Building Permit Fees
Centerville Circle Pines Hugo Lino Lexington
Res.Building Permit Valuation+65%Plan Review Based on Valuation Valuation+65%Plan Review Valuation+65%Plan Review Valuation+65%Plan Review
Access:200'or under 65(Flat Fee-No SS) 73
Access:200'over Valuation+65%Plan Review Valuation+65%Plan Review
Fence 60(Flat Fee-No SS) 25(Flat Fee-No SS) 73 60
Encroachment Agree. 100 Cry Recording+25
Windows(Same Size/Same Opening) 110 79/unit-Max.158 145
Windows(Diff.Size/Diff.Opening) Valuation+65%Plan Review Valuation+65%Plan Review
Roofing 150 Based on Valuation 106 145
Siding 150 Based on Valuation 106 145
Above Ground Pool(Mech.&Plumb.Inc Valuation+65%Plan Review 106 145
In-Ground Pool Valuation+65%Plan Review 160 345
73(Except New Construct.-Includes
Mech. 20/Item-Max.140 Based on Valuation-Res./Comm. 37+1 Hr.Min.Inspection Fee A/C Furnance Combined. 20/unit-min.40 max 140
Plumb. 5/Item-Max.140 Based on Valuation-Res./Comm. 8/Fix+1 Hr.Min.Inspection Fee 11/Fix(73 min.)
Development Fees -Y ` C,
Eng.&Legal r:Vilild
J JJJ"`^ , 4%of Cost of Improv.-Escrow
LOCt. �L 125%of Cost of lmpro.-Escrow
City Eng.Tech.Insp. )'L)T?
V93/hr
10%Market Valu-•
53,000/Unit Res&2,175/cre
Park Ded.Res. nd. )1 3400/unit 3500/unit •
P&Z � '4OP
ff Re ral) AoOw/1 9De it 300 w/1500 deposit 200 w/1000 Escrow
CUP(Comm.&Ind.) 200 w/7500 Escrow
IUP 200 w/7500 Escrow
CUP/IUP-App. 500 w/1,000 Escrow
CUP/IUP-Amend.&IUP Renewal 250
Comp.Plan Amend, 54 200 w/5000 Escrow(40 Acres or Less)
200 w/7500 Escrow(+40 Acres)
PUD-App. 500 800+20/Lot w/5000 Esc. 200 w/5000 Escrow-Gen.Concept
AP 500
w/12500 Escrow-Preliminary Plan
1✓ 200 w/7500 Escrow-Final Plan
PUD-Amend. w/IA66Oeposit. 325 w/2500 Escrow
Site Review 200 w/7500 Escrow
Property Line Related
Encorach.Agree. f- 120
Property Line Adjust.App. \ 150
Rezone Related
e p an SAcres) w/ Dep0. 540 w/1000 Escrow
Rezoning App.(More than 1e¢
1080 w/1000 Escrow
Site Plan Related
Comm/Ind.Site Plan 350
Farm 32 1
Sketch Plan Review 110
Street&Roadway Related 1,r�'}�
Street&Easement Vacation '�j 110 w/1000 Escrow
Subdivision Related(Payable w/Prelim&Final PI
n 50 w/ Deposi • 300 w/1500 Deposit 200 w/7500 Escrow r
200 w/1500 Escrow '
Minor Sub.(Rural(3 lots or less) 750+30/Lot 220 w/1000 Escrow 200 w/3000 Escrow(lust Minor)
Minor Sub.(Urban(3 lots or less) 220 w/2000 Escrow
Subdivision(4 to 15 Lots) 540 w/5000 Escrow
Subdivision(16 to 30 Lots) 700 w/10000 Escrow
Subdivision(31 to 100 Lots) 25/Lot w/20000 Escrow
Subdivision(Over 100 Lots) 25/Lot w/30000 Escrow
500 w/Deposit(5000,0-5 200 w/5000 Escrow(Less Than 5 Acres),
Lots),(10,000,6-10 Lots)& 200 w/7500 Escrow(5-40 Acres)&200
Preliminary Plat (20000,11+Lots) 750w/1500 Deposit w/12500 Escrow(40+Acres)
200 w/1500 Escrow(Less than 5 Acres),
200 w/5000 Escrow(Less Than 5-40
Acres)&200 w/7500 Escrow(40;
Fi at L 1 4e8" Acres)
Variance Related
J'U`• `1`�
Variance to Zoning Ord. ,06 w/500 Deposit 300 w/1500 Deposit 200 200 w/750 Escrow-w/Appeat
Minor Deviations to Zoning Ord.
Building Permit Fees
Centerville Circle Pines Hugo Lino Lexington
Res.Building Permit Valuation+65%Plan Review Based on Valuation Valuation+65%Plan Review Valuation+65%Plan Review Valuation+65%Plan Review
Access:200'or under 65(Flat Fee-No SS) 73
Access:200'over Valuation+65%Plan Review Valuation+65%Plan Review
Fence 60(Flat Fee-No SS) 25(Flat Fee-No SS) 73 60
Encroachment Agree. 100 Cty Recording+25
Windows(Same Size/Same Opening) 110 79/unit-Max.158 145
Windows(Diff.Size/Diff.Opening) Valuation+65%Plan Review Valuation+65%Plan Review
Roofing 150 Based on Valuation 106 145
Siding 150 Based on Valuation 106 145
Above Ground Pool(Mech.8 Plumb.Inc Valuation+65%Plan Review 106 145
In-Ground Pool Valuation+65%Plan Review 160 345
73(Except New Construct.-Includes
Mech. 20/Item-Max.140 Based on Valuation-Res./Comm. 37+1 Hr.Min.Inspection Fee A/C Furnance Combined. 20/unit-min.40 max 140
Plumb. 5/Item-Max.140 Based on Valuation-Res./Comm. 8/Fix+1 Hr.Min.Inspection Fee 11/Fix(73 min.)
Development Fees
Eng.8 Legal 4%of Cost of Improv.-Escrow
LOC 125%of Cost of Impro.-Escrow
City Eng.Tech.Insp. 93/hr
10%Market Value or
53,000/Unit Res.8 2,175/Acre
Park Ded.Res. Ind. 3400/unit 3500/unit
P&Z
CUP(Res.B Rural) 250 w/1000 Deposit 300 w/1500 deposit 200 w/1000 Escrow
CUP(Comm.&Ind.) 200 w/7500 Escrow
IUP 200 w/7500 Escrow
CUP/IUP-App. 500 w/1,000 Escrow
CUP/IUP-Amend.81UP Renewal 250
Comp.Plan Amend. 540 200 w/5000 Escrow(40 Acres or Less)
200 w/7500 Escrow(+40 Acres)
PUD-App. 500 800+20/Lot w/5000 Esc. 200 w/5000 Escrow-Gen.Concept
200 w/12500 Escrow-Preliminary Plan
200 w/7500 Escrow-Final Plan
PUD-Amend. 250 w/1000 Deposit 325 w/2500 Escrow
Site Review 200 w/7500 Escrow
Property Line Related
Encorach.Agree. 120
Property Line Adjust.App. 150
Rezone Related
Rezoning App.(Less than S Acres) 250 w/1000 Deposit 540w/1000 Escrow
Rezoning App.(More than 5 Acres) 1080 w/1000 Escrow
Site Plan Related
Comm/Ind.Site Plan 350
Farm 32
Sketch Plan Review 110
Street&Roadway Related
Street 8 Easement Vacation 110 w/1000 Escrow
Subdivision Related(Payable w/Prelim 8 Final Plat App.)
Site Plan Review 250 w/5000 Deposit 300 w/1500 Deposit 200 w/7500 Escrow
Concept Plan Review 200 w/1500 Escrow
Minor Sub.(Rural(3 lots or less) 750+30/Lot 220 w/1000 Escrow 200 w/3000 Escrow(lust Minor)
Minor Sub.(Urban(3 lots or less) 220 w/2000 Escrow
Subdivision(4 to 15 Lots) 540 w/5000 Escrow
Subdivision(16 to 30 Lots) 700 w/10000 Escrow
Subdivision(31 to 100 Lots) 25/Lot w/20000 Escrow
Subdivision(Over 100 Lots) 25/Lot w/30000 Escrow
500 w/Deposit(5000,0-5 200 w/5000 Escrow(Less Than 5 Acres),
Lots),(10,000,6-10 Lots)8 200 w/7500 Escrow(5-40 Acres)8 200
Preliminary Plat (20000,11+Lots) 750 w/1500 Deposit w/12500 Escrow(40+Acres)
200 w/1500 Escrow(Less than 5 Acres),
200 w/5000 Escrow(Less Than 5-40
Acres)8 200 w/7500 Escrow(40+
Final Plat 100 Acres)
•
Variance Related
Variance to Zoning Ord. 250 w/500 Deposit 300 w/1500 Deposit 200 200 w/750 Escrow-w/Appeat
Minor Deviations to Zoning Ord.
