HomeMy WebLinkAbout2019-08-14 CC Packet
1
2
3
4
5
6
7
8
9
10
8/14/2019
Police/Fire/Public Works
VII.4
Anoka County 2019 Multi-Jurisdiction All Hazards Mitigation Plan
Anoka County has recently received final approval from federal agencies for their most recent iteration of our
Multi-Jurisdictional All Hazards Mitigation Plan. With this approval, the county is requesting adoption of the
joint plan by all participating agencies (cities, townships, etc.). The full plan can be viewed at:
www.anokacounty.us/1048/Emergency-Management
Adoption of this plan, allows our city to be eligible for a number of federal emergency funding programs,
including FEMA disaster recovery funds.
No cost. Large potential cost implications if not adopted.
Motion to adopt the Anoka County 2019 Multi-Jurisdiction All Hazards Mitigation Plan.
Full plan available on Anoka Co. website
11
12
13
14
15
8/14/19
Public Works/Engineering
VIII.1
Downtown Street and Utility Improvements - Feasibility Report
Attached you will find a Feasibility Report, financing plan and resolution calling for a public hearing on the
2020 Downtown Street and Utility Improvements. This project is the final project to be completed from the
city's 2003 Pavement Management Plan. It would install water main to the only remaining neighborhood
without access to city water and reconstruct the streets in the downtown that have not been improved since the
sewer was installed in the early 1970's.
After reviewing the Feasibility Report and financing plan, the council should decide if they are ready to move
forward with the first of the two required hearings under MN State Statute Chapter 429, for special assessment
projects.
$2.4 M ($1.6 M Street Fund, Assessments; $0.5 M Water Fund; $0.3 M Stormwater Fund)
Motion to adopt Resolution 19-0XX Accepting the Feasibility Report and Calling for a Public Hearing.
Feas. Report; Finacing Plan
16
Feasibility Study
2020 Downtown Street and Utility
Improvement Project
Prepared for:
City of Centerville
Prepared by:
Stantec
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.:193804758
17
Stantec Consulting Services Inc.
733Marquette Avenue Suite 1000, Minneapolis MN 55402-2309
August7, 2019
File: 193804758
Attention: Honorable Mayor and City Council
CityofCenterville
1880 MainStreet
Centerville, MN 55038-9794
Dear Mayorand Council,
Reference: 2020 Downtown Area Street andUtility Improvements – Feasibility
Weare pleased to presentthe Feasibility for the2020 Downtown Area Streetand Utility
Improvements Project. This projectwas identifiedinthe 2003 Pavement ManagementStudy. Thereport
updates the findings ofthatstudy and examines in greater detail the proposed improvements and estimated
costs.
The report finds that theimprovements are necessary,cost effective and feasible (see Conclusions and
Recommendations). This report is required underMinnesota Statute Chapter 429 if the project is to be
speciallyassessed in any amount.
Regards,
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Engineer under the laws of the State
of Minnesota.
Stantec Consulting Services Inc.
Lee M. Mann PE
Principal
Phone: 612 712-2085
Kellie M. Schlegel, PE
Mobile: 651-775-5956
Date: August 7, 2019 Reg. No. 46200
Lee.mann@stantec.com
18
FEASIBILITY STUDY
Table of Contents
1.0 EXECUTIVE SUMMARY .................................................................................................1
1.1 RECOMMENDED IMPROVEMENTS ..............................................................................1
1.1.1Project Costs .................................................................................................. 1
1.2 ASSESSMENTS .............................................................................................................2
2.0 INTRODUCTION .............................................................................................................3
3.0 PROPOSED ROADWAY IMPROVEMENTS ...................................................................4
3.1 STREET SECTION IMPROVEMENTS - FULL RECONSTRUCTION ..............................4
4.0 STORM SEWER IMPROVEMENTS ................................................................................6
4.1 STORM SEWER SYSTEM EXPANSION ........................................................................6
4.2 PROPOSED STORM WATER MANAGEMENT ..............................................................6
5.0 SANITARY SEWER IMPROVEMENTS ..........................................................................7
6.0 WATER MAIN IMPROVEMENTS ...................................................................................8
6.1 WATER MAIN EXTENSIONS ..........................................................................................8
6.2 WATER SERVICE STUB INSTALLATION ......................................................................8
6.3 WATER SERVICE CONNECTIONS TO PROPERTIES ..................................................8
7.0 PATHWAY AND SIDEWALK IMPROVEMENTS ............................................................9
8.0 COST ESTIMATES/FUNDING ......................................................................................10
9.0 ASSESSMENTS ...........................................................................................................11
10.0 PROJECT SCHEDULE .................................................................................................12
11.0 CONCLUSIONS AND RECOMMENDATIONS .............................................................13
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.:193804758
19
FEASIBILITY STUDY
Appendices
Appendix A: List of Figures
FIGURE 1: PROPOSED IMPROVEMENTS ................................................................................
FIGURE 2: AREAS TO BE ASSESSED ......................................................................................
FIGURE 3: PAVEMENT MANAGEMENT PLAN OVERVIEW .....................................................
FIGURE 4: TYPICAL SECTIONS – 28’ FACE TO FACE SECTION ...........................................
FIGURE 5: TYPICAL SECTIONS – 34’ FACE TO FACE SECTION ...........................................
FIGURE 6: PROPOSED ROADWAY IMPROVEMENTS .............................................................
FIGURE 7: PROPOSED UTILITY IMPROVEMENTS ..................................................................
Appendix B: Detailed Cost Estimate
Appendix C: Preliminary Assessment Roll
(Prepared by City of Centerville, MN)
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.:193804758
20
FEASIBILITY STUDY
1.0EXECUTIVE SUMMARY
The following is a summary of the findings of this report.
1.1RECOMMENDED IMPROVEMENTS
The streets identified in the proposed project area of downtown Centerville are in poor condition
and are overdue for repair. This project was first identified in the 2003 Pavement Management
Plan. Recently, the City of Centerville was awarded Anoka County Community Development
Block Grant funds to connect existing downtown properties to municipal water service.
Consequently, if the City of Centerville wishes to invest in improvements to this area, now is an
ideal time due to the available funding for extending water service to the area. It is the
recommendation of this report to complete these roadway and water main improvements
concurrently and utilize the available grant funding. In addition, the existing storm sewer system
will be replaced and expanded as necessary to improve drainage conditions.
The existing conditions of the sanitary sewer system in the project area have recently been
evaluated through the examination of the City’s regularly scheduled sewer televising program.
Based on that review, no sanitary sewer improvements are proposed with this project.
The proposed schedule calls for construction activity to begin in early 2020 with construction to
be completed in early 2021.
1.1.1Project Costs
The following table is a summary of the estimated total project costs based on the
recommended improvements:
TABLE 1 – PROJECT COSTS
TypeScopeTotal CostFunding Source
Street Fund/
Street ImprovementsTotal Street Costs$1,585,940
Bonds**/Assessments
Water MainTotal Water System Costs$494,053Grant/Water Fund
Storm SewerTotal Sewer System Costs$341,415Storm Sewer Fund
Total Potential Costs$2,421,407
*Based on open cut installation of water main in conjunction with full street reconstruction.
