September 24, 2025
Authorize Solicitation of Quotes
Xfmm!Op/!2!Nbjoufobodf0Sfefwfmpqnfou
1.Project Location and Background2.Scope of Work3.Estimated Costs4.Project Schedule
Bhfoeb
TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW
McBride
evAdahS
Tracie Joy
Memorial Park
Fox Run
Fnfshfodz!Vtf!PomzTboe!jo!XfmmPwfsevf!gps!SpvujofNbjoufobodf
QspkfduMpdbujpo!'Cbdlhspvoe
Cbdlhspvoe;•••
TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW
Decision Point
Determined by inspection of pump/motor during initial disassemblyDetermined after televising well
OROR
Pump Repairs/MaintenancePump ReplacementBailing (small quantity)Decompression and Airlifting (larger quantity)
oo
Initial InspectionBasic Well MaintenancePump/Motor:Removal of Sand:
Tdpqf!pg!Xpsl
TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW
$52,000$42,000$47,500$15,000$75,000
motor
DecisionPoint: Continue with WellMaintenance/RedevelopmentOR Consider Drilling New Well•CostswillvarydependingonconditionofOROR
Ftujnbufe!Dptut
Initial Costs –Well InspectionRepair Existing Pump/Motor:Replace Motor:Remove small quantity of sand:Remove large quantity of sand
(decompression and airlifting):
•••••Total:$109,000 to $175,000 +/-(Construction)$24,666(Engineering)Source of Funding: Water Fund
TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW
June 25, 2025September 24, 2025October 17, 2025October 23, 2025November/December 2025March 31 or May 22, 2026*
Order Plans and SpecificationsApprove Plans and Specifications/Authorize QuotesReceive QuotesCouncil Reviews Bids/Consider AwardStart DateCompletion Date* Completion date is contingent
on the need to use air lifting and decompression to redevelop the well
Qspkfdu!Tdifevmf
TNEMPOLEVEDER/ECNANETNIAM1.ONLLEW
Rvftujpot