HomeMy WebLinkAbout2019-09-11 CC Packet 3 4 5 6 7 8 9 10 9/11/2019 Administration/Engineering V.1 Public Hearing - Downtown Street and Utility Improvements Because the city is contemplating special assessments to benefiting properties for the proposed street and utility improvements, there are two public hearings required. Tonight's public hearing is the first of those two and is known as the Improvement Hearing. The purpose of the hearing is to take input from the public on the need for and scope of the proposed improvements. While the primary purpose of the hearing is not to discuss assessments, a reasonable estimate of costs to be assessed must be made available at the meeting. Staff encourages Council to take input on assessment methodology, overall % of costs assessed and other general items related to assessments. The opportunity to discuss individual assessments will come with the second hearing (Assessment Hearing), to be held after bids have been taken. $2.4 Million; Water Utility Fund; General Fund (Street Fund); Stormwater Utility Fund; CBDG Grant Hold a Public Hearing on the Proposed Improvements PowerPoint Presentation on Project 11 City of Centerville2020 Downtown AreaStreet & Utility Improvements Feasibility Report 12 13 History Project avement Management Location & Project LimitsPPlanAnoka County Community Development Block Grant ••• Roadway ConditionUtilitiesDrainage ••• 14 Existing Conditions 15 Storm Sewer: Replacement and Extension Water Main: New Water Main and Services Proposed Utility Improvements 16 Roadway: Full Reconstruct with concrete curb and gutter Proposed Roadway Improvements 34’ Wide (Parking on one side) 17 Typical Sections 28’ Wide City) = - 459 18 ontingencies and 25% indirect costs Estimated costs include 10% construction cEstimated assessment amount (non$306, •• Estimated Project Costs and Funding 19 Project Schedule 298 20% $5, -– 2020 Downtown 2020 Downtown •• ssessed Percentage of Project Costs A Average Assessment/Residential Lot Proposed 2020 Downtown•• 20 884 29% 141 $6, oot Assessment basis per policy -– f - 25% 15 years, 4%100% of front yard (short side)20% of side yard (long side) $4, -– ••• TermsFront All Projects•• 2009 Peltier Lk Dr 2013 Center St 2009 Peltier Lk Dr 2013 Center St •••• ssessed Percentage of Project Costs A Average Assessment/Residential Lot Previous Projects•• Proposed Assessments (Residential) 21 Improvements are feasible and cost effectiveAdopt report as a guide for the proposed improvementsOrder and hold Public Improvement HearingAuthorize preparation of plans and specifications (design phase)Receive bidsHold an Assessment HearingConstruct improvements ••••••• Conclusion & Recommendations 22 Questions 23 24 25 26 27 28 29 30 31 32 9/11/2019 Parks VII.4 Storage of Bald Eagle Waterski Club Ramp Bald Eagle Waterski Club has requested the storage of their ski jump on Trailside park. Our agreement with the club allows storage of their docks. This request has been reviewed by the public works department and and the Parks and Recreation Committee, both of whom recommended approval of this request. N/A Motion to approve storage of the Bald Eagle Wateski Club's ramp at Trailside Park. Support info 33 From:Douglas Shipp To:Mark Statz Subject:Dock & Jump Placement Date:Friday, August 30, 2019 9:39:36 AM Attachments:Jump & Dock Placement.pdf Caution: This email originated outside our organization; please use caution. Good Morning Mark, Attached please find an aerial map depicting the proposed winter storage location of Bald Eagle's dock system and jump. We have already positioned and collapsed the docks near the southernmost property line, and are hoping to locate the jump next to the docks. The overall size of our jump requires a lowboy trailer and MnDOT oversize load permitting in order to transport it via roadways for winter storage. This method is cost-prohibitive for our club, and causes damage to the jump frame. With the side curtains removed, our jump has a rectangular footprint of 14ft wide by approximately 24ft long. Our hope is to place it next to our docks on shore, while avoiding the sewer manhole to allow for emergency access. The ramp deck will be folded down to the supporting structure to reduce its profile view as much as possible. We estimate its folded height will not exceed 4ft, and would likely be less. I expect it to be very close to the same height as our docks when on shore. We performed some rough measurements from the land side riprap to the manhole cover, and believe we have 24ft of clearance