HomeMy WebLinkAbout2017-03-22 Handouts at CC MeetingNTI' NORTHERN
ECHNO
TECNNOO
LOGIES,IIC
6160 Carmen Avenue East
Inver Grove Heights, MN 55076
P:651.389.4191 F:651.389.4190
www.NTIgeo.com
Dailey Companies
P. O. Box 490206
Blaine, Minnesota 55449-0206
Attention: Mr. Jay Thorson
Subject: Geotechnical Exploration and Engineering Review Summary
Ruffridge Johnson Equipment Company
Centerville, Minnesota
NTI Project No. 17.61877.100
Dear Mr. Thorson,
Unearthing confidence -
March 21, 2017
Northern Technologies, LLC (NTI) has been asked by the City of Centerville to provide a project
summary based on our geotechnical exploration and our understanding of the provided soil
improvement testing reports and documentation. This letter provides our summary.
Subsequent to the issuance of our initial report, additional documentation was provided to NTI by
the City of Centerville consisting of site field testing reports prepared by Twin City Testing
Corporation during the site's soil improvement activities. The provided documentation included
density tests (performed in the fill soils) and Dynamic Cone Penetrometer (DCP) tests (performed on
the base native soils below the fill materials) for Parcel C and only DCP tests (performed on the base
native soils below the fill materials) for Parcel B (see the attached soil test summary and the boring
and test location plan). Parcel C is the west half of the property and Parcel B is the east half of the
property. The majority of the project's proposed structure and the soil borings performed for this
project are located on Parcel B.
Based on the provided test reports, it appears that the fill may have been placed in a controlled
manner on Parcel C; however, since documentation of the placement of fill on Parcel B was not
provided, NTI still considers these fill soils to be undocumented and placement conditions to be
unknown.
Our soil borings encountered topsoil over fill extending to depths ranging from approximately 2.0 to
7.0 feet below the existing ground surface. The fill encountered at Borings SB -3 (located near the
southwest corner of the proposed structure) and SB -5 (located within the east parking area)
contained organic materials and/or organic soil layers at depths of approximately 4.5 feet below the
existing ground surface. Based on the results of our geotechnical investigation and the lack of fill
placement documentation for the Parcel B site, it is our opinion that in order to reduce risk of
settlement and the potential for subsequent structural damage, a complete soil correction to remove
the existing fill is recommended within the building pad footprint.
Piecision Fl-,i:LiEsse - GVstechruf t11 Klotclwls
F AI'l;Ej [3ISMAHC:K - GRAND FDRK5 M1N101 1N'Vf R GHEJVF HE 11; 111 S RAM SE Y HAP11)1:1TY S1471JX FA[ 15
4,
Ruffridge Johnson Equipment Company
Centerville, Minnesota
NTI Project No. 17.61877.100
Without documentation of the placement of the fill soils (Parcel B), it is NTI's opinion that they are
not suitable for direct support of the foundations or floor slabs and that they may not provide a
uniform subgrade support. Additionally, the organic laden soils are not suitable for support of
foundations or slabs. These may be limited in extent, but, even with documentation, we recommend
that they be removed from the building area.
If the floor slab is to be supported on the existing, non-organic, fill soils, there is the potential for
increased distress within the floor slab. If this option is selected, the modulus of subgrade reaction
(k) design value should be reduced to 150 pci (pounds per square inch per inch of depth). The risk of
differential settlements in the slab could be reduced if the upper 1 foot, or more, of the slab
subgrade is over -excavated and replaced with properly compacted granular backfill.
If the floor slab is to be constructed directly over documented engineered fill or non-organic,
competent native soil as described in the Site Preparation section of our geotechnical report, the
design of the floor slab may be based on an estimated modulus of subgrade reaction (k) of 200 pci.
Maximum net allowable soil bearing pressure recommendations for founding the foundation on
native soils with on-site documented backfill that should be used for design is 2,500 pounds per
square foot (psf). Maximum net allowable soil bearing pressure recommendations for founding the
foundation on newly prepared properly compacted fill soils or competent native soils that should be
used for design is 3,500 psf.
These recommendations are predicated on foundation design and construction complying with
recommendations presented within our geotechnical report. To minimize local failure of supporting
soils, it is our opinion foundation construction should comply with the International Building Code
(IBC) requirements.
If the Owner, in conjunction with the design team, wishes to explore an option to support the
proposed structure on the existing fill soils, NTI suggests that a series of test pits be advanced at the
site to refine our understanding of the fill soil profile prior to construction. Additionally, to aid in
evaluating the fill soil conditions, density testing of the in-place fill soils could be performed within
building pad area.
We appreciate the opportunity to have been of service on this project. If there are any questions
regarding the soils explored or our review and recommendations, please contact us at your
convenience at (651) 389-4191.
