Loading...
HomeMy WebLinkAbout2026 Neighboring City Research • Building Permit Fees Centerville Circle Pines Hugo Lino Lexington Res.Building Permit Valuation+65%Plan Review Based on Valuation Valuation+65%Plan Review Valuation+65%Plan Review Valuation+65%Plan Review Access:200'or under 65(Flat Fee-No SS) 73 Access:200'over Valuation+65%Plan Review Valuation+65%Plan Review Fence 60(Flat Fee-No SS) 25(Flat Fee-No SS) 73 60 Encroachment Agree. 100 Cry Recording+25 Windows(Same Size/Same Opening) 110 79/unit-Max.158 145 Windows(Diff.Size/Diff.Opening) Valuation+65%Plan Review Valuation+65%Plan Review Roofing 150 Based on Valuation 106 145 Siding 150 Based on Valuation 106 145 Above Ground Pool(Mech.&Plumb.Inc Valuation+65%Plan Review 106 145 In-Ground Pool Valuation+65%Plan Review 160 345 73(Except New Construct.-Includes Mech. 20/Item-Max.140 Based on Valuation-Res./Comm. 37+1 Hr.Min.Inspection Fee A/C Furnance Combined. 20/unit-min.40 max 140 Plumb. 5/Item-Max.140 Based on Valuation-Res./Comm. 8/Fix+1 Hr.Min.Inspection Fee 11/Fix(73 min.) Development Fees -Y ` C, Eng.&Legal r:Vilild J JJJ"`^ , 4%of Cost of Improv.-Escrow LOCt. �L 125%of Cost of lmpro.-Escrow City Eng.Tech.Insp. )'L)T? V93/hr 10%Market Valu-• 53,000/Unit Res&2,175/cre Park Ded.Res. nd. )1 3400/unit 3500/unit • P&Z � '4OP ff Re ral) AoOw/1 9De it 300 w/1500 deposit 200 w/1000 Escrow CUP(Comm.&Ind.) 200 w/7500 Escrow IUP 200 w/7500 Escrow CUP/IUP-App. 500 w/1,000 Escrow CUP/IUP-Amend.&IUP Renewal 250 Comp.Plan Amend, 54 200 w/5000 Escrow(40 Acres or Less) 200 w/7500 Escrow(+40 Acres) PUD-App. 500 800+20/Lot w/5000 Esc. 200 w/5000 Escrow-Gen.Concept AP 500 w/12500 Escrow-Preliminary Plan 1✓ 200 w/7500 Escrow-Final Plan PUD-Amend. w/IA66Oeposit. 325 w/2500 Escrow Site Review 200 w/7500 Escrow Property Line Related Encorach.Agree. f- 120 Property Line Adjust.App. \ 150 Rezone Related e p an SAcres) w/ Dep0. 540 w/1000 Escrow Rezoning App.(More than 1e¢ 1080 w/1000 Escrow Site Plan Related Comm/Ind.Site Plan 350 Farm 32 1 Sketch Plan Review 110 Street&Roadway Related 1,r�'}� Street&Easement Vacation '�j 110 w/1000 Escrow Subdivision Related(Payable w/Prelim&Final PI n 50 w/ Deposi • 300 w/1500 Deposit 200 w/7500 Escrow r 200 w/1500 Escrow ' Minor Sub.(Rural(3 lots or less) 750+30/Lot 220 w/1000 Escrow 200 w/3000 Escrow(lust Minor) Minor Sub.(Urban(3 lots or less) 220 w/2000 Escrow Subdivision(4 to 15 Lots) 540 w/5000 Escrow Subdivision(16 to 30 Lots) 700 w/10000 Escrow Subdivision(31 to 100 Lots) 25/Lot w/20000 Escrow Subdivision(Over 100 Lots) 25/Lot w/30000 Escrow 500 w/Deposit(5000,0-5 200 w/5000 Escrow(Less Than 5 Acres), Lots),(10,000,6-10 Lots)& 200 w/7500 Escrow(5-40 Acres)&200 Preliminary Plat (20000,11+Lots) 750w/1500 Deposit w/12500 Escrow(40+Acres) 200 w/1500 Escrow(Less than 5 Acres), 200 w/5000 Escrow(Less Than 5-40 Acres)&200 w/7500 Escrow(40; Fi at L 1 4e8" Acres) Variance Related J'U`• `1`� Variance to Zoning Ord. ,06 w/500 Deposit 300 w/1500 Deposit 200 200 w/750 Escrow-w/Appeat Minor Deviations to Zoning Ord. Building Permit Fees Centerville Circle Pines Hugo Lino Lexington Res.Building Permit Valuation+65%Plan Review Based on Valuation Valuation+65%Plan Review Valuation+65%Plan Review Valuation+65%Plan Review Access:200'or under 65(Flat Fee-No SS) 73 Access:200'over Valuation+65%Plan Review Valuation+65%Plan Review Fence 60(Flat Fee-No SS) 25(Flat Fee-No SS) 73 60 Encroachment Agree. 100 Cty Recording+25 Windows(Same Size/Same Opening) 110 79/unit-Max.158 145 Windows(Diff.Size/Diff.Opening) Valuation+65%Plan Review Valuation+65%Plan Review Roofing 150 Based on Valuation 106 145 Siding 150 Based on Valuation 106 145 Above Ground Pool(Mech.8 Plumb.Inc Valuation+65%Plan Review 106 145 In-Ground Pool Valuation+65%Plan Review 160 345 73(Except New Construct.-Includes Mech. 20/Item-Max.140 Based on Valuation-Res./Comm. 37+1 Hr.Min.Inspection Fee A/C Furnance Combined. 20/unit-min.40 max 140 Plumb. 5/Item-Max.140 Based on Valuation-Res./Comm. 8/Fix+1 Hr.Min.Inspection Fee 11/Fix(73 min.) Development Fees Eng.8 Legal 4%of Cost of Improv.-Escrow LOC 125%of Cost of Impro.-Escrow City Eng.Tech.Insp. 93/hr 10%Market Value or 53,000/Unit Res.8 2,175/Acre Park Ded.Res. Ind. 3400/unit 3500/unit P&Z CUP(Res.B Rural) 250 w/1000 Deposit 300 w/1500 deposit 200 w/1000 Escrow CUP(Comm.&Ind.) 200 w/7500 Escrow IUP 200 w/7500 Escrow CUP/IUP-App. 500 w/1,000 Escrow CUP/IUP-Amend.81UP Renewal 250 Comp.Plan Amend. 540 200 w/5000 Escrow(40 Acres or Less) 200 w/7500 Escrow(+40 Acres) PUD-App. 500 800+20/Lot w/5000 Esc. 200 w/5000 Escrow-Gen.Concept 200 w/12500 Escrow-Preliminary Plan 200 w/7500 Escrow-Final Plan PUD-Amend. 250 w/1000 Deposit 325 w/2500 Escrow Site Review 200 w/7500 Escrow Property Line Related Encorach.Agree. 120 Property Line Adjust.App. 150 Rezone Related Rezoning App.(Less than S Acres) 250 w/1000 Deposit 540w/1000 Escrow Rezoning App.(More than 5 Acres) 1080 w/1000 Escrow Site Plan Related Comm/Ind.Site Plan 350 Farm 32 Sketch Plan Review 110 Street&Roadway Related Street 8 Easement Vacation 110 w/1000 Escrow Subdivision Related(Payable w/Prelim 8 Final Plat App.) Site Plan Review 250 w/5000 Deposit 300 w/1500 Deposit 200 w/7500 Escrow Concept Plan Review 200 w/1500 Escrow Minor Sub.(Rural(3 lots or less) 750+30/Lot 220 w/1000 Escrow 200 w/3000 Escrow(lust Minor) Minor Sub.(Urban(3 lots or less) 220 w/2000 Escrow Subdivision(4 to 15 Lots) 540 w/5000 Escrow Subdivision(16 to 30 Lots) 700 w/10000 Escrow Subdivision(31 to 100 Lots) 25/Lot w/20000 Escrow Subdivision(Over 100 Lots) 25/Lot w/30000 Escrow 500 w/Deposit(5000,0-5 200 w/5000 Escrow(Less Than 5 Acres), Lots),(10,000,6-10 Lots)8 200 w/7500 Escrow(5-40 Acres)8 200 Preliminary Plat (20000,11+Lots) 750 w/1500 Deposit w/12500 Escrow(40+Acres) 200 w/1500 Escrow(Less than 5 Acres), 200 w/5000 Escrow(Less Than 5-40 Acres)8 200 w/7500 Escrow(40+ Final Plat 100 Acres) • Variance Related Variance to Zoning Ord. 250 w/500 Deposit 300 w/1500 Deposit 200 200 w/750 Escrow-w/Appeat Minor Deviations to Zoning Ord. City of Lexington Permit Fee Schedule Residential Permits Building Permits Residential Permit Fee Valuation based on Lexington Permit Fee Schedule Plan Review Fee 65%of Permit Fee State Surcharge The greater of.0005 x valuation or$.50 Interior Remodeling/Basement Finish Permit Fee Valuation based on Lexington Permit Fee Schedule Plan Review Fee 65%of Permit Fee Surcharge The greater of.0005 x valuation or $.50 Building Permits-Maintenance Roofing $145.00+$1.00 state surcharge =$146.00 Siding $145.00+$1.00 state surcharge =$146.00 Window Replacement-opening size changes Value based +Plan review fee+state surcharge Window Replacement-same size opening $145.00+$1.00 state surcharge =$146.00 Above ground pools (both mechanical&plumbing Included) $145.00 +$1.00 state surcharge=$146.00 In-Ground Pool $345.00 +$1.00 state surcharge=$346.00 Water Heater $40.00+$1.00 state surcharge=$41.00 Demolition (excludes manufactured homes) The greater of$250.00 or 1.5% of valuation+state surcharge Manufactred Home Placement or On Site Demo $100.00 ea Fences $60.00 Plumbing Permit Residential Alteration See Lexington Permit Fee Schedule Residential New See Lexington Permit Fee Schedule Sprinkler/Irrigation Systems $100.00+ $1.00 state surcharge=$101.00 Mechanical Permit Residential Alteration $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge Residential Fireplace $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge Residential New $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge Commercial Permits Building Permits Building Permit Fee Valuation based on Lexington Permit Fee Plan Review Fee 65%of Permit Fee Surcharge The greater of.0005 x valuation or$.50 Plumbing Permits Permit Fee The greater of 2%of Project Valuation or$40.00 Plan Review Fee 65%of the Permit Fee Surcharge The greater of.0005 x valuation or$.50 Mechanical Permits Permit Fee The greater of 2%of Project Valuation or$40.00 Plan Review Fee 65%of the Permit Fee Surcharge The greater of.0005 x valuation or$.50 Demolition Permits Building Permit Fee Greater of$250.00 or 1.5%of valuation Plan Review Fee N/A Surcharge The greater of.0005 x valuation or$.50 Sign Permits-Commercial Only Temporary $50.00 Permanent Greater of $50.00 or 1.5%of cost Fence/Walls Over 6 Feet-Commercial Permit Fee $60.00 Inspections Outside Normal Business Hours $60.00 per hour/1 hour minimum Inspections for which no fee is specifically indicated $60.00 per inspection Investigation Fee Work which was started without a permit shall be subject to an investigation fee equal to the permit fee less the surcharge Teresa Bender From: Kate Manson Sent: Tuesday,July 22, 2025 4:22 PM To: Teresa Bender Subject: RE: Fee Schedule We're still using 2023's fees Kate Manson Finance Director, City of Circle Pines and Centennial Utilities 763-231-2612 http://www.centennialutilities.com/ I http://www.ci.circle-pines.mn.us/ From:Teresa Bender<TBender@centervillemn.com> Sent:Tuesday,July 22, 2025 3:14 PM To: Kate Manson<KManson@ci.circle-pines.mn.us> Subject: RE: Fee Schedule Dear Kate: Do you have 2025 fees? Thank you, Teresa From: Kate Manson<KManson@ci.circle-pines.mn.us> Sent:Tuesday,July 22, 2025 3:02 PM To:Teresa Bender<TBender@centervillemn.com> Subject: Fee Schedule Got your message; see attached. Kate Manson Finance Director, City of Circle Pines and Centennial Utilities 763-231-2612 http://www.centennialutilities.com/ I http://www.ci.circle-pines.mn.us/ 1 2023 CITY OF CIRCLE PINES FEES Other Permits Parade Permit $ 25.00 Open Burning $ 50.00 Right-of-way permit fees Listed on pages 16/17, Chapt. 17 City Code Trailers/containers parked on city ROWs $50/unit + .05/linear foot Road Permit $ 75.00 Temporary Sales Event Permit $ 25.00 Fireworks Fees Exclusive Seller $ 350.00 In Existing Retail $ 100.00 Mini Truck Permit $ 50.00 Park Shelter Permit Non Resident Fees Golden Lake Park #1 Monday-Thursday (non resident) $ 65.00 Golden Lake Park #1 Friday-Sunday (non resident) $ 95.00 Golden Lake Park #2 Monday-Thursday (non resident) $ 120.00 Golden Lake Park #2 Friday-Sunday (non resident) $ 175`00 Resident Fees Golden Lake Park #1 Monday-Thursday (resident) $ 35.00 Golden Lake Park #1 Friday-Sunday (resident) $ 50.00 Golden Lake Park #2 Monday-Thursday (resident) $ 65.00 Golden Lake Park #2 Friday-Sunday (resident) $ 90.00 Heritage Commons Park & Pier Monday-Thursday $ 20.00 Heritage Commons Park & Pier Friday-Sunday $ 30.00 RENTAL DEPOSIT Golden Lake #1 $ 50.00 RENTAL DEPOSIT Golden Lake #2 $ 100.00 Fee to change pavilion rental reservation date $ 25.00 Licenses Arborist (Sectio- 40) $ 50.00_ Adult-Oriented Business (Section 355) $600 + $1,500 investigation fee Amusement Devices (Section 310) $15 per site + $15 per machine Animal Hospitals, Pet Shops, Animal Grooming, Private Kennels (Section 330) $ 20.00 Billiard Halls & Pool Halls (Section 315) $25 per table Bowling Alleys (Section 315) $15 per lane Beekeeping Annual License $ 75.00 Chicken 2-year License $ 75.00 Contractors $ 50.00 Commercial Lawn Fertilizer Contractor $ 100.00 Skating Rinks (Section 315) $30 per location 2023 CITY OF CIRCLE PINES FEES Potentially Dangerous Dog Registration $ 35.00 Dangerous Dog Registration-includes tags/signs $ 60.00 Exhibits and Carnivals (Section 335) $ 250.00 Filling Stations (Section 340) $ 100.00 Rental Housing License/Registration (Chapter 16) $100 for 1st unit & $20 each addl Late Fee for not Completing Rental Housing Application and Inspection within 30 days and Additional Fee if not $50 Late Fee 30 days within 60 Days Additional $50 Late Fee if 60 Days Therapeutic Massage/Sauna Initial Business License $ 150.00 Therapeutic Massage/Sauna Initial Personal License $ 100.00 Therapeutic Massage/Sauna Business License Renewal $ 100.00 Therapeutic Massage/Sauna Personal License Renewal $ 50.00 Therapeutic Massage/Sauna Business License Background $ 100.00 Investigation Therapeutic Massage/Sauna Personal License Background $ 50.00 Investigation Garbage and Refuse $ 150.00 Non-intoxicating Malt Liquors (Section 400) $200 on-sale $50 off-sale Wine Only $300 on-sale On-sale- New req. addl $1,000 background investigation fee $ 5,000.00 Off-sale - New req. addl $1,000 background investigation fee $ 250.00 Sunday Liquor $ 200.00 Setup $ 25.00 Liquor License Late Fee After November 1 $ 50.00 Peddlers, Solicitors, Transient Merchants (Section 305) $ 300.00 Transient Merchants Qualified in 305.07 $ 62.50 $150 Class A; Private Clubs (Section 410) $350 Class B; $350 Class C Vending Machines (Food) (Section 300) $50.00 per machine Tobacco Products (Section 345) $ 200.00 Landscaping Management Plan (Section 710) $ 50.00 Lawn Fertilizer Applicator $ 100.00 Pawnbroker License (Section 306) $10,000 Investigation fee $15,000 License Fee Tree Treatment Fees Permit Review Fee for Private Treatment of a Public Tree $ 25.00 Injection Treatments $150 per injection 2023 CITY OF CIRCLE PINES FEES Miscellaneous Fees Contractor State License Verification Fee $ 5.00 Domestic Partner Registration/Termination $ 45.00 Notary Fee $ 2.00 Search $ 20.00 Blueprint copy $ 20.00 FAX Charge $ 1.00/page (long