between these two points, in case we cannot maneuver the jump far enough south to avoid the manhole altogether. I'm confident that we can maintain adequate clearance for access. The jump frame is set inside the ramp surface on the approach end and sides, and will be flush with the deck on the takeoff side when collapsed. We will purchase a tarp large enough to conceal the jump if the City of Centerville and the Parks and Recreation Committee so desires. This will also potentially conceal our docks while in storage. We have postponed our club's work day for jump removal pending your approval of our placement plan. Our next proposed date is Thursday, Sept. 5. Will Centerville please allow us to store our jump next to our docks in Trailside Park over the winter? Thank you for your consideration. Please feel free to contact me if you have any questions, need me to clarify any part of our plan, or would like me to address your Parks and Recreation Committee directly. Sincerely, Doug Shipp Bald Eagle Waterski Shows, Inc. 651-329-1022 34 airhsipp5@msn.com 35 Dfoufswjmmf Mblf Manhole Jump Docks Qbsl!Cfodi Usbjm!Tjef!Qbsl 8256!Nbjo!Tu 1/59!bdsft 36 Nbsdi!312: September 11, 2019 Stormwater Pave trail at SE Corner of Acorn Creek Park The City had Olson Contracting replace rotted culverts under the trail and install new culverts. The trail needs to be paved and the City is contracting separately the paving portion as a cost saving measure. The city recived 3 quotes ranging of $1,970.00, $2,100.00, $2,715.00 and recommend the work be awarded to Asphalt Restoration Company Inc. for $1,970.00. Storm Water Fund To award the work to Asphalt Restoration Company, Inc. for $1,970.00. Quote 37 38 39 40 9/11/2019 Public Works VII.7 Minnesota Department of Health Grant Application - Well Sealing As part of our Wellhead Protection Plan work, we sent out surveys to land owners with wells on their property. Several of them have sent those surveys back, indicating that they would be interested in sealing their wells. The attached grant application would fund that work along with administrative costs. Up to $10,000 grant. Motion to approve submittal of MDH Grant Application. Grant Application 41 9/11/2019 Public Safety VII.6 Proposed 2020 Centennial Lakes Police Department Budget Annually, the Centennial Lakes Police Department (CLPD) Governing Board formulates and approves a proposed budget for the coming year. At its July 15 meeting, the Governing Board adopted the attached budget. It is customary for each of the three cities involved to have their City Council's approve of the budget as well. $861,589 - General Fund (Public Safety) - 0.7% decrease from last year's budget Motion to approve proposed 2020 Budget for CLPD. Budget and support memo. 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 9/11/2019 Administration/Engineering VIII.1.a Resolution 19-0XX Ordering the Improvements & Authorizing Plans and Specifications - Downtown S&U Imp After taking public input at the Improvement Hearing, if the City Council wishes to move forward with the next step in the process for the Downtown Street and Utility Improvements Project, it should consider adopting the attached resolution. The resolution adopts "orders the improvements" and authorizes the plans and specifications to be prepared. "Ordering the improvements" is a term in state statute that must be used, but it can be a bit misleading. By taking this action, you are simply asking to have the plans prepared. The decision on whether or not to go forward with constructing the project will come once bids have been received and after hearing from the public, again, during the Assessment Hearing. $2.4 Million; Water Utility Fund; General Fund (Street Fund); Stormwater Utility Fund; CBDG Grant Motion to adopt Resolution 19-0XX Ordering the Improvements and Authorizing the Preparation of Plans and Specifications for the Downtown Street and Utility Improvements. 71 72 9/11/2019 Administration/Engineering VIII.1.b Approving Proposal for Design Services - Stantec Stantec has submitted a proposal to prepare the plans and specifications and to aid the city in bidding the project. $113,036; Water Utility Fund; General Fund (Street Fund); Stormwater Utility Fund; CBDG Grant Motion to accept proposal from Stantec for design and bidding services. 