CITY OF CENTERVILLE
PLANNING AND ZONING COMMISSION
MEETING AGENDA
Tuesday, June 8,20,21
6:3 01 1). m®
Meeting
Centerville City flail
1880, Main Street
Centerville, MN 550,38
I. CALL TO ORDER
1. Roll Call
II. PLEDGE OF ALLEGIANCE
III. APPROVAL OF AGENDA
IV. PUBLIC HEARINGS (6:30 PM or shortly thereafter)
1. None
V. AWARDS, PRESENTATIONS, APPEARANCES
1. Concept Plan — Sutton Transportation
VI. OLD BUSINESS
1. None
VIL NEW BUSINESS
1. None
VIII. APPROVAL OF MINUTES
1. None
IX. ANNOUNCEMENTS/UPDATES
1. Council Member Liaison
2. Administrator's Report
X. ADJOURNMENT
INFORMATION
otic
REMINDERS
All meetings are now being held in person at City Hall.
Meetings may be live -streamed at https.//northmetrotv.com/centerville-stream/
All meetings begin at 6:30 PM unless otherwise noted.
F,c�rmrq-nuc ruu', '��;���,r, Jum,� ,2027�
CITY OF CENTERVILLE REQUEST
FOR COMMISSION ACTION
Agenda Item #
Department:
Requested Meeting Date:
V.l
Planning and Zoning
June 8, 2021
TITLE OF ISSUE:
Concept Plan - Sutton Transportation
BACKGROUND AND SUPPLEMENTAL INFORMATION:
Sutton Transportation is looking for informal input from the Commission on a cross-dock/warehouse facility in
the city's industrial -zoned area south of Fairview and adjacent to 21st Avenue. Two options are presented; one
with service bays and one without. Representatives from Sutton Transportation will be on hand to discuss their
proposal.
COST AND SOURCE(S) OF FUNDING:
N/A
REQUESTED ACTION:
Discussion only. No action required at this time.
For Clerk's Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By:
Resolution Ordinance Contract Minutes Plan Map
Second By:
X
Vote Record: Ave Nay
Kuiper
Kubat
Other (specify) Project Narrative
Twohy
Krueger
Broussard Vickers
Olson
Refer to:
Consent
Tabled Until:
Regular
L= Other:
Sutton Transport Narrative May 24, 2021
Parcel "B" Clearwater Business Park
Sutton Transport, Inc. was founded on November 191", 1979 and is a privately -held LTL regional common
carrier based in Weston, WI, whose focus is in interstate and intrastate transportation of general
commodities. Sutton prides itself with superior service with a personal touch.
Sutton Transport specializes in the following services:
• LTL Trucking
• Local Cartage
• Full Truckloads
• Lift Gate Delivery Service
• Same Day Delivery Service
• Nationwide Expedited Service
Their fleet consists of a combination of over 200 tractors and 350 trailers and an employer to nearly 500
people.
Currently Sutton Transport operates seven terminals throughout Wisconsin, Illinois and Minnesota.
Sutton's current facility in Maple Grove is inadequate for their planned growth. The Facility in
Clearwater Creek Business Park will be a step to aid in expanding their business in Minnesota.
Sutton Transport intends to purchase approximately 15 Acres of vacant land in the Clearwater Business
Park and construct a new cross -dock truck terminal industrial warehouse facility. The facility would
initially employ approximately 30 drivers and 8 office staff for dispatch and coordination requirements
and 8 warehouse personnel to load and unload trucks. We would hope to grow the number of jobs by
10-20% annually in the next five years.
The building area contemplated for Phase 1 ranges between 45,700 and 55,000 SF with a future
greenspace growth area for a Phase 2 building addition. Phase 2 addition areas are anticipated to be
between 20,860 and 16,500 SF. Grand total building area on either facility layout range between
66,560 to 71,560 SF.
The facility operates approximately 5 days a week and 18 hours a day. Normal business hours are 4:00
AM to 10:OOPM with the bulk of the activity coming between 7:OOAM and 6:3013M.
The exterior of the building will be smooth form faced loadbearing precast concrete panels having a
clear height between 18-20FT. Total exterior building height would be between 21-23Ft depending on
the final clear height selected. The office component would have 1" insulated glass set in painted
aluminum frames. Landscaping would complement the site as required in the city code.
The facility would also have an above ground diesel fuel tank and be located in the Southwest corner of
the land site.
Sutton looks forward to expanding into the Clearwater Business Park.
o \
w
KGRONJ
w
Q
W
H LL V)
=o0
�oCD
1-0
� J
F-
0
LU
0
0
O
1.0-1V 1,0-19V
W LL
V_ "'
O
LL. O
LL.o
OL'i
W
H
O
W
21
LL
0
O
O
U
O
n
0
,.0-,V9
,.0-,9V
,o 1 oz
w
CD
Q
O
F—
Oe
LU
Q
W k 14
r--
V)
fl�
U.j
-j
0
x
UJ
8
u
0
F-
0
so
ce
an
J
a
3:
i
W
V
z
a
z
W
W
V
O
N�
Iwo
U
w
N LU
OI
CL
U
W k 14
r--
V)
fl�
U.j
-j
0
x
UJ
8
u
0
F-
0
so
ce
an
J
a
3:
i
W
V
z
a
z
W
W
V
O
reI ::D
C