Loading...
HomeMy WebLinkAbout2015-09-23 CC Agenda w-Handouts CITY OF CENTERVILLE COUNCIL MEETING AGENDA cteryiCCe'L,1abhdted 185T Wednesday, September 23, 2015 - Set Agenda = Red 6:30 p.m. or shortly thereafter OPEN FORUM 6:30 P.M.: An opportunity for members of the public to address the City Council on items not on the current agenda. Items requiring Council action may be deferred to Staff or Boards and Commissions for research and future Council Agendas if appropriate. You will be limited to two (2) minutes and we ask that you conduct yourself in a professional, courteous manner and refrain from the use of profanity. Failure to abide by this policy may result in the loss of your privilege to speak. Persons wishing to speak will be required to complete a sign-up sheet and give it to the Mayor or a Staff person prior to 6:15 p.m. COUNCIL MEETING I. CALL TO ORDER 1. Roll Call II. PLEDGE OF ALLEGIANCE III. APPOINTMENTS/PRESENTATION 1. Parks & Recreation Committee Presentation—Past Chairperson/Fete des Lacs 5K/8K Run/Walk Coordinator Mr. Pat Branch a. Res.#15-030—A Resolution Recognizing Patrick Branch for His Years of Dedicated Public Service on the Centerville Parks& Recreation Committee (Page i) 2. Anoka County Commissioner Rhonda Sivarajah & Transportation Division Manager Mr. Doug Fischer—CSAH14/Main Street Improvements 3. Mr.Mike Rogers,Ramsey County Regional Railroad Authority, Rush Line Corridor—Update (Pages 1-2) IV. PUBLIC INPUT V. APPROVAL OF AGENDA VI. APPROVAL OF MINUTES 1. September 9,2015 City Council Meeting Minutes (Pages 3-8) VII. CONSENT AGENDA 1. City of Centerville September 10, 2015 through September 23, 2015 Claims (Check 29717-29733) (Pages 9-10) & (Check #29734-29741) (Page 10a) 2. Centennial Lakes Police Department Claims through September 10,2015 (Check #10521-10531) (Page 11) 3. Centennial Fire District Claims through September 4, 2015 (Check#7106-7119) (Page 12) 4. Encroachment Agreement, 1692 Lakeland Circle,—Replacement& Enlargement of Existing Shed Within Drainage/Utility Easement (Pages 13-17) 5. Multi-City Residential Recycling Drop-Off Day, October 24,2015 (8:00 a.m.— Noon), City of Circle Pines Public Works Facility, 760 Civic Heights Drive (Page 18) 6. Centerville Elementary PTA Request for Charitable Gambling Permit (Bingo) & Waiving of Associated Fees,November 13, 2015 (Annual Centerville Family Bingo Night) (Pages 19-28) 7. Stantec Proposal for Part 1 Wellhead Protection Plan Amendment—Not to Exceed $7,350 (Pages 21-28) 8. Successful Performance Review,Lead Project Coordinator Mr. Greg Burmeister Completion of Year 5 VIII. OLD BUSINESS 1. Ms. Diane Hankee, City of Lino Lakes City Engineer—West Cedar Street Agreements a. Res. #15-OXX—Approving the Joint Powers Agreement Between the City of Lino Lakes and Centerville Regarding West Cedar Street Paving(Pages 30-32) b. Res. #15-OXX—Approving Joint Powers Agreements Between the City of Lino Lakes and Centerville Regarding Maintenance of West Cedar Street (Pages 29,33-34) (Pages 34a-34g) 2. Discussion On Ordering of Feasibility Report for 2016 Thin Mill & Overlay Project (Pages 34h-34j) IX. NEW BUSINESS 1. Reader Board Request—Open House (Ultimate Martial Arts, 6845—20th Avenue South, Ste. #160) (Pages 35-39) X. COUNCIL & ADMINISTRATION ANNOUNCEMENTS 1. Administrator Ericson 2. Council XI. ADJOURNMENT *REMINDERS** Planning&Zoning Commission Meeting—October 6, 2015, 6:30 p.m. (Council Chambers) Parks &Recreation Committee Meeting— October 7, 2015, 6:30 p.m. (Council Chambers) City Council Meeting— September 23, 2015, 6:30 p.m. (Council Chambers) City Council Meeting—October 14, 2015, 6:30 p.m. (Council Chambers) Out Run Homelessness, 5, 8K"s & Kids Run/Walk— September 19, 2015 (Around Centerville Lake and Out and Back) CHS Diamond in the Rough 5K & l OK Run/Walk— September 26, 2015 (Around Centerville Lake and Out and Back) -1tennial Flag Football—LaMotte Park Fields 1, 2 & 11 —August 1 —October 30, 2015 (Tuesdays, .rsdays & Saturdays