City of Lexington Permit Fee Schedule
Residential Permits
Building Permits
Residential Permit Fee Valuation based on Lexington Permit Fee Schedule
Plan Review Fee 65%of Permit Fee
State Surcharge The greater of.0005 x valuation or$.50
Interior Remodeling/Basement Finish
Permit Fee Valuation based on Lexington Permit Fee Schedule
Plan Review Fee 65%of Permit Fee
Surcharge The greater of.0005 x valuation or $.50
Building Permits-Maintenance
Roofing $145.00+$1.00 state surcharge =$146.00
Siding $145.00+$1.00 state surcharge =$146.00
Window Replacement-opening size changes Value based +Plan review fee+state surcharge
Window Replacement-same size opening $145.00+$1.00 state surcharge =$146.00
Above ground pools (both mechanical&plumbing Included) $145.00 +$1.00 state surcharge=$146.00
In-Ground Pool $345.00 +$1.00 state surcharge=$346.00
Water Heater $40.00+$1.00 state surcharge=$41.00
Demolition (excludes manufactured homes) The greater of$250.00 or 1.5% of valuation+state surcharge
Manufactred Home Placement or On Site Demo $100.00 ea
Fences $60.00
Plumbing Permit
Residential Alteration See Lexington Permit Fee Schedule
Residential New See Lexington Permit Fee Schedule
Sprinkler/Irrigation Systems $100.00+ $1.00 state surcharge=$101.00
Mechanical Permit
Residential Alteration $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge
Residential Fireplace $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge
Residential New $20.00 a unit-min$40.00 max$140.00 +$1.00 state surcharge
Commercial Permits
Building Permits
Building Permit Fee Valuation based on Lexington Permit Fee
Plan Review Fee 65%of Permit Fee
Surcharge The greater of.0005 x valuation or$.50
Plumbing Permits
Permit Fee The greater of 2%of Project Valuation or$40.00
Plan Review Fee 65%of the Permit Fee
Surcharge The greater of.0005 x valuation or$.50
Mechanical Permits
Permit Fee The greater of 2%of Project Valuation or$40.00
Plan Review Fee 65%of the Permit Fee
Surcharge The greater of.0005 x valuation or$.50
Demolition Permits
Building Permit Fee Greater of$250.00 or 1.5%of valuation
Plan Review Fee N/A
Surcharge The greater of.0005 x valuation or$.50
Sign Permits-Commercial Only
Temporary $50.00
Permanent Greater of $50.00 or 1.5%of cost
Fence/Walls Over 6 Feet-Commercial
Permit Fee $60.00
Inspections Outside Normal Business Hours
$60.00 per hour/1 hour minimum
Inspections for which no fee is specifically indicated
$60.00 per inspection
Investigation Fee
Work which was started without a permit shall be subject to an investigation fee
equal to the permit fee less the surcharge
Teresa Bender
From: Kate Manson
Sent: Tuesday,July 22, 2025 4:22 PM
To: Teresa Bender
Subject: RE: Fee Schedule
We're still using 2023's fees
Kate Manson
Finance Director, City of Circle Pines and Centennial Utilities
763-231-2612
http://www.centennialutilities.com/ I http://www.ci.circle-pines.mn.us/
From:Teresa Bender<TBender@centervillemn.com>
Sent:Tuesday,July 22, 2025 3:14 PM
To: Kate Manson<KManson@ci.circle-pines.mn.us>
Subject: RE: Fee Schedule
Dear Kate:
Do you have 2025 fees?
Thank you,
Teresa
From: Kate Manson<KManson@ci.circle-pines.mn.us>
Sent:Tuesday,July 22, 2025 3:02 PM
To:Teresa Bender<TBender@centervillemn.com>
Subject: Fee Schedule
Got your message; see attached.
Kate Manson
Finance Director, City of Circle Pines and Centennial Utilities
763-231-2612
http://www.centennialutilities.com/ I http://www.ci.circle-pines.mn.us/
1
2023 CITY OF CIRCLE PINES FEES
Other Permits
Parade Permit $ 25.00
Open Burning $ 50.00
Right-of-way permit fees Listed on pages 16/17, Chapt. 17 City
Code
Trailers/containers parked on city ROWs $50/unit + .05/linear foot
Road Permit $ 75.00
Temporary Sales Event Permit $ 25.00
Fireworks Fees
Exclusive Seller $ 350.00
In Existing Retail $ 100.00
Mini Truck Permit $ 50.00
Park Shelter Permit
Non Resident Fees
Golden Lake Park #1 Monday-Thursday (non resident) $ 65.00
Golden Lake Park #1 Friday-Sunday (non resident) $ 95.00
Golden Lake Park #2 Monday-Thursday (non resident) $ 120.00
Golden Lake Park #2 Friday-Sunday (non resident) $ 175`00
Resident Fees
Golden Lake Park #1 Monday-Thursday (resident) $ 35.00
Golden Lake Park #1 Friday-Sunday (resident) $ 50.00
Golden Lake Park #2 Monday-Thursday (resident) $ 65.00
Golden Lake Park #2 Friday-Sunday (resident) $ 90.00
Heritage Commons Park & Pier Monday-Thursday $ 20.00
Heritage Commons Park & Pier Friday-Sunday $ 30.00
RENTAL DEPOSIT Golden Lake #1 $ 50.00
RENTAL DEPOSIT Golden Lake #2 $ 100.00
Fee to change pavilion rental reservation date $ 25.00
Licenses Arborist (Sectio- 40) $ 50.00_
Adult-Oriented Business (Section 355) $600 + $1,500 investigation fee
Amusement Devices (Section 310) $15 per site + $15 per machine
Animal Hospitals, Pet Shops, Animal Grooming, Private
Kennels (Section 330) $ 20.00
Billiard Halls & Pool Halls (Section 315) $25 per table
Bowling Alleys (Section 315) $15 per lane
Beekeeping Annual License $ 75.00
Chicken 2-year License $ 75.00
Contractors $ 50.00
Commercial Lawn Fertilizer Contractor $ 100.00
Skating Rinks (Section 315) $30 per location
2023 CITY OF CIRCLE PINES FEES
Potentially Dangerous Dog Registration $ 35.00
Dangerous Dog Registration-includes tags/signs $ 60.00
Exhibits and Carnivals (Section 335) $ 250.00
Filling Stations (Section 340) $ 100.00
Rental Housing License/Registration (Chapter 16) $100 for 1st unit & $20 each addl
Late Fee for not Completing Rental Housing Application
and Inspection within 30 days and Additional Fee if not $50 Late Fee 30 days
within 60 Days Additional $50 Late Fee if 60 Days
Therapeutic Massage/Sauna Initial Business License $ 150.00
Therapeutic Massage/Sauna Initial Personal License $ 100.00
Therapeutic Massage/Sauna Business License Renewal $ 100.00
Therapeutic Massage/Sauna Personal License Renewal $ 50.00
Therapeutic Massage/Sauna Business License Background $ 100.00
Investigation
Therapeutic Massage/Sauna Personal License Background $ 50.00
Investigation
Garbage and Refuse $ 150.00
Non-intoxicating Malt Liquors (Section 400) $200 on-sale $50 off-sale
Wine Only $300 on-sale
On-sale- New req. addl $1,000 background investigation fee $ 5,000.00
Off-sale - New req. addl $1,000 background investigation fee $ 250.00
Sunday Liquor $ 200.00
Setup $ 25.00
Liquor License Late Fee After November 1 $ 50.00
Peddlers, Solicitors, Transient Merchants (Section 305) $ 300.00
Transient Merchants Qualified in 305.07 $ 62.50
$150 Class A;
Private Clubs (Section 410) $350 Class B;
$350 Class C
Vending Machines (Food) (Section 300) $50.00 per machine
Tobacco Products (Section 345) $ 200.00
Landscaping Management Plan (Section 710) $ 50.00
Lawn Fertilizer Applicator $ 100.00
Pawnbroker License (Section 306) $10,000 Investigation fee $15,000
License Fee
Tree Treatment Fees
Permit Review Fee for Private Treatment of a Public Tree $ 25.00
Injection Treatments $150 per injection
2023 CITY OF CIRCLE PINES FEES
Miscellaneous Fees
Contractor State License Verification Fee $ 5.00
Domestic Partner Registration/Termination $ 45.00
Notary Fee $ 2.00
Search $ 20.00
Blueprint copy $ 20.00
FAX Charge $ 1.00/page (long distance) .50/page
local _
Computer Reports $50.00 + .25/page
City Council Filing Fee $ 2.00
Utility Billing
-Commercial List $ 50.00
-Lino Listing $ 50.00
-Circle Pines List $ _ 50.00
-Complete List $ 75.00
Copies
-8% x 11 $ .25/page
-81/2 x 14 $ .30/page
-11 x 17 $ .50/page
DVD Copies $ 25.00
Map Copies per page
