pedestrian Environment A number of goals emerged during the initial The intent of the Downtown Master Plan is meetings with downtown land owners, the to provide a comfortable, safe, Mixed-Use general public, the Downtown Task Force community with emphasis on pedestrian and through the analysis of existing oriented streetscapes, diverse housing conditions and upon review of the Market options, adequate open space and quality Analysis conducted by the McCombs architecture. Group. The goals were developed with an eye More specifically, the Guidelines are towards providing the development intended to: community with a clear and concise Ensure the compatible integration of understanding of the communities' vision for retail, office and residential uses. the downtown. The vision includes the desire to incorporate the History of Maintain a scale and form of Centerville into the redevelopment. development that emphasizes sensitivity to A system was needed to set standards for the pedestrian environment and existing the overall project but also to allow enough neighborhoods nearby. flexibility for developers to tailor their • Ensure the compatible integration of a individual projects within the downtown area variety of housing types, including towards the needs of the end users. townhouses, medium density and high density residential. January 4, 2006 Page 4 of 34 maittr` ?4An- appropriate design standards. A range • Minimize the impact of automobiles into of housing types will be available in the setting through strategies such a shared downtown, each meeting high design parking", in which adjacent land uses having standards. Centerville will meet the different peak-hour parking demands can challenge of managing growth while share parking facilities. enhancing the historic small town flavor, safety and strong sense of community • Improve access to and from County that has attracted people to live here." State Aid Highways 14 and 21. - Task Force Vision Statement • Achieve"traffic calming"benefits through: an integrated street network, History of Centerville provision of options for traffic flow, the Centerville has a rich French-Canadian design of streets with adequate width, and history with the first white settlers arriving to the provision of on-street parking. the area in the 1840's. They were trappers Provide for public open space that uses coming to the area for the abundant wildlife. Prior to the white settlers moving into the storm water treatment ponds as a visual area the Dakota Indians lived here in the and recreational amenity to the project. 1600s and 1700s. At that time, this area Ensure the compatibility of buildings with was covered with dense woodlands and respect to the specific character of their many square miles of marshes, lakes, and p p waterways. The Dakotas abandoned their immediate context within each district. settlement in the late 1700's, but returned Encourage active ground floor uses, annually to harvest wild rice. such as restaurants, shops and services, to Soon after,families from Canada arrived animate the street within the Mixed-Use and settled here because it reminded them Corridors portion of the area. of their former homeland. Several descendants of these original settlers still • Develop a better connection between live in Centerville. downtown and Centerville Lake The city was officially established on August The task force developed a vision statement 11, 1857,when Minnesota was still a for the entire project that will guide the territory. At that time Centerville was known development of the plan and aid in the as Centerville Township and encompassed evaluation of development proposals. the current City of Centerville and the City of Lino Lakes. The downtown area of "Centerville will continue to be a small Centerville was originally known as the town and will be a safe community where French Section. German immigrants settled people know their neighbors. The farther to the west in what is now part of the historic fabric of the downtown and the City of Lino Lakes. The pioneers cleared surrounding neighborhood provide a the land for farming and agriculture soon strong sense of place and pride for followed. Residents formed the Church of residents. Residents will be able to walk St. Genevieve of Paris. to downtown through a well-connected The Downtown Redevelopment Task Force trail system. Centerville's historic wanted to build off of Centerville's history downtown will offer a mix of uses, with with an emphasis on our uniqueness of the small town character preserved by having the downtown still standing, but all of January 4, 2006 Page 5 of 34 Master Plan � a ill i the building have been greatly modified and A. 111 Purpose. What are Development no long meet the criteria for registration as a Guidelines? National Historic site. With this knowledge The primary purpose of Development the Downtown Redevelopment Task Force Guidelines is to set basic parameters, felt the necessity to build off our heritage in describe preferences and design intent. the redesign plans for the downtown area. These guidelines serve as a framework within which creative design can occur. You will see the French-Canadian reflection Development Guidelines are established to in the design plan with great detail given to ensure that public and private development iron work and building design reflective of projects implement the Goals, Objectives, turn of the century Canadian architecture. Policies and Character envisioned by the community. The Guidelines provide a framework to: '4 "'3 r.° t ,, • Enhance the quality of the built environment; •Achieve quality contextual design •Achieve design that implements the vision of each district in which the property is located, thereby promoting an identity for the downtown; Quality Residential Architecture • Encourage a diversity of architectural styles that incorporate historic architectural Districts elements and materials previously used The project area is broken into two unique downtown; districts that relate directly to each other. The Mixed-Use Corridors and the • Provide design flexibility instead of Downtown Neighborhood district form the aesthetic control; primary development opportunities within the area. • Create a unique pedestrian-oriented environment; and; The Mixed-Use Corridors will provide primarily retail uses on the first floor with • Provide investor and property owner housing or office uses above. It will become confidence through design continuity. a pedestrian friendly town center and community destination. The Development Guidelines encompass the above goals through standards for new The Downtown Neighborhood will provide a construction that regulate site design, range of medium to high density housing building placement and building design. styles and choices for everyone from empty Lastly, the Guidelines establish standards nesters to young professionals. for seven important systems. The Guidelines include an explanation of the general and specific design principles promoted by each aspect of the guidelines, January 4, 2006 Page 6 of 34 ,F Mast@t l a _ F. as well as a variety of images describing Transportation Systems Storm Water appropriate design solutions to implement Systems those principles.This approach values Utilities creativity and allows for numerous design Mix of Uses solutions for any particular project. The City Parking Strategy Administrator and Planning and Zoning The Second document, Standards for Commission are responsible for the Private Development is intended to provide administration of the Development guidance to the private developers as they Guidelines. Projects in the Downtown Area take responsibility for individual components must comply with the Development within the Master Plan. It will help assure Guidelines, as well as the provisions of the that the private development that takes place City Code and compliance will be in the Downtown Area will fulfill the City's determined during the site plan review goals and objectives for the area. process. The Standards for Private Development - deal with the two individual districts within JLthe Master Plan and the individual buildings H�w�yy M W within those districts. tE` Well Detailed Buildings E A. IV Application The format and content of these guidelines are specifically tailored for use as a reference workbook. They are organized into two separate documents that are intended to be used by two different audiences, the Systems Guidelines and the Standards for Private Development. The first document, Systems Guidelines provides design guidance for all elements of the public infrastructure. It outlines issues and provides design standards that apply to the entire Downtown Area. It is intended as � 1 an attachment to the Master Plan Document itself. The Systems Guidelines describe the seven distinct items of the overall infrastructure framework: . . _, ^:Y _ Context Improved Public bdrastructure Open Space January 4, 2006 Page 7 of 34 t 10. x s-n s .. ih r .~e''� � '�e�.v,�.rir-tt�. p I3, � •,e��,{j '.��.w- 2ftl f - ?�M 2 y -1 Ll I t U: L JT � i+ ll Ah 4 .L7 ML Z. — ^�- Mtstefffl B. Systems Guidelines stand alone district within the City; instead it will be a part of, and connect with, a variety Systems Guidelines describe the elements of local, city-wide and regional systems. of the public infrastructure. The System Each development project,whether a single Guidelines outline issues and provides building, one lot, or a series of blocks, must guidance for standards that apply to the provide reasonable links to these systems entire Downtown Area. It is intended as an as a primary design objective. attachment to the Master Plan Document itself. The Systems Guidelines will deal Guideline Recommendations with the seven distinct items of the overall To ensure that the Downtown Area takes infrastructure framework: full advantage of local and regional systems,development should: Context Open Space •Provide safe, easily recognized Transportation Systems connections to city and regional trail Storm Water Systems systems; Utilities Mix of Uses Support increased use of transit services Parking Strategy by maintenance of existing service to St. Paul and strengthen service to Minneapolis These seven items represent the overall for residents; organizing elements that give shape and form to the public elements of the Master -Tie into, and improve,the utility network; Plan. Presumably,they will be adopted by the City as part of the Master Plan,will • Integrate with and complement the become part of City policy and will be existing (and future)street framework; implemented by the City or with City participation before or concurrently with - Become an integral part of the city and the work of private developers. The county drainage/storm water management Systems Guidelines will create the plan; framework within which the private parcels are allowed to be developed. They will - Parks and open space will be easily prescribe Development Standards for all accessible to all Downtown Area residents, above ground,visible elements of the visitors, people who work here and also for public infrastructure including street and the citizens of Centerville and the roadway design, streetscape and surrounding area. landscape design, pedestrian spaces, connectivity between private and public B. 11. Open Space spaces, parking strategies and policy, etc. The overall design framework of the Systems Guidelines will prescribe Downtown Area is based on links to everything in the public realm from curb LaMotte Park,trails, new open space sections and paving materials to street downtown and regional open space. The lights, park benches, waste receptacles City of Centerville will take the lead role in and tree species. local parks programming, design review, construction sequencing, implementation B. I. Context and ultimately maintenance and operation Although unique to Centerville, the of key public spaces within this framework. Downtown Area is not intended to be a The goal is to link existing parks and trails January 4, 2006 Page 9 of 34 �,. Mas#erflor ' defined in regional park plans with the trails • Maintain trail width shall be 12'where it within the Downtown Area. occurs on residential streets and a minimum of 10' in other areas; • Encourage private development(block by block)to share in the responsibility to j` provide inviting, innovative and useable Y , green space as integral parts of each development project; • Continue to work with St. Genevieve's church on the future of their land on Centerville Lake and insure that public Trails Provide Access to Downtown access to the lake can be accommodated at some point in the future; Of equal importance is the contribution from each block and each development project to • Integrate storm water management this open space network, adding a variety of components (meeting water quality and quantity requirements)within both private, semi-private, and perhaps some additional public space throughout the public/private parks and open space Downtown Area. Private development will improvements. Together, the system of public and semi-public green space will share the responsibility to provide inviting, innovative and useable green space as result in a welcoming public realm throughout the revitalized downtown. integral parts of individual parcel site design. x ' Guideline Recommendations The Centerville Downtown Area will have new open space that did not previously exist in the City. Toward that end, Open Space guidelines encourage the following: • Work with the City to create an integrated, r !