**Only if needed.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 1
21
FEASIBILITY STUDY
1.2ASSESSMENTS
The following tables summarize the City’s estimated assessment rates for the proposed project:
TABLE 2 – ASSESSMENT COSTS
ItemAmount to be AssessedEstimated Assessment Rate
Commercial50%$127.50/FF
Institutional50%$127.50/FF
Vacant50%$127.50/FF
Residential20%$51.00/FF
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 2
22
FEASIBILITY STUDY
2.0INTRODUCTION
The proposed 2020 Downtown Area Street and Utility Improvement Project is the final project
identified in the 2003 Pavement Management study. The study evaluated the existing condition
of all streets in the City and, based on these findings, outlined proposed improvements. A
graphical representation of this plan can be found in Figure 3.
The City of Centerville recently was awarded Anoka County Community Development Block
Grant funds for extension of municipal water service into this project area of downtown.
Performing water main installation and roadway reconstruction simultaneously will allow the City
to realize economic and construction efficiencies as compared to separate projects.
The streets in the project area are in poor to failing condition. Based on the roadway conditions,
a complete reconstruction of the streets is recommended as the most practical long-term
solution, which also helps economically facilitate the concurrent extension of water service to
the area.
Potential redevelopment within this downtown area was also taken into consideration with these
proposed improvements. With Block 7 redevelopment pending and other properties adjacent to
the project area zoned for redevelopment, this project is compatible with these potential future
redevelopments.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 3
23
FEASIBILITY STUDY
3.0PROPOSED ROADWAY IMPROVEMENTS
Given the poor condition of the existing roadways, the need for extending municipal water
service, potential future redevelopment opportunities, and efficiencies of combining these
improvements, it is the recommendation of this report that the following improvements be
completed as part of this project:
3.1STREET SECTION IMPROVEMENTS - FULL RECONSTRUCTION
The streets in the project area have a lack of both proper drainage and subbase material to
withstand the high water table and typical freeze thaw cycles. Therefore, the proposed
improvement is a full reconstruction of the street section. Soil borings have been ordered to
confirm our assumptions regarding the existing road section conditions which are based on the
general knowledge of the area and observations of the pavement conditions/structure. The
proposed street section will add significant depth to the materials in the section, including the
aggregate base, sand, drain tile and geotextile fabric, which will conform to the City of
Centerville standard pavement sections for 9 ton residential roadways (see Figures 4 and 5).
Additionally, catch basins and storm sewer will be replaced and added to improve drainage
within and adjacent to the roadway.
Because these improvements will generally widen roadways and will extend water services to
the property line, a significant amount of front-yard disturbance will occur. Boulevards will be
restored with sod and driveways will be replaced in-kind. The amount of sod and driveway
replaced on each lot will depend on service locations and any changes in street grade which
may be part of the final design to fit the existing topography.
On most streets within this project area, the proposed roadway width is 28’ between the faces of
the curb. This is narrower than the City of Centerville’s standard residential street width of 32’.
Several factors were considered in recommending the proposed narrower street width:
The existing Right of Way widths are 50’, which is narrower than other developed areas
in Centerville.
The existing setbacks to homes in the downtown area are generally less than in other
areas. Using this narrower 28’ roadway width will minimize shortening of driveways so
that vehicles are able to continue parking in driveways without encroaching into the road.
The existing street width in the project area is approximately 22’. The widening impacts
to adjacent properties (driveways, yard grades, etc.) with the proposed 28’ width will be
less than a 32’ wide roadway.
The proposed 28’ section will also reduce the overall increase in impervious area
compared to the standard 32’ street width, therefore lessening the amount of stormwater
management/treatment that is required. This allows the storm water to be mitigated
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 4
24
FEASIBILITY STUDY
using less of the capacity of the existing re-use system the runoff from this area will be
utilizing.
There are two areas within the project area where proposed roadway widths differ from the 28’
wide typical section:
Sorel Street west of Centerville Road from Centerville Road to the existing trail crossing
approximately mid-block.: A 34’ roadway width is proposed in order to accommodate on-
street parking in anticipation of future redevelopment. The roadway would be comprised
of a 14’ westbound lane, 12’ eastbound lane, and an 8’ wide parallel parking lane on the
south side of the roadway. This parking lane can accommodate approximately 5 parking
stalls.
Centerville Road north of Main Street: The existing roadway width will be maintained at
approximately 44’ wide to accommodate school bus traffic, as well as on-street parking.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 5
25
FEASIBILITY STUDY
4.0STORM SEWER IMPROVEMENTS
The existing storm sewer will be replaced and expanded within the project area as necessary to
improve drainage conditions. As a result, the amount of runoff that currently discharges directly
to Centerville Lake at the west end of Sorel Street will be reduced to the extent possible and
rerouted south along Centerville Road to the Lamotte Park stormwater reuse system. The City
has been planning for these drainage modifications, and the trunk storm sewer line along the
west side of Centerville Road was designed to accommodate this additional drainage. Refer to
Figure 7 for the proposed storm sewer improvements.
4.1STORM SEWER SYSTEM EXPANSION
Improved storm sewer pipe and structures are needed on Sorel Street and Heritage Street
within the project area. These additions will help surface drainage which will in-turn add to the
durability of the street surface. Furthermore, future redevelopment will be considered during the
design phase such that the new storm sewer system can accommodate the increased runoff.
Subsurface drainage improvements are also proposed with the use of drain tile beneath the
curb in areas of full street reconstruction.
4.2PROPOSED STORM WATER MANAGEMENT
The proposed project area lies within the Rice Creek Watershed District (RCWD). Therefore,
the RCWD will have permit authority over the project and the storm water management within
the project.
In 2011, the City of Centerville implemented a stormwater reuse reclamation system at LaMotte
Park. This system was designed with the intent to provide stormwater management credits to
offset the impacts of future roadway and redevelopment projects in the downtown area. The
majority of the storm water from the proposed project area will be routed to the reuse system. It
is anticipated that remaining credits from the Lamotte Park irrigation system will be used to
offset stormwater treatment that is required as a result of the proposed improvements. If
sufficient credits are not available, the City intends to expand the reuse system as needed.
Costs of any expansion to the reuse system are not included in this report. Ultimately, it is the
goal that additional on-site stormwater treatment would not be required as part of this project.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 6
26
FEASIBILITY STUDY
5.0SANITARY SEWER IMPROVEMENTS
The existing conditions of the sanitary sewer system in the project area have recently been
evaluated through the examination of the City’s regularly scheduled sewer televising program.