73 Stantec Consulting Services Inc. 733 Marquette Avenue Suite 1000, Minneapolis MN 55402-2309 September 4, 2019 File: 193804758 Attention: Mr. Mark Statz, City Administrator/Engineer City of Centerville 1880 Main Street Centerville, MN 55038 Reference: Proposal for Engineering Design Services – Downtown Street and Utility Reconstruction Project Dear Mark, This letter outlines the Scope of Services and estimated costs for providing engineering design services for Centerville’s proposed downtown street and utility reconstruction project (the Project). The streets included in the project include 2-1/2 blocks of Sorel Street, Goiffon Road, Progress Road south of Main Street, one block of Centerville Road north of Main Street, Heritage Street east of Centerville Road. See the attached map of the proposed project area. The improvements will generally include full reconstruction of the road with the addition of curb and gutter, storm sewer improvements, and the addition of water main and water service to the existing residences that are currently served by private wells. The City has received a grant to extend water service to income-qualified residents in the project area. The design for this project would consist of the following tasks in accordance with Stantec’s Professional Services Agreement with the City of Centerville: Engineering Phase: Task 1 – Design of street and pedestrian facilities with parameters as proposed in the feasibility study. Task 2 – Design of water main and water services with parameters as proposed in the feasibility study. Task 3 – Analysis of stormwater management and permitting requirements, and design of storm water conveyance system within project area. Design of stormwater management systems such as off- site irrigation is not included in this scope. Task 4 – Attendance at one Council Meeting to present plans and receive authorization to advertise for bids. Task 5 – Preparation of bidding documents to include plans, specifications, and Advertisement for Bids. Documents to conform with bidding requirements set forth by funding agencies. Task 6 – Assistance during bidding including answering contractor questions, preparing Addenda as necessary, and attendance at bid opening. 74 September 4, 2019 Mr. Mark Statz, City Administrator/Engineer Page 2 of 3 Reference:Proposal for Engineering Design Services – Downtown Street and Utility Reconstruction Project Task 7 – Review of bids and preparation of bid tab and award letter to City Council. Task 8 – Attendance at one Council Meeting to present bid results Task 9 – Prepare permitting application materials and follow-up on permit procurement for the following permits: MN Department of Health for Water Main Expansion NPDES Stormwater Permit, including preparation of Stormwater Pollution Prevention Plan Rice Creek Watershed (design of required stormwater management BMPs not included in scope) Proposed Schedule The anticipated schedule for the design and bidding of the project is as follows: September 11, 2019Authorization to begin work October 23, 2019Approve plans and specifications/Authorize Bidding December 4, 2019Receive Bids December 11, 2019Review Bids/Award Contract Spring 2020Begin Construction The Engineering Phase will be performed on an hourly basis with an estimated fee of $113,036 including expenses. This is a not-to-exceed fee without prior authorization. This scope and fee assume that the process will commence from start to finish with no interruption of engineering services. Once the project has been awarded and a schedule submitted by the contractor, we will provide a more detailed proposal for construction services for consideration by the City, which will include full-time project inspection and construction management, construction staking, and record plan preparation. This letter and scope of services represents the understanding between the City and Stantec in respect to the Project and may only be modified in writing signed by both of us and is subject to the current Master Services Agreement between the City and Stantec. If this letter satisfactorily sets forth conditions of our Agreement, please sign in the space below and return one copy to our office. Thank you for the opportunity to provide these services. 