distance) .50/page local _ Computer Reports $50.00 + .25/page City Council Filing Fee $ 2.00 Utility Billing -Commercial List $ 50.00 -Lino Listing $ 50.00 -Circle Pines List $ _ 50.00 -Complete List $ 75.00 Copies -8% x 11 $ .25/page -81/2 x 14 $ .30/page -11 x 17 $ .50/page DVD Copies $ 25.00 Map Copies per page -11 x 17 $ 5.00 -Zoning $ 5.00 Meeting Room Use -Group 1 No Fee -Group 2 $ 25.00 $50.00/hr. with 2-hour min. Plus deposit of $100, which is refundable if no excess cleanup -Group 3 or damages Building Permits Inside Plumbing — Water Softeners & Backflow Preventers - Residential Based on Valuation Inside Plumbing - Commercial Based on Valuation Irrigation Permit - Residential $25.00 (Requires Plumbing Permit Also) Irrigation Permit - Commercial Based on Valuation Mechanical Permit/Gas Appliance - Residential Based on Valuation Mechanical Permit/Gas Appliance - Commercial Based on Valuation Hot Tub - outside (zoning check & plan review) Based on Valuation Hot Tub - inside (no plans necessary) Based on Valuation Building Permits Based on Valuation Demolition Permit Based on Valuation Excavation and Grading Permits Based on Valuation Reside or Reroof: Based on Valuation 2023 CITY OF CIRCLE PINES FEES Fuel Tank Removal $125 + $1.00 surcharge Fence Permits $25.00 no surcharge Driveway Construction Permits $25.00 no surcharge Water Permit Connection/Water System: New residential $100.00 +$1.00 surcharge +WAC Connection/Water System: Residential repair $100.00 +$1.00 surcharge Connection to Water System: New Commercial $100.00 +$1.00 surcharge + WAC Connection to Water System: Commercial repair $100.00 +$1.00 surcharge Sewer Permit Connection to Sewer System: New residential $100.00 + $1.00 surcharge + SAC Connection to Sewer System: Residential repair $100.00 + $1 .00 surcharge Connection to Sewer System: New commercial $100.00 + $1.00 surcharge+SAC per unit Connection to Sewer System: Commercial repair $100.00 +$1.00 surcharge Septic Pumping - required every 3 years $25.00 no surcharge Water Meter Fees 5/8" Cost plus $10 1" Cost plus $10 1 1/2" Cost plus $10 2" (Compound) Cost plus $10 WAC & SAC WAC $ 1 ,800.00 WAC-Filtration $ 1 ,450.00 SAC MCES $ 2,485.00 SAC-Local $ 1 ,500.00 Zoning and Other Permits Cost Street Opening Fee Chapter 17 City Code Telecommunications Permit Same as Chapter 17 of City Code City of Circle Pines Zoning Fees Sign Permit (temporary) $40, if after the fact $80 Sign Permit (permanent) $40 per sign + $.50 per sq. ft. $300+$1500 deposit(any additional amount accrued in attorneys Conditional Use Permit- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will Ord. be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) Subdivision - Fee Established by Ordinance $750+ $30 per lot $300+ $1500 deposit(any additional amount accrued in attorneys Variance - Fee Established by Ordinance fees, engineering fees, county fees above the$1500 in escrow will be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $300+ $1500 deposit(any additional amount accrued in attorneys Site Plan Review - Fee Established by fees, engineering fees, county fees above the$1500 in escrow will Ordinance be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $750+$1500 deposit(any additional amount accrued in attorney's Community Unit Plan - Fee Established by fees, engineering fees, county fees above the$1500 in escrow will Ordinance be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $300+$1500 deposit(any additional amount accrued in attorney's Vacation of Right-of-Way- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will Ord. be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $300+$1500 deposit(any additional amount accrued in attorney's Vacation of Easement- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will Ord. be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $750+ $1500 deposit(any additional amount accrued in attorney's Preliminary and Final Plat- Fee Established fees, engineering fees, county fees above the$1500 in escrow will by Ord. be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $750+ $1500 deposit(any additional amount accrued in attorney's Comprehensive Plan Amendment- Fee fees,engineering fees, county fees above the$1500 in escrow will Established by Ordinance be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $500+$5000 deposit(any additional amount accrued in attorney's Tax Increment District Establishment- Fee fees, engineering fees, county fees above the$5000 in escrow will Established by Ordinance be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) $300+ $1500 deposit(any additional amount accrued in attorney's Rezoning or Zoning District Change - Fee fees, engineering fees, county fees above the$1500 in escrow will Established by Ordinance be charged to the applicant.The total amount not used in attorney, engineer and county fees will be refunded to the applicant) 888888888888888 . . . . . . . . . . . . . §g§§§§§g000g§§ N'g s.1. E i it It e o gg ss f 3 0 H I a o 3 N e o I S 1. K¢ ¢ > SS 8811888818888 > 3,5 Q 3 3 3 3 3 3 3 3 3 3 i 3 a m ¢K C K K rc K K K K K K¢ E e°o_a°o`m_o e e`o_ _ o o e g p "iF u,__Bull 8 arn$'rni8'S'$'°rn$'8'$ a mrco:rco:rcrc�ssarcrc q wwwwwwwwwwwwww e 8 88 8 888888888s888 a. §1 § 888§§§§§8Z868 3 `m € $a C s` �08 og ° a m = E� Q .� oqQ o� m 88 0 0 25v ^oS=E. i NN N S > 'mg >wU Q 33 Al y _ 2` =m �j 2 OUD I 11 =z! 2 $ 88 LLO�F q wr. w gwwwwwgww wwq ,—�c 3m qq rn p 8 8.8 8 8 8 8 2 y 8 t a on g §g § 8 IIII, m m § § =W O: 1�LL LL LL 1LL lLL LL li ILL ° W LL ;W C c c c c c H S C OO o O O.� 0 0 0._.� O 71,1 cc C Rio N G y N y N m 'Si y m - 8 O 8 8 8 8 8 W S N5 °im m W a�i rn °�ri ri r N> 0.0 ? il�L vm2� a t$ a xrcrcrco:rcrc.wwrcrcrc E m mam mad v dm a $ q wq q q eccEcE2cccacc `88 w J. 01,OmGGSd. S ' 8888888.88 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 N N r A 8 22 8 8 8 8 8 §8§§?§ s� 8 8 88 8 8 §8 8A8 5§ s §?P 882�s NN <-2 8 >"a" gN _YO - O s O n in WL :S 8 2 O 5 5 wggwqwqqq N NN q N N wwwwwgwgqwqww q www ggqqww wwwww wwwwwggqqwqwwww Q g - A a d 8 r i 16 .a ° me 15T. `Am' Ti a p'—° 8 0. 2 $' c N> m - !E Zy°- Ec mw0 2> = mm M - g 2 m g V _ m =ui O `m�m— m i n n 1 O e m o d p W.�q Vl W N u o 5E ° u8 52 ;Mori 2cWW o gg L (%1 m.8. a W Ec mo mWiw'! -m t- p' m m m mTmaw w L ge LLin�'E0 OF �3 W _ " 5 S"'t > Qg $ . m �� ;0 �� w� J Q O 25 V5,1 OOn•.,N., 8 °c�,L�2' agm W' 31 �'`=o N_mi.=.m 3 I i? €€�€gIL Waciaula 2 § 8 § CC 8 § m ns. m `s 15111a z 5 s- m `d 5 '38 m� a1°v-=== m� o. ,6 $ g m JNNN °� to O-A O 3-`° m22U2K 2H F2 W.m.....V _N m cm a ITl>j N R N w w Wi to33 0 = omamE� 3 a c�L u °°"aa"'am--a--an°,.a°,W m �� m� 23.21D21 �mmww z 8» '" 8 =oggoam Bmao ava m goa" a .ZW i2<<2<2222� z tcw�2-- t EE R a 8 3 8 8 8 8 EP °1 m cl m �gc m mi° m odd zm`m`mm`m°`m<< g z ov Din—°m = Mu! J wN 8 w 8 mao`mM�=5m3� < w�m�W m`aa oiS 0 a`a e �u��uuciucicici9 � � a`a pa'�aul �'S33 Mu! m ,,, Cl N $ 8 88.!I 8 888 e 8 0 o c m g3 PH'- {{o 0 o c o mtt1;g &tt m m o 888 w w y_ w.... _g w 0,N _ 13 ma �2 omm 3a , mE c - m me gm _ O c a°ii m E& E 'E'E'E .- tE E E a O .E g8g8 88&&& 88 gg 8 888 8888 88 `` E 8 8 8 uy w»'o E .a+$ wn»ww as Ra `oo N U N € s 1 h w, g` i m U v v z ado 88gg a QN8 QQ$$Q >LLD W eO ES gg c -- 3 t0g Z° w�r 8 8-� $8� a�°.�i ' 88888 $8$Q8 Q8$8� 8 $8�Q8 88 s8 48 58�8s8$8�8$8� m �! a EE x p N 0 ;g.„ 8 8 8 m €€ I, fa,N �N �` w w C & g g p 8 g g'o rn „1 MP 8 8888'€8.8888:6 o 88 8 888 8888 81 888 8 68 88 888 888 80888888 88 888808 88888 it o---5N `" M VmgN°NN^^'No m r8^o' FAH 8i B.RN 8, EO 0 8n R RP E 23E5RE 8 88 `° N w .m -00 Isf m - a c tN ww LLiE -� m88 808 O a N D Spo $ ,L1 ? $ a ~Y `.W H W N W V, .... W .... w H W N 4n di N N,V,H . di V,vi N .A Yi N, .n.9.n Vi u,M ....... .. .... N ..... $$ 0 1 p c O! 58��Q8558��5g��Q8 B LL a o�g g�, titIL 2 m2525EEE h „a I s ` I y cwasw m e o IL a? i W K Qa Q Z. m c •S W CON '- Y o o.I o�' -3Q w E g E r c 3 8 rca q mma =o 30 0 _ ewa g€ i_ c �pmdzE° W_ �t`a W zoo "sue . $ g y g§m-'"_ `�c `6_g v`3 w v m 8$t ti "Z a m g g w E.g E o E ._ >>w E 3 3 E c m 5 3 i g 3 3 to>«,kgkkg w W—6 m m -z 38a Tie E_ saT,13a zwEEwagwg•sTd wo,'Lc ;3lgx'',9wggwor� w88 `1 ilS�-�- - - i g;wg'w rr d 17111 R _ z'nn - !ih z rn c w m w`8 cm$-_ °i� 'tz� O.ags` O3A Oo �x »FL�0z m�.eoBB � 5ws-> oa O'-o'rna c 1m OWzFoa5wtw z€'�'€ z,I'FCN .° v <8m?o� ,`,EmE sL= ___ Ezsz88w e'-- w�w�>wn.'n. �o Yu�m am w `W € !I8o a iEEO 11 e w o8S � ig itga-_ �, L_�8. >g Xp� �00 zggp'`�E AoB� w8€y��m__$$$Ss _ ma c o _..=_o m L'ya-NMONfD v2 mad aoUmoo W 4 U'Eadd g<U G W 33g."gW6 J2,1a:22i e8U8 g8821s a wa4rc11yo.imyiny��rnrnm'm R.8 f NNo0 R V'3f CITY OF HUGO ATTACHMENT TO ORDINANCE NO.2024-537 2025 FEES,RATES AND CHARGES ESCROW FEES AND OTHER ROADWAY RECONSTRUCTION/REHAB: Single-Family Residential/Duplex Rates: Complete Reconstruction $ 5,200.00 per unit Partial Reconstruction $ 4,100.00 per unit Roadway Reclamation/Overlay $ 3,400.00 per unit Urban Roadway Overlay $ 2,100.00 per unit Rural Roadway Overlay $ 1,800.00 per unit UTILITY RELATED: Water Utility Permit $ 32.00 $30.00 permit fee plus$2.00 technology fee Water Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES Sewer Utility Permit $ 32.00 $30.00 permit fee plus$2.00 technology fee Sewer Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES City Sewer Availability Charges(SAC): -Sewer Infrastructure Trunk Fee $ 1,632.00 per SAC unit as determined by MCES -Sewer Infrastructure Connection Fee $ 588.00 per SAC unit as determined by MCES -Total SAC Fee $ 2,220.00 City Water Availability Charges(WAC): -Water Infrastructure Trunk Fee $ 1,960.00 per SAC unit as determined by MCES -Water Infrastructure Connection Fee $ 680.00 per SAC unit as determined by MCES -Total WAC Fee $ 2,640.00 Water Meter Rental-Standard Residential 3/4' $ 472.00 plus sales tax of$39.37;$470.00 meter plus$2.00 technology fee Water Meter Rental-Commercial-1"Meter $ 617.00 E-Series plus sales tax of$51.51;$615.00 meter plus$2.00 technology fee Water Meter Rental-Commercial-181/2'Meter $ 1,092.00 E-Series plus sales tax of$91.30;$1,090.00 meter plus$2.00 technology fee Water Meter Rental-Commercial-2'Meter $ 1,382.00 E-Series plus sales tax of$115.58;$1,380.00 meter plus$2.00 technology fee Water Meter Rental-Commercial-Larger than 2' Cost+10% Not a stocked item Call for availability and pacing plus$2.00 technology fee Water Meter Rental-Irrigation-1'Meter $ 647.00 +1 WAC Fee$2,640 plus sales tax of$54.02;$645.00 meter plus$2.00 technology fee Water Meter Rental-Irrigation-181/2"Meter $ 1,122.00 +2 WAC Fees$5,280 plus sales tax of$93.80;$1,120.00 meter plus$2.00 technology fee Water Meter Rental-Irrigation-2'Meter $ 1.412.00 +2 WAC Fees$5,280 plus sales tax of$118.10;$1,410.00 meter plus$2.00 technology fee Water Meter Rental-Irrigation-Larger Than 2' Cost+10% +WAC Fees as determined by City Engineer plus$2.00 technology fee Water Meter Testing $ 80.00 Refundable if meter is faulty Water Meter No-Access Penally $ 200.00 per quarter Hydrant Water(per truck load) $ 30.00 Hydrant Meter Rental-Deposit $ 700.00 refundable deposit Hydrant Meter Rental-Use Charges $ 20.00 per day rental tee+actual usage calculated at the per thousand gallons irrigation rate reflected on the current Utility Rate Schedule I', Water Shut-Off Cap(Curb Stop) $ 32.00 plus sales tax of$2.52;$30.00 part plus$2.00 technology fee i Water Shut-Off Cap Repair Lid(Curb Stop) $ 57.00 plus sales lax of$4.61;$55.00 part plus$2.00 technology fee Driveway Curb Stop Cover(A1AY McDonald) $ 202.00 plus sales tax of$16.75;$200.00 part plus$2.00 technology fee Gate Valve Cap $ 32.00 plus sales tax of$2.52;$30.00 part plus$2.00 technology fee Standard Radio $ 217.00 replacement plus sales tax of$18.01;$215.00 part plus$2.00 technology fee Dual Port Radio $ 257.00 replacement plus sales tax of$21.36;$255.00 part plus$2.00 technology fee RENTALS: Room Rental(City Hall,Rice Lake Centre.Hanifl Shelter 8 Lions Park Pavilion): NON-PROFIT RATE: Rice Lake Centre(RLC) $ - Free Oneka Room,Hanifl Gathering Room $ 20.00 for up to 4 hours RESIDENT RATE: Oneka Room,RLC,Hanifl Gathenng Room $ 100.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Oneka Room.RLC,Hanifl Gathering Room $ 150.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room $ 200.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room $ 400.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room w/Servery $ 250.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room w/Servery $ 450.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Entire Building $ 300.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Entire Building $ 600.00 per rental mom than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Conference Room $ 20.00 for 2 hours Pedersen Pavilion Picnic Shelter $ 100.00 for 2 hours NON-RESIDENT RATE: Oneka Room,RLC.Hanifl Gathering Room $ 200.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Oneka Room,RLC,Hanifl Gathering Room $ 300.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room $ 400.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room $ 800.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room w/Servery $ 450.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Gathering Room w/Servery $ 850.