- comprehensive open space system that links with existing city and regional trails and open space. Reroute the proposed regional trail from CSAH 14 to Heritage Street, thus providing a safer and more appealing connection around downtown. Regional trail connection will be maintained along CSAH 14 until parcels to the south are Improved Access to Centerville Lake assembled for development and will accommodate the revised trail alignment B. Ill. Transportation Systems shown on the master plan; The system of streets and public rights-of- way are the primary way people will experience downtown. It is critical that the January 4, 2006 Page 10 of 34 character and arrangement reinforces the and by eliminating mid-block access to higher standard of development proposed parking areas. Instead,the parking areas and improves the overall legibility of the would gain access from Sorel Street or system from what exists today. The Progress Road. This allows for increased following paragraphs provide the intended on-street parking and a safer pedestrian transformation of the downtown area's environment. Additional amenities like roadway system from a set of narrow decorative street lighting, shade trees, roadways that lack a unique sense of benches, planters and hanging baskets will character to an understandable system of begin to create a unique sense of place roads with high quality pedestrian space downtown. With these recommended and an image that reflects the higher enhancements, CSAH 14 will become a standard of development desired for quality first impression to downtown downtown. Centerville,will accommodate future traffic needs and become an amenity for business owners within the downtown area. J County Road 21 Improvements r Although the County has no current plans for CSAH 21 (Centerville Road)aside from improvements to the block south of CSAH 14)the Development Guidelines recommend a desired street section for Centerville Road that improves the Existing Conditions on CSAH 14 at County Rd.21 pedestrian environment, introduces on- street parking and continues the pedestrian County State Aid Highway 14 amenities recommended for CSAH 14. Improvements One of the primary objectives of the plan is The first section on page 13 depicts Anoka to improve the overall understandability and County's proposed configuration of CSAR perceived quality of the transportation 21. The section below that illustrates the system. Characteristics and access Development Guidelines recommended associated with County State Aid Highway design for CSAR 21. It is important to note (CSAH) 14 are critical components to that increasing the ROW width on achieving this objective. Anoka County is Centerville Road will have a significant currently planning on constructing impact on existing property owners on the improvements to County Road 14 in 2007. west side of Centerville Road. The existing The road will be widened from a 50 foot parcel sizes have a depth of 150 feet. right-of-way(ROW)to 100 feet. Many Reducing this depth by 15 feet will make buildings and properties on the north side of these parcels difficult to redevelop given CSAR 14 will be taken by the County. parking requirements for retail and Utility improvements will also be made. commercial. The Master Plan illustrates a This project can become a catalyst for shared parking situation with St. downtown change. Genevieve's that would provide additional parking for the church and businesses along The Development Guidelines recommend Centerville Road. It is important that this pedestrian scale improvements by arrangement be resolved prior to any relocating the proposed trail system on the expansion of the Centerville Road ROW. south side of CSAH 14 to Heritage Street January 4, 2006 Page 11 of 34 Matt@ren ��.`.°L-".r:�... a .`J,.v."' -�; > � Yfi:;�-,'-�'f $'q[��'w;r,� ''c�k, �Z�i"� ds..��s',c�•'. r. �� '�~ � _� ,°; "���;;"='�`' •�` _ •mow 7T 7, �',��' -E`',s==•''S�.�k.:?rs .�' }:a`.- T'r.`-�-j''-_ - MOM? Anoka County Design for CSAH 14 ORs e� ;fit t ,rtu :�z�„. {%'�,';` '°� .,r°4p;- `�,.' az. .'f:. .;;P�.' ra'=' -, -.;rt:'� c"..' `�.'• R.O.W. Recommended Design for CSAH 14 January 4, 2006 Page 12 of 34 _-OILMaster _ �0. W. Anoka County Design for CSAH 24 Tl R.O.W. Recommended Design for CSAH 21 January 4, 2006 Page 13 of 34 NMI _ =tee The Local Streets inside the stores. A positive visual image is The further development of local important to retail success and to attracting commercial streets is important to people to live downtown. Coordination with attracting and keeping high quality retailers Anoka County will be required for in the downtown area. Local streets will be streetscape enhancements. easily accessible from CSAH 14 and CSAH 21 and will provide a clear and logical The transportation improvements portrayed system for shoppers and people living in the Master Plan combine to provide the downtown to access local shops. Once on Downtown Area with improved way finding, foot, users of the area should be able to easily accessible development parcels, access the local sidewalks easily from easily understood layout of streets and a parking areas and signage should orient system that can be phased in as them to the mixed use corridors. Too much development occurs. signage can clutter the streetscape and actually cause additional confusion,while The further development of neighborhood not enough can leave visitors with a sense streets will enhance the character of the of frustration. A balance must be achieved. downtown neighborhood and differentiate the residential areas from the commercial The sidewalk materials, lighting and core. The provision of a wider right-of-way landscaping all contribute to providing a allows for on-street parking as well as high quality pedestrian experience. The sidewalks which improve connectivity visual image of the street influences the throughout the downtown. perceived quality of goods and services . i _.;`di;.;�iaTt• ,.�� �a:s.�= 'cuf, '..t,!-�,eY w - i�i�: y,:° - .. � ^°r.'.'=- y'`' �+ yip .1" Ro.w. Recommended section for Local Commercial and Neighborhood Streets January 4, 2006 Page 14 of 34 B. IV. Storm Water Systems Guideline Recommendations Integration of the storm water management The overall drainage system for the area is system and public open space will provide a essential to the future performance and unique amenity for the downtown and the function of the downtown and the improved City of Centerville. water quality of Centerville Lake. The project will provide a series of regional Design creativity, use of high quality storm water collection areas on the east and materials and addressing safety concerns west ends of Sorel Street. The ponds will are critical objectives to be addressed. The provide a visual backdrop for new housing following objectives must also be addressed opportunities downtown. The project will in the final design: comply with Best Management Practice (BMP) standards and alternative storm • Regional storm water ponds. water treatment applications will be explored to minimize capital costs,future • Provide fountains to improve water maintenance and improve water quality. oxygen levels. • Filter storm water prior to entering the natural system. • Plant pond edges with native plantings to discourage geese from using sodded areas. B. V. Utilities A solid network of water distribution and wastewater collection infrastructure is vital to the health, safety, and welfare of the entire Downtown Area. While understanding the location, size and characteristics of individual utility components is important, development proposals must also acknowledge awareness of the entire redevelopment area, specifically how individual { = = improvements affect the overall utility system. The downtown will also be served j by a full complement of utility connections including cable television, fiber optic, electric, and telephone. Guideline Recommendations • Provide wastewater collection infrastructure; Ponds can become Visual AmenNes January 4, 2006 Page 15 of 34 4- - • Install water distribution system for potable water consumption and for fire protection; • All utilities should be buried within City Right-of-Way and make connections to individual projects from a 'back of house' location; • All utilities designed according to City standards. Although utilities are not typically seen, they play a vital role by establishing the needed framework for development to move forward. Downtown will be Connected ..�'�:.% � �+►: ,sus 1 �' . m,,, ,�1 •":::. .. Pff Plans for Utility Improvements January 4, 2006 Page 16 of 34 MAO 411 01 B. VI. Mix of Uses overall needs of the Downtown Area. The master plan identifies the desired mix of Parking will be provided through a uses within the downtown area. A combination of on-street spaces and off- horizontal and vertical mix of uses is desired street surface lots to support the mix of uses within the primary Mixed-Use Corridors. A at the core. Parking facilities should mix of complimentary housing styles and contribute to the overall character and scales should be incorporated into the image of the Downtown Area. Parking Downtown neighborhood districts of the facility edge design should include project. New uses should reinforce the elements, colors and materials that reflect, public open space and activity at street- or complement surrounding buildings and level. The mix of uses is designed to landscape. promote daytime activity with shoppers and workers and activity will continue in the �'F evening with residents and visitors enjoying new entertainment opportunities. F, Mixed-Use Project with 1' Floor Retail Parking Lots with Landscaped Edges Guideline Recommendations Guideline Recommendations • Promote vertical Mixed-Use within the Parking guidelines encourage the following: Mixed-Use Core of the project. Provide flexibility for developers wishing to be • Locate off-street surface parking lots away creative with potential retail uses in other from CSAH 14 and CSAH 21, either behind areas of the project; or to the side of primary buildings; • All uses should reinforce pedestrian • Provide a combination of fencing, activity at the street level. landscaping and landform to screen parking B. VII. Parking Strategy areas from all streets and important views; Balancing the realities of car-related • Create strategies for shared parking necessities (streets, parking and so on)and between adjacent uses, taking advantage of the desired character is a significant challenge.The goal is to provide adequate peak and off-peak cycles, business hours, nighttime activities, special events and other parking, both quantity and location, while pneeds. This is especially important on the promoting new strategies that support the west side of Centerville Road; January 4, 2006 Page 17 of 34 •Work with the City to review existing standards to provide flexibility including hours for on-street parking, security and enforcement practices, permit or metering. •The City should work with existing businesses and land owners to explore the possibility of creating a special service district within downtown to pay for an enhanced level of maintenance.. B. Vill. Summary The Systems Guidelines will guide public investment in the downtown and insure that as development occurs the appropriate public improvements are implemented based upon community input, fiscally responsibility and an overall vision for downtown. January 4, 2006 Page 18 of 34 fi_ C. Document Two; Standards characteristics and qualities of the district in for Private Developments non-technical terms. The section entitled Site Development C. I. Intent of the Standards Standards describes each district with The"Standards for Private Development" language and terms that are normally are intended to provide guidance to the associated with a zoning ordinance. selected private developers as they begin to It is the view from 20,000 feet in the air. Site design the individual pieces that comprise Development Standards specify