Based on that review, no sanitary sewer improvements are proposed with this project.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 7
27
FEASIBILITY STUDY
6.0WATER MAIN IMPROVEMENTS
Extending water main to areas without municipal water service has been a stated goal of the
City of Centerville for many years. With Anoka County Community Development Block Grant
funds awarded to Centerville for municipal water improvements, it is recommended that these
improvements be incorporated into this project
6.1WATER MAIN EXTENSIONS
Water main is proposed to be installed in the project area on Heritage Street, Sorel Street,
Goiffon Road, Centerville Road, and Progress Road (see Figure 7).
6.2WATER SERVICE STUB INSTALLATION
Each home along the new mains will have a service line extended to the right-of-way,
terminating with a curb stop. This will provide the homeowner the option to connect to city water
either in conjunction with this project, or in the future.
6.3WATER SERVICE CONNECTIONS TO PROPERTIES
It is recommended that property owners have the option to connect to the City’s water system in
conjunction with the proposed water and street improvements. Providing this option would limit
the disruption to those properties who choose it, to a one-time event.
The City’s residents would have two options regarding connection to water service. Option one
would be to have the City’s contractor install the water service from the curb stop (property line)
into the home during the time frame of this City project. Option two would be for residents to hire
their own contractor to complete the same installation, either during the time frame of this City
project or in the future.
If the resident chooses option one, the City would allow the cost of the connection to be
financed along with the assessment and the service would be directionally drilled into the
homeowner’s basement. This option would minimize restoration costs, minimize construction
costs by bidding this work with the overall project, and allow the homeowner to have a “turn-key”
project. If the resident chooses option 1, a right-of-entry waiver must be signed allowing the
Contractor access to the resident’s property. Additionally, a waiver of assessment appeal would
have to be completed and submitted to the City to fully finalize the matter.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 8
28
FEASIBILITY STUDY
7.0PATHWAY AND SIDEWALK IMPROVEMENTS
No additional pedestrian connections or segments are being proposed at this time. The existing
bituminous pathway along Sorel to the east of Centerville Road will be removed and replaced
with a 6-foot wide concrete sidewalk. This will better accommodate the proposed street section,
as well as be more consistent with potential future redevelopment. At this time, no impacts are
anticipated to the pathway along Centerville Road north of Main Street, or the pathway along
Sorel to the west of Centerville Road. If impacts to these facilities become necessary during
further design or construction, they will be replaced in kind.
With the proposed street and utility improvements, curb returns at intersections will need to be
reconstructed. Pedestrian facilities, including curb ramps, will be designed to conform to ADA
standards.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 9
29
FEASIBILITY STUDY
8.0COST ESTIMATES/FUNDING
Below is a summary of the estimated project costs for the improvements discussed in this
report. Detailed cost estimates have been prepared for all improvements identified in the
previous sections. These estimates can be found in Appendix A.
TABLE 3 - SUMMARY OF ESTIMATED COSTS
TypeScopeTotal CostFunding Source
Street Fund/
Street ImprovementsTotal Street Costs$1,585,940
Bonds**/Assessments
Water MainTotal Water System Costs$494,053Grant/Water Fund
Storm SewerTotal Sewer System Costs$341,415Storm Sewer Fund
Total Potential Costs$2,421,407
*Based on open cut installation of water main in conjunction with full street reconstruction.
**Only if needed.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 10
30
FEASIBILITY STUDY
9.0ASSESSMENTS
Assessments for the project are proposed in accordance with MN State Statue Chapter
429. The methodology for calculating assessments is based on the city’s adopted Assessment
Manual (1988, w/revisions in 1989).
The City has identified four classes of property to be assessed: Commercial, Institutional,
Vacant and Residential. The class of property identification was based on the current use of the
property. All of the area to be assessed is within the city’s Mixed Use zoning districts (M-1, M-
2).
All properties are proposed for assessments based on a Front Foot basis, in accordance with
the City’s Assessment Manual. Policies in this manual indicate that corner lots are assessed at
100% of the front foot rate for the short side, and 20% on the side yard footage. An equivalent
footage was assigned for one residential parcel which takes access to the improvements
through an easement. Vacant and Institutional lots within the area to be assessed but that have
no explicit right of access to the improved roads were not assigned an equivalent front footage.
Front foot assessment rates for each class of property were established based on previous
practice on similar projects. The rates were defined as a percentage of the estimated total
project costs, per front foot.
The estimated project costs for street work on a per front foot basis are $255/FF. Therefore, the
City’s proposed assessment rates are as follows:
TABLE 4 – ASSESSMENTS
ItemAmount to be AssessedEstimated Assessment Rate
Commercial50%$127.50/FF
Institutional50%$127.50/FF
Vacant50%$127.50/FF
Residential20%$51.00/FF
Assessments are only proposed for the Street portion of the work. Storm sewer and water main
improvements will not be assessed.
The total estimated amount to be assessed to non-city owned property is: $306,459.00
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 11
31
FEASIBILITY STUDY
10.0 PROJECT SCHEDULE
The following is a preliminary schedule for the project:
Authorize Preparation of Feasibility ReportJune 26, 2019
Order Public Improvement HearingJune 26, 2019
Accept Feasibility ReportAugust 14, 2019
Authorize Preparation of Plans & SpecificationsAugust 14, 2019
Hold Public Improvement HearingSeptember 11, 2019
Approve Plans & SpecificationsOctober 23, 2019
Authorize Advertisement for BidsOctober 23, 2019
Receive BidsDecember 4, 2019
Review Bids/Award ContractDecember 11, 2019
Begin ConstructionSpring 2020
Substantial CompletionFall 2020
Final CompletionSpring 2021
Order Final Assessment HearingTBD
Final Assessment HearingTBD
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 12
32
FEASIBILITY STUDY
11.0 CONCLUSIONS AND RECOMMENDATIONS
It is the finding of this study that the proposed improvements are necessary, feasible and cost
effective from an engineering standpoint. The proposed improvements are feasible as they
relate to general engineering principles and construction procedures. The feasibility of the
project as a whole is subject to the financial review. The improvements proposed are necessary
to address the deteriorated pavement and drainage conditions. The improvements are cost
effective based on proven methods for street and utility construction.
Based on the information contained in this report, it is recommended that the City:
Adopt this report as the guide for development of the proposed improvements.
Hold a Public Improvement Hearing.
Order the preparation of plans and specifications.
Receive bids.
Hold an Assessment Hearing
Install the street, storm sewer and watermain/service, with construction anticipated to be
completed in 2021.
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758 13
33
FEASIBILITY STUDY
Appendix A: Figures
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.: 193804758
34
E
L
C
R
I
C
C
.
S
D
.
A
N
.
H
A
L
.
C
E
N
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwgPlot Date: 08/05/2019 - 3:48pm
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW K
O
L
A
.
E
L
1
A
4
R
W
G
R
A
A
T
N
G
E
E
R
-
V
I
E
W
C
R
E
E
K
RY
ELEMENTA
NTERVILLE
CE
SCHOOL
TVIEW STREET
WES
NONE
7121
NONE
D
NONE
A
O
R
NONE
1695
1691
T
STREE
N
MAI
14
S.A.H.