from 5:00 p.m. —Sunset& 8:00 a.m. —2:00 p.m. Centennial Soccer—Acorn Creek Park Field 1 —April 1 —October 30, 2015 (5:00 p.m. — Sunset) Centennial Soccer—LaMotte Park, Fields 1, 2 & 11 —August 1 —October 30, 2015 (Mondays, Wednesdays &Fridays from 5:00 p.m. —Sunset Cub Scout Rocket Launch—Laurie LaMotte Memorial Park—October 3, 2015 w/Alternative Date October 10, 2015 (8:00 a.m. —5:00 p.m.) Troy Martenson—Hidden Spring Park—October 10, 2015 (10:00 a.m. — 12:00 (noon)) Res. #15-030 A RESOLUTION RECOGNIZING PATRICK BRANCH FOR HIS YEARS OF DEDICATED PUBLIC SERVICE ON THE CENTERVILLE PARKS & RECREATION COMMITTEE WHEREAS, Mr. Pat Branch was first appointed to the Parks & Recreation Committee by the City Council on December 26, 2007, and WHEREAS, Mr. Pat Branch has served the citizens of Centerville from December 26, 2007—July 26, 2015 as a Parks &Recreation Committee Member, and WHEREAS, Mr. Pat Branch has provided excellent leadership, demonstrated initiative and perseverance through difficult budget/economic times, and WHEREAS, Mr. Pat Branch was appointed Chair by his peers in 2010 and continued to serve in that capacity until his volunteered resignation in 2014; and WHEREAS, Mr. Pat Branch is a leader that is respected by his fellow Committee Members, City staff and elected officials he has served with. As a colleague, he has always treated his fellow Committee Members with respect and valued their opinions even when they disagreed with him, and WHEREAS, the Council recognizes that when an individual serves, so serves their family and the Council recognizes and acknowledges their sacrifices. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF CENTERVILLE, MINNESOTA, expresses its regrets to seeing him leave this honorable service; but, wishes him and his family well. We thank him for his dedication to the community as he has served others through his choices. The City of Centerville wishes you every success in your future. You will truly be missed. Adopted by the Council this 23rd day of September, 2015. Tom Wilharber, Mayor Attested: Teresa Bender—City Clerk L- CITY OF CENTERVILLE 09/22/153:21 PM Page 1 Check Detail — September 23, 2015 - Update Check Date Check# Vender Name Comments Amount 9/24/2015 000789E IRS/EFTPS FICA-MED W/H-PAY PERIOD 19 $2,925.54 9/24/2015 000789E IRS/EFTPS FED.W/H-PAY PERIOD 19 $2,299.33 Check Nbr 000789 IRS/EFTPS $5.224.87 9/24/2015 000790E MINNESOTA DEPT OF REVENUE STATE W/H-PAY PERIOD 19 Check Nbr 000790 MINNESOTA DEPT OF REVENUE $887.73 9/24/2015 000791E PERA PERA W/H-PAY PERIOD 19 Check Nbr 000791 PERA $2.619.82 9/24/2015 000792E WELLS FARGO H.S.A.W/H-PAY PERIOD 19 Check Nbr 000792 WELLS FARGO $1.052.07 9/23/2015 029734 ALL AMERICAN TITLE COMPANY-H 14-063-6757 BEAVER POND WAY-ESCROW RELEASE Check Nbr 029734 ALL AMERICAN TITLE COMPANY-H $5.000.00 9/23/2015 029735 ANOKA COUNTY 23-31-22-34-0056-PURCHASE PRICE/STATE DEED/STATE $42.67 9/23/2015 029735 ANOKA COUNTY 23-31-22-34-0056-PURCHASE PRICE/STATE DEED/STATE $42.67 9/23/2015 029735 ANOKA COUNTY 23-31-22-34-0056-PURCHASE PRICE/STATE DEED/STATE4$ 2.66 Check Nbr 029735 ANOKA COUNTY $128.00 9/23/2015 029736 COMCAST HIGH SPEED INTERNET _Check Nbr 029736 COMCAST $35.77 9/23/2015 029737 COMMISSIONER OF REVENUE ROF-23-31-22-34-0026-CONDITIONAL USE DEED $125.00 9/23/2015 029737 COMMISSIONER OF REVENUE ROF-23-31-22-34-0026-CONDITIONAL USE DEED $125.00 Check Nbr 029737 COMMISSIONER OF REVENUE $250.00 9/23/2015 029738 DELTA DENTAL COBRA-D. LARSON- 10-2015 $66.45 9/23/2015 029738 DELTA DENTAL OCT. 2015 DENTAL INSURANCE $335.95 Check Nbr 029738 DELTA DENTAL $402.40 9/23/2015 029739 ERICSON,MIKE PARKING REIMBURSEMENT $6.00 9/23/2015 029739 ERICSON, MIKE MILEAGE REIMBURSEMENT $8.05 9/23/2015 029739 ERICSON, MIKE MILEAGE REIMBURSEMENT $147.20 ChecK Nbr 029739 ERICSON MIKE $161.25 9/23/2015 029740 GRAINGER QUARTZ METAL HALIDE LAMPS Check Nbr 029740 GRAINGER $27.56 9/23/2015 029741 VERIZION WIRELESS CELL PHONE-SERV THRU 9-9-2015 $48.19 9/23/2015 029741 