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Entire Building $ 500.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Entire Building $ 1,100.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit Pedersen Pavilion Conference Room $ 20.00 fa 2 hours Pedersen Pavilion Picnic Shelter $ 200.00 fa 2 hours Park Shelter Rental: Permit $ 5.00 per permit Soccer Field Rental: Permit for Youth Organizations(full-sized field) $ 3,250.00 per season Permit for Youth Organizations(U11/U12 or other) $ 2,750.00 per season Youth Toumament Fee $ 40.00 per game Permit for Adult or Other Organizations $ 75.00 per hour Baseball Field Rental: Permit for Youth Organizations $ 10.00 per day Permit for Other Organizations $ 30.00 per day Page 3 CITY OF HUGO ATTACHMENT TO ORDINANCE NO.2024-537 2025 FEES,RATES AND CHARGES ESCROW FEES AND OTHER MISCELLANEOUS CHARGES: Assessment Search $ 30.00 Conduit Bond Financing 1/2 of 1 Y. of bond principal (may be negotiated based on size and purpose) Copies: Public Data Requests(100 copies and under) $ 0.250 per copy Public Data Requests(over 100 copies) $ 0.300 per copy over 100 All Other $ 0.300 per copy Document Certification $ 20.00 Document Recording $ 80.00 Property Ownership Search $ 55.00 Records Search $ 60.00 per hour Service Charge for Returned Checks $ 30.00 Service Charge for Disputed Credit Card Transactions $ 30.00 Special Meetings: City Council $ 1,030.00 Planning Commission $ 515.00 Page 4 Public Hearing: N/A Draft Posted to Website: October 29, 2024 1st Reading: October 28, 2024 Publication: November 19, 2024 2nd Reading: November 12, 2024 Effective: January 1, 2025 CITY OF LINO LAKES ORDINANCE NO. 16-24 Repeal and Replace of Chapter 218(Fee Schedule) The City Council of Lino Lakes ordains: Section 1. Findings. Pursuant to Minnesota Law, the Lino Lakes City Charter, and the Lino Lakes City Code, a fee schedule for city services and licensing is hereby adopted as follows: 2025 FEE SCHEDULE ALCOHOLIC BEVERAGES 3.2 Beer Off-Sale $ 200.00 /Year 3.2 Beer On-Sale $ 300.00 /Year 3.2 Beer On-Sale Temporary $ 50.00 Plus$5.00/Day Club License $ 300.00 /Year Liquor License Investigation (Initial Application Only) $ 267.75 1 or 2 $ 471.75 3+ Liquor License On-Sale $ 4,500.00 /Year Liquor License Off-Sale $ 200.00 /Year Liquor Temporary Permit $ 50.00 Wine License $ 500.00 /Year Sunday Liquor $ 200.00 /Year On-Sale Brewer Taproom $ 500.00 /Year Off-Sale Growler $ 200.00 /Year AMUESMENT& COMMERCIAL RECREATION Cabaret License $ 35.00 Dances $ 200.00 /Year Gambling Permit Application $ 10.00 BUSINESS& MISCELLANEOUS Assessment Search Fee $ 20.00 /Search Background Check Fee $ 35.00 /Background Cannabinoid License Investigation (Initial Application Only) $ 267.75 1 or 2 $ 471.75 3+ Cannabinoid License $ 250.00 /Year CD or DVD $ 7.00 City Charter $ - First Copy $ 10.00 Each Additional Copy City Code Book $ 140.00 No Binder or Tabs City Map $ 2.50 Comp. Plan $ 55.00 Copies: Large Scale (>11"x17") $ 0.50 /Square Foot Copies: New Resident Labels $ 5.00 /Month Flat Fee Copies: Per Page $ - /Page(1-10 Pages) $ 0.25 /Page (11-100 Pages) Actual Cost 100+ Pages Dog Kennel - Private $ 20.00 /Year Dog Kennel—Commercial $ 105.00 /Year Dog License Male/Female $ 11.00 Not Spayed or Neutered $ 6.00 Spayed or Neutered Election Filing Fee $ 5.00 Fax Charge $ - 1-10 Pages $ 0.25 /Page 11+ Pages Garbage Hauler License $ 100.00 First Truck $ 45.00 Each Additional Truck Massage Therapist License(Individual) $ 50.00 Annually Overweight Permit $ 50.00 Pawn Shop Class A, Class B, and Class C $ 10,000.00 Pawn Shop/Precious Metal Dealer/Secondhand Goods Dealer Class A Background Investigation (In State) $ 775.00 Fee $ 15,000.00 Escrow Deposit Pawn Shop/Precious Metal Dealer/Secondhand Goods Dealer Class A Background Investigation (Out State) $ 20,000.00 Fee& Escrow Deposit Peddler,Solicitor,Transient Merchant $ 250.00 /6 Months Precious Metal Dealer $ 10,000.00 Secondhand Goods Dealer Class A $ 10,000.00 Secondhand Goods Dealer Class B and Class C $ 300.00 Return Check Charge $ 30.00 Rental Housing License (Annual) $ 73.00 1 or 2 Units plus$15.00/Unit for 3 or More Units(fee to be reduced by 50% if issued less than six months from expiration date) Rental License Re-Inspection Fee $ 73.00 Special Event Permit $ 50.00 Therapeutic Massage Business License $ 200.00 Annually Tobacco License $ 250.00 Weed & Mowing Violation $ 150.00 First Hour $ 75.00 Each Additional Hour Additional Admin Fee $ 100.00 2nd Offense in Calendar Yr $ 200.00 3rd and Each Additional Offense in Calendar Yr Non-Payment Certification Fee $ 30.00 Zoning Maps $ 5.00 Large or Colored Zoning Ordinance $ 25.00 FIRE REGULATIONS Annual Permit for Sale of Consumer Fireworks $ 350.00 Exclusive Retail Seller $ 100.00 In Conjunction with Existing Retail Store Burning Permit $ 50.00 Day Care/Foster Care Inspection $ 50.00 False Fire Alarms $ - /Alarm (1-3) in Calendar Yr $ 100.00 /Alarm (4-10) in Calendar Yr $ 200.00 /Alarm (11+) in Calendar Yr Fire Watch $ 50.00 /Hour Fireworks Display Permit $ 100.00 Food Truck Inspection $ 50.00 Inspection Outside Business Hours $ 75.00 /Hour(2 Hour Minimum) POLICE FEES Copy of Report $ - To Subject of Data up to 3 Pages $ 1.00 4th Page $ 0.25 /Page 5-100 Pages Copy of Report—Mail In $ 4.00 Up to 4 Pages $ 0.25 /Page Thereafter Vehicle Lockouts $ - No Fee Clearance Letter $ 15.00 Fingerprinting $ 15.00 By Appointment Digital Photographs $ 25.00 Up to 16gb Flash Drive Other Digital Documentation/Video $ 50.00 Up to 16gb Flash Drive False Police Alarms $ - /Alarm (1-3) in Calendar Yr $ 52.50 /Alarm (4-10) in Calendar Yr $ 105.00 /Alarm (11+) in Calendar Yr Vehicle Forfeiture Fee $ 300.00 /Vehicle Dangerous Dog Registration $ 255.00 /Year RENTALS& RESERVATIONS Civic Complex Room Reservations Non-Residents& Businesses- Up to 4 Hours $ 100.00 Non-Residents& Businesses- Up to 8 Hours $ 200.00 Field Rental Baseball/Softball Drag Only $ 25.00 /Evening Baseball/Softball Drag&Chalk $ 50.00 /Evening Picnic Shelter Reservation $ 25.00 BUILDING -CONSTRUCTION UTILITES Building Permit Fee Schedule Building Permit Fees shall be based on the Fee Table. Fire Suppression Permit Fee shall be based on Fee Table. Minimum fee of$73.00 for all permits. Fee Table Total Valuation Fee $1.00 to$1,360.00 $73.00 $1,361.00 to$2,000.00 $23.50 for the first$500.00 plus$3.05 for each additional $100.00, or fraction thereof, to and including$2,000.00. Min. Fee$73.00 $2,001.00 to$25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00,or fraction thereof,to and including$25,000.00 $25,001.00 to$50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00,or fraction thereof,to and including$50,000.00 $50,001.00 to$100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00,or fraction thereof,to and including$100,000.00 $100,001.00 to$500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00,or fraction thereof,to and including$500,000.00 $500,001.00 to$1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00,or fraction thereof,to and including$1,000,000.00 $1,000,001.00 and up $5,608.75 for the first$1,000,000.00 plus$3.15 for each additional $1,000.00,or fraction thereof Other Inspections and Fees Work Commencing Before Permit Issuance Double Permit Fee Erosion Control Inspection Fee Single,Two-Family,Townhomes up to 8 $ 160.00 Units, Multi-Family>8 Units Commercial, Industrial, and Institutional Determined by Separate Agreement Change of Use/Occupancy Inspections $ 73.00 /Trip Inspections Outside of Normal Business Hours $ 73.00 /Hour* Re-Inspection Fee $ 73.00 /Trip Inspections for which no fee is specifically designed $ 73.00 /Trip Additional Plan Review Required by Changes,Additions, $ 73.00 /Hour** or Revisions For use of outside consultants for plan checking and Actual Cost*** inspections, or both Plan Review Fee a. 65%of the Building Permit Fee b. 25%of the Building Permit Fee for review of similar plans(Master Plan) in a 12 month period Easement Encroachment Fee County Recording Fee plus$25.00 Antenna, City Owned Property $ 250.00 Plus$6,000 Escrow Antenna, Private Property See Building Fee Table Accessory Building Permit: 200 sq.ft. or under in size $ 73.00 Accessory Building Permit: over 200 sq.ft. in size See Building Fee Table Fence Permit: 6 feet or under in height $ 73.00 Fence Permit: over 6 feet in height See Building Fee Table Grading Permit $ 160.00 Grading Permit Escrow Deposit(if not $ 300.00 included in Dev. Contract) Surface Water Management Plan (if applicable and $ 3,500.00 not covered in Site Performance or Development Contract Escrow) Roofing Permit $ 106.00 Siding Permit $ 106.00 Swimming Pool Permit $ 160.00 In Ground $ 106.00 Above Ground Window/Door Replacement Permit $ 79.00 /Unit (max$158.00) Retaining Wall Permit $ 73.00 Mechanical (HVAC) permit: Gas Fireplace $ 73.00 Plus$34.50 for Each Additional Fireplace Mechanical (HVAC) Permit: Residential $ 73.00 Except New Construction Includes AC/Furnace Combined Mechanical (HVAC) Fee: New Construction Residential $ 158.00 Does Not Include Fireplaces Mechanical (HVAC) Permit: Commercial 2%of the Contract Price ($73.00 Minimum Fee) Manufactured Home Permits $ 250.00 Plumbing Permit $ 11.00 /Fixture ($73.00 Min. Fee) Sewer Connection Inspection Fee $ 200.00 Water Connection Inspection Fee $ 250.00 Contractor License Verification $ 5.00 /Permit Contractor Lead Certification Verification $ 5.00 /Permit Contractor License $ 50.00 Metropolitan Council SAC(Sewer Availability Charge) Per Met Council Water Meter City Cost plus$50.00 MXU Unit City Cost plus$50.00 Water Meter+ MXU Unit City Cost plus$50.00 Touch Pad $ 18.00 Curb Stop Covers $ 70.00 Septic Installation or Repair Permit $ 250.00 Septic Pumping Permit $ 10.00 Demolition Permit $ 73.00 Lawn Sprinkler/Irrigation System Permit $ 73.00 Irrigating or Watering of New Landscaping Permit (Sod $ - No Fee or Seed) Driveway Replacement Permit $ 73.00 Sign Permit: Existing Billboard $ 85.00 /Year Sign Permit: Permanent See Building Fee Table Sign Permit: Sandwich Board $ 35.00 Sign Permit:Temporary(portable/banner) $ 35.00 /Term Storm Pond Aeration Permit $ 150.00 Fee Refund — Per applicant request, City staff may refund permit fees up to 80%for voided permits. Plan review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired. All permits issued are subject to applicable State surcharge fees. * Inspections made outside of normal business hours is a three-hour minimum charge. ** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. *** Actual costs include administrative and overhead costs. An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan revision and construction observation. ESCROW DEPOSITS In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any unfinished work must be completed within six months (weather permitting) from the date of issuance.The following escrow amounts are hereby established: a. Driveway- $1,000.00 b. Exterior Concrete -$1,000.00 c. As-built Surveys - $1,000.00 d. Stucco (final coat only) - $1,000.00 e. Garage Floor- $1,000.00 f. Landscaping-$2,500.00 (landscaping may be escrowed year-round per City Staff) g. Other—Determined by City staff at a rate of 125%of the actual improvement costs Escrow deposits will be charged a $100.00 non-refundable administrative fee. Escrow deposits can be submitted through one of the following procedures: a. Escrow can be paid to the City upon execution of an agreement signed by both the payee and the City. b. The title company or lending institution can hold the escrow upon execution of an agreement signed by both the title company or lending institution and the City. A partial release, of a multi-item escrow, will be charged a $75.00 non-refundable administrative fee. RIGHT-OF-WAY MANAGEMENT Excavation Permit Fees Hole (includes administration, plan review, $ 150.00 inspection,testing and mapping) Trench (includes administration, plan review, $ 70.00 /100 Lineal Feet plus Hole Fee inspection,testing& mapping) Obstruction Permit Fee Includes administration, recording, review& $ 50.00 Plus$0.50/Lineal Foot inspection Permit Extension Fee Includes administration, recording& review $ 55.00 Delay Penalty For up to three days of non-completion and non- $ 60.00 prior notice before specified date.After three days an additional charge of$10.00 per day will be levied. Degradation Fee Degradation Fee Formula: This formula covers degradation for depreciation caused by intrusion into the right-of- way. The depreciation applies to the original surface of the right-of-way and to the overlays and seal-coats applied to the surface.The formula includes life expectancy schedules for each and has an estimated cost per square yard based on the quality of the right-of-way surface required for different levels of traffic.This formula creates a degradation fee which is determined by the cost per square yard for street, overlay, and seal-coat, multiplied by the depreciation schedule, multiplied by the area of the street patch. Degradation Fee: (cost per square yard for street overlay and seal-coat x depreciation schedule rates)x area of street patch =degradation