the the Downtown Area. The Standards will relationship between buildings,their edges, assure that the City's overall goals of the streets and public spaces. The Standards Downtown Area are met and that the imply a strong link between architecture and individual pieces are well integrated and site, how buildings define, the spaces work together to create a cohesive around them and the visual and physical downtown within the City of Centerville. connections between the private and public realm. Like a zoning ordinance,this section These Standards for Private Development will prescribe allowable uses, density, will deal with the two individual districts building bulk, height, Floor Area Ratio and within the master plan (Mixed-Use Corridor parking requirements. It will also regulate and Downtown Neighborhood District)and the relationship of buildings to streets, the individual buildings within those districts. pedestrian ways and open spaces. Normally, bulk requirements establish upper The Standards for Private Development limits on the intensity of development in any apply to all future redevelopment and given district. Since a certain intensity of remodeling efforts within the M-1 zoned development will be needed in this area to area. Therefore, all Standards and sustain the public expenditure on Guidelines must be met with future infrastructure improvements, the improvements to existing and new requirements for this plan may also specify structures within Downtown Centerville. lower limits of bulk and intensity. C. I. a. Structure of the Standards If Site Development Standards are called the Unlike guidelines for other projects,these "view from 20,000"feet,Architectural standards are prepared in a multi-layered Guidelines are the"view from 5 feet." After fashion. They will have three distinct but the overall goals prescribed by the Site interrelated parts. Ensuing sections of this Development Standards are established, this document specify the development nearer view, the 5 foot perspective is needed standards of each District individually and in to ensure that the design, the details,the greater detail. They are structured to plainly quality and the craftsmanship of the private communicate the development's components of the development are requirements in each of three categories appropriate to and reflective of the overall below. public goals of the downtown. From 20,000 feet in the air, an $18,000 Chevrolet looks District Overview just like a$70,000 Mercedes. But from 5 Site Development Standards feet,there are distinct differences in quality, Architectural Guidelines detail and amenities. In any development, the quality of the individual components and For each district, a section entitled District the quality of the details are equally as Overview describes the desired import as the plan itself. Just like the car, January 4, 2006 Page 19 of 34 1111B;;t@x Plat° one's memory of their experience in the C. I. c. District Overview downtown will be made at this five foot In addition to the public open space, the perspective. master plan identifies two distinct districts that are available for private development. Architectural Guidelines define the desired Each of these districts will have its own quality standards that are expected for all unique character, mix and intensity of use, components within each district. They thus each is defined by a unique guideline. establish the foundation of the architectural The districts are intended to work together vision of the downtown. They may vary as a part of the whole, to compliment one somewhat from one district to the next but another. The districts are: they will strive to establish the guiding principles for the design of individual Mixed-Use Corridors components of the plan so they will work The Mixed-Use Corridors provide the together as parts of the whole. The broadest variety and highest intensity of Architectural Guidelines will not be development within the downtown. The prescriptive. The use of elements and Standards will require both vertically and detailing that reflect French Canadian style horizontally integrated mix of uses will be suggested,while the layout and containing multi-level retail as well as office architectural features will recognize current and residential uses over ground floor retail retail and commercial uses. uses. Standards will also require public open spaces, streets, sidewalks, plazas, etc. Architectural Guidelines will address that encourage and promote pedestrian individual aspects of design in hopes of activity. establishing standards for quality and good design that can be applied to any style of Downtown Neighborhood design. In no order of importance, the The Downtown Neighborhood is reserved for Architectural Guidelines will deal with such low-density and mid-rise housing. The things as: scale and context; proportion and district will allow the integration of service massing; articulation; materials and color; and/or restaurant related retail space that is craftsmanship/detailing; signage; integrated into the ground floor of residential streetscape and pedestrian environment; buildings. and sustainability. A more detailed description of each of the As the guidelines move from the general to two districts appears in the following the specific, the Architectural Guidelines sections of this guideline. establish separate goals for each district that regulate some or all of the major building C. II. Standard for Private and site components listed below: Development; Mixed-Use Corridors Building Character and Expression C. II. a. District Overview: Mixed-Use Scale, Proportion & Height Corridors Windows & Doors The overarching objective of the Standards Materials for Private Development for the Mixed-Use Streetscape Corridors is to create a unique opportunity to focus on the creation of a contemporary, C. I. b. Review and Approvals Process innovative, new urban development pattern See proposed zoning. that promotes richness and variety in the built environment. January 4, 2006 Page 20 of 34 �.. ..may Therefore, the Mixed-Use Corridors will provide the broadest variety, highest density and greatest intensity of development within the Downtown Area. Both vertical and horizontal integration of uses will be required as well as elements promoting pedestrian circulation within the district. Major retailers, supporting services, lifestyle and impulse retailers and their related parking facilities will be encouraged to locate in multi-level, Mixed-Use and Connections from Parking to Retail interconnected buildings. In addition to this vital mix, the guidelines for the Mixed-Use Characteristics: Mixed-Use Corridors Corridors will describe the qualities and The ground floor of all buildings will be character of a desired 'urban form'within limited to retail and restaurant uses only. the Mixed-Use Corridors. Compact buildings They will be designed with storefronts, and high-density blocks that define this entrances,windows and related district must include continuous built edges streetscapes that encourage the greatest that relate directly to streets and sidewalks. level of pedestrian circulation and traffic The Mixed-Use Corridors must incorporate as is possible. innovative parking strategies that support the mix of uses and that provide convenient . Ancillary uses, such as service and access to shopping destinations, restaurant delivery spaces will be allowed but and entertainment venues. Together these located away from pedestrian oriented elements will create a core area that is the storefronts. center of activity—the place to see and to be seen within the Downtown Area. . High-density housing and office uses on These objectives require that the majority of the upper floors are encouraged. Except for entry lobbies, pure office uses and buildings front on primary streets and pure residential uses will be prohibited pedestrian thoroughfares that may be part from the ground floor of buildings in this of any redevelopment plan and may district; connect to or relate to public open spaces. Parking and service areas should be Surface parking is to be confined to located internal to or on the sides of shared or municipal parking facilities. buildings, away from view. Pedestrian Quick-stop access to the retail fronts of buildings is parking needs such as dry cleaners and coffee shops or parallel critically important. Mid-block access from parking on public or private streets also parking is highly encouraged. be encouraged but will be reviewed or A mix of uses within individual blocks, considered on an individual basis. including retail, restaurant and residential, Building Placement and Setbacks: will further enhance this model and promote Mixed-Use Corridors activity throughout much of the day and evening hours. Site development guidelines include the following: • Buildings should be located at the build- to lines(zero setback), but allow January 4, 2006 Page 21 of 34 .Master Moly= " - '-�y�*'�-'--,-'k t; _ 3' F`'- �' w�'» _ms's .zs.�:•>•_"•.,_, } -s;{mac` _.�'.,�; n.T5= = . g" i i Rendering of Possible Architectural Character at Main Street b Centerville Road recessed spaces for outdoor dining, Parking Strategies: Mixed-Use Corridors other street level activities and variety of Provide required parking spaces for pedestrian environment. 80% of daily use that satisfy both quantity and building facades should address the location needs through a mix of on build-to lines; street and off-street parking solutions with a minimum of small surface lots; • Great emphasis should be given to building features located at the intersection of Centerville Road and • Encourage shared, district or municipal Main Street or where other streets parking facilities that minimize total intersect these two main roads.These parking numbers by taking advantage of locations will be seen from several around the clock and peak/off-peak directions and terminate views. They hours of operation for various uses will become future landmarks and way within the core area; finding icons as the Downtown Area develops; Locate any surface parking lots away from the major streets, either behind or • Minimize openings between buildings. to the side of primary buildings; surface Limited driveway access and provisions parking lots along major street frontage for pedestrian connections through are not allowed in the core area; blocks are encouraged. Gaps between buildings to accommodate surface . Encourage driveway access to parking parking lots,greater building setbacks or facilities along major streets or side other purposes are discouraged; streets in order to maintain a pedestrian friendly environment within the Mixed- Encourage recessed entries and Use Corridors. windows to create street-level interest, variety and enhance pedestrian scale along street frontage. January 4, 2006 Page 22 of 34 Master=' ,£ �x By individual review,but multi-story Y= buildings are encouraged throughout the Mixed-Use Corridors. Free standing, single story buildings are discouraged. Minimum Building Height: 32 ft. Maximum Building Height: Three floors or 45 ft. Subject to individual review. Off Street Parking-Retail/Office Parking facilities within the Mixed-Use Corridors will be subject to individual review. Parking facilities for the retail and public uses will be considered to be part of the public infrastructure and may be co- developed with City participation. Shared or "district" parking facilities will be encouraged. Off Street Parking - Residential Parking Strategy Includes On-Street Private and secure parking for residences within the Mixed-Use Corridors will be fully C. II. b. Site Development Standards: enclosed in private facilities. Guest parking Mixed-Use Corridors may be accommodated in public facilities or on-street. Parking demand will be market Allowable Land Use driven and subject to individual review. A Retail, office and high density residential minimum of one space per bedroom is uses are all allowed in the Mixed-Use anticipated. Corridors. With the exception of office or residential lobbies, retail and restaurant D. 11. c. Architectural Guidelines: uses should comprise the entire ground Mixed-Use Corridors floor of all buildings. Building Character and Expression: Minimum Lot Area: NA Mixed-Use Corridors Minimum Lot Width/Depth: NA Buildings in the Mixed-Use Corridors will Front Build-to Lines; 80% of the lot play a major role in defining the overall frontage must be built out to the built-to line character of the district.The proposed mix or lot line. Where buildings front on of uses for this signature destination common areas, pedestrian ways or other suggests the potential for a variety of open spaces, 80% building facades must be building types, demanding creativity and built to the open space line. Driveways