-11 x 17 $ 5.00
-Zoning $ 5.00
Meeting Room Use
-Group 1 No Fee
-Group 2 $ 25.00
$50.00/hr. with 2-hour min. Plus deposit of
$100, which is refundable if no excess cleanup
-Group 3 or damages
Building Permits
Inside Plumbing — Water Softeners & Backflow
Preventers - Residential Based on Valuation
Inside Plumbing - Commercial Based on Valuation
Irrigation Permit - Residential $25.00 (Requires Plumbing Permit Also)
Irrigation Permit - Commercial Based on Valuation
Mechanical Permit/Gas Appliance - Residential Based on Valuation
Mechanical Permit/Gas Appliance - Commercial Based on Valuation
Hot Tub - outside (zoning check & plan review) Based on Valuation
Hot Tub - inside (no plans necessary) Based on Valuation
Building Permits Based on Valuation
Demolition Permit Based on Valuation
Excavation and Grading Permits Based on Valuation
Reside or Reroof: Based on Valuation
2023 CITY OF CIRCLE PINES FEES
Fuel Tank Removal $125 + $1.00 surcharge
Fence Permits $25.00 no surcharge
Driveway Construction Permits $25.00 no surcharge
Water Permit
Connection/Water System: New residential $100.00 +$1.00 surcharge +WAC
Connection/Water System: Residential repair $100.00 +$1.00 surcharge
Connection to Water System: New Commercial $100.00 +$1.00 surcharge + WAC
Connection to Water System: Commercial repair $100.00 +$1.00 surcharge
Sewer Permit
Connection to Sewer System: New residential $100.00 + $1.00 surcharge + SAC
Connection to Sewer System: Residential repair $100.00 + $1 .00 surcharge
Connection to Sewer System: New commercial $100.00 + $1.00 surcharge+SAC per unit
Connection to Sewer System: Commercial repair $100.00 +$1.00 surcharge
Septic Pumping - required every 3 years $25.00 no surcharge
Water Meter Fees
5/8" Cost plus $10
1" Cost plus $10
1 1/2" Cost plus $10
2" (Compound) Cost plus $10
WAC & SAC
WAC $ 1 ,800.00
WAC-Filtration $ 1 ,450.00
SAC MCES $ 2,485.00
SAC-Local $ 1 ,500.00
Zoning and Other Permits Cost
Street Opening Fee Chapter 17 City Code
Telecommunications Permit Same as Chapter 17 of City Code
City of Circle Pines Zoning Fees
Sign Permit (temporary) $40, if after the fact $80
Sign Permit (permanent) $40 per sign + $.50 per sq. ft.
$300+$1500 deposit(any additional amount accrued in attorneys
Conditional Use Permit- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will
Ord. be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
Subdivision - Fee Established by Ordinance $750+ $30 per lot
$300+ $1500 deposit(any additional amount accrued in attorneys
Variance - Fee Established by Ordinance fees, engineering fees, county fees above the$1500 in escrow will
be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$300+ $1500 deposit(any additional amount accrued in attorneys
Site Plan Review - Fee Established by fees, engineering fees, county fees above the$1500 in escrow will
Ordinance be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$750+$1500 deposit(any additional amount accrued in attorney's
Community Unit Plan - Fee Established by fees, engineering fees, county fees above the$1500 in escrow will
Ordinance be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$300+$1500 deposit(any additional amount accrued in attorney's
Vacation of Right-of-Way- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will
Ord. be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$300+$1500 deposit(any additional amount accrued in attorney's
Vacation of Easement- Fee Established by fees, engineering fees,county fees above the$1500 in escrow will
Ord. be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$750+ $1500 deposit(any additional amount accrued in attorney's
Preliminary and Final Plat- Fee Established fees, engineering fees, county fees above the$1500 in escrow will
by Ord. be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$750+ $1500 deposit(any additional amount accrued in attorney's
Comprehensive Plan Amendment- Fee fees,engineering fees, county fees above the$1500 in escrow will
Established by Ordinance be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$500+$5000 deposit(any additional amount accrued in attorney's
Tax Increment District Establishment- Fee fees, engineering fees, county fees above the$5000 in escrow will
Established by Ordinance be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
$300+ $1500 deposit(any additional amount accrued in attorney's
Rezoning or Zoning District Change - Fee fees, engineering fees, county fees above the$1500 in escrow will
Established by Ordinance be charged to the applicant.The total amount not used in attorney,
engineer and county fees will be refunded to the applicant)
888888888888888
. . . . . . . . . . . . .
§g§§§§§g000g§§
N'g s.1.
E
i it It e o gg ss f
3 0 H I a o 3 N e o I
S 1. K¢ ¢ > SS 8811888818888 > 3,5
Q
3 3 3 3 3 3 3 3 3 3 i 3 a
m
¢K C K K rc K K K K K K¢
E
e°o_a°o`m_o e e`o_ _ o o e g p
"iF u,__Bull 8
arn$'rni8'S'$'°rn$'8'$ a
mrco:rco:rcrc�ssarcrc q wwwwwwwwwwwwww
e
8 88 8 888888888s888 a.
§1 § 888§§§§§8Z868 3
`m
€ $a
C s` �08 og ° a m
= E� Q .� oqQ o� m 88
0 0 25v ^oS=E. i NN
N S > 'mg >wU Q 33
Al
y _
2` =m
�j
2
OUD I 11
=z! 2 $ 88
LLO�F q wr. w gwwwwwgww wwq ,—�c 3m qq rn
p 8 8.8 8 8 8 8 2 y 8 t a
on g §g § 8 IIII, m m § §
=W O: 1�LL LL LL 1LL lLL LL li ILL °
W LL ;W C c c c c c
H S C OO o O O.� 0 0 0._.� O 71,1
cc C
Rio
N G y N y N m 'Si
y m - 8 O 8 8 8 8 8
W S N5 °im m W a�i rn °�ri ri r N> 0.0
? il�L vm2� a t$
a xrcrcrco:rcrc.wwrcrcrc E m mam mad v dm
a
$ q wq q q eccEcE2cccacc `88 w J. 01,OmGGSd. S '
8888888.88 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 N N r A 8 22 8 8 8 8 8
§8§§?§ s� 8 8 88 8 8 §8 8A8 5§ s §?P 882�s NN <-2 8 >"a"
gN _YO - O s O n in
WL :S 8 2 O
5 5
wggwqwqqq N NN q N N wwwwwgwgqwqww q www ggqqww wwwww wwwwwggqqwqwwww
Q
g
- A a d 8 r i 16
.a ° me 15T. `Am' Ti a p'—° 8 0. 2
$' c N> m - !E Zy°- Ec mw0 2> = mm M - g
2 m
g V _ m =ui O `m�m— m i n n 1 O e m o d p W.�q Vl W
N u o 5E ° u8 52 ;Mori 2cWW o gg L (%1 m.8. a W Ec mo
mWiw'! -m t- p' m m m mTmaw w L ge LLin�'E0 OF �3 W _ " 5 S"'t > Qg $ .
m �� ;0 �� w� J Q O 25
V5,1 OOn•.,N., 8 °c�,L�2' agm W' 31 �'`=o N_mi.=.m 3 I i? €€�€gIL Waciaula 2 § 8 § CC 8 § m
ns. m `s 15111a z 5 s- m `d 5 '38 m� a1°v-=== m� o. ,6 $ g
m JNNN °� to O-A O 3-`° m22U2K 2H F2 W.m.....V _N m cm a ITl>j N R N w w
Wi to33 0 = omamE� 3 a c�L u °°"aa"'am--a--an°,.a°,W m �� m� 23.21D21 �mmww z 8» '" 8
=oggoam Bmao ava m goa" a .ZW i2<<2<2222� z tcw�2-- t EE R a 8 3 8 8 8 8
EP °1 m cl m �gc m mi° m odd zm`m`mm`m°`m<< g z ov Din—°m = Mu! J wN 8 w 8
mao`mM�=5m3� < w�m�W m`aa oiS 0 a`a e �u��uuciucicici9 � � a`a pa'�aul �'S33 Mu! m ,,, Cl N $
8
88.!I 8 888 e 8
0 o c m g3 PH'- {{o 0 o c o
mtt1;g &tt m m o
888
w w y_ w.... _g w 0,N _ 13
ma
�2 omm 3a , mE c -
m me gm _ O c
a°ii m
E& E 'E'E'E .- tE E E a O .E
g8g8 88&&& 88 gg 8
888 8888 88 `` E 8
8 8 uy
w»'o E
.a+$ wn»ww as Ra `oo N U N
€
s
1
h
w, g` i m
U v v
z ado 88gg
a QN8 QQ$$Q
>LLD W eO ES gg
c -- 3
t0g Z° w�r 8 8-� $8� a�°.�i ' 88888
$8$Q8 Q8$8� 8 $8�Q8 88 s8 48 58�8s8$8�8$8� m �! a
EE
x p N 0 ;g.„ 8 8 8 m €€ I,
fa,N �N �` w w C & g g p 8 g g'o
rn
„1 MP 8 8888'€8.8888:6 o 88 8 888 8888 81 888 8 68 88 888 888 80888888 88 888808 88888
it o---5N `" M VmgN°NN^^'No m r8^o' FAH 8i B.RN 8, EO 0 8n R RP E 23E5RE 8 88 `° N
w .m -00 Isf m - a c tN ww
LLiE -�
m88
808 O a N
D Spo $ ,L1 ? $ a
~Y `.W H W N W V, .... W .... w H W N 4n di N N,V,H . di V,vi N .A Yi N, .n.9.n Vi u,M ....... .. .... N .....
$$ 0
1 p c
O!