fee UTILITY FEES Water Utility Rates Residential Base Fee $ 25.00 /Quarter/REU* Consumption Fee 0-20,000 Gallons $ 2.19 /Thousand Gallons 20,001-40,000 Gallons $ 2.43 /Thousand Gallons 40,001 -80,000 Gallons $ 3.04 /Thousand Gallons 80,001- 120,000 Gallons $ 3.65 /Thousand Gallons Over 120,000 Gallons $ 4.26 /Thousand Gallons Non-Residential Base Fee $ 25.00 /Quarter/REU* Consumption Fee 0- 20,000 Gallons $ 2.19 /Thousand Gallons 20,001-40,000 Gallons $ 2.43 /Thousand Gallons Over 40,000 Gallons $ 2.75 /Thousand Gallons Non-Residential Irrigation** Consumption Fee 0-40,000 Gallons $ 3.04 /Thousand Gallons 40,001-80,000 Gallons $ 3.65 /Thousand Gallons Over 80,000 Gallons $ 4.27 /Thousand Gallons *REU =a residential equivalent connection: 1. Residential -a single housing unit 2. Non-Residential - per Met Council Service Availability Charge Procedures Manual **Non-Residential users with irrigation systems that do not have a separate irrigation meter will be charged at residential rates until such time that a separate irrigation meter is installed and inspected. Sewer Utility Rates Metered Sewer Base Fee $ 61.48 /Quarter/REU* Consumption Fee Over 10,000 Gallons(based on winter average) $ 1.18 /Thousand Gallons Flat Sewer $ 72.52 /Quarter/REU* *REU = a residential equivalent connection: 1. Residential-a single housing unit 2. Non-Residential- per Met Council Service Availability Charge Procedures Manual Storm Water Utility Rates Quarterly Base Rate Residential Fee $ 12.00 /Parcel Non-Residential Fee $ 175.00 /Acre of Impervious ($12.00 minimum) Late Penalty 10%of Unpaid Balance,Assessed per Billing Cycle Non-Payment Certification Fee $ 30.00 Meter Testing(Our Cost, Delivered to Minneapolis) $ 100.00 5/8" -3/4" Meter Test $ 150.00 1" Meter Test $ 250.00 1-1/2" -2" Meter Test Water Meter Rental $ 600.00 Deposit $ 25.00 /Month Additional Accessories $ 25.00 /Month Water Usage Fee $ 5.00 /Thousand Gallons Water Use Violation $ 25.00 1st Violation $ 50.00 2nd and Subsequent Violations City Trunk Utility Connection Fees -the Trunk Utility Connection Fee consists of two components: a Trunk Charge and an Availability Charge. Trunk Charge The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, whichever is first. Residential trunk charges are based on one unit per dwelling unit. Commercial/Industrial/Institutional (CII)trunk charges are based on a factor of 2.92 units per acre. Sanitary Sewer $ 1,801.00 /Unit Water $ 2,588.00 /Unit Availability Charge For residential properties,the availability charge shall be paid at the time of subdivision approval or at the time of hook-up,whichever is first. Commercial/Industrial/Institutional availability charges shall be paid at the time of building permit. Fees are based on the number of sanitary access charge (SAC) units assigned by Metropolitan Council Environmental Services(MCES). Residential uses shall be assigned one unit per dwelling unit unless otherwise noted by MCES. City Sewer(CSAC) $ 1,686.00 /SAC Unit City Water(CWAC) $ 1,628.00 /SAC Unit The Lateral Service Connection Fee shall be in addition to the City Trunk Utility Connection Fees. Lateral Service Connection Fees If the lot or tract of land, or portion thereof,to be served by a lateral connection has not been assessed for the cost of construction,then the applicant shall pay, upon hook-up, a lateral connection in accordance with Resolution No.02-149(Bisel Amendment) based on the following front foot charges: Sanitary Sewer $ 80.10 /Front Foot Watermain $ 75.10 /Front Foot Vacant Buildings: Owners of a commercial/industrial building(s) connected to City water and/or sewer utilities that are vacant due to business closures or other reasons may apply to have the number of billed REU's reduced to one (1) REU for purposes of calculating utility fees effective from the date the building(s) were vacated for as long as the building(s) remain unoccupied. When the building(s) again becomes occupied the owner must inform the City of such occupation, at which time the number of REU's will be determined and utility fees assessed according to the current fee structure. (Ordinance No. 06-13, passed 8-26-13) REU = a residential equivalent connection: 1. Residential—a single housing unit 2. Non-Residential REU = per Met Council Service Availability Charge Procedures Manual Surface Water Management Single/Two Family Multi Family Commercial/Industrial/ Lots Lots Institutional Property Fee Charge per Acre of Development $8,217.00 $11,051.00 $12,241.00 Fees are based on developable land in accordance with the policy provisions established in Resolution No. 92- 70. Credits may be earned for sub-watershed trunk improvements. CULVERT PRICES All culvert prices are based on market prices and include tax & delivery and 15% administration fee. LAND USE Fees Alternative Urban Area-wide Review (I-35E AUAR) $ 325.00 /Acre To be charged at the time of land use approval for projects within the I-35E Corridor AUAR area that require preliminary plats; conditional use permits; site and building plans; and planned unit developments. Once paid,the same land will not be charged again. Administrative Permit $ 73.00 (no fee for Transient Merchant if issued by City Clerk) Zoning Confirmation Letter $ 75.00 Escrow Deposits (Application Fee Required With Each Submittal) Application Fee $ 200.00 Comprehensive Plan Amendment $ 5,000.00 40 Acres or Less $ 7,500.00 Over 40 Acres Conditional Use Permit $ 1,000.00 Residential/Rural $ 7,500.00 Commercial/Industrial/ Institutional Environmental Review $ 12,500.00 Interim Use Permit $ 7,500.00 Ordinance Amendment Map Amendment (Rezone) $ 1,500.00 40 Acres or Less $ 5,000.00 Over 40 Acres Text Amendment $ 1,500.00 Planned Unit Development $ 5,000.00 General Concept Plan $ 12,500.00 Preliminary Plan $ 7,500.00 Final Plan Site Plan Review $ 7,500.00 Subdivision Concept Plan Review $ 1,500.00 Minor Subdivision $ 3,000.00 Preliminary Plat $ 5,000.00 Less than 5 Acres $ 7,500.00 5-40 Acres $ 12,500.00 Over 40 Acres Final Plat $ 1,500.00 Less than 5 Acres $ 5,000.00 5-40 Acres $ 7,500.00 Over 40 Acres Vacation (Street, Utility, Drainage) $ 1,500.00 Variance or appeal $ 750.00 An escrow account shall be established as indicated above to cover all expenses incurred by the City as part of the plan review. In the case of applications including multiple requests the highest escrow deposit amount will be the only one initially required. The applicant is responsible for all costs incurred by the City during plan review. If the escrow account drops below 10% of the original deposit amount the City will require the submittal of an additional escrow deposit sufficient to cover any anticipated expenses. Upon City determination that the project is complete or expired, the City will return the remaining escrow deposit to the applicant. DEVELOPMENT FEES GIS Mapping Fee $ 90.00 /Lot Park Dedication Commercial/Industrial/Assisted-Living/Skilled $ 2,600.00 /Acre Nursing Residential $ 3,500.00 /Unit Tree Preservation Mitigation Fee $ 500.00 /Tree Street Lighting Operation Fee (New Development) $ 120.00 /Light ($8/mo/light x 15 months) ECONOMIC DEVELOPMENT ASSISTANCE Tax Increment Financing or Tax Abatement $ 12,500.00 Escrow Deposit Tax Exempt Financing $ 2,500.00 Application Fee, plus 1% Administration Fee STAFF TIME Staff time for chargeable event/projects shall be charged as the employee's hourly rate of pay plus benefits plus calculated overhead costs (when applicable). Overtime will be charged at 1.5 times the calculated hourly rate. LATE FEE Late penalty fee: a late charge of 10% or$25.00, whichever is greater, will be charged for fees not paid when due. Section 2. Effective Date of Ordinance. This ordinance shall be in force and effect on January 1, 2025 and from and after its passage and publication according to the Lino Lakes City Charter. Adopted by the Lino Lakes City Council on this 12th day of November, 2024. Rob Rafferty, Mayor ATTEST: Roberta Colotti, CMC, City Clerk I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES D J aft- I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES Type Fee I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES Type Fee Fees shall be based on valuation according to Building permit (state surcharge required, see M.S. § 3266.153, unless specifically noted M.S. § 326B.148) otherwise or as determined by the city's Building Official 65% of building permit fee (Building Official may waive plan review fee for certain projects that Building permit plan review require diminutive plan review such as partial basement finishes, kitchen remodeling, and minor repairs/alterations. Building permit reinspection $63.25 per M.S. § 326B.153 Building permit investigation fee (starting work Equivalent to permit fee without an approved/issued permit) Renewable energy system (solar PV building permit: small rooftop streamlined, geothermal, $150 wind energy conversion) - residential Renewable energy system (solar, geothermal, See M.S. § 326B.153 wind energy conversion) - commercial Billboards/billboard alterations (includes footings) $250 per billboard plus surcharge Roofing or siding - single family residential $100 Partial (less than 25%) of principal structure; or detached accessory structures only $65 Roofing or siding - townhomes and rental properties up to five units $60 per unit Roofing or siding - commercial See M.S. § 326B.153 Window or door replacement (within existing $65 for one window or door openings) $100 for two or more windows and/or doors $750 plus engineering/inspection fees if located Telecommunications antenna - new system on city-owned property plus surcharge (see Public Works for further information) Telecommunications antenna - repairs/ alterations/swapping or adding antennas to $250 per permit plus surcharge existing system (city or private property) COMMERCIAL ELECTRICAL PERMIT $50 per trip or the fee below, whichever is greater; solar fees are the same as residential solar fees) Valuation $1 to $1,000 $50 per trip Valuation $1,001 to $2,000 $50 for the first $1,000 plus $3.25 for each additional $100 or fraction thereof, to and including $2,000 $82 for the first $2,000 plus $14.85 for each Valuation $2,001 to $25,000 additional $1,000 or fraction thereof, to and including $25,000 $423.55 for the first $25,000 plus $10.70 for Valuation $25,001 to $50,000 each additional $1,000 or fraction thereof, to and including $50,000 $691.05 for the first $50,000 plus $7.45 for each Valuation $50,001 to $100,000 additional $1,000 or fraction thereof, to and including $100,000 $1,063.55 for the first $100,000 plus $6 for each Valuation $100,001 to $500,000 additional $1,000 or fraction thereof, to and including $500,000 $3,463.55 for the first $500,000 plus $5.10 for Valuation $500,000 to $1,000,000 each additional $1,000 or fraction thereof, to and including $1,000,000 Valuation $1,000,001 and up $6,013.55 for the first $1,000,000 plus $4 for each additional $1,000 or fraction thereof Reinspection fee (in addition to all other fees) $50 Investigation fee (working without permit) Double fee RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMENTS, AND CONDOMINIUMS) HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available from the Building Inspections Division. Add $1 for state surcharge to total cost of each permit. The fee is the total of the listed fees or the total number of inspection trips x $50, whichever is greater. Residential panel replacement $110 Sub panel $50 New service or power supply (circuits) Add $16 for each additional 100 amps 0 to 300 amp $55 400 amp $71 New service or power supply (feeders) Add $6 for each additional 100 amps O to 100 amp $9 101-200 amp $15 Minimum permit fee is $50 plus $1 state surcharge. This is for one inspection only. Minimum fee for rough-in and final inspection is $100 plus $1 state surcharge. Maximum fee for single-family dwelling or townhouse not over 200 amps (no max if service is over 200 amps) is $200 plus $1 state surcharge. Maximum of 2 rough-ins and 1 final inspection. (Failed inspections are an additional $50 each) Apartment or condominium complex (does not cover service, unit feeders or house panels) $90 per unit Swimming pool and hot tub $100 plus circuits at $9/each (includes 2 inspections) Addition/remodel/basement finish $100 (includes up to 10 circuits and 2 inspections) Residential accessory structure The greater of $55 for panel plus $9 per circuit or $100 for 2 inspections Street and parking lot lights $5 per each standard Transformers and generators: Up to 10 kva $5 11 to 74 kva $45 75 kva to 299 kva $60 Over 299 kva $165 Retrofit lighting $0.85 per fixture Sign transformer or driver $9 per transformer Low voltage fire alarm, low voltage heating and air conditioning control wiring $0.85 per device Residing jobs $50 first unit, $35 for each additional unit Reinspection fee (in addition to all other fees) $50 Solar Fees: 0 kw to 5 kw $90 5.1 kw to 10 kw $150 10.1 kw to 20 kw $225 20.1 kw to 30 kw $300 30.1 kw to 40 kw $375 40.01 kw and larger $375 plus $25 for each additional 10 kw Electrical inspection fee: