Loading...
HomeMy WebLinkAbout2025-05-14 HandoutsCopier Proposals City Hall Current Konica Minolta Konica Minolta Toshiba Toshiba Marco Coord Bus Syst EOJohnson Copier Manufacturer KM KM 01 Toshiba Toshiba KM Kyocera Canon Imagerunner Copier Model C451i C451i C551i 4525AC 5525AC 451i TASKalfa5054ci DXC5850i Speed - Color PPM 45 35 45 551 45 50 50 Base Price 202.42 $438.13 $545.84 $192.12 $259.82 $222.11 $564.00 173.75 Supplies Included Included Included Included Included Included Included Option - Fax Included Included Included Included Included Included 11.82 Option -Stapler Included Included Included Included Included Included 28.45 Option - Hole Punch Included Included Included Included Included Included 12.57 Option -Booklet 33.99 33.991ncluded Included Included Included 55.15 Cost per copy -B&W 0.011 Included Included 0.0041 0.0041 0.007 0.0085 0.0073 Cost per copy -Color U73 Included Included 0.0385 0.0385 0.05 0.049 0.049 BaseB&W - month Included Included 2000 3300 2000 Base Color - month Included Included 5000 6600 3000 AverageB&W - month 2823 Included Included 2823 2823 2823 2823 2823 Average Color - month 7612 Included Included 7612 7612 7612 7612 7612 Maintenance cost Included Included Included Included $264.60 Included $484.80 Overage B&W $31.05 $11.57 $11.57 $5.76 -$4.05 $6.01 Overage Color $555.68 $293.06 $293.06 $130.60 $49.59 $225.99 5 Year monthly lease $789.15 $472.12 $579.83 $496.75 $564.45 $623,07 $609.54 $890.55 Copier Proposals Public Works Current Konica Minolta Toshiba Marco Coord Bus Syst EO Johnson Copier Manufacturer Canon KM Toshiba KM Kyocera Canon Imaxellunnei Copier Model C35251 C251i 2525AC C301i TASKalfa 2554ci DX C3926i Speed - Color PPM 25 25 30 25 50 Base Price $33.13 $187.34 $106,74 $105,25 $110.50 74.96 Cost per copy -B&W 0.0074 Included 0.0041 0.007 0.012 0.0073 Cost per copy - Color 0.063Included 0.0385 0.05 0.056 0.049 Average B&W - month 410 410 410 410 410 Average Color -month 229 229 229 229 229 Maintenance cost Included Included Included Included $20.00 Cost B&W $3.03 Included $1.68 $2.87 $4.92 Cost Color $14.43 Included $8.82 $11.45 $12.82 5 Year monthly lease $50.59 $187.34 $117.24 $119,57 $128.24 $94.96 11,47 Stantec 733 Marquette Avenue, Suite 1000, Minneapolis, MN 55402 Supplemental Planning Report DATE: May 14, 2025 TO: Centerville City Council FROM: Phil Carlson, AICP, Stantec APPLICANTS: Jim and Mary Heron REQUEST: Variance - Accessory Structure Setback ADDRESS: 1421 Mound Trail INTRODUCTION The Planning and Zoning Commission recommended approval of the variance request at 1421 Mound Trail for a new accessory structure. I propose revised findings for approval of the variance: (Revised) Findings of Fact for Approval 1) Thomas and Mary Heron ("Applicants") own the property at 1421 Mound Trail, legally described as Lot 9 Block 1 THE SHORES, Anoka County, in the R-2 zoning district. 2) The Applicants propose to build an accessory structure on the north part of the lot in front of the house w0thin the required frGn+ setback. 3) The request complies with the comprehensive plan and zoning ordinance, other than not bein!-, located in the rear yard 4) The use, an accessory building on a residential lot, is reasonable. 5) There are unique circumstances on this lot that pose practical difficulties to meeting the vrdin!_Yence setback standard as it has been a'L;. died_ historicall��r__in the City. The house is situated on the south part of the lot near the lake, leaving only a very small rear yard where an accessory building would typically be required to be located, not enough space for a reasonable structure. There is ample room in the front of the lot, which is where the Applicants propose the new structure. These are circumstances not created by the Applicants. 6) The proposed structure will not alter the essential character of the locality, since there are similarly located accessary buildings in the front yards of several properties in the immediate vicinity. 7) The request satisfies the standards for approving a variance in Section 156.310 of the Centerville zoning ordinance. u.�usig v,ith community in mind 3 SME ELEVATION 4 �wo rncx7 ^� Gea nmi7 i L FRONT ELEVATION 792 TOTAL SQUARE FOOTAGE '�rc-. v<• e�rt yr I 1 I I a � —`4 4 it m I � GARAGE s I w FLOOR PLAN