C.
E
1724
L
L
I
V
7096
7087
R
E
7087
T
N
7085
1744
7086
E
C
NONE
SOREL STREET
7082
168716957082
D
A
O
R
1588168070721724
D
R
D
A
7067
D
E
A
O
1580
U
T
7072
NONE
O
R
P
A
R
R
E
NONE
W
S
R
7059
NS
A
E
O
E
R
F
L
7059
F
GC
I
O
7045
O
16431649
R
R
G
70567064
70601721704817451749
P
O
A
HERITAGE STREET
D
704617161724174017441748
D
R
I
V
E
E
Y
V
I
A
R
W
D
B
I
J
O
D
STREET & UTILITY
A
O
TT
ARE
Y B
CE
AUN
CH
R
IMPROVEMENTS
E
L
E
NS
RDE
L GA
T
I
T
V
O
R
M
E
A
L
T
N
E
C
150300
PROPOSED IMPROVEMENTS
CITY OF CENTERVILLE, MN
FIGURE:1
2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
35
www.stantec.com
DATE8/5/2019 PROJ. NO.193804758
E
L
C
R
I
C
C
.
S
D
.
A
N
.
HA
L
.
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwgPlot Date: 08/05/2019 - 3:48pm
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
C
E
N
K
O
L
A
.
E
L
1
A
4
R
W
G
R
A
A
T
N
G
E
E
R
-
V
I
E
W
CLASSES OF PROPERTY
C
COMMERCIAL
C
I
INSTITUTIONAL
R
E
R
RESIDENTIAL
E
K
RY
ELEMENTA
NTERVILLE
V CE
VACANT
CHOOL
S
TVIEW STREET
WES
NONE
I
7121
R
NONE
D
I
NONE
A
O
R
NONE
V
1695
I
1691
STREET
MAIN
H. 14
C.S.A.
V
V
E
1724 R
C
L
L
I
V
V
V
7096
7087
R
C
E
7087
T
VI
N
7085
I
1744
R
7086
E
R
C
V
R
R
NONE
SOREL STREET
V
7082
CV
R
168716957082
D
A
O
R
1588168070721724
R
R
D
7067
R
D
E
A
R
1580
U
7072 T
NONE
O
R
ROAD
P
RR
A
R
R
R
E
NONE
W
S
7059 R
R
V
NS
A
E
O
E
R
F
L
R
7059
F
GC
I
R
RR
R
R
O
7045
O
16431649
R
R
R R
G
7060705670641721704817451749
P
O
A
HERITAGE STREET
D
704617161724174017441748
RR
RR
RR
D
R
I
V
E
E
Y
V
I
A
R
W
D
B
I
J
O
D
A
O
T
RET
BA
CEY
UN
CHA
R
E
L
E
NS
RDE
L GA
T
I
T
V
O
R
M
E
A
L
T
N
E
C
LEGEND
ASSESSABLE PARCEL
150300
PROPOSED IMPROVEMENT AREA
AREAS TO BE ASSESSED
CITY OF CENTERVILLE, MN
FIGURE:2
2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
36
www.stantec.com
DATE8/5/2019 PROJ. NO.193804758
YAWHGIH ETATSRETNI .S.U
E53 .ON
55 .ON HCTID YTNUOC AKONA
T
E
E
R
T
S
S E K A L O N I L F O Y T I C
R
A
D
E
C
EUNEVA TS12
N
K
O
E
T
)
E
G3
R
N
C
IH
C
H
R
T
ES
I
A
T
D
A
W
L
-
W
A
A
RI
K
AC
I
O
E
D
LN
CAU
4E(J
1V
I
.
R
O
D
N
"
".E
D
"F
."E"HC
R"".733 Marquette Avenue, Suite 1000Minneapolis, MN 55402www.stantec.com
R
D.
.GA
.E
VR.
IR"
RSM
D..
PD
RCM
.
T
.
".VD O
E
CIV
.V C
IIE
R
R
DRR
RP
.PP"
VD ETAVIRP(H T
I).R "
RR.
PS
. D
V"
II
R. "
PR
D W
.
V
I E
PR
I
E
V
L
T
RC
"J"E
"I
.
BRER
. DA
".I
IVR
RF
..RPC
T
I
R
RSY
IC
D
A
CN
.WI
"
KW
V "A
WO.
IRE
S E K A L O N I L F O Y T I C L D
.
ROIVMT
LR
P
PLIA
L
G
I
W
W
45
.S EUNEVA HT02
22
36
4
5 .ON .H.A.S.C22
HT02
.N EUNEVA
14 13
23 24
45 .ON DAOR YTNUOC
E
E
NN
A
AE
L
L
V
U
AVENUEYTINI
TN
NR
I
RI
EVIRD
SSAPDB
U REEDB
OOLO
CAR
R
N
H
HI
T
T
D
RU
R
OAO
CS
N
TENAL NIBOR TSEW
RE
E
ES
I
TRW
L
L73RD STREET
O
ETA
UNEVA SEKAL NIWT72ND 1/2 STREETYD
PES
A
OPARK
E
R
M
D
COTTONWOOD COURT
NL
I
2
A
7YAW NAIRB
R
T
PARK
E
L
MUS
TGTRUOC CA
T
R
A
UE
E
OE
C
R
N
T
A
I
S
R
B
EVIRD NAIRB
EVIRD NAIRB
DRIVE
BRIAN DRIVE
BRIAN
L
I
A
R
R
PARKE
ET
KSHAD AVENUET
D
EK
I
NREN
ER
RL
RAE
B
OCcP
GC
CM FIGURE3
A
AMEMORIAL
ETRUOC YVI
FOX RUN
CITY HALL
H
C
T
I
D
L E
I
T
A
A
R V
E I
DRIVET
R
TN
P
EA
PETERSON
EL
R
LIE
AR
TRL
T
GE
S
AE
E
CN
EDAOR ERPUD
TO
BI
E
EP
E
U
R
Q
TD
ROA
S
D
T
R
R
3
U
7
T
EO
E
IHOULE CIRCLE
EC
EL
I
RR
RR
IAP
TRE
AU
T
S G
RDD
E
A
PAL
R
DYE
IAOR LLIM DLOG
O
AOC
ORE
VA
PARK
V
ELCRIC KAOL
E
E
LPD
R
GA
D
AE
L
EO
G
E
R
I
PARKD
FI
E
YR
R
AT
P
HR
U
A
D
P
AY
DAOR LLIMGE W
PORTA
DAOR LLIM DLENAL
O
TNASAEHP
E
NE
D
OAE
AR
C
S
LW
AU
LO
SHORTO
NTSTREETL
PRL
EE
GO
VE
H
PELTIER CIRCLEEER
EURT
RW CO
EADOT
TPVM
E
UIS
S
DRG
DD
I
GR
ANGER
-VIEW
ERT
G
DYE
IAR
RWBT
IA
J
ONP
CLEAR
E
E
VI
RC
D
CLEARWATER
DAORRETAWRAELC
YAW DRALLAM
4
1LANE
AEM
17491748RICWOD
1744ELC
CREEK NONE
.