58��Q8558��5g��Q8 B LL a o�g g�, titIL
2 m2525EEE h
„a I
s ` I
y cwasw m e o IL a? i W K Qa Q Z. m c •S W CON '- Y o o.I o�' -3Q w E g E r c 3 8
rca q mma =o 30 0 _ ewa g€ i_ c �pmdzE° W_ �t`a W zoo "sue . $ g
y g§m-'"_ `�c `6_g v`3 w v m 8$t ti "Z a m g g w E.g E o E ._ >>w E 3 3 E c m 5 3 i g 3 3
to>«,kgkkg w W—6 m m -z 38a Tie E_ saT,13a zwEEwagwg•sTd wo,'Lc ;3lgx'',9wggwor� w88 `1
ilS�-�- - - i g;wg'w rr d 17111 R
_ z'nn - !ih
z rn c w m w`8 cm$-_ °i� 'tz� O.ags` O3A Oo �x »FL�0z m�.eoBB � 5ws-> oa O'-o'rna c 1m OWzFoa5wtw z€'�'€ z,I'FCN .° v <8m?o� ,`,EmE sL= ___ Ezsz88w e'-- w�w�>wn.'n. �o Yu�m am w `W € !I8o a iEEO 11 e w o8S � ig itga-_ �, L_�8. >g Xp� �00 zggp'`�E AoB� w8€y��m__$$$Ss _ ma c o _..=_o
m L'ya-NMONfD v2 mad aoUmoo W 4 U'Eadd g<U G W 33g."gW6 J2,1a:22i e8U8 g8821s a wa4rc11yo.imyiny��rnrnm'm R.8 f NNo0 R V'3f
CITY OF HUGO
ATTACHMENT TO ORDINANCE NO.2024-537
2025 FEES,RATES AND CHARGES
ESCROW
FEES AND OTHER
ROADWAY RECONSTRUCTION/REHAB:
Single-Family Residential/Duplex Rates:
Complete Reconstruction $ 5,200.00 per unit
Partial Reconstruction $ 4,100.00 per unit
Roadway Reclamation/Overlay $ 3,400.00 per unit
Urban Roadway Overlay $ 2,100.00 per unit
Rural Roadway Overlay $ 1,800.00 per unit
UTILITY RELATED:
Water Utility Permit $ 32.00 $30.00 permit fee plus$2.00 technology fee
Water Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES
Sewer Utility Permit $ 32.00 $30.00 permit fee plus$2.00 technology fee
Sewer Infrastructure Fee(in lieu of assessment) $ 3,100.00 per SAC unit as determined by MCES
City Sewer Availability Charges(SAC):
-Sewer Infrastructure Trunk Fee $ 1,632.00 per SAC unit as determined by MCES
-Sewer Infrastructure Connection Fee $ 588.00 per SAC unit as determined by MCES
-Total SAC Fee $ 2,220.00
City Water Availability Charges(WAC):
-Water Infrastructure Trunk Fee $ 1,960.00 per SAC unit as determined by MCES
-Water Infrastructure Connection Fee $ 680.00 per SAC unit as determined by MCES
-Total WAC Fee $ 2,640.00
Water Meter Rental-Standard Residential 3/4' $ 472.00 plus sales tax of$39.37;$470.00 meter plus$2.00 technology fee
Water Meter Rental-Commercial-1"Meter $ 617.00 E-Series plus sales tax of$51.51;$615.00 meter plus$2.00 technology fee
Water Meter Rental-Commercial-181/2'Meter $ 1,092.00 E-Series plus sales tax of$91.30;$1,090.00 meter plus$2.00 technology fee
Water Meter Rental-Commercial-2'Meter $ 1,382.00 E-Series plus sales tax of$115.58;$1,380.00 meter plus$2.00 technology fee
Water Meter Rental-Commercial-Larger than 2' Cost+10% Not a stocked item Call for availability and pacing plus$2.00 technology fee
Water Meter Rental-Irrigation-1'Meter $ 647.00 +1 WAC Fee$2,640 plus sales tax of$54.02;$645.00 meter plus$2.00 technology fee
Water Meter Rental-Irrigation-181/2"Meter $ 1,122.00 +2 WAC Fees$5,280 plus sales tax of$93.80;$1,120.00 meter plus$2.00 technology fee
Water Meter Rental-Irrigation-2'Meter $ 1.412.00 +2 WAC Fees$5,280 plus sales tax of$118.10;$1,410.00 meter plus$2.00 technology fee
Water Meter Rental-Irrigation-Larger Than 2' Cost+10% +WAC Fees as determined by City Engineer plus$2.00 technology fee
Water Meter Testing $ 80.00 Refundable if meter is faulty
Water Meter No-Access Penally $ 200.00 per quarter
Hydrant Water(per truck load) $ 30.00
Hydrant Meter Rental-Deposit $ 700.00 refundable deposit
Hydrant Meter Rental-Use Charges $ 20.00 per day rental tee+actual usage calculated at the per thousand gallons irrigation rate
reflected on the current Utility Rate Schedule I',
Water Shut-Off Cap(Curb Stop) $ 32.00 plus sales tax of$2.52;$30.00 part plus$2.00 technology fee i
Water Shut-Off Cap Repair Lid(Curb Stop) $ 57.00 plus sales lax of$4.61;$55.00 part plus$2.00 technology fee
Driveway Curb Stop Cover(A1AY McDonald) $ 202.00 plus sales tax of$16.75;$200.00 part plus$2.00 technology fee
Gate Valve Cap $ 32.00 plus sales tax of$2.52;$30.00 part plus$2.00 technology fee
Standard Radio $ 217.00 replacement plus sales tax of$18.01;$215.00 part plus$2.00 technology fee
Dual Port Radio $ 257.00 replacement plus sales tax of$21.36;$255.00 part plus$2.00 technology fee
RENTALS:
Room Rental(City Hall,Rice Lake Centre.Hanifl Shelter 8 Lions Park Pavilion):
NON-PROFIT RATE:
Rice Lake Centre(RLC) $ - Free
Oneka Room,Hanifl Gathering Room $ 20.00 for up to 4 hours
RESIDENT RATE:
Oneka Room,RLC,Hanifl Gathenng Room $ 100.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Oneka Room.RLC,Hanifl Gathering Room $ 150.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room $ 200.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room $ 400.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room w/Servery $ 250.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room w/Servery $ 450.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Entire Building $ 300.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Entire Building $ 600.00 per rental mom than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Conference Room $ 20.00 for 2 hours
Pedersen Pavilion Picnic Shelter $ 100.00 for 2 hours
NON-RESIDENT RATE:
Oneka Room,RLC.Hanifl Gathering Room $ 200.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Oneka Room,RLC,Hanifl Gathering Room $ 300.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room $ 400.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room $ 800.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room w/Servery $ 450.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Gathering Room w/Servery $ 850.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Entire Building $ 500.00 per rental up to 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Entire Building $ 1,100.00 per rental more than 4 hours $500.00 Alcohol Damage Deposit
Pedersen Pavilion Conference Room $ 20.00 fa 2 hours
Pedersen Pavilion Picnic Shelter $ 200.00 fa 2 hours
Park Shelter Rental:
Permit $ 5.00 per permit