furnace, air conditioning, bath fan, fireplace or receptacle for $40 water heater vent Refunds must be requesting in writing. No refunds unless more than the minimum fee. Refunds are minus the city's 20% handling fee. Permit fee is doubled if the work starts before the permit is issued. Minimum fee permits expire in 6 months. Permits over the minimum fee and up to $250 expire in 1 year. Fire inspections (DHS) $50 Fire panel systems See M.S. § 326B.153 Fire permit (no surcharge), all permits unless $100 noted otherwise Fireworks display/fireworks sales $100 Fireworks sales only (businesses) $350 Fireworks sales with other retail (businesses) $100 Fire permit, temporary tent $50 Fire permit, tank installation (fuel, oil, gas, and $100 per tank the like) Fire permit, tank removal $50 per tank Fire permit, operational $50 per year Fire permit, chemical fire suppression $100 Fire sprinkler systems See M.S. § 326B.153 • Fire sprinkler plan check 65% of permit (for new construction or 20 heads or more only) Mechanical permit, residential (state surcharge Minimum $60 or 2% of valuation, whichever is required, see M.S. § 326B.148) larger Mechanical permit, commercial (state surcharge See M.S. § 326B.153 required, see M.S. § 326B.148) Plumbing inspection permit, residential and ° commercial (state surcharge required, see M.S. Minimum $60 or 1.25/° of valuation, whichever is larger § 326B.148) Plumbing permit plan review, commercial Plumbing system plans and specifications that are submitted to the City of Mounds View for review shall be accompanied by the appropriate plan examination fees shall be paid prior to plan approval. The City of Mounds View shall charge the following fees for plan reviews and audits of plumbing installations for public, commercial, and industrial buildings: 1. Systems with both water distribution and drain, waste, and vent systems and having: a. 25 or fewer drainage fixture units, $150 b. 26 to 50 drainage fixture units, $250 c. 51 to 150 drainage fixture units, $350 d. 151 to 249 drainage fixture units, $500 e. 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of $4,000; and f. Interceptors, separators, or catch basins, $70 per interceptor, separator, or catch basin design 2. Building sewer service only, $150 3. Building water service only, $150 4. Building water distribution system only, no drainage system, $5 per supply fixture unit or $150, whichever is greater 5. Storm drainage system, a minimum fee of $150 or: a. $50 per drain opening, up to a maximum of $500; and b. $70 per interceptor, separator, or catch basin design 6. Manufactured home park or campground, one to 25 sites, $300 7. Manufactured home park or campground, 26 to 50 sites, $350 8. Manufactured home park or campground, 51 to 125 sites, $400 9. Manufactured home park or campground, more than 125 sites, $500 10. Revision to previously reviewed or incomplete plans: a. Review of plans for which the city has issued two or more requests for additional information, per review, $100 or 10% of the original fee, whichever is greater b. Proposer-requested revision with no increase in project scope, $50 or 10% of original fee, whichever is greater c. Proposer-requested revision with an increase in project scope, $50 plus the difference between the original project fee and the revised project fee Type Fee Zoning Permits (No Surcharge), § 150.050(C)(2) Patio/deck 30 inches and under, or not attached $30 Driveways, sidewalks, parking lots, patios (no permit required for sealcoating or overlays without expansion). A right-of-way permit is required for any construction that disrupts city-owned streets, curbing, sidewalks, and the like; residential includes churches and schools. Residential R-1 or R-2 driveway $45 Residential R-3, R-4 and R-5 driveway or $75 parking lot Residential gravel (refer to Zoning Code for $25 limitations) Commercial/industrial driveway or parking lot $150 Commercial/industrial sidewalk or patio $75 Fence/kennel - 7 ft. or below (if higher, building $30 permit; see M.S. § 326B.153) Retaining wall - 4 ft. or below (if higher, building $30 permit; see M.S. § 326B.153) Shed (200 square feet or less) $30 Signs - billboards (building permit) See M.S. § 326B.153 Signs up to 100 square feet $75 Signs 100 square feet or over $95 Signs - re-facing or altering $40 Signs, banners - temporary $40 per 21-day period (limit 4 permits per year plus one additional permit for a banner) Swimming pools, residential (above ground) $30 Swimming pools (in-ground, building permit) See M.S. § 326B.153 (surcharge required) II. OTHER INSPECTION/PLANNING FEES Applicants are responsible for all costs incurred associated with the filing, review and processing of development applications. Such fees to be paid in escrow up front or upon receipt of statement from the City of Mounds View. Fees may include, but are not limited to, costs for consultants retained by the city, consultant planning services, attorney, and engineer fees.A deposit may also be required to cover costs of public notices, materials and staff time spent in the review, research or preparation of materials associated with each application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial fee and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant within 30 days after consideration of the application is completed. Payment of any park dedication fees shall be made by the applicant after final plat approval. Application fees are not refundable. II. OTHER INSPECTION/PLANNING FEES Type Fee II. OTHER INSPECTION/PLANNING FEES Type Fee Building inspections conducted outside normal $63.25/hour (two-hour minimum charge) business hours Change of address $150 Change of occupancy $75 Comprehensive plan amendment $500 Conditional use permit, R-1 or R-2 $400 Conditional use permit, all other districts $400 Conditional use permit amendment Same as CUP fee Contractor license (§ 150.053) $60 Contractor state license verification fee $5 per permit Development/site plan review $400 Escrow - manufactured homes $500 per permit Escrow - occupancy (seed, sod, landscaping; as-building grading survey; driveway installation; curb cut modifications; site clean-up; storm water management; drainage features; site $1,000 for each item erosion; right-of-way restoration; or any other items as determined by the Building Official) Escrow, planning (actual charges) $2,500 - $10,000 Housing inspection initial and one follow-up No charge (Chapter 119) (includes no shows) Housing inspection/no show, each additional $100 Interim use permit (IUP) $400 IUP amendment $400 Park dedication fees Residential: $3,500 per unit Non-residential: up to 10% of estimated market value (of land) 65% of permit fee for all commercial permits and Plan review (payment required before plans are for residential permits for new dwellings, reviewed) dwelling additions, garages, garage additions, decks, sheds over 200 square feet, and major remodeling. Plan review for changes, revisions, or additions $47/hour (one half-hour minimum charge) to plans Plan review, engineering (applicable to any project that changes the grade. To be $100 per permit determined by staff during application review). Plan review for outside consultants for plan Actual costs including administrative and checking and inspections or both overhead costs Plan review similar (all units are same or similar) Each unit after the first shall be 25% or original fee Planned Unit Development (PUD) (§ 160.300 et $1,000 seq.) PUD amendment $400 Refund, permits (within 100 days of application if All but $40 work is not commenced) Refund, plan review 100% (if review has not been done) Refund, state surcharge 100% Rezoning $500 Vacation, street or easement $250 Subdivision $750 Subdivision escrow $1,000 - $10,000 (at the discretion of the City Administrator) Subdivision (reapproval fee) $100 Text amendment, Zoning Code $400 Text amendment, other City Code $400 Variance, administrative R-1 or R-2 $100 (additional $300 if formal variance is required) Variance, formal R-1 or R-2 $400 Variance, all other districts $400 Wetland alteration permit, R-1 or R-2 $200 Wetland alteration permit, all other districts $350 Wetland buffer permit, R-1 or R-2 $30 Wetland buffer permit, all other districts $100 Zoning Code review $200 Zoning letter $100 per letter III. MISCELLANEOUS FEES III. MISCELLANEOUS FEES Type Fee III. MISCELLANEOUS FEES Type Fee Certified copy $5 plus copy charges if any Data request generating over 100 pages Staff time (plus copying charges, if any) Data requests with an estimated cost over $25 will require a $25 deposit. The remainder of payment will be requested at the time of pickup. Once the data request has been fulfilled and the actual total cost is under $25, the difference will be refunded at the time of pickup. Data pickup requests will expire in 30 days from completion of the request. If expired, a new request and deposit would need to be submitted. Filing fee for public office See Mounds View Charter Insufficient funds (NSF) check $30 Municipal/City Code, copy $200 Notary public (Mounds View residents only) Free of charge Photocopy/map, B/W 8'/2 x 11 Under 10 copies free, additional copies $0.25 per side Photocopy/map, B/W 11 x 17 Under 10 copies free, additional copies $0.50 per side Photocopy/map, color 8% x 11 Under 10 copies free, additional copies $1.00 per side Photocopy/map, color 11 x 17 Under 10 copies free, additional copies $2.50 per side City map, 24 x 36 B/W $5 City map, 24 x 36 color $10 Pending assessment search $10 Copy data to flash drive (customer provides new Free unopened flash drive) V. LICENSES (All licenses are subject to 20% late fee) V. LICENSES (All licenses are subject to 20% late fee) Type Fee V. LICENSES (All licenses are subject to 20% late fee) Type Fee Adult establishment $2,500 per year $500 per person identified on the application as an owner, operator or manager. (If it appears that the investigative costs will exceed $500, the Adult establishment, investigation fee City Administrator shall notify the applicant and give the applicant an estimate of costs. The applicant either shall make an additional deposit equal to the difference between $500 and the total estimate or may withdraw the application) Automobile sales (Chapter 112) $225 per year Amusement rides, carnivals, circuses (Chapter 111 ) $133 first day plus $21 for each additional day Bowling alleys (Chapter 111) $21 per alley per year Christmas tree sales $204 per season Cigarette and tobacco (Chapter 118) $330 per year Contractor license $60 per year Donation collection bin $100 per bin per year Garbage/recycling/rubbish hauler (Chapter 50) $120 plus $50 per vehicle per year Gasoline stations (Chapter 112) $75 plus $25 per pump per year Chickens/ducks, keeping of (Chapter 90) $100 first year Chicken/ducks, renewal $30 per year Honeybees, keeping of (Chapter 90) $50 (one time license) Kennel, dog (5 or more dogs/breeding/training $80 per year and/or boarding) Gambling, lawful (premises permit investigation $100 per permit fee) Gambling, lawful (§ 111 .128) 10% contribution of net profits per year Liquor (Chapter 110) Bottle club $330 per year Club $330 per year Investigation fee, renewal license $50 per year Investigation fee, single person $350 (new application) Investigation fee, partnership $385 (new application) Investigation fee, corporation $450 (new application) On-sale, brewer taproom $800 per year Off-sale, brewer malt liquor $200 per year $0.65 per square foot for that space used primarily as bar area and $0.53 per square foot On-sale, intoxicating for that space used primarily as dining area with a minimum fee of$3,000 and a maximum fee of $10,000 On-sale, intoxicating (movie theaters only) $3,000 base fee plus $100 per theater room allowing alcohol On-sale malt liquor/3.2 beer $800 per year Off-sale malt liquor/3.2 beer $200 per year On-sale microdistillery $800 per year Off-sale microdistillery $200 per year On-sale, Sunday sales $200 per year On-sale wine $800 per year Off-sale intoxicating $260 per year Set ups $330 per year State of MN AGED buyer's card $20 (new application only) Sunday growler sales $200 per year Temporary liquor $120 per event (includes background check) Rental Dwelling (Chapter 119) Administrative fee (multi-family dwelling) $30 (active license with no renters) Single-family dwelling $100 per year New single family rental $100 per year plus conversion fee Multi-family rental $100 plus $25 per unit per year Renewal late fee 10% of license fee (minimum $100) Reinstatement of a revoked rental license 5x rental fee (maximum $3,000) plus rental fee License fee discount, Certification Level C 20% fee reduction License fee discount, Certification Level B 33% fee reduction License fee discount, Certification Level A 50% fee reduction Transfer of license $100 per building Conversion fee (conversion from unlicensed $375 in addition to annual license fee. rental to licensed rental, if 3 or fewer units in one $100 if owner presents proof of participation in building). Buildings owned by nonprofits are an applicable education or