HomeMy WebLinkAbout2025-05-14 HandoutsCopier Proposals
City Hall
Current
Konica
Minolta
Konica
Minolta
Toshiba
Toshiba
Marco
Coord Bus Syst
EOJohnson
Copier Manufacturer
KM
KM
01
Toshiba
Toshiba
KM
Kyocera
Canon
Imagerunner
Copier Model
C451i
C451i
C551i
4525AC
5525AC
451i
TASKalfa5054ci
DXC5850i
Speed - Color PPM
45
35
45
551
45
50
50
Base Price
202.42
$438.13
$545.84
$192.12
$259.82
$222.11
$564.00
173.75
Supplies
Included
Included
Included
Included
Included
Included
Included
Option - Fax
Included
Included
Included
Included
Included
Included
11.82
Option -Stapler
Included
Included
Included
Included
Included
Included
28.45
Option - Hole Punch
Included
Included
Included
Included
Included
Included
12.57
Option -Booklet
33.99
33.991ncluded
Included
Included
Included
55.15
Cost per copy -B&W
0.011
Included
Included
0.0041
0.0041
0.007
0.0085
0.0073
Cost per copy -Color
U73
Included
Included
0.0385
0.0385
0.05
0.049
0.049
BaseB&W - month
Included
Included
2000
3300
2000
Base Color - month
Included
Included
5000
6600
3000
AverageB&W - month
2823
Included
Included
2823
2823
2823
2823
2823
Average Color - month
7612
Included
Included
7612
7612
7612
7612
7612
Maintenance cost
Included
Included
Included
Included
$264.60
Included
$484.80
Overage B&W
$31.05
$11.57
$11.57
$5.76
-$4.05
$6.01
Overage Color
$555.68
$293.06
$293.06
$130.60
$49.59
$225.99
5 Year monthly lease
$789.15
$472.12
$579.83
$496.75
$564.45
$623,07
$609.54
$890.55
Copier Proposals
Public Works Current
Konica
Minolta
Toshiba
Marco
Coord Bus Syst
EO Johnson
Copier Manufacturer Canon
KM
Toshiba
KM
Kyocera
Canon
Imaxellunnei
Copier Model C35251
C251i
2525AC
C301i
TASKalfa 2554ci
DX C3926i
Speed - Color PPM
25
25
30
25
50
Base Price $33.13
$187.34
$106,74
$105,25
$110.50
74.96
Cost per copy -B&W 0.0074
Included
0.0041
0.007
0.012
0.0073
Cost per copy - Color 0.063Included
0.0385
0.05
0.056
0.049
Average B&W - month 410
410
410
410
410
Average Color -month 229
229
229
229
229
Maintenance cost
Included
Included
Included
Included
$20.00
Cost B&W $3.03
Included
$1.68
$2.87
$4.92
Cost Color $14.43
Included
$8.82
$11.45
$12.82
5 Year monthly lease $50.59
$187.34
$117.24
$119,57
$128.24
$94.96
11,47
Stantec
733 Marquette Avenue, Suite 1000, Minneapolis, MN 55402
Supplemental Planning Report
DATE: May 14, 2025
TO: Centerville City Council
FROM: Phil Carlson, AICP, Stantec
APPLICANTS: Jim and Mary Heron
REQUEST: Variance - Accessory Structure Setback
ADDRESS: 1421 Mound Trail
INTRODUCTION
The Planning and Zoning Commission recommended approval of the variance request at 1421
Mound Trail for a new accessory structure. I propose revised findings for approval of the variance:
(Revised) Findings of Fact for Approval
1) Thomas and Mary Heron ("Applicants") own the property at 1421 Mound Trail, legally
described as Lot 9 Block 1 THE SHORES, Anoka County, in the R-2 zoning district.
2) The Applicants propose to build an accessory structure on the north part of the lot in front
of the house w0thin the required frGn+ setback.
3) The request complies with the comprehensive plan and zoning ordinance, other than not
bein!-, located in the rear yard
4) The use, an accessory building on a residential lot, is reasonable.
5) There are unique circumstances on this lot that pose practical difficulties to meeting the
vrdin!_Yence setback standard as it has been a'L;. died_ historicall��r__in the City. The house is
situated on the south part of the lot near the lake, leaving only a very small rear yard
where an accessory building would typically be required to be located, not enough space
for a reasonable structure. There is ample room in the front of the lot, which is where the
Applicants propose the new structure. These are circumstances not created by the
Applicants.
6) The proposed structure will not alter the essential character of the locality, since there are
similarly located accessary buildings in the front yards of several properties in the
immediate vicinity.
7) The request satisfies the standards for approving a variance in Section 156.310 of the
Centerville zoning ordinance.
u.�usig v,ith community in mind
3
SME ELEVATION
4
�wo rncx7 ^� Gea nmi7
i
L
FRONT ELEVATION
792 TOTAL SQUARE FOOTAGE
'�rc-. v<• e�rt yr
I 1 I I
a �
—`4 4
it
m
I �
GARAGE
s
I
w
FLOOR PLAN