H
R
E.
AT
W
R A1745
EA
CL.T E
S1744L
.
T
C
C
E R
I
E S
70727048 R C
Y
VDAORSSERGORP
ELCRIC REITLEP
IR N
709670867082
A
RA
E W
DTWELCRIC EL
B LIVRUOT
NO
OD
D
ED
D
E70591721A
Y A
M
R AO
KEE
172470877085NONE
E E
ALR
A
M
LE1724M
L C E
E G
OR
L
NONE171617241740 N
ROP
L
I
EHU
IV U
CT
D
TR
SE
A
LE
E
ET
R70727046 H
PN
12 .ON .H.A.S.C
T
EDAOR
C
S
C ELLIVRETNECDAO
708270567064R ELLIVRETNEC
NONENONENONE
CENTERVILLE ROAD
DAOR ELLIVRETNEC
1695
NONET
7121N
IE
E
A
1691
R
M
T
16871695T
E
S
E
R
E
NALEKAL
ELCRIC DT
G
S
T
A
E
T
WEI
SRETNUH
ERR
E
I
TE
L
V
CS1680NOFFIOG7060
ROADH
T ENAL EGDIR
R
IS
CE
D
W
N
D
AL706770597045
LA
E
E7087
RO
K
R
AO
L
S
4T
1
. RL
U
OOI
N C
RE
.EA
HE
.D
A158815801649RN
.
S
.TA
C
L
S
R
E
E
EG
VT
I
D
RNE
I
DL
UER
1643C
H
R
RS
IP
R
E
CU
E
V
IDT
N
E
RN
TO4
DTU
E
O
H
MG
EY
A
LDA
KW
I
D
N
AYAW
ODNOP RE
LWPVAEB
EB
REVA
YAW DNOP
REVAEB
R
E
I
T
L
E
P
6
2
7
22 232
15 14
22 23
T I C
O N I L F O Y
S E K A L
E
V
I
R
D
193804758
4E
L
1
L
.A
OV
A
N
L
.
H
.
A
.
S
.
C
PROJ. NO.
37
T
E
E
R
T
S
N
I
A
M
F
O
N
T
IOR
U
SO
NC
ED
TN
XU
EO
M
E
L
L
I
V
R
E
T
N
E
C
4
1
.
O
N
.
.H
.A
.S
C
8/5/2019
" E "
DATE
S
E
L
I
A
K R
T
A
L
O
N
D
I
A
O
L
R
F
O
Y
D
T
N
U
I
O
M
C
Y
A
W
K
R
A
P
P A L R E V O N O I T P I R C S E D
16 1521 22
L O N I L F O Y T I C
S E K A
6001200
STREETS TO BE PLACED IN THEOVERLAY PROGRAMCOUNTY ROADS
2004 STREET IMPROVEMENTS2009 STREET IMPROVEMENTS2013 STREET IMPROVEMENTS2020 STREET IMPROVEMENTSPRIVATE STREETS
PAVEMENT MANAGEMENT PLAN OVERVIEW CITY OF CENTERVILLE, MN2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
Plot Date: 08/05/2019 - 3:48pm
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwg
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwgPlot Date: 08/05/2019 - 3:48pm
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
ROAD IMPROVEMENT NOTES:
YEAR 1
1. REMOVE BITUMINOUS
2. INSTALL WATER MAIN & SERVICES
3. CONSTRUCT ROAD THROUGH BITUMINOUS BASE COURSE.
4. RESTORE DISTURBED TURF AND DRIVEWAYS BEHIND THE CURB
5. PERFORM 1ST STRUCTURE ADJUSTMENT
YEAR 2
6. PERFORM 2ND STRUCTURE ADJUSTMENT
7. COMPLETE ALL PUNCH LIST ITEMS
8. SWEEP
9. TACK COAT
10. PAVE WEAR
11. SAW & SEAL WEAR COURSE
1
6' CONCRETE WALK ON SOREL STREET EAST OF CENTERVILLE ROAD
C/L
R/WR/W
50'
10.50'14.50'14.50'10.50'
THRUTHRU
6.00'
28'
CONC
WALK
DESIGN CL
1
GRADE
VA
RIE
S
0.025'/FT
4" DRAIN TILE (TYP)
1'
B618 CONC.
C&G (TYP)
1 1/2" - WEARING COURSE (SPWEA240C)
2" - NON-WEARING COURSE (SPNWB230C)
8" CLASS 5 AGGREGATE BASE
20" SELECT GRANULAR BORROW
GEOTEXTILE FABRIC, TYPE V
TYPICAL SECTIONS - 28' FACE-TO-FACE SECTION
CITY OF CENTERVILLE, MN
FIGURE:4
2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
38
www.stantec.com
DATE8/5/2019 PROJ. NO.193804758
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwgPlot Date: 08/05/2019 - 3:48pm
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
ROAD IMPROVEMENT NOTES:
YEAR 1
1. REMOVE BITUMINOUS
2. INSTALL WATER MAIN & SERVICES
3. CONSTRUCT ROAD THROUGH BITUMINOUS BASE COURSE.
4. RESTORE DISTURBED TURF AND DRIVEWAYS BEHIND THE CURB
5. PERFORM 1ST STRUCTURE ADJUSTMENT
YEAR 2
6. PERFORM 2ND STRUCTURE ADJUSTMENT
7. COMPLETE ALL PUNCH LIST ITEMS
8. SWEEP
9. TACK COAT
10. PAVE WEAR
11. SAW & SEAL WEAR COURSE
C/L
R/WR/W
50'
10.50'14.50'12.00'8.50'6.00'8.00'
THRUTHRUEX. BIT.
PARKINGBLVD
PATH
34'4.50'
DESIGN CL
GRADE
VA
RIE
S
0.025'/FT
4" DRAIN TILE (TYP)
1'
B618 CONC.
C&G (TYP)
1 1/2" - WEARING COURSE (SPWEA240C)
2" - NON-WEARING COURSE (SPNWB230C)
8" CLASS 5 AGGREGATE BASE
20" SELECT GRANULAR BORROW
GEOTEXTILE FABRIC, TYPE V
TYPICAL SECTIONS - 34' FACE-TO-FACE SECTION
CITY OF CENTERVILLE, MN
FIGURE:5
2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
733 Marquette Avenue, Suite 1000
Minneapolis, MN 55402
39
www.stantec.com
DATE8/5/2019 PROJ. NO.193804758
D
A
O
R
E
E
R
V
P
I
U
D
R
D
733 Marquette Avenue, Suite 1000Minneapolis, MN 55402www.stantec.com
R
ETA
DAWRA
ORELC
4
1
17491748
1744
FIGURE6
NONE
CREE
K
.
H
.
A
1745
.
1744
S
.