Northern Technologies, LLC
__i� �___
Debra A. Schroeder, P.E.
Senior Engineer
Steven D. Gerber, P.E.
Senior Engineer
Attachments
711 Aw,-
11
IT
fAL
i F 41:]]
-
Boring and Prior Soil Tests Location Diagram
Completed Soil Borings:
Ruffrid@eJohnson Equipment Company ~
Centerville, Minnesota Completed DCpTests: NTI
NT|Pn�ect��17.61�77.1OO �w�m�m��
' . vmm"wRxMEaLLC
Completed Density Tests'
.
NOTE: Boring and Test locations are approximate.
NTr
'E� I [+�xweursa,�u
Unearth/ing confidence,
Summary of the Provided Soil Improvement Testing Documentation
Parcel D
Parcel C
Parcel 6
Parcel Name Not Noted
Date
Test No.
Location
Soil
Date
Test No.
Soil
Location
Description
Date
Test No.
5011
Location
Description
Date
Test N0.
Soil
Location
Description
Soft W and
15ft S & 20ft
45ft S of NW
101t N & 20ft E
DCP-903 ft,
W of NW
bldg comer-
of SW bldg
0-6,6-12
bldg comer -
6/20/2007
32
SM
6/21/200 7
34 m Retest #4
CL
902ft
pan
9/13/2006
1
SM -CL
corner
Inches
8/6/2007
36
SP
898ft
Proctor
25ft S & 1211
100ft Eof NW
loft 5&loft EWof
NW
bldg comer-
of NW bldg
DCP-903 ft,
bldg comer -
6/20/2007
33
SM
6/21/20071
35 a Retest #3
CL
903ft
ass.9/13/2006
2
SM -CL
comer
0-6 Inches
9/6/20071
37
SP
9008
Proctor
7SI t S & 20ft
DCP-903 ft,
W of NW
NE comer of
87ft SE of NW
Ofi, 6-12
bldg comer -
1 19 2007
39
CL
ad-902ft
Proctor
9/13/2006
3
SM -CL
bide comer
Inches
8/6/2007
38
SP
899ft
Proctor
DCP-903.5
3011 Sof NE
15ft W & 4011
ft, 06, 6 -
comer of pad-
N of SE bldg
12,12-18
11/19/2007
40
CL
904ft
Proctor
913 2006
4
SM -CL
corner
I Inches
45ft 5 and 45ft
E of NW comer
11/19/2007
41
CL
of ad-902ft
Proctor
SONE and 1011
N of SW comer
11/29/20071
42
CL
I of ad-904ft
Proctor
DCP-903It
D-6,6-12
9/1-3/20-061
5
CL
SE bide comer
Inches
NE bldg comer
DCP-903 ft,
9 13 2006
6
CL
ad
0-6 Inches.
5011 W and
45ft S of NW
bldg comer -
9 13 2006
17 = Retest #4
CL
I 90211
pass
10011 Eof NW
bldg comer -
omer-
9/13/2006.
9 13 2006
18 - Retest #3
CL
903ft
pan
50ft W and
45ft Sof NE
bldg corner,
middle pad -
9/13/200
4
CL
903ft
fall
10011 Eof SW
bldg comer,
ad -
middle pad -
9/13/2006.
9 13 2006
3
CL
902ft
fail
60ft S & 7011 E
DCP-902 ft,
of NW bldg
0-6, 6-12
9/13/20G6
7'
SM -CL
comer
inches
DCP-901 ft,
30ft E & 25ft 5
0-6,6-12
of NW bldg
12-18
9/13/200
e'
SM -Cl.
comer
Inches
DCP-900 ft,
Soft N & 20ft E
0-6, 6-12,
Of -Wig
12-18
9/13/2006
9'
—SM -CL
comer
Inches
3/22/2017 10:36 AM
A I B I C
I D E
F
G
H
1
Ruffridge Johnson Equipment Company
Building Permit
Plan Review 65% of Permit
State Surcharge 0.05% of Valuation
REU fee $2,300 x
WAC fee $1,850 x
SAC fee $2,485 x
1" Meter
Park Fee @ 2,175/acre
Erosion Control Site Fee
Professional Fees
Site Escrow*
Soil Remediation by Arnt Construction
Sewer Access Charge
Water Access Charge
Storm Water Area Charge @ $.07/sq. foot
9454.72
6145.57
718.05
5 =
5 =
5 =
*Will be Addressed with Letter of
Total
Estimate
Not Applicable
Not Applicable
Not Applicable
16318.34
11,500.00: 11,50_.0.,09
9,250.00
12,425.00`-
=_
527.00
10,875.00 10,875.00
360.00: -
5,000.001 (0aj
10,000.00 „ '. •"
76,255.34
ti
23,000. 2 00
12
13
14
15
16
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44