VERIZION WIRELESS CELL PHONE-SERV THRU 9-9-2015 $48.19 9/23/2015 029741 VERIZION WIRELESS CELL PHONE-SERV THRU 9-9-2015 $144.55 9/23/2015 029741 VERIZION WIRELESS CELL PHONE-SERV THRU 9-9-2015 $48.19 9/23/2015 029741 VERIZION WIRELESS CELL PHONE-SERV THRU 9-9-2015 $48.19 Check Nbr 029741 VERIZION WIRELESS $337.31 Total Checks $16,126.78 A�C Mike Ericson rom: Paul Palzer Sent: Tuesday, September 15,2015 2:27 PM To: Mike Ericson Subject: Joint Street Maintenance with Lino Lakes Hello Mike- The city has a JPA for 21'ave to the south of Main Street. This last winter,Centerville was plowing 21'ave and Lino Lakes plowed their portion of Mound Trail. With the new JPA's,Centerville will plow Cedar Street and Lino Lakes will plow 211t. All other maintenance is spelled out in the JPA's. Paul 1 Q- i CIT OF 11NORKE November 26,20M Kim Moors Sykes i City Administrator 1880 Main Street Centerville,MN 55038 Re: Joint Powers Agreement 21st Avenue Improvements Dear Kim: Enclosed is a fiilly executed copy of the Joint Powers Agreement for the 21 a Avenue Street and Storm Sewer project for your records. If you have any questions please contact me at(651)982-2427. Sincerely, Michael Grochala Enclosures CC: Linda Waite Smith,City Administrator SGpHN�� Jim Studenski,City Engineer 600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182 Phone: 651-982-2400 • Fax: 651-982-2499 9 TDD:651-982-2410 .z JOINT POWERS AGREEMENT BETWEEN THE CITY OF LINO LAKES AND TIRE CITY OF CENTERVILLE REGARDING 21sT AVENUE ROADWAY, PHASE I,RWMOVEMENTS AND MAINTENANCE THIS AGREEMENT,made and entered into on the day and year hereinafter set forth by and between the City of Lino Lakes and the City of Centerville;both of which are governmental subdivisions of the State of Minnesota located in the County of Anoka. RECITALS a. The City of Lino Lakes and the City of Centerville desire to improve 21�` Avenue by constructing street,curb and gutter between Main Street and 600 feet south of Main Street and storm sewer from Main Street to the south. b. The City of Lino Lakes has prepared a feasibility study of the Project as defined by this agreement. C. A portion of the Project is to be constructed within the corporate limits of the City of Lino Lakes and a portion is to be constructed within the corporate limits of the ' City of Centerville. (Exhibit A). d. Subject to the terms hereof,Lino Lakes is assuming full responsibility for the design and construction of the Project to be built both within the corporate limits of Lino Lakes and Centerville. e. Lino Lakes and Centerville recognize and acknowledge that the Project will benefit both Lino Lakes and Centerville. 1 v , L Lino Ickes and Centerville will both assess the benefited properties within their jurisdictions for all,or a portion of the relevant costs of the Project,all as is more fully set forth below. PURPOSE The purpose of this Agreement is to set forth the terms of the agreement Lino Lakes and Centerville have reached regarding the design and construction,maintenance and financing of the Project both within the corporate limits of Lino Lakes and Centerville,in accordance with Minnesota Statutes,Section 471.59. AGREENlEi`IT NOW,THEREFORE,in consideration of the mutual undertakings herein expressed,Lino Lakes and Centerville agree as follows: 1. Lino Lakes is responsible for the design and construction of both the portion of the Project located within Lino Lakes and the portion of the Project located within Centerville. Therefore,the parties agree that: a. Lino Lakes shall design the Project, administer the construction and conduct inspections of the construction process. Centerville shall have the right to inspect,review and comment upon constmction of the Project. Centerville shall have the right to review and approve the final plans and specifications prior to advertisement for bids. b. For purposes of performing its obligations under this Agreement, Centerville hereby grants to Lino Lakes the rights to use