C
70727048
Y
S
DASERGO
ORRP
R
70867082
7096
A
T
N
E
70591721
M
E
70877085
1724
NONE
L
E
1724
L
E
O
L
NONE171617241740
O
L
I
H
V
C
T
R
S
E
E
E
T
70727046
R
N
T
E
D
AOR
S
ELLIVRE
TNEC
C
70567064
7082
NONENONENONE
193804758
1695
NONE
T
PROJ. NO.
7121
N
E
I
40
E
A
1691
R
M
T
T
16871695
E
S
E
R
E
T
G
S 8/5/2019
T
A
E
T
E
I
W
DATE
ER
R
I
T
E
V
S 7060
N
1680 OFFIOG
H
DAOR
T
S
E
W
L
706770597045
E
7087
R
O
S
158815801649
1643
75150
ASPHALT ROADWAY
CONCRETE WALK
LEGEND
PROPOSED ROADWAY IMPROVEMENTS CITY OF CENTERVILLE, MN2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
Plot Date: 08/05/2019 - 3:45pm
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwg
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
>
>
>
>
>
D
A
O
R
>
>
>
>
>
E
E
R
>
V
P
>
I
U
D
R
>
>
D
>
>
l
>
>
>
>
>
733 Marquette Avenue, Suite 1000Minneapolis, MN 55402www.stantec.com
>
l
>
l
>
>
l
>
R
ETA
DAWRA
ORELC
>l
l
4
>1
>
l
>
>
>
17491748
1744
>
l
>
>
FIGURE7
NONE
>
CREE
K
.
>
>
H
l
.
>
>
>
>
A
>
1745
.
1744
l
S
.>
>
>
C
>
l
70727048
>
Y
>S
DASERGO
ORRP
>
l
R
>
70867082
7096
A
>>>
T
l
llll
>
l
l
l>
l>
l
>
>
N l
E
>
70591721
>>
M
>
>
>>
E
70877085
1724
NONE
>
L
l
E
l
1724
L
l
E
O
l
L
NONE171617241740
O
L
I
H
>
>
>
l>
>>
>>
V
C
T
>
>
R
l
S
E
l
E
E
l
T
70727046
R
N
T
E
D
AOR
S
>
ELLIVRE
TNEC
C
>
>70567064
7082
NONENONENONE
>
l
ll
>>
l
l
193804758
l
>>
>
>
>
>>>>>>
>>
>
>
>>
>
>
>
l
>>
>>
>>
>>
>
>
l
>
1695
>
>
l
NONE
l
T
PROJ. NO.
7121
N
E
I
41
>
>
E
A
>
>>
l
1691
>
R
M
l
>
T
T
>>
>16871695
>
E
l
l S
>
l
l
l
l
l
l
l
E
>
>
R
E
l
T
G
>>>
S 8/5/2019
T
>
A
E
>
T
E
l
I
W
>>
>
l DATE
ER
R
I l
T
E
V
S 7060
N
1680 OFFIOG
H
DAOR
T
>>
>
S
>
l
l
>
E
>
>
l
W
>
L
706770597045
E
>>
7087
l
>>
R
>
l
O
>
S
>
>
>
>
l
>>
>
l
>>
>
>
>
158815801649
>
>
>
>
>l
>
>>
>
>
l
>
>
>>
>
>
>
>
1643
>
>
>
>
75150
>
>
PROPOSED STORM SEWERPROPOSED WATER MAINEX. STORM SEWEREX. WATER MAINEX. SANITARY SEWER
l
l
>>
>
>
>
LEGEND
PROPOSED UTILITY IMPROVEMENTS CITY OF CENTERVILLE, MN2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT
Plot Date: 08/05/2019 - 3:45pm
Drawing name: C:\\Users\\jopond\\appdata\\local\\temp\\AcPublish_3404\\193804758_Feasibility Figures.dwg
Xrefs:, 616map_nad83, 193804758_XSPL, 193804758_XSNO, 193804758_XSWT, 193804758_C100, 193804758_XSST, 193804758_XSXT, 193804758_XSSW
FEASIBILITY STUDY
Appendix B: Detailed Cost Estimates
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.:193804758
42
Full Depth Street Reconstruction and Utility Improvements
$1,793,635
Construction Cost
$179,364
Contingencies10%
$448,409
Indirect Costs25%
$2,421,407
Total Estimated Project Cost
$510
Street Cost Per C/L Foot
$160
Water Cost Per C/L Foot
$110
Storm Cost Per C/L Foot
Total Cost Per C/L Foot$780
PART A - STREETS
No.ItemUnitsQuantityUnit PriceTotal Price
LS
$56,000.00
1MOBILIZATION1$56,000.00
LS
$24,000.00
2TRAFFIC CONTROL1$24,000.00
LS
$6,000.00
3TEMPORARY MAIL1$6,000.00
EA
$300.00
4INLET PROTECTION22$6,600.00
LF
$3.00
5SILT FENCE, TYPE MACHINE SLICED2,000$6,000.00
LS
$7,000.00
6EROSION CONTROL1$7,000.00
EA
$500.00
7REMOVE TREE10$5,000.00
LF
$4.00
8SAWING BITUMINOUS PAVEMENT275$1,100.00
SY
$4.00
9REMOVE BITUMINOUS PAVEMENT10,400$41,600.00
LF
$4.00
10REMOVE CONCRETE CURB & GUTTER800$3,200.00
SY
$5.50
11REMOVE BITUMINOUS DRIVEWAY PAVEMENT400$2,200.00
SF
$8.00
12REMOVE CONCRETE DRIVEWAY PAVEMENT2,050$16,400.00
SF
$1.00
13REMOVE CONCRETE WALK800$800.00
LS
$500.00
14REMOVE CONCRETE STEPS1$500.00
CY
$17.00
15COMMON EXCAVATION13,400$227,800.00
CY
$25.00
16SUBGRADE EXCAVATION2,300$57,500.00
SY
$2.00
17SUBGRADE STABILIZATION FABRIC12,600$25,200.00
TN
$14.00
18SELECT GRANULAR BORROW15,500$217,000.00
TN
$15.00
19CLASS 5 AGGREGATE BASE, 100% CRUSHED6,400$96,000.00
TN
$70.00
20TYPE NON WEARING COURSE MIXTURE1,300$91,000.00
TN
$80.00
21TYPE WEARING COURSE MIXTURE960$76,800.00
GAL
$3.50
22BITUMINOUS MATERIAL FOR TACK COAT520$1,820.00
TN
$120.00
23TYPE WEARING COURSE MIXTURE - DRIVEWAY70$8,400.00