Soccer Field Rental:
Permit for Youth Organizations(full-sized field) $ 3,250.00 per season
Permit for Youth Organizations(U11/U12 or other) $ 2,750.00 per season
Youth Toumament Fee $ 40.00 per game
Permit for Adult or Other Organizations $ 75.00 per hour
Baseball Field Rental:
Permit for Youth Organizations $ 10.00 per day
Permit for Other Organizations $ 30.00 per day
Page 3
CITY OF HUGO
ATTACHMENT TO ORDINANCE NO.2024-537
2025 FEES,RATES AND CHARGES
ESCROW
FEES AND OTHER
MISCELLANEOUS CHARGES:
Assessment Search $ 30.00
Conduit Bond Financing 1/2 of 1 Y. of bond principal (may be negotiated based on size and purpose)
Copies:
Public Data Requests(100 copies and under) $ 0.250 per copy
Public Data Requests(over 100 copies) $ 0.300 per copy over 100
All Other $ 0.300 per copy
Document Certification $ 20.00
Document Recording $ 80.00
Property Ownership Search $ 55.00
Records Search $ 60.00 per hour
Service Charge for Returned Checks $ 30.00
Service Charge for Disputed Credit Card Transactions $ 30.00
Special Meetings:
City Council $ 1,030.00
Planning Commission $ 515.00
Page 4
Public Hearing: N/A Draft Posted to Website: October 29, 2024
1st Reading: October 28, 2024 Publication: November 19, 2024
2nd Reading: November 12, 2024 Effective: January 1, 2025
CITY OF LINO LAKES
ORDINANCE NO. 16-24
Repeal and Replace of Chapter 218(Fee Schedule)
The City Council of Lino Lakes ordains:
Section 1. Findings. Pursuant to Minnesota Law, the Lino Lakes City Charter, and the Lino Lakes City Code, a
fee schedule for city services and licensing is hereby adopted as follows:
2025 FEE SCHEDULE
ALCOHOLIC BEVERAGES
3.2 Beer Off-Sale $ 200.00 /Year
3.2 Beer On-Sale $ 300.00 /Year
3.2 Beer On-Sale Temporary $ 50.00 Plus$5.00/Day
Club License $ 300.00 /Year
Liquor License Investigation (Initial Application Only) $ 267.75 1 or 2
$ 471.75 3+
Liquor License On-Sale $ 4,500.00 /Year
Liquor License Off-Sale $ 200.00 /Year
Liquor Temporary Permit $ 50.00
Wine License $ 500.00 /Year
Sunday Liquor $ 200.00 /Year
On-Sale Brewer Taproom $ 500.00 /Year
Off-Sale Growler $ 200.00 /Year
AMUESMENT& COMMERCIAL RECREATION
Cabaret License $ 35.00
Dances $ 200.00 /Year
Gambling Permit Application $ 10.00
BUSINESS& MISCELLANEOUS
Assessment Search Fee $ 20.00 /Search
Background Check Fee $ 35.00 /Background
Cannabinoid License Investigation (Initial Application Only) $ 267.75 1 or 2
$ 471.75 3+
Cannabinoid License $ 250.00 /Year
CD or DVD $ 7.00
City Charter $ - First Copy
$ 10.00 Each Additional Copy
City Code Book $ 140.00 No Binder or Tabs
City Map $ 2.50
Comp. Plan $ 55.00
Copies: Large Scale (>11"x17") $ 0.50 /Square Foot
Copies: New Resident Labels $ 5.00 /Month Flat Fee
Copies: Per Page $ - /Page(1-10 Pages)
$ 0.25 /Page (11-100 Pages)
Actual Cost 100+ Pages
Dog Kennel - Private $ 20.00 /Year
Dog Kennel—Commercial $ 105.00 /Year
Dog License Male/Female $ 11.00 Not Spayed or Neutered
$ 6.00 Spayed or Neutered
Election Filing Fee $ 5.00
Fax Charge $ - 1-10 Pages
$ 0.25 /Page 11+ Pages
Garbage Hauler License $ 100.00 First Truck
$ 45.00 Each Additional Truck
Massage Therapist License(Individual) $ 50.00 Annually
Overweight Permit $ 50.00
Pawn Shop Class A, Class B, and Class C $ 10,000.00
Pawn Shop/Precious Metal Dealer/Secondhand Goods
Dealer Class A Background Investigation (In State) $ 775.00 Fee
$ 15,000.00 Escrow Deposit
Pawn Shop/Precious Metal Dealer/Secondhand Goods
Dealer Class A Background Investigation (Out State) $ 20,000.00 Fee& Escrow Deposit
Peddler,Solicitor,Transient Merchant $ 250.00 /6 Months
Precious Metal Dealer $ 10,000.00
Secondhand Goods Dealer Class A $ 10,000.00
Secondhand Goods Dealer Class B and Class C $ 300.00
Return Check Charge $ 30.00
Rental Housing License (Annual) $ 73.00 1 or 2 Units plus$15.00/Unit
for 3 or More Units(fee
to be reduced by 50% if
issued less than six months
from expiration date)
Rental License Re-Inspection Fee $ 73.00
Special Event Permit $ 50.00
Therapeutic Massage Business License $ 200.00 Annually
Tobacco License $ 250.00
Weed & Mowing Violation $ 150.00 First Hour
$ 75.00 Each Additional Hour
Additional Admin Fee $ 100.00 2nd Offense in Calendar Yr
$ 200.00 3rd and Each Additional
Offense in Calendar Yr
Non-Payment Certification Fee $ 30.00
Zoning Maps $ 5.00 Large or Colored
Zoning Ordinance $ 25.00
FIRE REGULATIONS
Annual Permit for Sale of Consumer Fireworks $ 350.00 Exclusive Retail Seller
$ 100.00 In Conjunction with Existing
Retail Store
Burning Permit $ 50.00
Day Care/Foster Care Inspection $ 50.00
False Fire Alarms $ - /Alarm (1-3) in Calendar Yr
$ 100.00 /Alarm (4-10) in Calendar Yr
$ 200.00 /Alarm (11+) in Calendar Yr
Fire Watch $ 50.00 /Hour
Fireworks Display Permit $ 100.00
Food Truck Inspection $ 50.00
Inspection Outside Business Hours $ 75.00 /Hour(2 Hour Minimum)
POLICE FEES
Copy of Report $ - To Subject of Data up to 3
Pages
$ 1.00 4th Page
$ 0.25 /Page 5-100 Pages
Copy of Report—Mail In $ 4.00 Up to 4 Pages
$ 0.25 /Page Thereafter
Vehicle Lockouts $ - No Fee
Clearance Letter $ 15.00
Fingerprinting $ 15.00 By Appointment
Digital Photographs $ 25.00 Up to 16gb Flash Drive
Other Digital Documentation/Video $ 50.00 Up to 16gb Flash Drive
False Police Alarms $ - /Alarm (1-3) in Calendar Yr
$ 52.50 /Alarm (4-10) in Calendar Yr
$ 105.00 /Alarm (11+) in Calendar Yr
Vehicle Forfeiture Fee $ 300.00 /Vehicle
Dangerous Dog Registration $ 255.00 /Year
RENTALS& RESERVATIONS
Civic Complex Room Reservations
Non-Residents& Businesses- Up to 4 Hours $ 100.00
Non-Residents& Businesses- Up to 8 Hours $ 200.00
Field Rental
Baseball/Softball Drag Only $ 25.00 /Evening
Baseball/Softball Drag&Chalk $ 50.00 /Evening
Picnic Shelter Reservation $ 25.00
BUILDING -CONSTRUCTION UTILITES
Building Permit Fee Schedule
Building Permit Fees shall be based on the Fee Table.
Fire Suppression Permit Fee shall be based on Fee Table.
Minimum fee of$73.00 for all permits.