the streets,public ways, and easements of Centerville for purposes of constructing the Project,including any excavations necessary to perform work incidental to the performance of this agreement; 2 CJ/U- and Centerville hereby agrees,through its departmental agencies,to cooperate to the fullest extent in the protection of any excavations or barricades that may be necessary for the work performed by Lino Lakes. C. Lino Lakes agrees to notify and coordinate with businesses in Lots 7,8 and 9 of the Centerville Industrial Park(along the existing gravel segment of 21a Avenue) as early as practical the construction schedule of the Project. 2. Construction costs and design engineering shall be divided proportionally, 50%to Lino Lakes and 50%to Centerville,for the Project. Legal,administrative and construction engineering costs shall be paid separately by each City. 3. Each city has the right to terminate Agreement prior to award of construction contract. 4. Each municipality shall be solely responsibly for their share of the costs of the Project. Each municipality shall be responsible for the sale of bonds,if any, and levy of special assessments against properties within their cities boundaries. 5. City of Lino Lakes shall receive,from the City of Centerville,monthly payments,as certain portions of the construction are completed. The Project amounts are i then due and payable for work completed. Upon completion of the entire Project,the City of Lino Lakes shall prepare a final cost statement and submit it to the City of Centerville. Payment of the statement shall be completed within 45 days upon receipt of the statement. 6. Before this Agreement shall become binding and effective it shall be approved by an appropriate resolution of the City Council of Lino Lakes and of the City Council of Centerville,which shall be attached hereto as Exhibits B and C,respectively. 3 7. The City of Lino Lakes shall maintain 21"Avenue by performing annual street sweeping,crack sealing and pothole filling. The City of Centerville shall maintain 214 Avenue by plowing snow and winter sanding/de-icing. 8. The City of Lino Lakes and the City of Centerville will sealcoat the roadway on a 5-7 year interval by separate cost share agreement. 9. Other projects,such as reconstruction and overlays, shall be completed by I separate agreement between the City of Lino Lakes and the City of Centerville. 10. The City of Lino Lakes shall maintain the storm sewer consisting of performing periodic inspections of the conveyance system/pond and by taping any necessary corrective action,all by a separate cost share agreement- 4 .'t i IN WITNESS WHEREOF,Lino Lakes and Centerville have caused this Agreement to be executed on behalf of the proper officers. Dated: It 2° 47- . CITY OF LINO LAKES or City Cle4 I Dated: CITY OF CENTERVIII E I Mayor City Clerk 5 c Stantec September 17,2015 File:198803123 Attention: Mike Ericson 1880 Main Street Centerville,MN 55038 Dear Mike, Reference:Annual Thin Bituminous Overlay Program 2016 Thin Bituminous Overlay Project At your request we have prepared the following scope of services and fee proposal for engineering services related to the 2016 Thin Bituminous Overlay project. Those services include: Feasibility Report A portion of the costs of the past two projects have been specially assessed. This requires a feasibility report under MN Chapter 429 law. We will complete the feasibility study, prepare for and attend both the Public Improvement Hearing and Assessment Hearing. Our proposal anticipates these hearings to be conducted on the same night as regularly scheduled City Council Meetings. We also assume that the City Clerk will prepare the preliminary and final assessment rolls for the project as she has for past projects. The other element included in the Feasibility Report stage is the evaluation of streets scheduled for overlay. This involves a tour, with the Public Works Director, of the streets scheduled for overlay as well