to innovation to highlight unique architecture, parking facilities and access drives to while knitting the entire district together as a service areas are excepted. coherent whole. The build-to line for new development along Centerville road is offset 40' from the Overall building design is an important centerline. consideration, but emphasis on first floor Side Yard Setbacks: None. Subject to fagade treatments is essential to encourage individual review. street-level activity and enhance the Rear Yard Setback: pedestrian experience. Architecture is to be None. Subject to individual review. '4-sided' at all locations visible to public Floor Area Ratio: areas. Emphasis is to be on creating highly January 4, 2006 Page 23 of 34 animated design solutions along all street • Avoid large, unarticulated fagades; frontages and pedestrian ways. Architectural guidelines include the following: i Varied lagade treatment at 1 Floor • Provide a variety of building types and styles, expressed both in large scale (overall building) and small scale (design details); Emphasize Pedestrian Level Detall • Designs should minimize blank walls Emphasize important intersections by along the public rights-of-way and placing distinctive architectural elements should consider all street frontages, or interesting fagades at these including buildings at corners, as prominent locations; primary elevations; • Provide a variety of front elevations for • Emphasize transparency at street level rows of buildings along any given block; to encourage two way viewing—both window shopping and 'eyes on the Scale, Proportion and Height: Mixed-Use street'; Corridors • Articulate front fagades with projections • Promote interesting, animated and recesses; architectural features without being thematic or artificial. The use of • Encourage variety in building height decorative wrought iron is encouraged along front elevations and allow to evoke historical materials used and changes in roof treatments. fabricated downtown. Faux decorative elements are discouraged; January 4, 2006 Page 24 of 34 Iola Street Presence: Mixed-Use Corridors • Emphasize pedestrian experience with Materials: Mixed-Use Corridors architectural features at street level— • Provide a diverse mix of materials, canopies, decorative light fixtures and applied in a variety of proportions, material detail; exposures and detailing within a block, or along a street; • Encourage variety of color, texture and materials to complement other • Encourage durable, high quality streetscape elements; materials; • Conceal service entries, loading • Vinyl, metal and wood siding is not facilities and mechanical services from allowed except as a complimentary view along public streets; material. Composite siding will be considered on a conditional use basis; • Create a continuous building edge along street frontage, visually connecting • Encourage the use of mostly brick or adjacent buildings with complementary comparable alternative; minimum fagade treatments. requirement of 50%of non-glazed wall area; Windows and Doors: Mixed-Use • Metal and wood components are only Corridors acceptable as a complimentary material; • Maximize glass openings for all ground level, street front fagades—especially . Encourage overhead projections, either for retail, restaurant and other as a specific building component or as commercial uses—recommend 50% permanent/temporary canopies; minimum of total ground level fagade, or demonstrate great design through other means; • Provide real window openings for all street facing facades above ground level —recommend 40% minimum of total facade; • Provide recessed entries wherever possible; • Use clear or lightly tinted glass for all windows and doors—mirrored, reflective or highly tinted glazing is not acceptable; • Provide primary access doors facing public streets; Doors and Windows Enhance the Street January 4, 2006 Page 25 of 34 b Master Plan> n Ai 5 • Select materials that relate to the The Downtown Neighborhood will be building use, not artificially contrived or dominated by high-density and medium themed; density residential developments in low-rise buildings of one, two and three stories. • Include small scale elements, variety of Buildings fronting on comers may contain materials and careful detailing to service and restaurant related retail spaces support street level activities and on the ground floor comers only. Housing enhance the pedestrian experience. density will range from 20 to 45 units per The use of wrought iron is highly acre. encouraged to reflect historical elements downtown. M► i Streetscape: Mixed-Use Corridors • Provide gracious sidewalk width to invite pedestrian traffic; • Install street trees to frame the street and provide scale and shade; • Provide street lighting that meets all safety standards and design criteria, while creating a unique character for this district; • Explore street light spacing, height and a variety of fixture type that would support proposed mix of uses and activities (note, however, that too much light is as bad as too little); • Explore a range of options for streetscape improvements including special pavements, interesting concrete tinting or scoring patterns, additional plantings, ornamental fencing and other A Quality Streetscape Enhances Downtown Business features (note, however, that simpler is better and too much clutter is a Characteristics: Downtown negative). Neighborhood • All resident parking shall be enclosed in underground or tuck under garages. C. III. Standards for Private Guest parking should be on-street or Development; Downtown Neighborhood located in small lots of no more than 20 cars each accessed from side streets C. 111. a. Overview: Downtown only. Parking for retail uses should be in Neighborhood small lots of no more than 20 cars each, must not front on CSAH 14 or 21 and should be accessed from side streets only; January 4, 2006 Page 26 of 34 variety in architectural expression within the • Private courtyards within and in between district and on its public edges. buildings and opening toward the lake will be encouraged; Pedestrian entries and lobbies should Parking Strategies: Downtown orient toward the public street. Access Neighborhood To resident parking should be from side All resident parking must be enclosed in streets as far as is possible. No access below grade garages or garages that will be allowed from CSAH 14 or 21; are internal to the sites; • Setbacks from public streets should be consistent at 50 feet from street center line. All buildings should be required to have some portion that extends to exactly 45 feet from the street centerilne. All ground floor units oriented toward the F street should have stoops or porches. Ground floor stoops at the first floor should have a consistent setback of = `' exactly 8 feet. Stone Water Ponds can become a Residential Amenity • Parking spaces for ancillary retail should be provided through a combination of on-street and surface lot parking solutions; • Minimize surface parking lots fronting on primary streets, locate surface parking lots away from the major streets, either behind or to the side of buildings; • No more than 25% of street frontage Downtown Neighborhood Housing can be utilized for surface parking lots. C. III. b. Site Development Standards: Residential courts and private green Downtown Neighborhood space: Downtown Neighborhood There are many opportunities to integrate Allowable Land Use: privately owned and maintained courtyards High density residential. and pocket parks within this district.These Ancillary, ground floor restaurant or service small-scale greens provide important related retail. 'breathing space, contribute to storm water management and offer additional amenities Maximum Lot Area: NA to serve residents, building tenants and Minimum Lot Area: All lots shall be full adjacent uses. They can help create great depth from city streets January 4, 2006 Page 27 of 34 Ma Front Build to Lines: Primary building facades should be • Emphasize transparency of retail uses consistent at the built-to line. Build-to line at street level to encourage two way shall be 20 ft. behind the public ROW. viewing—both window shopping and Ground floor stoops or porches may extend eyes on the street; to 8 ft from the sidewalk. Setbacks from the built-to line for courtyards or other recesses Promote interesting, animated shall not comprise more than 40% of the architectural features without being fagade. All buildings must be built to the thematic or artificial—faux decorative build-to lines at all street corners. elements are discouraged. The use of wrought iron as an accent is Side Street Setbacks: NA encouraged to recall historic materials Rear Yard Setbacks:NA fabricated downtown; Internal Side Yard Setbacks: 5 feet from an adjoining residential property. • Avoid large, unarticulated fagades; Minimum Residential Density: 25 units per acre. 1,250 square feet/dwelling unit. Emphasize important intersections by Maximum Residential Density: 45 units placing distinctive architectural elements per acre. 900 square feet/dwelling unit. or interesting fagades at these Maximum Retail Density: prominent locations; Ground floor retail or restaurant space shall be limited to 50% of the ground floor,floor Provide a variety of front elevations for area and by adequacy of parking only. See rows of buildings along any given block. below. Building Height: Scale, Proportion and Height: Downtown Building height in the Downtown Neighborhood Neighborhood District shall be limited to two stories or 32 feet. • Articulate front fagades with projections Off Street Parking-Residential: See and recesses. Mixed-Use Corridors 0 Promote a maximum of two stories in Off Street Parking—Residential: this district, lower buildings are Private and secure parking for residences acceptable; continuous height rooflines within the Downtown Neighborhood will be should not dominate any street frontage. fully enclosed in private facilities. Guest parking may be accommodated in public Encourage upper level setbacks and facilities or on-street. Parking demand will variety of roof edge treatments. be market driven and subject to individual review. A minimum of one space per Street Presence: Downtown bedroom is anticipated. Neighborhood Off Street Parking-Retail: Parking numbers, placement and access for Emphasize pedestrian experience with ancillary retail subject to individual review architectural features at street level and approval, including stoops, steps porches awnings C. Ill. c. Architectural Guidelines: canopies, decorative light fixtures and Downtown Neighborhood material details. Building Character and Expression: Downtown Neighborhood January 4, 2006 Page 28 of 34 wr. lNastlot • Encourage variety of color, texture and Maximize glass openings for all ground materials to complement other level, street front fagades,especially for streetscape elements. retail, restaurant and other commercial uses. • Conceal service entries, loading facilities and mechanical services from • Provide real window openings for all view along public streets as much as street facing fagades. possible. • Create a continuous building edge for Provide recessed entries wherever the majority of street frontage, visually possible. connecting adjacent buildings with complimentary fagade treatments—in • Use clear or lightly tinted glass for all limited areas where gaps occur, windows and doors—mirrored, reflective architectural treatments,windows and or highly tinted glazing is unacceptable; detailing of side fagades should match faux windows are not allowed. front fa de. • Provide primary access doors facing public streets. _ r t - Consistent Building Setbacks Materials: Downtown Neighborhood • Provide a diverse mix of materials, Y applied in a variety of proportions, exposures and detailing within a block, Building Setbacks provide space for or along a street. Small Front Yards. • Encourage durable, high quality Window and Doors: Downtown materials-local sources if available. Neighborhood January 4, 2006 Page 29 of 34 .s • Siding is not allowed (vinyl, metal, special pavements, interesting concrete wood)except as a complimentary use. tinting or scoring patterns, additional plantings, ornamental fencing and other • Encourage the use of mostly brick or features (note, however, that simpler is comparable alternative; minimum better and too much clutter is a requirement of 50% of non-glazed wall negative). area. C. IV. Review and Approvals Process • Metal and wood components are Development within the Downtown Area will acceptable as a complimentary use. generally consist of a subdivision and site • Accommodate changes in material as plan. In these cases, the applicant will follow follows—return 8 foot minimum at side the normal subdivision and site plan walls and avoid terminating in the same requirements of the City subject to the plane. submittal requirements contained herein. For subdivisions, expansion or fagade • Encourage overhead projections, either replacement of existing buildings,the review as a specific building component or as process will include sketch plan review, permanent/temporary canopies. preliminary plat, and final plat. Existing businesses wishing to perform routine • Avoid overly complex or arbitrary use of maintenance such as window or door materials. replacement or renovate a minor portion of their structure without adding square • Include smaller scale elements, variety footage are subject to existing codes and of materials and careful detailing to will not be required to adhere to the support street level activities and development guidelines. For site plans, the enhance the pedestrian experience. review process will include a preliminary site plan and final site plan. Streetscape: Downtown Neighborhood a. Sketch Plan Review • Provide gracious sidewalk design to 1. Pre-meeting with City Staff Prior to invite pedestrian traffic. making an official subdivision application to the City for development of a parcel within • Install street trees to frame the street the Downtown Area, the applicant shall and provide shade. meet with City Staff to present the proposed development. City staff shall review the • development with all relevant ordinances Provide street lighting that meets all and ensure compatibility with the Downtown safety standards and design criteria, Area intent, Master Plan and Development while creating a unique character for this Guidelines for the Downtown Area. district. 