hires a management exempt from conversion fee. company for at least a year Pawn shop (Chapter 115), non-refundable $500 application fee (includes investigation fee) Pawn shop, new manager investigation fee $150 Pawn shop, license $10,000 per year (pro-rated in 30-day increments after June 30) Pawn shop, billable transaction $1.50 per transaction Pawn shop, performance bond $10,000 Pawn shop, failure to provide daily report to city $100 per day $65 per day Peddler/transient merchants/solicitor (Chapter $225 per month 113) permits $600 per year $15 each person/year Registered person (under the main applicant) $10 each person/month $5 each person/day Peddler investigation fee, per person No charge (included in permit fee) Peddler ID card, per person No charge (included in permit fee) Recuperation/half way house (Chapter 114) less than 10 beds $33 per year Recuperation/halfway house, 10-49 beds $55 per year Recuperation/halfway house, 50-99 beds $82 per year Recuperation/halfway house, over 100 beds $110 per year Restaurant, Class A (occupancy load greater than 100) (Chapter 111), operating 16 hours per $320 per year day or less Restaurant, Class A (occupancy load greater than 100), operating more than 16 hours per day $560 per year Restaurant, Class B (occupancy load of 100 or less), operating 16 hours per day or less $204 per year Restaurant, Class B (occupancy load 100 or less), operating more than 16 hours per day $337 per year Therapeutic massage (Chapter 114), enterprise $255 per year (pro-rated in 30-day increments after June 30) Therapeutic massage, each therapist $102 per year (pro-rated in 30-day increments after June 30) Therapeutic massage investigation, individual $100 new application; $50 per year renewal Therapeutic massage investigation, partnership $350 per year or corporation Therapeutic massage, temporary $100 VII. PUBLIC WORKS RELATED FEES VII. PUBLIC WORKS RELATED FEES Type Fee VII. PUBLIC WORKS RELATED FEES Type Fee Call-Out Rate Schedule Based on Current Wages Normal business hours for call-out rates 7:00 am to 3:30 pm, Monday through Friday After hours call-out rate, specified time conducted outside normal business hours $100/hr. (minimum 2 hours) Holiday call-out rate, specified time conducted on holidays $150/hr. (minimum 2 hours) Right-Of-Way Management Fees (Chapter 54). Additional fees may be required for legal and engineering costs incurred by the city). All issued right-of-way permits will include a $200 administrative fee. Excavation, hole fees, boulevard areas $100 per hole Excavation, hole fees, pavement areas $200 per hole Excavation, underground utility work, open trenching - boulevard areas open $50 per 100 lineal feet (requires hole fee) Excavation, underground utility work, open trenching - pavement areas $70 per 100 lineal feet (requires hole fee) Excavation, trenchless installation $35 per 100 lineal feet (requires hole fee) Excavation, overhead installation $25 per 100 lineal feet Obstruction, new pavement $100 per obstruction Obstruction, replace existing obstruction (in- kind) $50 per obstruction Temporary obstruction, dumpster, portable restroom, and the like $25 per obstruction Temporary obstruction, equipment used for excavation No charge Miscellaneous ROW Management Fees and Costs (discount for work done pertaining to city project; additional fees may be required for legal and engineering costs incurred by the city) Street opening permit (requires deposit) $200 Street opening deposit To be determined by the Director of Public Works Registration fee (ROW users and registrants) $30 Permit extension $30 Delay penalty 10% of ROW permit Degradation fee Calculated at time of permit Restoration cost Calculated at time of permit Overhead utility line repair No charge Penalty for work done without a permit Double fee 50% Municipal Water System Fees (Chapter 51) Water Availability Charge (WAC), residential $500 per unit WAC charge, commercial/industrial $1,000 per acre of developable land ($1,000 minimum charge) Residential water usage base charge $28.60 per quarter Residential water - 0 to 12,000 gallons $2.85 per 1,000 gallons per quarter Residential water - 12,001 to 24,000 gallons $3.14 per 1,000 gallons per quarter Residential water - over 24,000 gallons $3.61 per 1,000 gallons per quarter Commercial water usage base charge $28.60 per quarter Commercial water - 0 to 125,000 gallons $2.85 per 1,000 gallons per quarter Commercial water - 125,001 to 700,000 gallons $3.14 per 1,000 gallons per quarter Commercial water - 700,001 to 1 ,100,000 gallons $3.61 per 1,000 gallons per quarter Commercial water - Over 1,100,000 gallons $4.51 per 1,000 gallons per quarter Water quality testing charge (state) $2.43 per connection per quarter Water service line repair insurance charge $13 per connection per quarter Failure to participate or grant access regarding Public Works ordinance programs $175 per connection per quarter (installation/repair/inspect/ replace) Utility bill late payment 10% of delinquent bill amount Utility bill assessment search $10 Water service connection/repair/disconnect $100 plus surcharge size less than 4 inches Water service connection/repair/disconnect $150 plus surcharge size over 4 inches Water service inspection or reinspection after After hours call-out rate per visit (minimum 2 hours hours) Manual water meter read After hours call-out rate per visit Hydrant meter deposit $2,500 Hydrant meter rental (one week minimum) $50 per week $150 per month Water shut-off/turn-on No charge during normal business hours, otherwise one hour at call-out rate per visit Water shut-off/turn-on (snowbirds) $50 per shut-off $50 per turn-on Water meter testing Call-out rate per visit (minimum 2 hours) Water testing One hour at call-out rate Water meter City cost plus 10% administrative fee Curb stop - valve cover City cost plus 10% administrative fee Municipal Sanitary Sewer System Fees (Chapter 52) I/I application fee - H2OPP program $150 per lateral line Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental Services Sewer usage rate $3.75 per 1,000 gallons water sold per quarter Sewer service charge, residential $47.06 per residential equivalent unit (REU) connection per quarter Sewer service charge, commercial/industrial/public buildings and $115.58 per REU connection per quarter churches Sewer connection/repair/disconnect $100 plus surcharge Sewer unit charge (new connection only) $150 per connection Sewer inspection or re-inspection after hours Call-out rate per visit (minimum 2 hours) Surface Water Management (SWM) Utility Fees (Chapter 53) SWM new construction, R-1 $212 per lot SWM new construction, R-2 $1,038 per acre SWM new construction, R-3, R-4, R-O $1,500 per acre SWM new construction, B-1, B-2, B-3, B-4 $1,500 per acre SWM new construction, I-1, PUD $2,096 per acre SWM utility rate charge, R-1 Single-Family and R-2 Single and Two-Family Residential $18.50 per unit per quarter SWM utility rate charge, R-3 Medium Density Residential $101.02 per acre per quarter SWM utility rate charge, R-4 High Density Residential, R-5 Mobile Homes and R-O $119.79 per acre per quarter Residential Office SWM utility rate charge, B-1 Neighborhood Business, B-2 Limited Business, B-3 Highway $156.91 per acre per quarter Business and B-4 Regional Business SWM utility rate charge, I-1 Industrial $127.14 per acre per quarter SWM utility rate charge, PUD Planned Unit Development $138.94 per acre per quarter SWM utility rate charge, CRP Conservancy, Recreation and Preservation $18.50 per acre per quarter SWM utility rate charge, school or church, public $56.38 per acre per quarter or private Illicit discharge fee To be determined by the Public Works Director on a case-by-case scenario. Storm Water Management (The permit fee schedule adopted 12/08/2021 by the Rice Creek Watershed District Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are exempt from the permit fees). Rule C (Storm Water Management): Residential, commercial, industrial, institutional $3,000 non-refundable fee due at time of development that proposes less than 5 acres of application. new and/or reconstructed impervious surface Once application review costs (district engineer and legal counsel) exceed $9,000*, any additional cost must be reimbursed by the applicant before the permit can be issued. $5,400 non-refundable fee due at time of Residential, commercial, industrial, institutional application. development that proposes 5 or more acres of Once application review costs (district engineer new and/or reconstructed impervious surface and legal counsel) exceed $9,000*, any additional cost must be reimbursed by the applicant before the permit can be issued. Notes: An application subject to a Rule C fee is exempt from the non-Rule C fee of $300. The following is exempt from the Rule C fee and subject to only the non-Rule C fee of $300: single- family residential subdivision that creates seven or fewer lots and establishes no new public roadway or a private roadway/driveway serving three or more lots Non-Rule C fee: A$300 non-refundable fee is due at the time of application for a project subject to one or more of the following Rules: Rule D (Erosion and Sediment Control Plans) Rule E (Floodplain Alteration) Rule F (Wetland Alteration) Rule G (Regional Conveyance Systems) Rule I (Public Drainage Systems) Rule J (Appropriation of Public Waters) Rule L (Variances): Variable. See district permit variance guidance policy * Review cost is calculated according to the consultant hourly rate, which the District will publish annually. The review cost incurred between the non-refundable fee amount and $9,000 will be absorbed by the District and will not be the responsibility of the applicant. District staff will notify the applicant of the incurred cost to date once the total review cost exceeds $7,500, and at subsequent $3,000 intervals. A delay in notice, however, will not affect the applicant's reimbursement responsibility Surface Water Management (SWM) Utility Fees (Chapter 53) (Cont'd) Storm water connection/repair/disconnect $100 plus surcharge Storm water inspection or re-inspection after Call-out rate per visit (minimum 2 hours) hours. Percolation tests during work hours only. Street Lighting Utility Fees (§ 152.018) Residential (single-family homes, duplexes, fourplexes, condominium and townhomes) $5.25 per unit per quarter Commercial/industrial $24.58 per acre per quarter Institutional/charitable $24.58 per acre per quarter Apartments $24.58 per acre per quarter Construction Site and Land Disturbance Fees (§ 156.006). Additional fees may be required for legal and engineering costs incurred by the city. 50 to 1,000 cubic yards $150 1,001 to 10,000 cubic yards $250 base fee plus $35 for each 1,000 cubic yards 10,001 to 100,000 cubic yards $500 base fee plus $100 for each 10,000 cubic yards 100,001 cubic yards or more $1,500 base fee plus $250 for each 100,000 cubic yards Other Miscellaneous Public Works Fees Load limit waiver (must be authorized by the Public Works Director) $175 per trip Call-out rate per visit (minimum 2 hours) plus Call-out charge for contractor negligence (lack of cost(s)* of any materials required to remedy the maintenance, traffic signs, and the like) issue. *TBD by the Director of Public Works/Parks and Recreation Water tower telecommunications maintenance No charge if during normal business hours, or repair access fee otherwise 2 hour minimum charge for each after hours call-out Water tower telecommunications plan review Actual legal and consulting engineering costs and inspections plus $200 for administration costs and $2,500 escrow. RPZ annual inspection violation See property based violations, Section IV, Police/Administrative Offenses Appeal of public improvement bond $250 (M.S. § 429.036) mDEPARTMENT OF HEALTH Safe Drinking Water Fee Also known as the public water supply fee When customers receive their water bill from their water supplier,they may notice that one of the items in the list of charges is"water testing fee"or"state test fee."This fee is called the safe drinking water fee.It is also known as the service connection fee. The fee helps ensure that all public water systems get the support needed to provide safe drinking water everywhere in Minnesota. The 2025 Minnesota State Legislature passed a bill raising the safe drinking water fee from$9.72 to$15.22 per water service connection,effective January 1,2026.This fee increase reduces the state's reliance on federal infrastructure funds,making more dollars available for local drinking water infrastructure projects. I low the fee protects drinking water statewide The fee funds Minnesota Department of Health's(MDH)regulatory and technical assistance services for public drinking water systems.Our staff across the state build relationships with drinking water operators that result in extensive knowledge,trust,and a willingness to take action to prevent a violation of the safe drinking water standards.This cost-effective assistance results in over 97%compliance with federal Safe Drinking Water Act(SDWA) standards year after