75 September 4, 2019 Mr. Mark Statz, City Administrator/Engineer Page 3 of 3 Reference:Proposal for Engineering Design Services – Downtown Street and Utility Reconstruction Project CITY OF CENTERVILLE By Print Name and Title Date If you have any questions, need additional information, or wish to discuss this proposal in greater detail, please contact us. Regards, Stantec Consulting Services Inc. Lee M. Mann P.E.Kellie Schlegel, P.E. PrincipalAssociate 612-712-2085612-712-2125 Lee.mann@stantec.comKellie.schlegel@stantec.com c:file Attachment:Figure 1: Proposed Improvements 76 C N Drawingname:V:\\1938\\active\\193804758\\CAD\\Dwg\\193804758_FeasibilityFigures.dwgPlotDate:08/19/2019-10:52am Xrefs:,616map_nad83,193804758_XSPL,193804758_XSNO,193804758_XSWT,193804758_C100,193804758_XSST,193804758_XSXT,193804758_XSSW K O L A . E L 1 A 4 R W G R A A T N G E E R - V I E W C R E E K EMENTARY RVILLEEL CENTE OOL SCH STREET WESTVIEW NONE 7121 NONE D NONE A O R NONE 1695 1691 TREET S MAIN .14 C.S.A.H E 1724 L L I V 7096 R 7087 E 7087 T N 7085 1744 7086 E C NONE SORELSTREET 7082 168716957082 D A O R 1588168070721724 D R D A D E A O 1580 U T 7072 NONE O R P A R R E NONE W S R NS A E O E R F L 7059 F GC I O 704570597067 O 16431649 R R G 70567064 70601721704817451749 P O A STREET HERITAGE D 704617161724174017441748 D R I V E E Y V I A R W D B I J O D A O ETT AR YB NCE AU CH R E L E NS RDE L GA T I T V O R M E A L T N E C 150300 LEGEND PROPOSED IMPROVEMENT AREA PROPOSED IMPROVEMENTS CITY OF CENTERVILLE, MN FIGURE:1 2020 DOWNTOWN STREET AND UTILITY IMPROVEMENT PROJECT 733 Marquette Avenue, Suite 1000 Minneapolis, MN 55402 77 www.stantec.com DATE8/19/2019 PROJ. NO.193804758 CITY OF CENTERVILLE REQUEST FOR COUNCIL ACTION Agenda Item # Department: Requested Council Meeting Date: September11,2019 Administration TITLE OF ISSUE: AuthorizeModificationstoParkCapitalLoanfromSewerFund BACKGROUND AND SUPPLEMENTAL INFORMATION: StaffisbringingforwardaResolutiontomodifytheexistingloantoprovideforazerointerestratefrom inception.Thisrecommendationisbasedoffthediscussionheldatthepreviouscouncilmeeting. COST AND SOURCE(S) OF FUNDING: Nonetcost. REQUESTED COUNCIL ACTION: StaffrecommendsthattheCityCouncilapprovetheattachedresolutionaspresented. For Clerk’s Use: SUPPORTED DOCUMENTS ATTACHED Motion By: ____________________________________ Resolution Ordinance Contract Minutes Plan Map Second By: ____________________________________ Y Vote Record: Aye Nay _____ Other (specify) ____________ _____ _____ Love _____ _____ Paar ResolutionModifyingtheInterfundLoan _______________________________________________________________ _____ _____ Koski _____ _____ Montain _______________________________________________________________ Administration Department Use: Refer to: _________________________________ Consent Tabled Until: ______________________________ Regular 5 Other: ___________________________________ 78 79 9/11/2019 Planning IX.2 Downtown Zoning Changes See Planning Memo for background info. N/A Motion to adopt Resolution #19-0XX Rezoning Certain Properties from M-1 to M-2. Motion to adopt Resolution #19-0XX Changes to M-1, M-2 and Table of Allowed Uses. Motion to approve changes to the Downtown Master Plan. Planning Memo 80 733 Marquette Avenue, Suite 1000, Minneapolis, MN 55402 Memorandum DATE: September 11, 2019 TO: Centerville City Council FROM: Phil Carlson, AICP, and Lauren Walburg, Stantec RE: Downtown Zoning Changes BACKGROUND In light of the possible redevelopment of Block 7, the City has decided to revisit the relevant Master Plan and zoning requirements to ensure that any potential development meets City expectations. The City held a joint meeting of the EDA, Planning and Zoning Commission, and City Council on October 24, 2018 to discuss changes to the zoning map, zoning code and Master Plan. The understanding at that meeting was that more formal action would be taken down the road to formalize these changes. At their meeting on September 3, the Planning and Zoning Commission recommended approval of the changes to the city zoning code, zoning map and Master Plan. The City Council is asked to consider formal changes to the zoning code, zoning map and Master Plan as detailed in this memo to address these issues. A public hearing is required prior to amending the zoning code and official zoning map. The notice of public hearing was published in the official newspaper at least 10 days prior, and the hearing was held at the Planning Commission meeting on September 3, 2019. 