2. A sketch plan shall be prepared in • Explore street light spacing, height and accordance with the regulations of this a variety of fixture type that would Chapter and the applicant shall submit the support proposed mix of uses and plan to the Zoning Administrator for review activities. and comment, to ensure compliance with the Downtown Area Master Plan and • Explore a range of options for Development Guidelines, the Downtown streetscape improvements including Area and other City codes and regulations. January 4, 2006 Page 30 of 34 3. The Planning Commission shall review I.C. Grading and Drainage Plan. The the sketch plan for its consistency with the grading and drainage plan shall be drawn at Downtown Area Master Plan and a scale of one inch equals 50 feet, 100 feet Development Guidelines and make a or 200 feet and shall contain the following recommendation to the City Council as to information: the appropriateness of the sketch plan. aa. Existing and proposed, grades with a 4. The sketch plan shall be scheduled for a minimum of two foot contour intervals to a Council meeting within 30 days after the known sea level datum; submittal of the Planning and Zoning bb. Sufficient spot elevations on all Commissions recommendation. proposed hard surface areas; 5. The City Council shall approve, postpone, cc. Estimated runoff of the area based on or disapprove the sketch plan. 10 and 100 year storm events; b. Preliminary Plat and Site Plan dd. Provisions to carry runoff to the nearest 1. Requirements for Preliminary Plans adequate outlet, such as storm drain, I.A. Preliminary Site Plan.The preliminary natural drainage way, or street; site plan shall be drawn at a scale of one ee. Location of proposed ponding areas, inch equals 50 feet, 100 feet, or 200 feet. indicating the size and depth of the pond The submission may be composed of one and amount of acre feet of water to be or more sheets and drawings and shall stored; include: ff. Finished floor elevations of all buildings; aa. Location of all proposed buildings and gg. Identify soils by type and location, their proposed uses; including identification of the water table, bb. Location of driveways and parking areas and suitability of soil for the proposed (all driveways and parking areas must development; and include curbing); hh. Identify any areas located in a flood cc. Indicate front, side and rear yard hazard zone as identified by FEMA. setbacks proposed; 1.D. Topographic Map. The topographic dd. Indicate square footage and dimensions map shall be drawn at a scale of one inch of all proposed lots; and; equals 100 feet and shall contain the ee. Location of all easements, width and following information: purpose. aa. One foot contour intervals; 1.13. Landscape Plan. The landscape plan bb. Indicate water courses, rock shall be prepared at a scale of one inch outcroppings, and other significant land equals 50 feet and shall contain the features; and following information: cc. Use U.S. Geological Service datum for aa. Indicate areas for berming and sodding; mapping. bb. Indicate the location of proposed 1.E. Floor Plans and Elevations. All floor plantings, identify plant materials; plans and elevations shall be drawn to a cc. Indicate any existing vegetation; and legible scale and include the following information: dd. Indicate any trees to be removed. January 4, 2006 Page 31 of 34 MASW-p1 aa. Floor plans indicating square footage the public hearing, the Planning and dimensions of all proposed rooms and Commission shall submit in writing to the areas within the structures; and City Council its recommendation as to the bb. Elevations of the proposed building(s), appropriateness of the Preliminary Plat and identifying exterior treatment, materials to Site Plan in relation to the Downtown Area be used, and paint color. Master Plan and Development Guidelines. 1.F. Preliminary Plat. If a Subdivision is 2.G. The Preliminary Plat and Site Plan required, the preliminary plat shall be shall be scheduled for a Council meeting prepared in accordance with the Centerville within 30 days after the submittal of the Code. Planning Commission meeting. 2. Preliminary Plat and Site Plan Review 2.H. The City Council shall approve, Process. postpone, or disapprove the Preliminary Plat and Site Plan. 2.A. Pre-meeting with City Staff. Prior to c. Final Plat and Site Plan making an official application to the City, the applicant shall meet with City Staff. City 1. Requirements for Final Plan: Final Site staff shall review the development with all Plan. The final site plan shall be prepared at relevant ordinances and ensure a scale of one inch equals 50 feet, 100 feet compatibility with the Downtown Area or 200 feet, and shall contain the following Master Plan and Development Guidelines. information: 2.6.A Preliminary Plat and Site Plan shall aa. Location of proposed structures; be prepared in accordance with the bb. Location of proposed driveways and regulations of this Chapter and shall submit parking areas (all driveways and parking the plan to the Zoning Administrator 30 days must have curbing); prior to the public hearing. 2.C. The Preliminary Plat and Site Plan cc. Indicate front, rear and side yard shall be submitted to the City staff for review setbacks. and comment, to ensure compliance with 2. Final Landscape Pian. The final other City codes and regulations. landscape plan shall be drawn at a scale of 2.13. The Planning Commission shall hold a one inch equals 50 feet and shall contain public hearing on the Preliminary Plat and the following information: Site Plan. The notice for public hearing shall aa. Plant types (botanical and common be published in the official newspaper at names), number, location, and size; least ten days, but not more than 30 days, bb. Areas to be sodded; prior to the public hearing, at which time the item will be heard. Notices will also be sent cc. Indicate existing vegetation; and to property owners within 350 feet of the dd.lndicate trees to be removed. subject property. 2.E. A written evaluation from the Ci staff 3. Final Grading and Drainage Plan. The City grading and drainage plan shall be drawn at shall be forwarded to the Planning a scale of one inch equals 50 feet, 100 feet Commission and the applicant prior to the or 200 feet and shall contain the following public hearing. information: 2.F.The Planning Commission shall simultaneously hold a public hearing on the Preliminary Plat and Site Plan. Following January 4, 2006 Page 32 of 34 aa. Existing and proposed grades with a 1. The Final Plat and Site Plan shall be minimum of two foot contour intervals to a submitted to the City staff for review and known sea level datum; comment, to ensure compliance with the bb. Sufficient spot elevations on all Preliminary Plan, Site Plan and other City proposed hard surface areas; codes and regulations. cc. Estimated runoff of the area based on 2. The Final Plat and Site Plan shall be 10 and 100 year storm events; submitted to the Planning 8 Zoning Board for its review and comment. The Downtown dd. Provisions to carry runoff to the regional Area Review Board shall review the stormwater pond; proposed project for its compatibility with ee. Amount of acre feet of water to be the Preliminary Plat, Site Plan, Downtown stored in regional pond; Area Master Plan and Development Guidelines and make a recommendation to ff. Finish floor elevations of all buildings; the City Council regarding the proposed gg. Identify soils by type and location, Final Plat and Final Site Plan. The City including identification of the water table, Council shall approve, postpone, or and suitability of soil for the proposed disapprove the Final Plat and Site Plan development; and based on its appropriateness and conformance with the Preliminary Plat and hh. Identify any areas located in a flood Site Plan and the Downtown Area Master hazard zone as identified by FEMA. Plan and Development Guidelines. 4. Floor Plans and Elevations. All floor plans 3. Major Changes. If the applicant proposes and elevations shall be drawn to a legible major changes in the final site plan that are scale and shall include the following inconsistent with the preliminary site plan, information: these changes can only be made by re- aa. Floor plans indicating square footage submission of a new preliminary site plan and dimensions of all proposed rooms; and and rezoning application to the Zoning Administrator, and re-scheduling of a new bb. Elevations of the proposed building(s), public hearing before the Planning identifying exterior treatment, material(s), Commission and review again by the and paint color. Council.The following constitute major 5. Final Plat. If a Subdivision is required, the changes: final plat shall be prepared in accordance aa. Increase in density; with the Centerville Code. With the final plans, the developer shall submit,for bb. Change in architectural design or style; approval by the City, a development cc. Change in type of ownership, private, schedule for construction of all structures, condominium, or rental; open space, and recreational facilities. dd. Change of more than 10% in total floor 2. Final Plat and Site Plan Review area; Process Upon approval of the Preliminary Plat and Site Plan, a Final Plat and Site ee. Increase in height of any building; Plan shall be prepared in accordance with ff. Major modification in the landscape plan; the regulations of this Chapter and submit it gg. Reduction in the proposed open space; to the Zoning Administrator 30 days prior to the public hearing. hh. Change in the development schedule; January 4, 2006 Page 33 of 34 ii. Change in the road location or standards; and B.Any changes determined to be major by the Council. 4. Minor Changes. The Council may, in its discretion, permit minor deviations from the preliminary site plan which do not change the concept or intent of the proposed development as previously approved. 5. Denial. The Council shall deny any application if it finds the final plans do not substantially conform to the preliminary plat and site plan as previously approved by the Council as well as the Downtown Area Master Plan and Development Guidelines. If the final plans are subsequently modified to conform to the approved preliminary plan, the applicant may resubmit said final plans to the Council for approval. 6. No development shall occur nor shall any building permits be issued for any construction that is not in accord with the approved final plans. January 4, 2006 Page 34 of 34 e r CONSULTING GROUP, INC. I MINNEAPOLIS ENGINEERS I PLANNERS I DESIGNERS FARC PMADISON SRF No. 0076275 MEMORANDUM TO: Jane Rose, Traffic Engineering Manager Jack Corkle, Senior Multi-Modal Transportation Planner Anoka County FROM: Marie Cote,PE, Principal Carla Stueve, PE,PTOE,Associate DATE: October 16,2007 SUBJECT: CENTERVILLE EAW TRAFFIC ANALYSIS REVIEW As requested, we have completed a review of the Centerville EAW traffic analysis that was completed by Bonestroo, Rosene, Anderlik Associates, Inc, dated August 24, 2007. Based on our review,we offer the following comments for your consideration: Trip Generation • The 2012 land use and trip generation estimates are shown in Table 21-1. In general, the trip estimates seem reasonable, with the daily trip estimates rounded to the nearest ten. A couple of items to note for the trip generation: 1 1. The land use type used to generate trips for the proposed retail square footage is not clear,particularly for the a.m. peak hour. 1 2. There appears to be'a miscalculation for the apartment land use for the daily trip ' estimates. Based on our calculation, the daily trips should be 1,720, instead of the ' 1,560 shown in the table. 