TN
$120.00
24TYPE WEARING COURSE MIXTURE - TRAIL40$4,800.00
LF
$20.00
25B618 CONCRETE CURB & GUTTER4,850$97,000.00
LF
$20.00
26CONCRETE RIBBON CURB270$5,400.00
SF
$6.00
27CONCRETE SIDEWALK4,700$28,200.00
SF
$13.00
286" CONCRETE PEDESTRIAN RAMP1,080$14,040.00
SF
$8.00
296" CONCRETE DRIVEWAY2,050$16,400.00
TN
$20.00
30GRAVEL DRIVEWAY PATCH27$540.00
LS
$3,000.00
31INSTALL CONCRETE STEPS1$3,000.00
SF
$60.00
32TRUNCATED DOME SURFACE72$4,320.00
SY
$3.00
33HYDROSEED WITH MULCH950$2,850.00
CY
$20.00
34LOAM TOPSOIL BORROW175$3,500.00
EA
$200.00
35SALVAGE AND REINSTALL STREET SIGN12$2,400.00
LS
$3,000.00
36STRIPING2$6,000.00
HR
$140.00
37STREET SWEEPER WITH PICKUP BROOM60$8,400.00
Subtotal$1,174,770.00
Contingencies (10%)$117,477.00
Indirect (25%)$293,692.50
$1,585,939.50
Total Cost
43
PART B - WATER MAIN
No.ItemUnitsUnit PriceTotal Price
LS
$18,000.00
1MOBILIZATION$18,000.00
LS
$9,000.00
2TRAFFIC CONTROL$9,000.00
LF
$7.00
3REMOVE WATER MAIN$280.00
EA
$300.00
4ADJUST GATE VALVE AND BOX$2,400.00
EA
$750.00
5ADJUST HYDRANT$1,500.00
EA
$2,000.00
6CONNECT TO EXISTING WATER MAIN$16,000.00
EA
$7,500.00
7HYDRANT, 6" GATE VALVE & BOX$37,500.00
LF
$45.00
86" PVC WATER MAIN$3,150.00
LF
$50.00
98" PVC WATER MAIN$145,000.00
EA
$2,500.00
128" GATE VALVE AND BOX$20,000.00
LB
$8.50
13DUCTILE IRON FITTINGS$11,985.00
EA
$400.00
141" CORPORATION STOP$8,800.00
EA
$500.00
151" CURB STOP & BOX$11,000.00
LF
$40.00
161" TYPE "K" COPPER PIPE$22,000.00
LF
$75.00
171" WATER SERVICE, CURB STOP TO HOME$33,000.00
EA
$1,000.00
18CONNECT WATER SERVICE TO INSIDE PLUMBING$22,000.00
LF
$6.00
17IMPROVED PIPE FOUNDATION$4,350.00
Subtotal$365,965.00
Contingencies (10%)$36,596.50
Indirect (25%)$91,491.25
$494,052.75
Total Cost
PART C - STORM SEWER
No.ItemUnitsUnit PriceTotal Price
LS
$13,000.00
1MOBILIZATION$13,000.00
LS
$6,500.00
2TRAFFIC CONTROL$6,500.00
LF
$70.00
315" RCP STORM SEWER$73,500.00
LF
$80.00
424" RCP STORM SEWER$32,000.00
EA
$2,700.00
52' x 3' CATCH BASIN$13,500.00
EA
$3,000.00
64' DIA. STORM CATCH BASIN MANHOLE$15,000.00
EA
$4,000.00
75' DIA. STORM CATCH BASIN MANHOLE$16,000.00
LF
$12.00
86" PVC PERFORATED COLLECTION PIPE, WITH SOCK$63,000.00
EA
$400.00
9DRAINTILE CLEANOUT$9,600.00
EA
$200.00
10CONNECT TO STRUCTURE (COREDRILL DRAINTILE)$4,800.00
EA
$1,500.00
11CONNECT TO EXISTING STORM SEWER$6,000.00
Subtotal$252,900.00
Contingencies (10%)$25,290.00
Indirect (25%)$63,225.00
$341,415.00
Total Cost
44
FEASIBILITY STUDY
Appendix C: Preliminary Assessment Roll
(Prepared by City of Centerville, MN)
City of Centerville
2020 Downtown Street and Utility Improvement Project
Project No.:193804758
45
----
9,562.509,562.502,550.006,375.006,375.006,375.002,040.003,187.509,562.503,825.003,825.006,630.007,650.003,825.003,825.005,100.005,100.006,630.006,375.003,825.005,100.006,375.005,100.005,100.007,650.0
09,690.005,100.003,825.009,180.004,080.004,080.005,100.007,905.001,530.007,650.003,825.001,275.006,375.00
7,650.003,825.001,275.007,599.00
19,125.0012,750.0015,937.5014,662.5023,460.0012,750.0012,750.0036,465.00
342,924.00306,459.00
$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
$$$$
AssessmentTotal
00000000000000000000000000000000000000000000000000
000
555555555555555500000000000000000000000000055555
00000
.....................................................
777777777777777711111111111111111111111111111177777
11
2222222222222222555555555555555555555555555522222
5555
111111111111111111111
$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
$$$$
AssessmentRate/FF
5%
50%50%50%50%50%50%50%50%50%50%50%50%50%50%50%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%20%50%50%50%50%50%
20%20%20%20%
Net Assessment Income
Percentageof ProjectCost to beAssessed
000000000000000000000000000000000000000000
00000000000
Total Proposed Assessments
000000000000000000000000000000000000000000
00000000000
................................................
.....