81 September 11, 2019 Centerville City Council Page 2 of 10 RE: Downtown Zoning Updates PLANNING ISSUES Master Plan Updates There are several changes that have been discussed to the Master Plan and Development Guidelines for Downtown Centerville. This document is referenced directly in the zoning code and provides development guidelines for downtown. Given past discussions with the Planning and Zoning Commission, the following changes are proposed to the Master Plan document: (1) Neighborhood as M-2 to better correlate with the zoning code. (2) and maximum residential density standards. The minimum residential density will be 12 units per acre, and the maximum density will be 30 units per acre. These changes are consistent with the Comprehensive Plan. (3) secure parking for residences within the Mixed-Use Corridors will be fully enclosed in private facilities, where feasible. Given the limitations with the water table experienced at Block 7, there should be some flexibility for this requirement. (4) promote consistency in the public realm, the City will be responsible for designing and building streetscaping, with the costs borne by developers and/or abutting property (5) (6) regarding setbacks shall be updated to be more in line with current setback language standards. The section will be updated as follows: Setbacks from public streets should be consistent at 50 feet from street center line. All buildings should be required to have some portion that extends to exactly 45 feet from the street centerline. Buildings shall be set back no more than five (5) feet from the right-of- way or roadway easement. All ground floor units oriented toward the street should have stoops or porches. Ground floor stoops at the first floor should have a consistent setback of exactly 8 5 to 10 feet. 82 September 11, 2019 Centerville City Council Page 3 of 10 RE: Downtown Zoning Updates (7) ll resident parking must be enclosed in below grade garages or garages that are internal to the sites, where feasible. (8)In Section C. II. a. the photo below parking strategies showing a stormwater pond and is inconsistent with the content of this section. (9) zoning code which does not set a minimum lot area. (10) with other setback requirements in this section: Primary building facades should be consistent at the built-to line. Build-to line shall be 20 ft. behind the public ROW no more than 5 feet from the right-of-way or roadway easement. Ground floor stoops or porches may extend to 8 ft from the sidewalk should have a consistent setback of 5-10 feet. Setbacks from the built-to line for courtyards or other recesses shall not comprise more than 40% of the façade. All buildings must be built to the build-to lines at all street corners. (11) be updated to 30 units per acre. These densities are consistent with the zoning code. (12) subject to individual review. (13) parking for residences within the Downtown Neighborhood will be fully enclosed in private facilities, where feasible. (14) promote consistency in the public realm, the City will be responsible for designing and building streetscaping, with the costs borne by developers and/or abutting property (15)In Section C. IV. all text will be removed as it is redundant with the zoning code. The only section that will remain is the first paragraph 83 September 11, 2019 Centerville City Council Page 4 of 10 RE: Downtown Zoning Updates Land Use Plan essentially the same areas guided for the Central Business District/Mixed Use. The exceptions are the strip to the south of Main Street, and the area to the east of Centerville Lake that were both reguided from low density residential to CBD/MU (see map excepts below). ted for background purposes, and no action is needed at this time with regard to the land use plan. These changes were made during the 2040 Comprehensive Plan Update, and approval is pending with the Metropolitan Council. 2030 Future Land Use Plan 2040 Future Land Use Plan Proposed Zoning Map Changes The purpose of the proposed changes is to decrease the size of the M-1 Mixed Use Corridor, and to rezone the majority of the CBD to M-2 Downtown Neighborhood District. Part of the rationale for this change is that the M-1 District requires retail on the first floor of every building, at a minimum. The M-2 District on the other hand allows both retail and higher density residential on the first floor, allowing for greater flexibility of uses in the CBD. These proposed changes are shown on the next page. 84 September 11, 2019 Centerville City Council Page 5 of 10 RE: Downtown Zoning Updates Current Zoning Proposed Zoning 85 September 11, 2019 Centerville City Council Page 6 of 10 RE: Downtown Zoning Updates Zoning Code Text Changes Changes are needed to the zoning code in order to maintain consistency with the Master Plan and zoning map, as well as to remove unnecessary language and fix typographical errors. These include the following changes which are summarized in part in the attached revised Table 156-A.1 in the Zoning Code, as well as in the attached draft ordinance: (1)A