1 • The traffic study documents the use of a 30-percent pass-by trip reduction for the retail development. This seems reasonable based on data provided in the ITE Trip Generation ` Handbook. However, it appears from Table 21-1 that the pass-by trip reductions were applied to the initial trip estimates: Since technically pass-by trips are only reduced from the through volume on the roadway with access to the site, reducing them from the initial ' trip estimates would result in too few trips being distributed to the system. ' www.srfconsulting.com t One Carlson Parkway North,Suite 150 1 Minneapolis, MN 55447-4443 1 763.475.0010 Fax:763.475.2424 ' An Equal Opportunity Ernployrr 1 Jane Rose October 16,2007 Jack Corkle Page 2 F Background Growth 4 E • A yearly growth rate of 2.4 percent was used to account for background growth in the area. It was documented that this percentage corresponds to the most recent County State Aid factor used by Mn/DOT. This amount of background growth seems reasonable based on the CSAH 14 forecasts developed by SRF for the 2030 regional access alternatives in the CSAH 14 (I-35W to I-35E) Study. It is important to note that when considering "full g build"of the area, i.e. future development of the parcels adjacent to the proposed northerly crossing of Peltier Lake or the proposed interchange areas, the ADT for the roadway network increases significantly,resulting in a yearly growth rate ranging between five and six percent. However, this was identified for long-term planning purposes and is considered beyond the scope of this study. • A cursory review of the future 2030 no-build traffic volumes was completed to compare to existing volumes. Using a 2.4 percent yearly growth rate between existing and 2030 no T build volumes, the no build numbers appear low, resulting in closer to two-percent yearly growth. Directional Distribution - • The directional distribution that was used for the proposed development is shown in Figure 21-5. As shown, 65 percent of the trips are routed to/from the east on I-35E_and east of the interchange,which indicates a regional trip distribution. It is assumed that this distribution was used for all proposed uses (i.e. residential, office and retail). Generally, - directional distribution varies based on the land use type. For example,retail development typically has a "local' draw and residential and office uses have a "regional" trip draw during the peak periods. -- • In the CSAH 14 Study that was completed by SRF Consulting Group in 2004, seven construction alternatives were conceptualized for Main Street (CSAR 14) in the surrounding area. The'detailed traffic operations analysis that was completed for the study (Option 5A) consists of two additional regional accesses, one at CSAH 14/I-35W and the other at 80th Street/1-35E. It does not appear that the Centerville EAW Traffic Study took any future changes to the regional roadway system into account. Changes in regional access would likely change the directional distribution, and the overall affect on the adjacent intersections. Operations/Capacity 4. • The Centerville EAW traffic analysis indicates that all intersections are currently operating at an acceptable level of service during the peak periods. In fact, the worst operations were found at the intersection of CSAH 14/20th Avenue with a LOS C during a- the p.m.peak hour. tY, Jane Rose October 16,2007 Jack Corkle Page 3 • In reviewing the CSAH 14 Study that was completed by SRF, the intersection of CSAH 14/20th Avenue was found to operate at an unacceptable LOS E during the p.m.peak hour under all-way stop control. The Centerville EAW traffic analysis documented that this intersection is operating at LOS C during this time period. In comparing the intersection turning movements, the volumes increased during both the a.m. and p.m. peak periods between 2004 and 2007, which would indicate similar or worse operations. Due to the discrepancy, analysis was,,completed for this intersection with the current traffic volumes and all-way stop control using the Highway Capacity Software and Synchro/SimTraffic software package. Based on this analysis, we found this intersection to operate at an overall unacceptable LOS E during the p.m. pear hour. This intersection should be checked to ensure that adequate capacity is provided for existing and future [ conditions. r - • The 2012 operations analysis assumed upgrades to the CSAH 14 corridor that are scheduled to be completed in 2009, including signalization of CSAH 14/20th Avenue and f widening CSAH 14 to improve the 90-degree curve just west of the intersection with F CSAH 21 (Centerville Road). No additional improvements are recommended. Based on the CSAH 14 roadway design plans that will be constructed next year, the southbound approach of 20th Avenue at CSAH 14 should consist of dual left-tum lanes, one through lane, and a shared through/right-tum lane. It appears that this study analyzed this approach with dual left-turns lanes, one through lane, and a right-tum lane. Although this will not significantly impact operations, the correct future geometries should be noted in the study. In addition, the geometries shown on this approach are not consistent throughout the report for 2030 conditions. Based on the operations analysis shown in the h appendix of the report,dual southbound left-tum lanes were included. r • For 2030 conditions, the roadway upgrades identified for 2012 conditions are assumed as a baseline. However, the improvements were recommended to be modified to improve safety. The modified improvement includes the installation of a northbound left-tum lane instead of a right-tum lane at the intersection of CSAH 14/Centerville Road. In addition, installation of a southbound left-tum lane is recommended at this intersection, with future signalization,to align the left-tum lanes on the north and south approaches. Installation of a southbound right-turn lane at CSAH 14/Progress Road is also recommended. Based on our analysis, the suggested modifications to the roadway geometries will not change the overall intersections 9perations, and it may provide some additional safety for the intersections and flexibility in providing future left-tum phasing. In regards to the southbound right-tum lane at Progress Road/CSAH 14, this improvement does not significantly improve operations or safety, based on our review. If the right-of-way is available to construct a right-tum lane on this approach, it would provide some delay reduction to that individual movement. I Jane Rose October 16,2007 Jack Corkle Page 4 • Based on the distribution, 65-percent of the traffic was routed through the I-35E/Main Street (CSAR 14) interchange. Since these intersections seem to be significantly impacted by the proposed development, analysis of the intersection operations at the interchange intersections should be considered. In addition,based on the CSAH 14 Study completed by SRF, the CSAH 14 ramp intersections were operating at poor levels of service during the p.m. peak hour under existing geometric and traffic control conditions. Therefore, these intersections should be evaluated to determine the impacts from the proposed development. i i s t MEMORANDUM EMMONS To: Dallas Larson & OLIVIER City Administrator _ :ESOP The City of Centerville From: Marcey L. Westrick Subject: EAW for the City of Centerville's Downtowr Date: October 22, 2001 Redevelopment The purpose of this memorandum is to provide comments of concern on behalf of the Rice Creek Watershed District (District) on the Mandatory EAW for the Centerville Downtown Redevelopment. The comments listed below are with reference to the pertinent section in the ® EAW. #10. The approximate proposed wetland impacts of 0.38 acres will be subject to WCA r sequencing and mitigation requirements through the District permitting process. In addition, wetlands before and after construction should at a minimum be equal given WCA requirements. •' #17. As part of the Centerville Lake TMDL, the District has completed a nutrient budget analysis for ® Centerville Lake. In addition, preliminary analysis completed by the District indicates that the proposed District rule will allow the city to redevelop the downtown area while meeting the Centerville TMDL goal. This information has been shared with the City of Centerville, and as a result, the District does not find it necessary for the city to complete a nutrient budget analysis separate from the Districts. With that said, as noted in the EAW, Clearwater Creek is also listed as'an impaired waterbody due to biological impairment and the city should attempt to reduce stormwater volume and rates entering the creek to the maximum extent practicable. r Several stormwater management strategies are listed such as rain gardens, depressed parking lot islands, pervious pavement with underground storage, and pretreatment and infiltration basins. It should be also noted that Low Impact Development techniques could be used including native landscaping and reduced imperviousness. The District appreciates the open communication with the City of Centerville regarding the Centerville Lake TMDL and sees the Centerville Redevelopment as an opportunity to improve the quality of stormwater that is discharging to both the lake and Clearwater Creek. The District looks forward to assisting the city as this project goes forward to ensure that District Rules and TMDL goals are met. ® If there are any questions regarding the comments for this review, or if the District can provide additional assistance, please feel free to contact me at (651) 203-6009 or Doug Thomas at (763) 398-3071. c: RCWD Board of Managers 4 RCWD District Office, ATTN: Doug Thomas 10/26/07 09:58 FAX 651 602 1674 METRO COUNCIL Q002 I October 23,2007 Dallas Larson, Administrator City of Centerville 1880 Main Street Centerville,MN 53038 RE:. Environmental Assessment Worksheet(EAW) Centerville Downtown Redevelopment Metropolit;m Council District 11 Metropolitan Council Review File No. 20095-1 Dear Mr. Larson: Council staff reviewed the environmental assessment worksheet(EAW)for the Centerville Downtown Redevelopment area. The proposal involves redevelopment of Centerville's downtown and environs into a mixed use area of multi-family housing and retail/office space over a period of five years. The area encompasses over 37 acres of the existing downtown along Main Street/CSAH 14,plus several blocks to the south on either side of Centerville Road/CSAH 23. Staff finds this EA W to be incomplete with respect to the transportation analysis because it does not analyze impacts on the,regional system by addressing connections between CSAH 14(an"A"minor Arterial) and I-35E and I-35W. While the EAW includes a traffic analysis of'ocal road impacts,it does not address potential regional transportation system impacts. Item 21,Traffic, states that if the project is within the Metropolitan ° Area the EAW needs to discuss its impact on the regional transportation system. This is particularly impor-,ant considering that Main Street/CSA.H 14 connects to both I-35E nearby to the east,mid to I-35W further west. Consequently, Coimcil staff is unable to determine at this time whether the project is in conformity with regional system plans and whether an Environmental Impact Statement E (EIS)may be needed to address regional transportation issues. We encourage you to withdraw and repi;.blish the EAW with the missing data,or to issue a supplemental EAW to address the missing information. Questions regarding the specifics of the transportation information needed'should be directed to Ann Braden, 651-602-1705, ann.braden(a),metc.state.mn.us . ° it 10/26/07 09:58 FAX 651 602 1674 METRO COUNCIL x{003 Page Two Dallas Larson October 23, 2007 i Metropolitan Council staff review iof the EAW finds that it is complete and accurate with respect to other regional concerns and offers the following comments for consideration as the project is implemented: Item 12—1 1hysical Impacts on Water Resources(Jim Larsen, 651-602-1159) The project proposes to eliminate the only wetland within the proposed 37-acre redevelopment area and to excavate the depression for use as a stormwater treatment basin. Eliminati¢n of significant