as others which may not have been on the schedule, but which the Public Works Director feels should be examined for possible inclusion in the project. This work is necessary to give the Council an informed opinion on the appropriateness of an overlay for the programmed streets. Plans and Specifications In 2014, we developed a set of programmatic plans and specifications for the Thin Bituminous Overlay program which we continue to use for each project. Minor modifications to these specifications are made each year to adapt to new MNDOT bituminous specifications, or to refine our approach to the program based on our experiences with last year's project. Plans are, of course, updated to show this year's streets and reviewed for any changes to the standard details that may be appropriate. Assistance with Bidding As part of this phase, we will publish an advertisement for bids(ad costs paid by city) as required by public bidding law,answer bidder questions, produce and distribute Addenda, attend the Bid Opening,and produce and review a Bid Tabulation. Once bids are received and presented to the City Council for award, contracts will be prepared and distributed for execution. Design with community in mind I September 17,2015 Mike Ericson Page 2 of 3 Reference: Annual Thin Bituminous Overlay Program 2016 Thin Bituminous Overlay Project Construction Phase This proposal assumes that the city's Lead Project Inspector, Greg Burmeister will continue in his role as the primary,on-site representative during construction. We would support him with the following tasks: • Preparation for and attendance at a Preconstruction Conference • Periodic support of City's Project Inspector(Greg Burmeister) during construction (<5 hrs/wk) • Production of minor Change Orders • Issuance of Pay Requests; final payment after review of IC-134s, Lien Waivers These services would be provided for the scope of the proposed 2016 Thin Bituminous Overlay Project which includes(see attached): • Meadow Circle • Deer Court • Meadow Court • Hunters Trail • Cottonwood Court • Mill Road The preliminary construction cost estimate for these improvements is$220,000. Fees Based on the scope of work and scope of project outlined above, the following is a summary of our not-to- exceed fees. Our work would be billed on a monthly basis, in accordance with our Master Services Agreement and per our current rate schedule. The values in the table below would not be exceeded without a change in scope and written permission from city officials. Phase NTE Fee Feasibility Study $3,500 Plans/Specs $1,500 Bidding $1,500 Construction $2,500 Total $9,000 Schedule It is our understanding that the City Council would like to take bids prior to adopting their final budget for the year, in December. This would allow the Council to more accurately understand the ability of their levy to fund the overlay program in 2016. In order to accomplish this, we propose the following schedule: Order Feasibility Report September 23, 2015 Receive Feasibility Report/Call for Public Imp. Hearing/Authorize Plans October 14, 2015 Approve Plans/Hold Public Improvement Hearing/Authorize Bidding October 28, 2015 Open Bids December 2, 2015 Council Review Bids and Approve General Levy December 9, 2015 Call for and Hold Assessment Hearing/Award Bid January 2016 Design with ccmmunt y in mind September 17,2015 Mike Ericson Page 3 of 3 Reference: Annual Thin Bituminous Overlay Program 2016 Thin Bituminous Overlay Project If services beyond those discussed in this scope of work become necessary or if the scope of the construction project changes, we will present this information and request authorization for the additional compensation, as appropriate. Regards, Stantec Consulting Services,Inc. '0� "14 Mark Statz,PE City Engineer Phone:651-604-4709 mark.statz@stantec.com Attachment:Project Area(Figure i) c. Brian Hare,Lee Mann—Stantec Paul Palzer—Public Works Director sm document2 Design with cornmunit y in mind