typographical error will be fixed in Section 156.051 to reflect the correct term, Mixed Use District (M-1). (2)The Purpose statement of Sections 156.051(A) will be updated to clarify that the M-1 district implements the Master Plan, and all subsequent revisions. This is important given the proposed revisions to the Master Plan document. (3) must occupy the first floor of all building requirements in the Master Plan. (4)Unnecessary or redundant language will be removed from Section 156.051 (C) Special requirements. Subpoint (5) regarding stormwater management will be removed and the list will be renumbered accordingly. (5)The Purpose statement of Sections 156.052(A) will be updated to clarify that the M-2 district district implements the Master Plan, and all subsequent revisions. This is important given the proposed revisions to the Master Plan document. (6)Permitted uses in the M-2 (Section 156.052 (B)), will be updated to remove the statement limiting the percentage of ground level or office space in corner lot structures. (7)Unnecessary or redundant language will be removed from Section 156.052 (C) Special requirements. Subpoint (6) regarding stormwater management will be removed and the list will be renumbered accordingly (8)Table 156.A.1 District Allowed Uses will be updated to allow residential, specialized and day care facilities only by PUD. 86 September 11, 2019 Centerville City Council Page 7 of 10 RE: Downtown Zoning Updates Accessory Structures and Storage in the CBD At the August 13 Planning and Zoning Commission meeting, there was a discussion of accessory structures in the downtown. The consensus was that accessory structures should be allowed, with reasonable conditions and restrictions. A related issue is whether storage or warehousing as a separate use should be allowed within the principal structure, and how to better regulate this in the zoning code. Please note the distinction between an accessory structure, which is a separate structure on the site, and an accessory use, which is some use of space, but it could be in the principal structure or in a separate accessory structure. The following are options to consider. The Zoning Code currently does not allow accessory structures to be constructed in the M-1 and M-2 districts. This is indicated in the zoning code table of uses for these districts by the absence of a P or C in either the M-1 or M-2 columns across from Accessory Structures. In order to allow for the M-1 and M-2 columns for the row listing accessory buildings. This would allow the Commission and the Council to place reasonable conditions on the construction of accessory structures. Accessory structures for residential uses are regulated by a list of conditions in the zoning code structures in non-residential areas. However, the conditions and regulations placed on these structures are much less stringent. One option could be to include a list of conditions in the zoning code text for accessory structures in non-residential areas as well. Zoning Code section 156.107 is already referenced in the Zoning Code table of uses, so any regulations added to the zoning code text would be applied to accessory use structures in the M-1 and M-2, if they were to be allowed. A list of proposed conditions is shown in the summary on the next page. A related issue is whether storage should be allowed as a use within the principal structure. Currently storage is allowed as a principal use in the I-1 industrial area. Mini storage is allowed as a conditional use, and warehouse/distributing is allowed as a permitted use in I-1. Storage is not allowed now as a principal use within the M-1 and M-2 downtown areas. Certainly, most typical commercial uses within the M-1 and M-2 would have storage as an accessory use within the principal structure. For example, restaurants typically have some amount of space that is used for storing goods and equipment, but the principal use would not be considered storage. One could say that the storage is accessory, and incidental to the principal use as a restaurant. Every office use has some kind of storage space or closets, but it is also accessory or incidental. This raises the question of how much space would be allowed as storage or warehousing within a principal structure. The zoning code currently does not provide limitations on the amount of warehouse or storage space within a principal use, although the storage could not be the principal use under current code. We suggest that storage be indicated in the zoning code as a