wetlands during the redevelopment process is contrary to Council Policies that promote protection of such water resources. Council policies recommend utilization of best wetland management practices d at result in maintenance and improvement of water quality,control of runoffrate;;and volumes to reduce erosion and flooding, and preservation of the designated beneficial uses of such natural basins. This wetland area should be avoided and proposed stormwater detention and treatment f acilities should be accommodated elsewhere on or off of the immediate site. The ongoing CSAH14 reconstruction project in the City already resulted in elimination.of several acres of wetland in the City. Since Clearwater Creek is impaired for fish and invertebrate according to the index of biotic integrity(IBI), further wetland losses in the City could incrementally worsen the Creek's IBI. ® Item 17— l Vater Quality:Surface Water Runoff The docum ent states that sformwater management features for the site will be designed tc,meet the Rice Creek Watershed District's(RCWD)proposed new rules,dated June 13,2007. The City and site developers should meet with the RCWD staff as soon as possible to site both infiltration and surface detention and treatment f acilities for runoff where they will function most efficiently and in harmony with the existing natural features. (Jim Larsen, 651-602-1159) Also,the Minnesota Depatltment of Health designates the bedrock sensitivity to contamination in Centerville as "high",based on the geologic character of the ® aquifers in the area. Land use,therefore,has a significant chance of impacting groundwati;r quality. Storm water infiltration projects should follow guidelines put forth by the Minnesota Department of Health in 2006 for Evaluating Proposed Storm Water Infiltration Projects in Vulnerable Wellhead Protection Areas. (Sara Bertelsen, 651-602-1035) f E 10/26/07 09:58 FAX 651 602 1674 METRO COUNCIL 1004 r i Page Three ® Dallas Larson October 23, 2007 ID 0 Item 18— Water Quality: Wastewaters (Roger Janzig,651-602-1119) ID The EAW indicates an average projected wastewater flow of 120,000 gallons per It day. Metropolitan Disposal System facilities serving the redevelopment site have itadequate capacity for the proposed flow. it Item 25—Nearby Resources (Jan Youngquist, 651-602-1022) The EAW identifies the two planned regional trails that will be located in or near the project area—the Central Anoka County Regional Trail and the Rice Creek ID Chain of Lakes-Bald Eagle Regional Trail. The Central Anoka County Regional Trail will be located on the south side of CSAH 14/Main Street and will be built it in conjunction with the pending road reconstruction project. The EAW states that ID the Rice Creek Chain of Likes-Bald Eagle Regional Trail will run along ID Centerville Road to connect to the Central Anoka County Regional Trail. The planned regional trail is proposed to follow Goiffon Road instead of Centerville Road,however. This proposed alignment will route the trail near the project area, not through the center of the redevelopment. Item 27—j"ermits and Approvals Required The EAW zorrectly indicates the proposed redevelopment is consistent with the City's comprehensive plan and downtown master plan and states that the purpose of the projoct is to revitalize a straggling downtown business district and to add new and affordable housing stock to the City. This appears consistent with.the Council's Housing policy. The proposed addition of 374 housing units over the next five years will afford the community an opportunity to achieve its Livable Community negotiated housing goals through 2010. It will also allow the community the opportunity to address its share of the region's affordable housing need of 80 units during the 2011-2020 time period. (Linda Milashius,651-602- 1541) However,job growth likely to result from the redevelopment could push employment levels above i�he Council's 2030 employment forecast for the City unless it st ictly replaces e�isting jobs,i.e. no net increase. Centerville has had 179 net job growth from 2Q00 to 2006,is above the 2010 Council forecast, and is only 128 jabs short of the 030 forecast. The City is encouraged to re-evaluate its employment growth and f6recasts for purposes of its 2008 comprehensive plan update and to discuss its eXpectations with Council research staff. (Regan Carlson, 651-602-1407) 10/26/07 09:59 FAX 651 602 1674 METRO COUNCIL IM005 Page Four Dallas Larson October 23, 2007 In summary,this FLAW is incomplete as submitted regarding analysis of regional transportation impacts. If the above regional transportation data and information are provided, staff will be able to complete its review in a timely manner. If you have any Lo questions or need further information with respect to these matters,please contact Bob Mazanec,Principal Reviewer,at 651-602'-1330. Sincerely, Phyllis Hanson,M anager Local Planning A,sistance cc: Doug Thomas,Rice Creek Watershed District Jack Jackson, MultiFamily Market Analyst,MHFA Tod Sherman,Development Reviews Coordinator,MnDOT-Metro Division Georgie H:lker, Metropolitan Council District i 1 Keith Butt',eman,Environmental Services Bob Mazwiec, Principal Reviewer- Sector Representative Ann Braden, Transportation Joanne BaaTon,Livable Communities Linda Milashius,Housing-Livabale Communities Cheryl Olsen,Reviews Coordinator Paul Hanson, GIS Jim Uttley., LPA V:\REVIEWS\Communities\Centervill6\Letters\Centerville 2007 Downtown Redevelopment EAW#F20095-I.doc I Metropolitan Council v November 6,2007 Dallas Larson,Administrator City of Centerville 1880 Main Street Centerville,MN 55038 RE: Environmental Assessment Worksheet(EAW) Centerville Downtown Redevelopment Metropolitan Council District 11 Metropolitan Council Review File No.20095-1 Dear Mr.Larson: As indicated in my October 23 letter Council staff reviewed the environmental assgssment worksheet (EAW)for the Centerville Downtown Redevelopment area. The proposal involves redevelopment of Centerville's downtown and environs into a mixed use area of multi-family housing and retail/office space over a period of five years. The area encompasses over 37 acres of the existing downtown along Main Street/CSAH 14,plus several blocks to the south on either side of Centerville Road/CSAH 23. In the October 23 letter staff found the EAW to be incomplete with respect to regional transportation analysis. On November 5 Council staff received additional information from the City's consultant regarding potential regional transportation system impacts. This information and analysis satisfactorily addresses the Council's previous concerns. With the new November 5 information Council staff finds the EAW complete and accurate for regional review purposes. The project raises no concerns in terns of regional systems and an Environmental Impact Statement does not appear wan-anted from a regional perspective. If you have any questions or need further information with respect to these matters,please contact Bob Mazanec,Principal Reviewer,at 651-602-1330. Sincerely, 2 Phyllis son,Manager Local anning Assistance cc: Doug Thomas,Rice Creek Watershed District Jack Jackson,MultiFamily Market Analyst,MHFA Tod Sherman,Development Reviews Coordinator,MnDOT-Metro Division Georgie Hilker,Metropolitan Council District 11 Keith Buttleman,Environmental Services Bob Mazanec,Principal Reviewer-Sector Representative Ann Braden,Transportation Joanne Barron, Livable Communities Linda Milashius,Housing-Livabale Communities Cheryl Olsen,Reviews Coordinator Paul Hanson,GIS Jim Uttley,LPA V:\REVIEWS\Communities\CentervilleUxttets\Centerville 2007 Downtown Redevelopment EAW#20095-lcomplete.doc www.metrocouncil.org 390 Robert Street North • St. Paul, MN 55101-1805 , (651)602-1000 • Fax(651)602-1550 • TTY(651)291-0904 An Equal Opportunity Employer + 8/25/2015 s Centerville City Council August 26,2015 osrn► Improvements on 1-35E ■ Bridge and pavement improvements throughout corridor ■ New interchange at Cayuga St ■ New frontage road and auxiliary lane between Maryland Ave and University Ave ■ Additional exit lane from 1-35E to 1-94/Hwy. 52 ■ New Park & Ride lots at Cty Rd E and Cty Rd 14 ■ New MnPASS Express Lanes on 1-35E 1 8/25/2015 A-'MnPass Express Lanes - coming to the east metro ■ Phase I - New MnPASS Express Lanes on northbound and southbound 1-35E between Little Canada Rd and Cayuga St open toward the end of 2015 ■ Phase II — New MnPASS Express Lanes between Little Canada Rd and Cty Rd J open toward the end of 2016 — Southbound between Cty Rd 96 and Little Canada Rd — Northbound between Cty Rd E and Cty Rd J 1-35E MnPASS Express Lanes Phase 1. co Rd i l Added MnPASS lane -\9 Dec 2015 Phase IL Co Rd 96 Added MnPASS lane —""� Dec 2016 - Phase R. co Rd e� _ Converted MnPASS lane Dec 2016 i Canada Rd St -1 _BNd 2 8/25/2015 What is MnPASS? ■ A state transportation system that provides a congestion-free travel option during peak MMA55 Epess lanes drive times on highways with high levels of congestion ■ MnPASS Express Lanes have been in use on 1-394 since 2005 and on 1-35W since ' > - 2009 7 ■ MnPASS Express Lanes V — Give commuters a reliable travel choice that i saves them time i — Increase a highway's capacity for moving � = more people during congestion 4 1 a What MnPASS means for the City of Centerville ■ Less congestion and much better travel times on 1-35E ■ During peak-drive times, motorists will have a convenient, congestion-free, reliable travel option ■ Faster, more reliable bus service 4� 3 8/25/2015 How to use 1-35E MnPASS Express Lanes ■ All motorists may use the lanes for free outside of peak weekday drive times ■ During peak drive times: — Car/vanpools (vehicles with two or more people), public transit and motorcyclists can drive in the designated MnPASS lanes for free — Solo motorists who have a MnPASS account and a MnPASS tag can drive in the lanes for a fee ■ 1-35E peak drive times - Monday through Friday — Southbound 6 to 10 a.m. — Northbound 3 to 7 p.m. How to use 1-35E MnPASS Express Lanes ■ MnPASS Express Lanes are separated from regular lanes by double solid and dashed white lines ■ Enter and exit the MnPASS Lanes only where there are double dashed white lines , ■ Do not cross double solid white lines 4 8/25/2015 MnPASS Fees ■ A variable electronic fee is charged to solo drivers using EXPRESS MnPASS Express Lanes ■ No tollbooths - overhead antennas read the MnPASS tag on windshield ■ Posted fee is automatically deducted from a prepaid HOV 2+=Vehleles with two or more people MnPASS account MnPASS Fees cont. ■ Varying the fee based on current congestion levels helps keep traffic in the MnPASS Express Lanes moving between 50-55 miles per hour ■ High demand/volumes in the MnPASS Lane = higher fee to drive in the lane ■ Fees between $0.25 and $8 ■ Fees stay in the corridor and are used for capital, operations, maintenance and corridor improvement expenses 5 8/25/2015 MnPASS Tags NEW ■ Two "tag" options will be available ■ Switchable Tag — One-time purchase fee — Can be moved between vehicles — HOV 2+ (free) mode or MnPASS (fee) mode �r MnPASS Tags ■ Sticker Tag — Free — Get as many free sticker ■ ASSI tags as you have vehicles — Always "on" (fee) mode _T`y. . 