Fee Table
Total Valuation Fee
$1.00 to$1,360.00 $73.00
$1,361.00 to$2,000.00 $23.50 for the first$500.00 plus$3.05 for each additional $100.00, or fraction
thereof, to and including$2,000.00. Min. Fee$73.00
$2,001.00 to$25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional
$1,000.00,or fraction thereof,to and including$25,000.00
$25,001.00 to$50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional
$1,000.00,or fraction thereof,to and including$50,000.00
$50,001.00 to$100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional
$1,000.00,or fraction thereof,to and including$100,000.00
$100,001.00 to$500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional
$1,000.00,or fraction thereof,to and including$500,000.00
$500,001.00 to$1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional
$1,000.00,or fraction thereof,to and including$1,000,000.00
$1,000,001.00 and up $5,608.75 for the first$1,000,000.00 plus$3.15 for each additional
$1,000.00,or fraction thereof
Other Inspections and Fees
Work Commencing Before Permit Issuance Double Permit Fee
Erosion Control Inspection Fee
Single,Two-Family,Townhomes up to 8 $ 160.00
Units, Multi-Family>8 Units
Commercial, Industrial, and Institutional Determined by Separate Agreement
Change of Use/Occupancy Inspections $ 73.00 /Trip
Inspections Outside of Normal Business Hours $ 73.00 /Hour*
Re-Inspection Fee $ 73.00 /Trip
Inspections for which no fee is specifically designed $ 73.00 /Trip
Additional Plan Review Required by Changes,Additions, $ 73.00 /Hour**
or Revisions
For use of outside consultants for plan checking and Actual Cost***
inspections, or both
Plan Review Fee
a. 65%of the Building Permit Fee
b. 25%of the Building Permit Fee for review of similar plans(Master Plan) in a 12
month period
Easement Encroachment Fee County Recording Fee plus$25.00
Antenna, City Owned Property $ 250.00 Plus$6,000 Escrow
Antenna, Private Property See Building Fee Table
Accessory Building Permit: 200 sq.ft. or under in size $ 73.00
Accessory Building Permit: over 200 sq.ft. in size See Building Fee Table
Fence Permit: 6 feet or under in height $ 73.00
Fence Permit: over 6 feet in height See Building Fee Table
Grading Permit $ 160.00
Grading Permit Escrow Deposit(if not $ 300.00
included in Dev. Contract)
Surface Water Management Plan (if applicable and $ 3,500.00
not covered in Site Performance or Development
Contract Escrow)
Roofing Permit $ 106.00
Siding Permit $ 106.00
Swimming Pool Permit $ 160.00 In Ground
$ 106.00 Above Ground
Window/Door Replacement Permit $ 79.00 /Unit (max$158.00)
Retaining Wall Permit $ 73.00
Mechanical (HVAC) permit: Gas Fireplace $ 73.00 Plus$34.50 for Each
Additional Fireplace
Mechanical (HVAC) Permit: Residential $ 73.00 Except New Construction
Includes AC/Furnace Combined
Mechanical (HVAC) Fee: New Construction Residential $ 158.00 Does Not Include Fireplaces
Mechanical (HVAC) Permit: Commercial 2%of the Contract Price ($73.00
Minimum Fee)
Manufactured Home Permits $ 250.00
Plumbing Permit $ 11.00 /Fixture ($73.00 Min. Fee)
Sewer Connection Inspection Fee $ 200.00
Water Connection Inspection Fee $ 250.00
Contractor License Verification $ 5.00 /Permit
Contractor Lead Certification Verification $ 5.00 /Permit
Contractor License $ 50.00
Metropolitan Council SAC(Sewer Availability Charge) Per Met Council
Water Meter City Cost plus$50.00
MXU Unit City Cost plus$50.00
Water Meter+ MXU Unit City Cost plus$50.00
Touch Pad $ 18.00
Curb Stop Covers $ 70.00
Septic Installation or Repair Permit $ 250.00
Septic Pumping Permit $ 10.00
Demolition Permit $ 73.00
Lawn Sprinkler/Irrigation System Permit $ 73.00
Irrigating or Watering of New Landscaping Permit (Sod $ - No Fee
or Seed)
Driveway Replacement Permit $ 73.00
Sign Permit: Existing Billboard $ 85.00 /Year
Sign Permit: Permanent See Building Fee Table
Sign Permit: Sandwich Board $ 35.00
Sign Permit:Temporary(portable/banner) $ 35.00 /Term
Storm Pond Aeration Permit $ 150.00
Fee Refund — Per applicant request, City staff may refund permit fees up to 80%for voided permits. Plan
review fees and state surcharge fees are non-refundable. No refund shall be provided if permit has expired.
All permits issued are subject to applicable State surcharge fees.
* Inspections made outside of normal business hours is a three-hour minimum charge.
** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision,
overhead, equipment, hourly wages, and fringe benefits of the employees involved.
*** Actual costs include administrative and overhead costs.
An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan
revision and construction observation.
ESCROW DEPOSITS
In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be
completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of
Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any
unfinished work must be completed within six months (weather permitting) from the date of issuance.The
following escrow amounts are hereby established:
a. Driveway- $1,000.00
b. Exterior Concrete -$1,000.00
c. As-built Surveys - $1,000.00
d. Stucco (final coat only) - $1,000.00
e. Garage Floor- $1,000.00
f. Landscaping-$2,500.00 (landscaping may be escrowed year-round per City Staff)
g. Other—Determined by City staff at a rate of 125%of the actual improvement costs
Escrow deposits will be charged a $100.00 non-refundable administrative fee.
Escrow deposits can be submitted through one of the following procedures:
a. Escrow can be paid to the City upon execution of an agreement signed by both the payee and the
City.
b. The title company or lending institution can hold the escrow upon execution of an agreement
signed by both the title company or lending institution and the City.
A partial release, of a multi-item escrow, will be charged a $75.00 non-refundable administrative fee.
RIGHT-OF-WAY MANAGEMENT
Excavation Permit Fees
Hole (includes administration, plan review, $ 150.00
inspection,testing and mapping)
Trench (includes administration, plan review, $ 70.00 /100 Lineal Feet plus Hole Fee
inspection,testing& mapping)
Obstruction Permit Fee
Includes administration, recording, review& $ 50.00 Plus$0.50/Lineal Foot
inspection
Permit Extension Fee
Includes administration, recording& review $ 55.00
Delay Penalty
For up to three days of non-completion and non- $ 60.00
prior notice before specified date.After three days
an additional charge of$10.00 per day will be
levied.
Degradation Fee
Degradation Fee Formula:
This formula covers degradation for depreciation caused by intrusion into the right-of-
way. The depreciation applies to the original surface of the right-of-way and to the
overlays and seal-coats applied to the surface.The formula includes life expectancy
schedules for each and has an estimated cost per square yard based on the quality of the
right-of-way surface required for different levels of traffic.This formula creates a
degradation fee which is determined by the cost per square yard for street, overlay, and
seal-coat, multiplied by the depreciation schedule, multiplied by the area of the street
patch.
Degradation Fee:
(cost per square yard for street overlay and seal-coat x depreciation schedule rates)x
area of street patch =degradation fee
UTILITY FEES
Water Utility Rates
Residential
Base Fee $ 25.00 /Quarter/REU*
Consumption Fee
0-20,000 Gallons $ 2.19 /Thousand Gallons
20,001-40,000 Gallons $ 2.43 /Thousand Gallons
40,001 -80,000 Gallons $ 3.04 /Thousand Gallons
80,001- 120,000 Gallons $ 3.65 /Thousand Gallons
Over 120,000 Gallons $ 4.26 /Thousand Gallons
Non-Residential
Base Fee $ 25.00 /Quarter/REU*
Consumption Fee
0- 20,000 Gallons $ 2.19 /Thousand Gallons
20,001-40,000 Gallons $ 2.43 /Thousand Gallons
Over 40,000 Gallons $ 2.75 /Thousand Gallons
Non-Residential Irrigation**
Consumption Fee
0-40,000 Gallons $ 3.04 /Thousand Gallons
40,001-80,000 Gallons $ 3.65 /Thousand Gallons
Over 80,000 Gallons $ 4.27 /Thousand Gallons
*REU =a residential equivalent connection:
1. Residential -a single housing unit
2. Non-Residential - per Met Council Service Availability Charge Procedures Manual
**Non-Residential users with irrigation systems that do not have a separate irrigation meter
will be charged at residential rates until such time that a separate irrigation meter is installed
and inspected.
Sewer Utility Rates
Metered Sewer
Base Fee $ 61.48 /Quarter/REU*
Consumption Fee
Over 10,000 Gallons(based
on winter average) $ 1.18 /Thousand Gallons
Flat Sewer $ 72.52 /Quarter/REU*
*REU = a residential equivalent connection:
1. Residential-a single housing unit
2. Non-Residential- per Met Council Service Availability Charge Procedures Manual
Storm Water Utility Rates
Quarterly Base Rate
Residential Fee $ 12.00 /Parcel
Non-Residential Fee $ 175.00 /Acre of Impervious ($12.00
minimum)
Late Penalty 10%of Unpaid Balance,Assessed per
Billing Cycle
Non-Payment Certification Fee $ 30.00
Meter Testing(Our Cost, Delivered to Minneapolis) $ 100.00 5/8" -3/4" Meter Test
$ 150.00 1" Meter Test
$ 250.00 1-1/2" -2" Meter Test
Water Meter Rental $ 600.00 Deposit
$ 25.00 /Month
Additional Accessories $ 25.00 /Month
Water Usage Fee $ 5.00 /Thousand Gallons
Water Use Violation $ 25.00 1st Violation
$ 50.00 2nd and Subsequent Violations
City Trunk Utility Connection Fees -the Trunk Utility Connection Fee consists of two components: a Trunk
Charge and an Availability Charge.
Trunk Charge
The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up,
whichever is first. Residential trunk charges are based on one unit per dwelling unit.
Commercial/Industrial/Institutional (CII)trunk charges are based on a factor of 2.92 units per acre.