year. Annually,$22 million is collected through the fee.About$3 million is spent on lab costs for drinking water tests. Much of the rest is used to support staff who conduct inspections,collect and analyze required water samples,and provide technical assistance,training,and support to enhance water systems'capacity to meet SDWA requirements. For past budgetary information,visit How the Safe Drinking Water Fee Supports Drinking Water Protection Efforts ,O_[LINK http://www.health.state.mn.us/communities/environment/water/does/fee p. f]: MDH services are especially helpful to small,rural water systems,which have more difficulty meeting water standards.Because of smaller customer bases,these systems have fewer resources for testing,investigations,and physical improvements. This work helps ensure that everyone,everywhere in Minnesota has access to safe and sufficient drinking water. Investing in technical support for drinking; water safety The safe drinking water fee increase will go into effect on January 1,2026.It accounts for several changes since the last fee increase in 2019: • Significant inflationary pressures. • Increased lab costs for drinking water testing. • Projected and potential deep reductions in federal funding. • Numerous SDWA changes that have occurred and are on the horizon. • Need for drinking water data system updates and improvements. While federal funding from the Infrastructure Investment and Jobs Act(IIJA)has enabled increased capacity and technical support to be provided to public water systems,this funding is set to expire.The fee increase provides stability to maintain the current level of support to water systems during a time of uncertain federal funding. Reducing MDH program dependence on IIJA for technical support will make more funding available for local drinking water infrastructure. The fee increase also supports existing staff that were hired to meet increased expectations and expansions of SDWA requirements for drinking water.These include regulation of per-and polyfluoroalkyl substances(PFAS), cybersecurity requirements,enhanced lead and copper regulations,increased consumer reporting,increased regulation of microbial and disinfection by products,and increased oversight of public water system operation and maintenance.The staff will continue to administer new federal rules,to conduct sampling and inspections at public water systems,and provide technical assistance,particularly to smaller systems that have fewer resources. 1/2 Date: August 1, 2025 To: Metropolitan Council Environmental Services (ES) Customer Communities Re: 2026 Municipal Wastewater Charge Attachment: Municipal Wastewater Charge Breakdown by Community On July 23, 2025, the Metropolitan Council adopted the 2026 ES wastewater rates and charges. This included the Municipal Wastewater Charge in the amount of$314,622,000. This is an increase of 5.8% from the 2025 charge of$297,360,000. ES continues to use an allocation method to calculate each municipality's charges. The method uses the 2024 calendar year flow to allocate the $314.6 million total municipal wastewater charges to customer communities. ES bills two years following flow data in accordance with a 2016 customer community taskforce recommendation. Your municipality's percentage of the overall system flow during that period is the percentage of the Municipal Wastewater Charge that will be charged to your community in 2026. We have included the calculation on the attached table and will bill your municipality in equal monthly amounts in 2026. There were no material changes to the estimated MWC allocations provided to you in May 2025. Additional information regarding the 2026 ES wastewater rates and charges is available here: Council Approved Rates and Charges: 2025-157: ES Wastewater Rates and Charges (metrocouncil.org) Please note that the ES Sewer Availability Charge (SAC) will be $2,485 in 2026, which is no change from the prior year. As always, ES welcomes your comments, questions, and suggestions on our services. Feel free to contact me, Deb McKinley, at (651) 602-1035 or e-mail me at deb.mckinley(c�metc.state.mn.us. Please contact Kyle Colvin with questions about your community's wastewater flows at (651) 602-1151 or kyle.colvin(a)metc.state.mn.us. Thank you! Sincerely, Deb McKinley Assistant General Manager,Strategic Performance Support Services 390 Robert Street North I Saint Paul, MN 551 01-1 805 211 P 651.602.1000 117Y.651.291.0904 I metrocouncil.org METROPOLITAN COUNCIL 2026 Community Flow Data and Municipal Wastewater Charge 2026 Metropolitan Wastewater Charge to be allocated: $ 314,622,000 Community Flow data: Flow data: MWC 2026 MWC 2026 Flow(mg) %of Total Annual Monthly Andover 525.29 0.5792% $ 1,822,355.21 $ 151,862.93 Anoka 621.38 0.6852% $ 2,155,714.14 $ 179,642.85 Apple Valley 1,187.02 1.3089% $ 4,118,053.04 $ 343,171.09 Arden Hills 304.57 0.3358% $ 1,056,625.34 $ 88,052.11 Bayport 172.61 0.1903% $ 598,824.90 $ 49,902.08 Birchwood 17.88 0.0197% $ 62,029.95 $ 5,169.16 Blaine 1,652.99 1.8227% $ 5,734,613.15 $ 477,884.43 Bloomington 2,748.13 3.0303% $ 9,533,912.74 $ 794,492.73 Brooklyn Center 946.68 1.0439% $ 3,284,256.75 $ 273,688.06 Brooklyn Park 2,278.42 2.5123% $ 7,904,377.69 $ 658,698.14 Burnsville 1,844.27 2.0336% $ 6,398,208.69 $ 533,184.06 Carver 138.70 0.1529% $ 481,183.09 $ 40,098.59 Centerville 97.92 0.1080% $ 339,707.63 $ 28,308.97 Champlin 519.37 0.5727% $ 1,801,817.33 $ 150,151.44 Chanhassen 985.42 1.0866% $ 3,418,654.97 $ 284,887.91 Chaska 1,258.38 1.3876% $ 4,365,617.75 $ 363,801.48 Circle Pines 91.26 0.1006% $ 316,602.52 $ 26,383.54 Columbia Heights 471.84 0.5203% $ 1,636,924.52 $ 136,410.38 Columbus 21.06 0.0232% $ 73,062.12 $ 6,088.51 Coon Rapids 1,378.42 1.5199% $ 4,782,064.90 $ 398,505.41 Corcoran 99.48 0.1097% $ 345,119.64 $ 28,759.97 Cottage Grove 885.17 0.9760% $ 3,070,864.02 $ 255,905.34 Crystal 617.17 0.6805% $ 2,141,108.65 $ 178,425.72 Dayton 204.87 0.2259% $ 710,742.47 $ 59,228.54 Deephaven 220.24 0.2429% $ 764,064.63 $ 63,672.05 Eagan 2,179.44 2.4032% $ 7,560,992.67 $ 630,082.72 East Bethel 23.90 0.0264% $ 82,914.75 $ 6,909.56 Eden Prairie 1,397.84 1.5414% $ 4,849,437.47 $ 404,119.79 Edina 1,973.04 2.1756% $ 6,844,942.27 $ 570,411.86 Elko New Market 105.22 0.1160% $ 365,033.06 $ 30,419.42 Empire 65.39 0.0721% $ 226,853.37 $ 18,904.45 Excelsior 65.21 0.0719% $ 226,228.91 $ 18,852.41 Falcon Heights 213.69 0.2356% $ 741,341.14 $ 61,778.43 Farmington 678.79 0.7485% $ 2,354,883.00 $ 196,240.25 Forest Lake City 562.56 0.6203% $ 1,951,653.65 $ 162,637.80 Fridley 1,888.73 2.0826% $ 6,552,450.95 $ 546,037.58 Gem Lake 13.80 0.0152% $ 47,875.46 $ 3,989.62 Golden Valley 826.49 0.9113% $ 2,867,289.23 $ 238,940.77 Greenfield 2.96 0.0033% $ 10,268.94 $ 855.74 Greenwood 21.74 0.0240% $ 75,421.20 $ 6,285.10 Hastings 515.74 0.5687% $ 1,789,224.00 $ 149,102.00 Hilltop 35.41 0.0390% $ 122,845.66 $ 10,237.14 Hopkins 583.46 0.6434% $ 2,024,160.69 $ 168,680.06 Page-2 I August 1,2025 I METROPOLITAN COUNCIL Community Flow data: Flow data: MWC 2026 MWC 2026 Flow(mg) A of Total Annual Monthly Hugo 314.86 0.3472% $ 1,092,323.79 $ 91,026.98 Independence 18.90 0.0208% $ 65,568.57 $ 5,464.05 Inver Grove Heights 712.81 0.7860% $ 2,472,906.43 $ 206,075.54 Lake Elmo 239.44 0.2640% $ 830,673.97 $ 69,222.83 Laketown Township 20.85 0.0230% $ 72,333.58 $ 6,027.80 Lakeville 1,754.72 1.9349% $ 6,087,538.57 $ 507,294.88 Landfall 18.91 0.0209% $ 65,603.26 $ 5,466.94 Lauderdale 52.20 0.0576% $ 181,094.14 $ 15,091.18 Lexington 49.90 0.0550% $ 173,114.90 $ 14,426.24 Lilydale 24.01 0.0265% $ 83,296.37 $ 6,941.36 Lino Lakes 400.29 0.4414% $ 1,388,700.66 $ 115,725.05 Little Canada 431.28 0.4756% $ 1,496,212.29 $ 124,684.36 Long Lake 125.28 0.1381% $ 434,625.94 $ 36,218.83 Loretto 23.52 0.0259% $ 81,596.44 $ 6,799.70 Mahtomedi 160.34 0.1768% $ 556,257.37 $ 46,354.78 Maple Grove 1,903.46 2.0989% $ 6,603,552.80 $ 550,296.07 Maple Plain 81.84 0.0902% $ 283,922.31 $ 23,660.19 Maplewood 1,516.37 1.6721% $ 5,260,646.06 $ 438,387.17 Medicine Lake 12.82 0.0141% $ 44,475.61 $ 3,706.30 Medina 159.84 0.1763% $ 554,522.75 $ 46,210.23 Mendota 7.00 0.0077% $ 24,284.66 $ 2,023.72 Mendota Heights 544.55 0.6005% $ 1,889,172.70 $ 157,431.06 Minneapolis 17,295.89 19.0716% $ 60,003,531.89 $ 5,000,294.32 Minnetonka 1,632.00 1.7996% $ 5,661,793.87 $ 471,816.16 Minnetonka Beach 17.95 0.0198% $ 62,272.79 $ 5,189.40 Minnetrista 145.95 0.1609% $ 506,335.06 $ 42,194.59 Mound 298.50 0.3291% $ 1,035,567.08 $ 86,297.26 Mounds View 364.60 0.4020% $ 1,264,883.61 $ 105,406.97 New Brighton 693.28 0.7645% $ 2,405,152.24 $ 200,429.35 New Hope 741.27 0.8174% $ 2,571,640.90 $ 214,303.41 Newport 116.13 0.1281% $ 402,882.43 $ 33,573.54 North Oaks 27.97 0.0308% $ 97,034.54 $ 8,086.21 North St Paul 372.09 0.4103% $ 1,290,868.19 $ 107,572.35 Oak Park Heights 168.91 0.1863% $ 585,988.73 $ 48,832.39 Oakdale 848.30 0.9354% $ 2,942,953.27 $ 245,246.11 Orono 221.81 0.2446% $ 769,511.34 $ 64,125.94 Osseo 72.91 0.0804% $ 252,942.03 $ 21,078.50 Plymouth 2,446.96 2.6982% $ 8,489,082.80 $ 707,423.57 Prior Lake 623.28 0.6873% $ 2,162,305.69 $ 180,192.14 Ramsey 403.16 0.4446% $ 1,398,657.36 $ 116,554.78 Richfield 758.02 0.8358% $ 2,629,750.61 $ 219,145.88 Robbinsdale 315.08 0.3474% $ 1,093,087.02 $ 91,090.58 Rogers 426.83 0.4707% $ 1,480,774.19 $ 123,397.85 Rosemount 569.00 0.6274% $ 1,973,995.54 $ 164,499.63 Roseville 1,076.17 1.1867% $ 3,733,488.18 $ 311,124.02 Savage 770.50 0.8496% $ 2,673,046.68 $ 222,753.89 Shakopee 929.94 1.0254% $ 3,226,181.74 $ 268,848.48 Page-3 I August 1,2025 I METROPOLITAN COUNCIL Community Flow data: Flow data: MWC 2026 MWC 2026 Flow(mg) % of Total Annual Monthly Shoreview 734.21 0.8096% $ 2,547,148.09 $ 212,262.34 Shorewood 345.96 0.3815% $ 1,200,217.04 $ 100,018.09 South St Paul 1,081.73 1.1928% $ 3,752,777.14 $ 312,731.43 Spring Lake Park 186.27 0.2054% $ 646,214.67 $ 53,851.22 Spring Park 82.76 0.0913% $ 287,114.01 $ 23,926.17 St Anthony 281.32 0.3102% $ 975,965.60 $ 81,330.47 St Bonifacius 95.30 0.1051% $ 330,618.23 $ 27,551.52 St Louis Park 1,640.66 1.8091% $ 5,691,837.46 $ 474,319.79 St Paul 10,151.95 11.1942% $ 35,219,514.90 $2,934,959.57 St Paul Park 120.27 0.1326% $ 417,245.07 $ 34,770.42 Stillwater 646.58 0.7130% $ 2,243,138.90 $ 186,928.24 Tonka Bay 73.81 0.0814% $ 256,064.34 $ 21,338.70 Vadnais Heights 413.71 0.4562% $ 1,435,257.81 $ 119,604.82 Victoria 319.94 0.3528% $ 1,109,947.51 $ 92,495.63 Waconia 393.51 0.4339% $ 1,365,179.23 $ 113,764.94 Wayzata 210.16 0.2317% $ 729,094.73 $ 60,757.89 West St Paul 795.15 0.8768% $ 2,758,563.36 $ 229,880.28 White Bear Lake 619.54 0.6831% $ 2,149,330.75 $ 179,110.90 White Bear Township 348.69 0.3845% $ 1,209,688.05 $ 100,807.34 Willernie 19.44 0.0214% $ 67,441.96 $ 5,620.16 Woodbury 1,776.52 1.9589% $ 6,163,167.92 $ 513,597.33 Totals 90,689.12 100.00% $314,622,000.00 $26,218,500.00 Charge per million gallons =$3,469 Page-4 I August 1,2025 I METROPOLITAN COUNCIL G park dedication fees, mn \ X Al Mode All News Images Maps Shopping Videos More - Tools - Al Overview Park dedication fees in Minnesota vary by city and are based on development type, such as residential, commercial, or industrial. These fees are typically calculated based on factors like a flat rate per unit (e.g., a residential unit), a percentage of the land's value, or a rate per acre. Cities use the collected fees to acquire or develop parks and recreational facilities, and the specific rates are set by each municipality and may be updated annually. How fees are calculated • By unit: For residential developments, a flat fee per unit is common (e.g., Maple Grove's residential fee is $4,177/unit, while Minneapolis charges $1,948.50/unit). • By acreage: Commercial and industrial developments are often charged per acre (e.g., Maple Grove charges $11,000/acre for commercial and $6,500/acre for industrial). • By land value: Some cities may require a fee based on a percentage of the land's fair market value (e.g., 10% of the land's value). How fees are used • Park development: Fees are used for park and recreation purposes, including acquiring land, developing facilities, and building trails. • Capital fund: The money is typically held in a separate capital fund and cannot be used for ongoing maintenance or operational costs. How to find specific fees • Check local ordinances: Since fees are determined by each city, you must check the specific ordinance or fee schedule for the municipality where your development is located. • Look for city websites: Look for "park dedication fees" or similar terms on your city's official website or in its planning and zoning department. • Contact the local planning department: The local planning or parks and recreation department can provide the most accurate and up-to-date fee information. Other considerations • Administrative fees: Some cities may charge an additional administrative fee, though this is often capped at a certain amount. • Appeals: Developers can appeal park dedication fees if they believe they are not proportionate to the need created by their development, as Minnesota Statutes section 462.361 allows for disputes. Park Dedication Fee Proportional to Development? Jun 26, 2024 — In addition,the Collis decision noted "a percentage requirement could be problematic because it does not consider the... .