555555555555555555555555555555555555555555555555
55555
5555555555555555555555555555555555555555555555555
5555
2222222222222222222222222222222222222222222222222
2222
$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
$$$$
ProjectCost/FF
5500000065500055550055000550500000500005005504000
0559Total City-Owned Property Assessments
775205551227177357700327020059078880535728500
5724
111111111111111111111111
11
EquivalentFrontFootage(Front Yard+ 20% SideYard)
0000000000
0555055555
1111211111
SideYardFootage
Side RoadCenterville RdSorel StreetGoiffon RoadSorel StreetProgress RoadSorel StreetSorel StreetHeritage StreetProgress RoadSorel Street
CornerLot
0Y0000
757550505016257585Y75N75N75757550Y50Y752550
7525
150100125100Y150Y100100100Y125100125100100150150Y100150Y100125Y150184100100
150149
FrontRoadFootage
55413Progress Road55038Progress Road55038Sorel Street55038Main St.55038Sorel Street55038Sorel Street55038Sorel Street55038Sorel Street55038Sorel Street55014Sorel Street55014Sorel Street55014550145501
455014Sorel Street55038Progress Road55038Centerville Rd55038Centerville Rd55038Sorel Street55102Goiffon Road55038Sorel Street55038Sorel Street55038Goiffon Road55108Goiffon Road55038Goiffon
Road55038Sorel Street55038Sorel Street55038Heritage Street55038Heritage Street55038Heritage Street55038Heritage Street55038Heritage Street55038Heritage Street55038Heritage Street55038Heritage
Street55038Progress Road55038Progress Road55038Progress Road55038Progress Road55038Sorel Street5503855038Heritage Street55038Heritage Street55038Heritage Street55014Goiffon Road055014Sorel
Street55014Centerville Rd55014Centerville Rd55014Centerville Rd
55038Progress Road55038Progress Road55038Progress Road55431Progress Road
OwnerZip CodeFront Road
OwnerStateMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMNMN
MNMNMNMN
46
MINNEAPOLISCENTERVILLELINO LAKESCENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLECENTERVILLELINO LAKESCENTERVILLECENTERVILLECEN
TERVILLEHUGOCENTERVILLECENTERVILLEST PAULHUGOCENTERVILLECENTERVILLEHUGOCENTERVILLECENTERVILLECENTERVILLECENTERVILLEHUGOCENTERVILLEHUGOHUGOCENTERVILLECENTERVILLECENTERVILLEHUGOCENTERVILLEHUGOCENTERVIL
LECENTERVILLECENTERVILLECENTERVILLECENTERVILLECIRCLE PINESCIRCLE PINESCIRCLE PINES
CENTERVILLECENTERVILLEMINNEAPOLIS
Owner AddressOwner City208 13TH AVE NE1743 MEADOW LN6625 LACASSE DR1880 MAIN ST1880 MAIN ST1694 SOREL ST1880 MAIN ST1880 MAIN ST1880 MAIN ST7087 GOIFFON ST7087 GOIFFON ST7087 GOIFFON
ST7087 GOIFFON ST7087 GOIFFON ST7087 GOIFFON ST6625 LACASSE DR7121 CENTERVILLE RD7121 CENTERVILLE RD1680 SOREL ST360 SPRINGS ST APT 325ST PAUL1695 SOREL ST1687 SOREL ST7045 GOIFFON
RD1457 ALBERT ST N7067 GOIFFON ST1588 SOREL ST1580 SOREL ST1748 HERITAGE ST1744 HERITAGE ST1740 HERITAGE ST1716 HERITAGE ST7046 CENTERVILLE RD7048 PROGRESS RD1749 HERITAGE ST1745 HERITAGE
ST7072 PROGRESS RD7082 PROGRESS RD1721 HERITAGE ST7059 PROGRESS RD1724 SOREL ST7072 CENTERVILLE RD7056 CENTERVILLE RD1724 HERITAGE ST1724 HERITAGE ST7096 PROGRESS RD7087 GOIFFON ST7087
GOIFFON ST4707 NORTH RD4707 NORTH RD4707 NORTH RD
7086 PROGRESS RD7082 PROGRESS RD3753 TOWNDALE DR
FLEETHAM TRUSTEE BARBARA & SORG TRUSTEE ROBERT
5503855038RIVARD DONALD55038SUMMIT LAKES PROPERTIES LLC55038CENTERVILLE CITY OF55038CENTERVILLE CITY OF55038CENTERVILLE CITY OF55038CENTERVILLE CITY OF55038CITY OF CENTERVILLE55038CENTERVILLE
CITY OF55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038SUMMIT
LAKES PROPERTIES LLC55038CAMP PATRICIA R55038CAMP-BARON PATRICIA R55038BOHL REBECCA ANN55038BURKE PAUL & RIVARD TRUSTEE DONALD55038KILIAN DAVID P55038LINDSAY JULIE A55038WANLESS RALPH
J & PENELOPE A55038JACOBSON MATTHEW55038KAPAUN DAVID L55038NESHEIM MARIE55038BRICKNER JON55038BUSSE RICHARD O JR55038NELSON DENNIS55038HEMANN GENE L55038FERWERDA JONATHAN M55038RIVARD
JR MATTHEW & RIVARD BRITTNEY55038NEISIUS THOMAS J55038MCKAY CURTIS L & RHONDA J55038MORAVEC GARY M & MICHELLE A55038ANDERSON PAUL A & MARGARET A55038XIONG PAO55038SZULIM EDWARD55038NEKOWITSCH
JEANNE55038KING STEVEN D & DONNA K55038GALLAWAY NICHOLAS55038BELDEN JOHN55038ANDERSON IAN55038ANDERSON IAN55038PIERSIAK THOMAS R55038CHURCH OF ST GENEVIEVE55038CHURCH OF ST GENEVIEVE55038IND
SCHOOL DISTRICT #1255038CENTENNIAL ISD #1255038INDEPENDENT SCHOOL DISTRICT #12
55038HILLMAN M R & REHBEIN C J55038XIONG PAO55038WESALA GARY
ZIPCODEOwner
CITYSTATECENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVI
LLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEM
NCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMNCENTERVILLEMN
CENTERVILLEMNCENTERVILLEMNCENTERVILLEMN
COMMERCIALVACANTRESIDENTIALINSTITUTIONAL
ADDRESS
C = CommercialI = InstitutionalR = ResidentialV = VacantPROPERTY ID23-31-22-24-00271724 MAIN ST23-31-22-24-00267087 PROGRESS RD23-31-22-24-00417082 CENTERVILLE RDCENTERVILLEMN23-31-22-22-00041695
MAIN ST23-31-22-23-00087073 CENTERVILLE RDCENTERVILLEMN23-31-22-23-000923-31-22-23-00101694 SOREL ST23-31-22-23-00111688 SOREL ST23-31-22-23-006723-31-22-23-002423-31-22-23-002523-31-22-23-002723-31
-22-23-002823-31-22-23-003023-31-22-23-003223-31-22-24-004023-31-22-22-00157121 CENTERVILLE RDCENTERVILLEMN23-31-22-22-001623-31-22-23-00121680 SOREL ST23-31-22-23-00137060 GOIFFON RD23-31-22-23-0015
1695 SOREL ST23-31-22-23-00161687 SOREL ST23-31-22-23-00347045 GOIFFON RD23-31-22-23-00357059 GOIFFON RD23-31-22-23-00367067 GOIFFON RD23-31-22-23-00631588 SOREL ST23-31-22-23-00641580
SOREL ST23-31-22-24-00041748 HERITAGE ST23-31-22-24-00051744 HERITAGE ST23-31-22-24-00061740 HERITAGE ST23-31-22-24-00091716 HERITAGE ST23-31-22-24-00107046 CENTERVILLE RDCENTERVILLEMN23-31-22-24-00
127048 PROGRESS RD23-31-22-24-00131749 HERITAGE ST23-31-22-24-00141745 HERITAGE ST23-31-22-24-00167072 PROGRESS RD23-31-22-24-00227082 PROGRESS RD23-31-22-24-00311721 HERITAGE ST23-31-22-24-00327059
PROGRESS RD23-31-22-24-00331724 SOREL ST23-31-22-24-00347072 CENTERVILLE RDCENTERVILLEMN23-31-22-24-00367056 CENTERVILLE RDCENTERVILLEMN23-31-22-24-00381724 HERITAGE ST23-31-22-24-003923-31-22-24-00
437096 PROGRESS RD23-31-22-23-00267087 GOIFFON RD23-31-22-23-00687087 GOIFFON RD23-31-22-21-002323-31-22-21-002423-31-22-21-0025
23-31-22-24-00447086 PROGRESS RD23-31-22-24-00457082 PROGRESS RD23-31-22-24-01367085 PROGRESS RD
47
48
49
50
51
52