Sanitary Sewer $ 1,801.00 /Unit
Water $ 2,588.00 /Unit
Availability Charge
For residential properties,the availability charge shall be paid at the time of subdivision approval or
at the time of hook-up,whichever is first. Commercial/Industrial/Institutional availability charges
shall be paid at the time of building permit. Fees are based on the number of sanitary access charge
(SAC) units assigned by Metropolitan Council Environmental Services(MCES). Residential uses shall
be assigned one unit per dwelling unit unless otherwise noted by MCES.
City Sewer(CSAC) $ 1,686.00 /SAC Unit
City Water(CWAC) $ 1,628.00 /SAC Unit
The Lateral Service Connection Fee shall be in addition to the City Trunk Utility Connection Fees.
Lateral Service Connection Fees
If the lot or tract of land, or portion thereof,to be served by a lateral connection has not been
assessed for the cost of construction,then the applicant shall pay, upon hook-up, a lateral
connection in accordance with Resolution No.02-149(Bisel Amendment) based on the following
front foot charges:
Sanitary Sewer $ 80.10 /Front Foot
Watermain $ 75.10 /Front Foot
Vacant Buildings: Owners of a commercial/industrial building(s) connected to City water and/or sewer utilities
that are vacant due to business closures or other reasons may apply to have the number of billed REU's
reduced to one (1) REU for purposes of calculating utility fees effective from the date the building(s) were
vacated for as long as the building(s) remain unoccupied. When the building(s) again becomes occupied the
owner must inform the City of such occupation, at which time the number of REU's will be determined and
utility fees assessed according to the current fee structure. (Ordinance No. 06-13, passed 8-26-13)
REU = a residential equivalent connection:
1. Residential—a single housing unit
2. Non-Residential REU = per Met Council Service Availability Charge Procedures
Manual
Surface Water Management
Single/Two Family Multi Family Commercial/Industrial/
Lots Lots Institutional Property
Fee Charge per Acre
of Development $8,217.00 $11,051.00 $12,241.00
Fees are based on developable land in accordance with the policy provisions established in Resolution No. 92-
70. Credits may be earned for sub-watershed trunk improvements.
CULVERT PRICES
All culvert prices are based on market prices and include tax & delivery and 15% administration fee.
LAND USE
Fees
Alternative Urban Area-wide Review (I-35E AUAR) $ 325.00 /Acre
To be charged at the time of land use approval for
projects within the I-35E Corridor AUAR area that
require preliminary plats; conditional use permits;
site and building plans; and planned unit
developments. Once paid,the same land will not
be charged again.
Administrative Permit $ 73.00
(no fee for Transient Merchant if issued
by City Clerk)
Zoning Confirmation Letter $ 75.00
Escrow Deposits (Application Fee Required With Each Submittal)
Application Fee $ 200.00
Comprehensive Plan Amendment $ 5,000.00 40 Acres or Less
$ 7,500.00 Over 40 Acres
Conditional Use Permit $ 1,000.00 Residential/Rural
$ 7,500.00 Commercial/Industrial/
Institutional
Environmental Review $ 12,500.00
Interim Use Permit $ 7,500.00
Ordinance Amendment
Map Amendment (Rezone) $ 1,500.00 40 Acres or Less
$ 5,000.00 Over 40 Acres
Text Amendment $ 1,500.00
Planned Unit Development $ 5,000.00 General Concept Plan
$ 12,500.00 Preliminary Plan
$ 7,500.00 Final Plan
Site Plan Review $ 7,500.00
Subdivision
Concept Plan Review $ 1,500.00
Minor Subdivision $ 3,000.00
Preliminary Plat $ 5,000.00 Less than 5 Acres
$ 7,500.00 5-40 Acres
$ 12,500.00 Over 40 Acres
Final Plat $ 1,500.00 Less than 5 Acres
$ 5,000.00 5-40 Acres
$ 7,500.00 Over 40 Acres
Vacation (Street, Utility, Drainage) $ 1,500.00
Variance or appeal $ 750.00
An escrow account shall be established as indicated above to cover all expenses incurred by the City as part of
the plan review. In the case of applications including multiple requests the highest escrow deposit amount will
be the only one initially required. The applicant is responsible for all costs incurred by the City during plan
review. If the escrow account drops below 10% of the original deposit amount the City will require the
submittal of an additional escrow deposit sufficient to cover any anticipated expenses. Upon City
determination that the project is complete or expired, the City will return the remaining escrow deposit to the
applicant.
DEVELOPMENT FEES
GIS Mapping Fee $ 90.00 /Lot
Park Dedication
Commercial/Industrial/Assisted-Living/Skilled $ 2,600.00 /Acre
Nursing
Residential $ 3,500.00 /Unit
Tree Preservation Mitigation Fee $ 500.00 /Tree
Street Lighting Operation Fee (New Development) $ 120.00 /Light ($8/mo/light x 15
months)
ECONOMIC DEVELOPMENT ASSISTANCE
Tax Increment Financing or Tax Abatement $ 12,500.00 Escrow Deposit
Tax Exempt Financing $ 2,500.00 Application Fee, plus 1%
Administration Fee
STAFF TIME
Staff time for chargeable event/projects shall be charged as the employee's hourly rate of pay plus benefits
plus calculated overhead costs (when applicable). Overtime will be charged at 1.5 times the calculated hourly
rate.
LATE FEE
Late penalty fee: a late charge of 10% or$25.00, whichever is greater, will be charged for fees not paid when
due.
Section 2. Effective Date of Ordinance. This ordinance shall be in force and effect on January 1, 2025 and
from and after its passage and publication according to the Lino Lakes City Charter.
Adopted by the Lino Lakes City Council on this 12th day of November, 2024.
Rob Rafferty, Mayor
ATTEST:
Roberta Colotti, CMC, City Clerk
I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES D J
aft-
I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES
Type Fee
I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES
Type Fee
Fees shall be based on valuation according to
Building permit (state surcharge required, see M.S. § 3266.153, unless specifically noted
M.S. § 326B.148) otherwise or as determined by the city's Building
Official
65% of building permit fee (Building Official may
waive plan review fee for certain projects that
Building permit plan review require diminutive plan review such as partial
basement finishes, kitchen remodeling, and
minor repairs/alterations.
Building permit reinspection $63.25 per M.S. § 326B.153
Building permit investigation fee (starting work Equivalent to permit fee
without an approved/issued permit)
Renewable energy system (solar PV building
permit: small rooftop streamlined, geothermal, $150
wind energy conversion) - residential
Renewable energy system (solar, geothermal, See M.S. § 326B.153
wind energy conversion) - commercial
Billboards/billboard alterations (includes
footings) $250 per billboard plus surcharge
Roofing or siding - single family residential $100
Partial (less than 25%) of principal structure; or
detached accessory structures only $65
Roofing or siding - townhomes and rental
properties up to five units $60 per unit
Roofing or siding - commercial See M.S. § 326B.153
Window or door replacement (within existing $65 for one window or door
openings) $100 for two or more windows and/or doors
$750 plus engineering/inspection fees if located
Telecommunications antenna - new system on city-owned property plus surcharge (see
Public Works for further information)
Telecommunications antenna - repairs/
alterations/swapping or adding antennas to $250 per permit plus surcharge
existing system (city or private property)
COMMERCIAL ELECTRICAL PERMIT
$50 per trip or the fee below, whichever is greater; solar fees are the same as residential solar fees)
Valuation $1 to $1,000 $50 per trip
Valuation $1,001 to $2,000 $50 for the first $1,000 plus $3.25 for each
additional $100 or fraction thereof, to and
including $2,000
$82 for the first $2,000 plus $14.85 for each
Valuation $2,001 to $25,000 additional $1,000 or fraction thereof, to and
including $25,000
$423.55 for the first $25,000 plus $10.70 for
Valuation $25,001 to $50,000 each additional $1,000 or fraction thereof, to and
including $50,000
$691.05 for the first $50,000 plus $7.45 for each
Valuation $50,001 to $100,000 additional $1,000 or fraction thereof, to and
including $100,000
$1,063.55 for the first $100,000 plus $6 for each
Valuation $100,001 to $500,000 additional $1,000 or fraction thereof, to and
including $500,000
$3,463.55 for the first $500,000 plus $5.10 for
Valuation $500,000 to $1,000,000 each additional $1,000 or fraction thereof, to and
including $1,000,000
Valuation $1,000,001 and up $6,013.55 for the first $1,000,000 plus $4 for
each additional $1,000 or fraction thereof
Reinspection fee (in addition to all other fees) $50
Investigation fee (working without permit) Double fee
RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMENTS, AND
CONDOMINIUMS)
HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available from the
Building Inspections Division. Add $1 for state surcharge to total cost of each permit. The fee is the
total of the listed fees or the total number of inspection trips x $50, whichever is greater.