-,. National Recreation and Park Association , 2024 Park Dedication rates - Maple Grove, MN Feb 4, 2024 —*2024. Residential. $4,177/unit. $4,332/unit. $4,236/unit. $4,156/unit. * $4,092/unit. Commercial. $11,000/acre. $11,0... • City of Maple Grove (.gov) , 2023 Park Dedication Rates Residential Unit Fee ... - Maple Grove, MN • Feb 5, 2023 — On February 7, 2022 the City Council established the per acre fee of $6,500 per acre for industrial subdivisions and $1... f City of Maple Grove (.gov) Show all Dive deeper in Al Mode Al responses may include mistakes. For legal advice,consult a professional. Learn more U ;u City of Minneapolis (.gov) https://www.minneapolismn.gov>permits-overview>fees Parkland Dedication Fee • Jun 9, 2025 —The administrative fee will not exceed $1,000 per project. Refunds and appeals. Refund for parkland dedication fees are handled by Minneapolis ... s American Legal Publishing https://codelibrary.amlegal.com>latest>weststpaul_mn § 152.06 PARK DEDICATION FEE. The city shall use park dedication fees only for acquisition and development or improvement of parks, recreational facilities, playgrounds,trails, wetlands or ... League of Minnesota Cities https://www.lmc.org>jan-feb-2024>ftb-jan-2024 Court Finds City's Park Dedication lee Complied With ... The fee may be "based on the average fair market value of the unplatted land for which park fees have not already been paid."The subdivision statute also ... Cottage Grove, MN (.gov) 11411 https://www.cottagegrovemn.gov>View>2025-... 2025 Development Fees & Charges PDF Jan 7, 2025 — PARK DEDICATION FEES. Park dedication for residential and commercial subdivisions is a minimum of 10 percent of the net area/buildable area ... ® stpaul.gov https://www.stpaul.gov>DocumentCenter>View5 PARKLAND DEDICATION - StPaul.gu� F Oct 3, 2015 — Application forms and fees. . . . b. Fee schedule. Fees for the following zoning control applications shall be as follows: 1. Site plan ... 3 pages National Recreation and Park Association https://www.nrpa.org>parks-recreation-magazine>july Park Dedication Fee Proportional to Development? Jun 27, 2024 — Stat. § 462.358, subd. 2c(a). While the park dedication fee of$37,804 in this case was based upon a 5 percent dedication formula found ... People also ask How much is the Minneapolis park dedication fee? Are MN state parks still free? How much does a permit cost in MN? Feedback i City of Maple Grove (.gov) https://www.maplegrovemn.gov>ViewFile>Item 2024 Park Dedication rates - Resiut uaI 'unit fee and ... Feb 5, 2024 — Motion to continue the park dedication rate of$6,500/acre for an industrial subdivision and. $11,000/acre for a commercial subdivision filed ... City of Brooklyn Park https://www.brooklynpark.org>development-costs Development Costs - Brooklyn Park Residential park dedication, $4,600 per unit (single family and townhomes) ; Multi-family residential, 10% of average land value; Commercial park dedication ... Sherburne County https://www.co.sherburne.mn.us>View>Ordinan... Ordinance 033 - Park Dedication (PLI-5F- Sherburne County WHY IS A FEE OF $600 PER UNIT OR 10% OF THE LAND AREA A REASONABLE. AMOUNT? 1. This fee is comparable to park land dedication fees imposed by counties, cities,. City of Roseville, MN GIP https://www.cityofroseville.com>ViewFile> Item PARK DEDICATION: A. Authority: N PDF iesbta Statutes Mar 30, 2021 — Park Dedication Amount: The portion of land to be dedicated in all residentially zoned areas shall be 10%and 5% in all other areas. Park. 1 2 3 4 5 6 7 8 9 10 Next Results are not personalized 55113, Minnesota- From your IP address -Update location Help Send feedback Privacy Terms Reference Chapter FEE Private Fire Hose Connection Rates(§51.09, G) Water Test Fee $9.72 $15.22 Annually $2.54 Bi-monthly Water Usage Rates (§51.02) Private Fire Hose Connection Rates(§51.09 (G)) Private Fire Hose Connection Access Charge $1,850.00/REU* Private Fire Hose Connection Water System Management Fee $14.85/REU* *Where sanitary sewer service is not provided, and therefore no MCES SAC Unit determination has been made, the City shall make a determination of the number of REUs based on same or similar building usage based on the MCES SAC Procedure Manual for usages which do not rely on a fixture count as a basis for calculation. These fees are waived for fire connections made in conjunction with a building which is fully served by domestic sewer and water,and therefore,pays standard SAC/WAC charges. Water Charges will include two components. The first is a flat fee,generally covering the City's fixed costs for operation and maintenance of the supply, treatment, storage and distribution system (Water System Management Fee). The second fee is a variable rate to generally cover the cost of producing water(Variable Rate). For residential properties,the Water System Management Fee shall be charged to each home at the rates and intervals shown below, whether the home is connected to city water or not. For Commercial properties, a fee shall be charged at the rates and intervals shown below, multiplied by the number of Residential Equivalency Units (REUs) assigned to that property as determined through a SAC Unit evaluation from the Met Council. If the property does not have municipal sewer service or has not had a SAC Unit determination completed, the REUs shall be determined by the Public Works Director using the same methodology outlined in the Met Council's SAC Manual. The total Water System Management Fee for Institutional Properties shall be capped at a maximum of 5x the Water System Management Fee,regardless of how many REUs are assigned to the property. Residential Water System Management Fee/Bi-Monthly Billing Period $13.38 Variable—Rate Per Thousand Gallons/Qtr. (0- 15,000) $2.08 Variable—Rate Per Thousand Gallons/Qtr. (15,001- 30,000) $2.38 Variable—Rate Per Thousand Gallons/Qtr. (30,001-XXX) $2.71 Commercial/* Water System Management Fee/Bi-Monthly Billing Period $13.38 (1 Unit) $26.76 (2 Units) $40.14 (3 Units) $53.53 (4 Units) $66.90 (>4 Units) Page 11 of 23 Reference Chapter FEE Variable—Rate Per Thousand Gallons/Qtr. (0-500,000) $2.08 Variable—Rate Per Thousand Gallons/Qtr. (500,001-XXX) $2.71 *Multi Family buildings which do not have individual meters for each unit will be treated as commercial buildings (Capped at 5 REUs). Their tiered rate structure will be based on multiplying the residential tier thresholds by the number of units. Sewer/Wastewater fee(bi-monthly) Sewer Charges will include two components. The first is a flat fee covering the City's fixed and variable costs for sewer collection (Collection Rate). The second fee is to cover the variable charge for wastewater treatment (Treatment Fee). The Treatment charge will be the Treatment Fee rate multiplied times the water meter use for the billing period. To account for summer irrigation water not being treated, the charge for the July and through November billings shall not exceed the average use during the first billing period of that year and the final billing period of the prior year (winter average). If the home is unoccupied during a significant part of the winter period, the average shall be manually calculated using other reasonable means to determine the anticipated sewer treatment volume. Collection Rate Treatment Fee Residential charge $20.15/SAC Unit $ 3.6 8c/1,000 gal. Commercial/Institutional $29.95/SAC Unit $ 3.4586/1,000 gal. Sewer-only customers shall be charged a flat rate per SAC unit or may purchase a city water meter and install it on their well in order to be billed at the lower fixed and variable rates above. Otherwise sewer-only customers shall be billed at the following rates: Collection Rate Treatment Fee Residential rate per SAC $20.15/SAC $20.15/SAC Commercial/Institutional $29.95/SAC Unit $29.95/SAC Storm Water Management Fee(bi-monthly): (§51.11) Residential(Fixed) $10.26 Comm./Industrial/Multi-Family $.0028/sq. ft. impervious with minimum $10.26 Utilities/(Water/Sewer/Garbage Billing)Penalties& Late Fees Residential/Commercial Penalty/Late Payment 3%Bi-Monthly On Delinquent Balance Page 12 of 23 Reference Chapter FEE Utilities/(Water/Sewer/Garbage Certification) 5%of Outstanding Balance or$50.00 whichever is greater(§50.03) Utility billing is billed on a bi-monthly basis for the previous two months of service Use of Meter& Hydrant(§51.09, J) Meter Rental $50.00 per 1st day or one day use $5.00 each Additional day $1,000.00 Deposit $25.00 Conn. Fee $4.00/1,000 Gallons Page 13 of 23 RESIDENTIAL ELECTRICAL PERMIT FEES(SINGLE FAMILY HOMES,APARTMENTS, ASSISTED LIVING, and CONDOMINIUMS) Effective: 1/1/2026 HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections Division.Add$1.00 for State surcharge to total cost of each permit.The fee is the total of the listed fees or the total number of inspection trips x$50.00($60.00),whichever is greater. Residential panel replacement is $110.00($125.00), sub panel $50.00 ($75.00). New service or power supply is: Circuits and Feeders 0 to 300 Amp $55.00($75.00) 0-100 Amp $9.00($12.00) 400 Amp $71.00($100.00) 101-200Amp $15.00($20.00 Add$16.00 ($25.00)for each additional 100 Add$6.00 ($10.00)for each additional 100 amps amps Maximum Fee: (Dwelling Fees:) Minimum Fee: Fee for single family dwelling or Minimum permit fee is$50.00 ($60.00)plus townhouse not over 200 amps (and up to $1.00 State surcharge.This is for one 25 circuits)(Additional circuits are inspection only. $12.00/ea) Minimum fee for rough-in and final inspection is 200Amps) is $200.00 plus(is $225.00 $100.00 ($120.00)plus$1.00 State surcharge. plus) $1.00 State surcharge. Maximum of 2 rough-in's and 1 final Apartment Buildings inspection. (Failed inspections are an additional $50.00 each)($60.00/each) Fee per unit of an apartment or condominium complex is$90.00 ($110.00).This does not cover service, unit feeders or house panels, (and includes up to 15 circuits per unit) Swimming Pools and Hot Tubs Additions, $100.00 ($120.00)plus circuits at$9.00/each ($12.00/each).This includes 2 inspections. Remodels or Basement Finishes $100.00 ($120 00)this include up to 10 circuits and 2 inspections Residential Accessory Structures The Greater of$55.00($75.00)for panel plus$9.00($12.00)per circuit or$100($120.00)for 2 inspections. Street and Parking Lot Lights $5.00($10.00)per each standard Transformers and Generators $5 up to 10kva,$45($55)11 to 74kva,$60($70)75kva to 299kva, over 299kva is$165($175) Retrofit Lighting $0.85 cents($1.00) per fixture Low voltage fire alarm, low voltage $1.00 per device heating and air conditioning control wiring Residing jobs $50($60.00) Re-Inspection Fee in addition to all other fees $50.00($60.00) Solar fees: 0kw to 5kw=$90($100) 5.1kw to 10kw=$150($165) 10.1kw to 20kw=$225($245) 20.1kw to 30kw=$300($330) 30.1kw to 40kw=$375($410) 40.1kw and larger is$375($410)plus$25 for each additional 10kw Electronic inspection fee for these items only;furnace, air conditioning, bath fan,fireplace or receptacle for water heater vent is$40. Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities handling fee. THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. Minimum fee permits expire in 6 months. Dnrmilc n,,nr thn minim,ern foo nnrl i in#n QOC.n/Q 4 nnn\ ovnirn in 4 .ionr Commercial Electrical Permit: Effective: 1/1/26 $50 ($60) per trip or the fees below,whichever is greater—Solar fees are the same as residential solar fees Description Fee Calculation Permit Fee Valuation$1 to$1,000 $50.00 ($60.00) Per trip Valuation$1,001 to$2,000 $50.00 ($60.00)for the first$1,000 plus $3.25 for each additional $100 or fraction thereof, to and including $2,000 Valuation $2,001 to$25,000 $82.00 for the first$2,000 plus$14.85 for each additional$1,000 or fraction thereof,to and including$25,000 Valuation $25,001 to $50,000 $423.55 for the first$25,000 plus$10.70 for each additional $1,000 or fraction thereof,to and including$50,000 Valuation $50,001 to $100,000 $691.05 for the first$50,000 plus $7.45 for each additional $1,000 or fraction thereof,to and including$100,000 Valuation $100,001 to$500,000 $1,063.55 for the first$100,000 plus$6 for each additional $1,000 or fraction thereof,to and including$500,000 Valuation $500,001 to $1,000,000 $3,463.55 for the first$500,000 plus$5.10 for each additional $1,000 or fraction thereof,to and including$1,000,000 Valuation $1,000,001 and up $6,013.55 for the first$1,000,000 plus$4 for each additional$1,000 or fraction thereof Reinspection fee (in addition to all other fees) $50.00 ($60.00) Investigative fee (working without permit)the fee is doubled Refunds issued only for permits over: $100.00 ($120.00) State Surcharge is.0005 times the project value:$ Total Permit Fee Submitted:$ Minimum fee permits expire in 6 months.Permits over the minimum fee and up to$250.00($1.000)expire in 12 months from the filing date.A service charge of$35.00 will be added for all dishonored checks.