4 when driving in a MnPASS Express Lane 6 8/25/2015 Get in, get going and get there! ■ www.mnpass.orq ■ MnPASS Customer Service Center 2055 Lilac Drive N Golden Valley, MN 55422 ■ Satellite customer service centers - Minneapolis Transportation Management Organization - East metro locations coming soon! 6C."i3l Questions and Contacts ■ Brad Larsen MnDOT, MnPASS Policy & Planning 651-234-7024 Brad.Larsen(a),state.mn.us ■ Bobbie Dahlke MnDOT, MnPASS Communications 651-234-7088 Bobbie.dahIkeCc�state.mn.us 7 OaN"Es", O1 We all have a stake in •Pa� 1-35E Construction Update: Little Canada to Lino Lakes Summary of work • Resurface existing pavement and ramps • Replace 1-35E bridges over Goose Lake Rd • Redeck Hwy 96 bridge over 1-35E • Widen bridges for MnPASS lanes • Update drainage and other infrastructure • Repair or replace existing guardrail • Construct a pedestrian trail on Hwy 96 from Centerville Rd to White Bear Lake Parkway • Add MnPASS lane on southbound 1-35E between Hwy 96 and County Rd E • Add MnPASS lane on northbound 1-35E between County Rd E and County Rd J Traffic Impact Construction crews will maintain two lanes on 1-35E in each direction for much of the work. • Goose Lake Rd closes for 14 months • Weekend road closures on 1-35E and Hwy 96 • Hwy 96 traffic reduced to one lane in each direction in 2016 • Temporary ramp closures starting September 2015 (ramp closures will not take away access to 1-35E at Hwy 96 and County Rd E at the same time) MnPASS Express Lane Extension Opens Late 2016 • Southbound MnPASS lane extension begins at Hwy 96 and connects to the MnPASS lane at Little Canada Rd. Through the 1-35E/1-694 commons area, the existing inside lane will be designated as a MnPASS lane during the weekday morning rush-hour period (6:00-10:00 AM) • Northbound MnPASS lane extension begins at County Rd. E and ends just north of County Rd J. Through the 1-35E/1-694 commons area (between Little Canada Rd. and County Rd. E), there will be no MnPASS lane designation. • The performance of the different MnPASS lane approach through the 1-35E/1-694 commons will be evaluated over a two year period to determine whether modifications need to be made. Project Benefits • Improved mobility, smoother, safer, longer-lasting roads and bridges • Better pedestrian accessibility • Upgraded drainage capabilities • MnPASS lanes will provide a reliable uncongested option for commuters and will increase I- 35E's capacity to move more people For more information and to sign up for project email updates, visit http://www.dot.state.mn.us/metro/projects/i35vadnaisheights/ Contact Us Denise Workcuff—MnDOT Public Affairs—denise.workcuff@state.mn.us—651-234-7502 Dale Gade— MnDOT Project Manager- dale.gade@state.mn.us —651-234-7713 Traffic Updates -www.511 mn.org or Twitter: @mndottraffic We all have a stake in �OFTRP��� 1-35E Construction Update: St. Paul to Little Canada Construction Activities Update 2015 • The northbound 1-35E lanes/bridges have been reconstructed. • Southbound 1-35E lanes, ramps and bridges between Little Canada Road and Maryland Avenue will be completed in late August. • Southbound 1-35E lanes and bridges between Maryland Avenue and 1-94 will be completed in November. • Local street reconstruction (such as County Road B under 1-35E in Maplewood and L'Orient Street in St. Paul) will continue through fall. 2016 • The southbound 1-35E ramps to/from Cayuga Street will be completed and open in spring/summer. • West frontage road construction in St. Paul between Cayuga Street and Pennsylvania Avenue will be completed by spring/summer. Upcoming Traffic Changes • A third lane of southbound 1-35E and all ramps between Maryland Avenue and Little Canada Road are anticipated to reopen in late August. • The ramp from southbound 1-35E to eastbound 1-94/southbound Hwy 52 is scheduled to close from Aug. 24 through November for bridge replacement/ramp widening. • The ramps from Cayuga Street to northbound 1-35E and Maryland Avenue to southbound 1-35E will close from late August through early November, until the new southbound 1-35E lanes in St. Paul open. • Other currently closed ramps near downtown St. Paul (such as southbound 1-35E to University Avenue and University Avenue to westbound 1-94) will reopen by November. MnPASS Express Lanes Open Late 2015 • New northbound and southbound 1-35E MnPASS Express Lanes between Little Canada Road and Cayuga Street are anticipated to open in late 2015. Project Benefits • Replaces area bridges currently on the state's list for replacement. • Provides geometric improvements for interchanges and 1-35E, improving safety and traffic flow. • Resurfaces all driving lanes and ramps, for long-term durability and a better driving experience. • Adds new MnPASS Express Lanes to move more people through the corridor and provide a reliable commuting option. For more information and to sign up for project email updates, visit www.mndot.qov/metro/projects/35egpg Contact Us Call: 612-284-1782 Email: 35ECayugaMnpass(a)-zanassoc.com Traffic Updates www.511 mn.orq Twitter: @mndottraffic Teresa Bender From: Cindy Reichert <Cindy.Reichert@co.anoka.mn.us> Sent: Thursday,August 20, 2015 4:40 PM To: City of Andover- Michelle Hartner, City of Anoka -Amy Oehlers;City of Bethel - Ginger Berg;City of Blaine -Cathy Sorensen;Teresa Bender; City of Circle Pines - Kathleen McBride; City of Circle Pines Contact 2 - Linda Gresback; City of Columbia Heights - Katie Bruno;City of Columbus - Elizabeth Mursko; Emmy Robinson; City of Coon Rapids -Joan Lenzmeier; City of Coon Rapids Contact 2 - Stephanie Lincoln; City of East Bethel - Carrie Frost; City of East Bethel Contact 2 - Karen White; City of Fridley - Deb Skogen; City of Ham Lake- Denise Webster, City of Hilltop - Ruth Nelsen; City of Lexington - Mary Vinzant; City of Lexington Contact 2 - Peggy McNamara; City of Lino Lakes -Julie Bartell; Corrie LaDoucer, City of Oak Grove - Sherry Fiskewold; City of Ramsey -Jo Ann Thieling; Daniel Buchholtz; City of Spring Lake Park Contact 2 - Wanda Brown;City of Spring Lake Park Contact 3 -Jenny Gooden; City of St Francis - Barb Held; Linwood Township - Election Contact Cc: Teri McMahon; Diana L.Trujillo Subject: Elections and Meeting Restrictions Attachments: Meeting Restrictions - Elections and Caucuses.docx Hello, all. I know those of you who aren't having elections this year are enjoying the breather. I don't blame you one bit! This is just a reminder about meeting restrictions on Election Day, November 3'd. The restrictions only apply if there are elections being held within the boundaries of your jurisdiction. This year,elections are being held in: City of Circle Pines City of Lino Lakes Anoka-Hennepin ISD#11 Centennial ISD#12 Fridley ISD#14 Spring Lake Park ISD 16 White Bear Lake ISD 624 Forest Lake ISD 831 Thanks, and enjoy the rest of your summer! Cindy Reichert, Manager Anoka County Elections and Voter Registration 325 East Main Street Anoka MN 55303 (763) 323-5277 cindy.reichert@co.anoka.mn.us NOTICE: Unless restricted by law, email correspondence to and from Anoka County government offices may be public data subject to the Minnesota Data Practices Act and/or may be disclosed to third parties. This email has been scanned by the Symantec Email Security.cloud service. I For more information please visit http://www.sManteceloud.com 2 ! Anoka County PROPERTY RECORDS & TAXATION DIVISION Elections & Voter Registration 2015 MEETING AND EVENT RESTRICTIONS Political Party Caucuses None Scheduled in 2015 Primary Election None Scheduled in Anoka County in 2015 General Election November 3, 2015 204C.03 PUBLIC MEETINGS PROHIBITED ON ELECTION DAY. Subdivision 1. School districts; counties; municipalities; special taxing districts. No special taxing district governing body, school board, county board of commissioners, city council, or town board of supervisors shall conduct a meeting between 6:00 p.m. and 8:00 p.m. on the day that an election is held within the boundaries of the special taxing district, school district, county, city, or town. As used in this subdivision, "special taxing district" has the meaning given in section 275.066. Subd. 2. State colleges and universities. Except for regularly scheduled classes, no Minnesota state college or university shall schedule an event between 6:00 p.m. and 8:00 p.m. on the day that an election is held in any political subdivision in which the university or college is located. Subd. 3. Public elementary and secondary schools. Except for regularly scheduled classes, a public elementary or secondary school may not schedule a school sponsored event between 6:00 p.m. and 8:00 p.m. on the day that a regularly scheduled election is held in any political subdivision in which the school is located. Subd.4. State government. No state agency, board, commission, department, or committee shall conduct a public meeting on the day of the state primary or general election. 202A.19 CAUCUS, SCHOOL SCHEDULE PREEMPTION, EXCUSAL FROM EMPLOYMENT TO ATTEND. THIS SECTION APPLIES FOR ANY CAUCUS DATE Subdivision 1. Limits on local government meetings. No special taxing district governing body, school board, county board of commissioners, township board, or city council may conduct a meeting after 6:00 p.m. on the day of a major political party precinct caucus. As used in this subdivision, "special taxing district" has the meaning given in section 275.066. Subd. 2. Absence from work. Respectful, Innovative, Fiscally Responsible 325 East Main Street A, Anoka, MN 55303 ` www.anokacounty.uslelections elections@co.anoka.mn us a 763-323-5275 A FAX: 763-422-7526 Affirmative/action/Equal Opportunity Employer Every employee who is entitled to attend a major political party precinct caucus is entitled, after giving the employer at least ten days' written notice, to be absent from work for the purpose of attending the caucus during the time for which the caucus is scheduled without penalty or deduction from salary or wages on account of the absence other than a deduction in salary for the time of absence from employment. Subd. 3. Limits on college or university meetings. The University of Minnesota may not schedule an event which will take place after 6:00 p.m. on the day of a major political party precinct caucus unless permission to do so has been received from the Board of Regents. No Minnesota state college or university may schedule an event which will take place after 6:00 p.m. on the day of a major political party precinct caucus unless permission to do so has been received from the Board of Trustees of the Minnesota State Colleges and Universities. Subd. 4. Use of public school buildings. No school official may deny the use of a public school building for the holding of a major political party precinct caucus if the school office has received a written request for the use of the school building 30 days or more prior to the date of the caucus. THIS SECTION APPLIES FOR ALL CAUCUS DATES Subd. 5. Limits on public school events. No public elementary or secondary school may hold a school sponsored event after 6:00 p. m. on the day of a major political party precinct caucus. Subd. 6. Limits on state public meetings. No state agency, board, commission, department, or committee shall conduct a public meeting after 6:00 p.m. on the day of a major political party precinct caucus. CITY OF CENTERVILLE PLANNING AND ZONING COMMISSION Pursuant to due call and notice thereof, the Planning and Zoning Commission held its regular meeting on August 11, 2015 at 6:30 p.m. PRESENT: Chairperson Darrin Mosher r@ved Commissioner Matthew Montain Commissioner Nick Twohy Commissioner Russ Koski b ABSENT: Commissioner Mark Haiden Commissioner Tom Wood Commissioner James Flint STAFF: City Administrator Mike Ericson OTHERS PRESENT: Council Member D. Love I. CALL TO ORDER. The meeting was called to order at 6:30 p.m. by Chairperson Mosher. 1. Roll Call IL APPEARANCES -None III. PUBLIC HEARING(S) -None IV. OLD BUSINESS 1. Metropolitan Council Draft Water Supply Plan Plan—Review & Comment Administrator Ericson stated that the plan is 955 pages and was available at Metropolitan Council's web site or he had one printed copy available. The commission briefly discussed the item and will continue to review the plan prior to forwarding comment. Commission members asked a number of good questions. V. NEW BUSINESS 1. Purchase Agreement 2065 Commerce Drive(5 Acre Parcel)Zoned B-1 (Commercial) Ruffridge Johnson Equipment Company Administrator Ericson reported on the specifics of the purchase agreement stating that Staff would be working with the architect regarding building requirements and placement along with additional requirements for a Conditional Use Permit (CUP) as the companies operation similarly fits that of what would be placed in a commercially zoned area. Administrator Ericson stated that as the process continues he would keep the Commission abreast of the status of planned Page 1 of 2 City of Centerville Planning and Zoning Commission August 11,2015 construction. The Commission discussed, in detail, the merits of rezoning the property versus a CUP and agreed that a CUP would be best for the company and city. 2. 2015 City of Centerville Fete des Lacs Administrator Ericson stated gave a brief overview of the events, participation and vision for future celebrations. He stated that it is important to have a P & Z member at a future Festival Committee meeting. 3. Sewer&Water Rates Administrator Ericson explained the city's sewer and water funds and stated they are Enterprise Funds which are independent of the City's general fund. He stated that the City's funding of the water and sewer system are steady; however, with depreciation and anticipated repair(s) in the future an increase in rates may take place and Council is considering this item along with the 2016 budget. No action taken by the Commission but excellent discussion took place with positives and negatives on rate increases. VI. DISCUSSION ITEMS-None VII. CONSIDERATION OF MINUTES 1. June 2, 2015 Planning& Zoning Commission Meeting Minutes Motion by Commissioner Montain seconded by Commissioner Twohv to approve minutes from the June 2, 2015, meeting as presented. All in favor. Motion carried. VIII. ADJOURNMENT Motion by Commissioner Koski, seconded by Commissioner Twohv to adjourn the meeting at 8:20 p.m. All in favor. Motion carried. Respectfully submitted, Michael A. Ericson City Administrator Page 2 of 2