Loading...
HomeMy WebLinkAbout2025-09-24 Handout - Well #1 September 24, 2025 Authorize Solicitation of Quotes Xfmm!Op/!2!Nbjoufobodf0Sfefwfmpqnfou 1.Project Location and Background2.Scope of Work3.Estimated Costs4.Project Schedule Bhfoeb TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW McBride evAdahS Tracie Joy Memorial Park Fox Run Fnfshfodz!Vtf!PomzTboe!jo!XfmmPwfsevf!gps!SpvujofNbjoufobodf QspkfduMpdbujpo!'Cbdlhspvoe Cbdlhspvoe;••• TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW Decision Point Determined by inspection of pump/motor during initial disassemblyDetermined after televising well OROR Pump Repairs/MaintenancePump ReplacementBailing (small quantity)Decompression and Airlifting (larger quantity) oo Initial InspectionBasic Well MaintenancePump/Motor:Removal of Sand: Tdpqf!pg!Xpsl TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW $52,000$42,000$47,500$15,000$75,000 motor DecisionPoint: Continue with WellMaintenance/RedevelopmentOR Consider Drilling New Well•CostswillvarydependingonconditionofOROR Ftujnbufe!Dptut Initial Costs –Well InspectionRepair Existing Pump/Motor:Replace Motor:Remove small quantity of sand:Remove large quantity of sand (decompression and airlifting): •••••Total:$109,000 to $175,000 +/-(Construction)$24,666(Engineering)Source of Funding: Water Fund TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW June 25, 2025September 24, 2025October 17, 2025October 23, 2025November/December 2025March 31 or May 22, 2026* Order Plans and SpecificationsApprove Plans and Specifications/Authorize QuotesReceive QuotesCouncil Reviews Bids/Consider AwardStart DateCompletion Date* Completion date is contingent on the need to use air lifting and decompression to redevelop the well Qspkfdu!Tdifevmf TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW Rvftujpot