permitted accessory use as long as it is directly related to and incidental to the principal use. 87 September 11, 2019 Centerville City Council Page 8 of 10 RE: Downtown Zoning Updates In summary, the proposed changes to the zoning code to address accessory structures and storage in the downtown include: (1)ssory buildings in the M-1 and M-2 districts, indicating that accessory buildings are allowed as a conditional use. (2) that accessory storage is allowed within all districts as a permitted use. (3)Section 156.107 relating to accessory uses and structures will be updated with the following conditions for non-residential accessory structures a.No more than two detached accessory buildings are permitted on any parcel. Combined aggregate square footage for detached accessory structures shall not exceed 1000 square feet or 10% of the lot area, whichever is less b.In no event may any accessory building exceed the square footage of the main level of the principal structure. c.No accessory structure may be constructed on a parcel without a principal structure. d.No accessory structure shall be erected or located within the front yard. (4) principal structure shall be directly related to and incidental to the principal use. The attached ordinance shows the changes as they would appear within the City Zoning Code. RECOMMENDATIONS There are numerous individual changes being proposed, but there are four basic actions to be taken: 1)We recommend the City Council approve of the draft ordinance amending the text and table of uses for the M-1 and M-2 districts, and text regarding accessory structures and storage. 2)We recommend that the City Council approve rezoning the following properties from M-1 to M-2, as illustrated in the map excerpts in this memo: 23-31-22-24-0026 7087 Progress Road 23-31-22-24-0040 88 September 11, 2019 Centerville City Council Page 9 of 10 RE: Downtown Zoning Updates 23-31-22-24-0136 7085 Progress Road 23-31-22-21-0028 7128 Progress Road 23-31-22-21-0030 23-31-22-21-0051 1737 Main Street 23-31-22-21-0055 7124 Progress Road 23-31-22-21-0057 1751 Main Street 23-31-22-21-0058 23-31-22-23-0005 23-31-22-23-0006 23-31-22-23-0007 23-31-22-23-0008 7073 Centerville Road 23-31-22-23-0009 23-31-22-23-0010 1694 Sorel Street 23-31-22-23-0011 1688 Sorel Street 23-31-22-23-0014 23-31-22-23-0046 1688 Heritage Street 23-31-22-23-0047 7045 Centerville Road 23-31-22-24-0009 1716 Heritage Street 23-31-22-24-0010 7046 Centerville Road 23-31-22-24-0034 7072 Centerville Road 23-31-22-24-0035 7064 Centerville Road 23-31-22-24-0036 7056 Centerville Road 23-31-22-22-0032 23-31-22-23-0068 7087 Goiffon Road 3) OPTIONS For each of the actions and recommendations above the City Council can: 1)Move to approve and adopt Findings in support of the motion; 2)Move to deny and adopt Findings in support of the motion; or 3)Move to continue the item(s) for further discussion or to gather additional information. FINDINGS OF FACT If the City Council moves to approve the actions above, the following Findings of Fact could be cited in support of those decisions. 89 September 11, 2019 Centerville City Council Page 10 of 10 RE: Downtown Zoning Updates (1)The City wants to maintain a mixed-use Central Business District with a balance of retail and moderately dense residential housing. Given these priorities, updating the standards for the mixed use and downtown neighborhood districts is reasonable and appropriate. (2)With the updated standards to the M-1 and M-2 districts, it is necessary to rezone properties to be consistent with guided land use. Updating the zoning map is therefore both reasonable and appropriate. (3)The Master Plan & Development Guidelines for Downtown Centerville is a document that was adopted by the City Council in 2006. Over time, some of the language and standards in the document have changed, and therefore it is reasonable and appropriate to update the document. (4)The Zoning Code directly references the Master Plan & Development Guidelines for Downtown Centerville document, and therefore text changes to the zoning code are also reasonable and appropriate. (5)Attractive, high quality development in Downtown Centerville is an important goal of the City and large or unsightly storage uses are inappropriate. Limiting accessory structures and storage uses in the M-1 and M-2 districts with reasonable regulations is therefore reasonable and appropriate. 90 Purpose Permitted uses. Special Requirements. 91 Purpose. Permitted Uses. 92 Special Requirements. 93 94 95 96 97 98 99 100 101 102