Loading...
HomeMy WebLinkAboutMandatory Municipal Water Connection Deadline Date of December 31, 2017•rrits Lmction DPaC • r. Lm- D ;; 7)0�cp ber 31. Z00 rl is =Ko ac "3 KF`4 "y ^v h t y k dv t ac "3 KF`4 MY' dv t Property Total of io9 property owners would be affected if deadline date runs its course. Seven (7) commercial users, one (i) church facility (school building). Six (6) properties are on the list but were installed after januaryl,2013 and are not affected by the December 31, 2017 deadline date but the December 31, 2021 deadline date as amended per City Code. (42) forty-two residential properties have not paid the Water Access Charge (Fee in lieu of Assessment) of $6,500 = $a73,000. Some of these date back to 199o. City Fees Associated w/Connection $1,850 -Water (WAC)/Trunk System Fee (Residential Equivalent Unit) io9 Units = $2oi,650 $411-3/4" Water Meter (Residential/i Church (Elem. School Building) 102Units = $411,922 $527 = i" Water Meter (Commercial) 7 Units = $3,689 Total One Time Fees to City if All Non -Connected Where Connected $273, 000 + $2o1, 650 + $41,922+ 3,689 = $520,261 Does not include fees for internal plumbing Revenue Loss Average Residential Water Only Utility Bill Yearly - $144.72 Average Commercial Water Only Utility Bill Yearly -$213-84 $144..72 X 101 = $14,616.72. Annually $213.84. x 8 = $1,710.72. Annually A flat rate Of $14.4.7/billing cycle for water availability is charged to everyone. Residents that have private wells are charged a flat rate fee Of $26.71/billing cycle for sewer treatment. Residents that have municipal water are charged a fee Of $2.26/per l,000 gallons which could be less, dependent on amount of water usage, than the $26.']1/billing cycle. �—Residents-Granted Special Provisions In 1990 & 1998, zoth Avenue property owners were assessed but some did not connect - (6) six have yet to connect. In 1993, Residents along Mill Road were afforded an opportunity to pay Water Access Charges without connection, with connection or when connecting - (5) five have yet to connect. In zoo5, 1299135513691375,.13g5, 13931397 & 1405 Mound Trail residents were granted a special provision (Res. #05-048) that they would not be charged a Water Access Charge until they connected. (One (i) resident requested water to be installed due to failing system and never connected). Deadline date the same. In2014, i7i6, i7a4 & i74o Heritage Street residents were granted a special provision (Res. #14-028) that they would not have to connect to municipal water that runs along their rear property lines until it was brought down their street which was a shorter distance for connection. Municipal services were installed after januaryl,2013 and have a connection deadline date of December 31, Zoai (Highlighted in Red) with six (6) properties not connecting. Reasonings Behind Council's Previous Decisions Complaints from residents -well is fine and they like it. Economy Cost Practical difficulty in forcing people to connect. Ordinance Amendments Current Ordinance states "All property served by private water systems must connect to public water, if it is available, no later than 12-31-201'7, except that where water is made available by the City after Januaryl,2013, properties served shall be connected no later than 12-31-2021. In 2013 the fee associated with well repair was increase from $500 to $1,000. City Code from 1987 states "At such time as municipal water becomes available to existing homes or buildings, a direct connection shall be made to such public system within a period of time as determined by the City Council. If such connection is not made pursuant to this ordinance, a penalty shall be levied in an amount set by City Council Resolution. What Precipitates Connection Selling of the home - (Requirement of new owner, mortgage company, etc.) Failure of existing well (With repair costs of in excess of $i,000). Resident Notification In May of 2014 all water available, unconnected residents received a letter similar to the attached when the City offered mass connections/one (1) contractor, financial grant funding with income -based guidelines. This offering also included an interest rate of 4% for 15 years and 5.25%for 25 years of assessments for those that costs exceeded$12,000. Past Incentives Grant Funding -Income Based Length of Assessment &Interest Rate Charged Hiring (i) one contractor -many connections, equipment in town -reap benefit and ability to assess for contractor fees versus homeowner paying for out of pocket. City liability with waterline versus contractor liability. Staff time.