Residential panel replacement $110
Sub panel $50
New service or power supply (circuits) Add $16 for each additional 100 amps
0 to 300 amp $55
400 amp $71
New service or power supply (feeders) Add $6 for each additional 100 amps
O to 100 amp $9
101-200 amp $15
Minimum permit fee is $50 plus $1 state surcharge. This is for one inspection only. Minimum fee for
rough-in and final inspection is $100 plus $1 state surcharge.
Maximum fee for single-family dwelling or townhouse not over 200 amps (no max if service is over
200 amps) is $200 plus $1 state surcharge. Maximum of 2 rough-ins and 1 final inspection. (Failed
inspections are an additional $50 each)
Apartment or condominium complex (does not
cover service, unit feeders or house panels) $90 per unit
Swimming pool and hot tub $100 plus circuits at $9/each (includes 2
inspections)
Addition/remodel/basement finish $100 (includes up to 10 circuits and 2
inspections)
Residential accessory structure The greater of $55 for panel plus $9 per circuit
or $100 for 2 inspections
Street and parking lot lights $5 per each standard
Transformers and generators:
Up to 10 kva $5
11 to 74 kva $45
75 kva to 299 kva $60
Over 299 kva $165
Retrofit lighting $0.85 per fixture
Sign transformer or driver $9 per transformer
Low voltage fire alarm, low voltage heating and
air conditioning control wiring $0.85 per device
Residing jobs $50 first unit, $35 for each additional unit
Reinspection fee (in addition to all other fees) $50
Solar Fees:
0 kw to 5 kw $90
5.1 kw to 10 kw $150
10.1 kw to 20 kw $225
20.1 kw to 30 kw $300
30.1 kw to 40 kw $375
40.01 kw and larger $375 plus $25 for each additional 10 kw
Electrical inspection fee: furnace, air
conditioning, bath fan, fireplace or receptacle for $40
water heater vent
Refunds must be requesting in writing. No refunds unless more than the minimum fee. Refunds are
minus the city's 20% handling fee.
Permit fee is doubled if the work starts before the permit is issued.
Minimum fee permits expire in 6 months.
Permits over the minimum fee and up to $250 expire in 1 year.
Fire inspections (DHS) $50
Fire panel systems See M.S. § 326B.153
Fire permit (no surcharge), all permits unless $100
noted otherwise
Fireworks display/fireworks sales $100
Fireworks sales only (businesses) $350
Fireworks sales with other retail (businesses) $100
Fire permit, temporary tent $50
Fire permit, tank installation (fuel, oil, gas, and $100 per tank
the like)
Fire permit, tank removal $50 per tank
Fire permit, operational $50 per year
Fire permit, chemical fire suppression $100
Fire sprinkler systems See M.S. § 326B.153
•
Fire sprinkler plan check 65% of permit (for new construction or 20 heads
or more only)
Mechanical permit, residential (state surcharge Minimum $60 or 2% of valuation, whichever is
required, see M.S. § 326B.148) larger
Mechanical permit, commercial (state surcharge See M.S. § 326B.153
required, see M.S. § 326B.148)
Plumbing inspection permit, residential and °
commercial (state surcharge required, see M.S. Minimum $60 or 1.25/° of valuation, whichever
is larger
§ 326B.148)
Plumbing permit plan review, commercial
Plumbing system plans and specifications that are submitted to the City of Mounds View for review
shall be accompanied by the appropriate plan examination fees shall be paid prior to plan approval.
The City of Mounds View shall charge the following fees for plan reviews and audits of plumbing
installations for public, commercial, and industrial buildings:
1. Systems with both water distribution and drain, waste, and vent systems and having:
a. 25 or fewer drainage fixture units, $150
b. 26 to 50 drainage fixture units, $250
c. 51 to 150 drainage fixture units, $350
d. 151 to 249 drainage fixture units, $500
e. 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of $4,000; and
f. Interceptors, separators, or catch basins, $70 per interceptor, separator, or catch basin design
2. Building sewer service only, $150
3. Building water service only, $150
4. Building water distribution system only, no drainage system, $5 per supply fixture unit or $150,
whichever is greater
5. Storm drainage system, a minimum fee of $150 or:
a. $50 per drain opening, up to a maximum of $500; and
b. $70 per interceptor, separator, or catch basin design
6. Manufactured home park or campground, one to 25 sites, $300
7. Manufactured home park or campground, 26 to 50 sites, $350
8. Manufactured home park or campground, 51 to 125 sites, $400
9. Manufactured home park or campground, more than 125 sites, $500
10. Revision to previously reviewed or incomplete plans:
a. Review of plans for which the city has issued two or more requests for additional information,
per review, $100 or 10% of the original fee, whichever is greater
b. Proposer-requested revision with no increase in project scope, $50 or 10% of original fee,
whichever is greater
c. Proposer-requested revision with an increase in project scope, $50 plus the difference between
the original project fee and the revised project fee
Type Fee
Zoning Permits (No Surcharge), § 150.050(C)(2)
Patio/deck 30 inches and under, or not attached $30
Driveways, sidewalks, parking lots, patios (no permit required for sealcoating or overlays without
expansion). A right-of-way permit is required for any construction that disrupts city-owned streets,
curbing, sidewalks, and the like; residential includes churches and schools.
Residential R-1 or R-2 driveway $45
Residential R-3, R-4 and R-5 driveway or
$75
parking lot
Residential gravel (refer to Zoning Code for $25
limitations)
Commercial/industrial driveway or parking lot $150
Commercial/industrial sidewalk or patio $75
Fence/kennel - 7 ft. or below (if higher, building $30
permit; see M.S. § 326B.153)
Retaining wall - 4 ft. or below (if higher, building $30
permit; see M.S. § 326B.153)
Shed (200 square feet or less) $30
Signs - billboards (building permit) See M.S. § 326B.153
Signs up to 100 square feet $75
Signs 100 square feet or over $95
Signs - re-facing or altering $40
Signs, banners - temporary $40 per 21-day period (limit 4 permits per year
plus one additional permit for a banner)
Swimming pools, residential (above ground) $30
Swimming pools (in-ground, building permit) See M.S. § 326B.153 (surcharge required)
II. OTHER INSPECTION/PLANNING FEES
Applicants are responsible for all costs incurred associated with the filing, review and processing of
development applications. Such fees to be paid in escrow up front or upon receipt of statement from
the City of Mounds View. Fees may include, but are not limited to, costs for consultants retained by the
city, consultant planning services, attorney, and engineer fees.A deposit may also be required to cover
costs of public notices, materials and staff time spent in the review, research or preparation of
materials associated with each application. The applicant shall be responsible for all reasonable
incurred costs in excess of the initial fee and/or deposit amount. Any portion of the deposit not spent or
encumbered shall be refunded to the applicant within 30 days after consideration of the application is
completed. Payment of any park dedication fees shall be made by the applicant after final plat
approval. Application fees are not refundable.
II. OTHER INSPECTION/PLANNING FEES
Type Fee
II. OTHER INSPECTION/PLANNING FEES
Type Fee
Building inspections conducted outside normal $63.25/hour (two-hour minimum charge)
business hours
Change of address $150
Change of occupancy $75
Comprehensive plan amendment $500
Conditional use permit, R-1 or R-2 $400
Conditional use permit, all other districts $400
Conditional use permit amendment Same as CUP fee
Contractor license (§ 150.053) $60
Contractor state license verification fee $5 per permit
Development/site plan review $400
Escrow - manufactured homes $500 per permit
Escrow - occupancy (seed, sod, landscaping;
as-building grading survey; driveway installation;
curb cut modifications; site clean-up; storm
water management; drainage features; site $1,000 for each item
erosion; right-of-way restoration; or any other
items as determined by the Building Official)
Escrow, planning (actual charges) $2,500 - $10,000
Housing inspection initial and one follow-up No charge (Chapter 119)
(includes no shows)
Housing inspection/no show, each additional $100
Interim use permit (IUP) $400
IUP amendment $400
Park dedication fees Residential: $3,500 per unit
Non-residential: up to 10% of estimated market
value (of land)
65% of permit fee for all commercial permits and
Plan review (payment required before plans are for residential permits for new dwellings,
reviewed) dwelling additions, garages, garage additions,
decks, sheds over 200 square feet, and major
remodeling.
Plan review for changes, revisions, or additions $47/hour (one half-hour minimum charge)
to plans
Plan review, engineering (applicable to any
project that changes the grade. To be $100 per permit
determined by staff during application review).
Plan review for outside consultants for plan Actual costs including administrative and
checking and inspections or both overhead costs
Plan review similar (all units are same or similar) Each unit after the first shall be 25% or original
fee
Planned Unit Development (PUD) (§ 160.300 et $1,000
seq.)
PUD amendment $400
Refund, permits (within 100 days of application if All but $40
work is not commenced)
Refund, plan review 100% (if review has not been done)
Refund, state surcharge 100%
Rezoning $500
Vacation, street or easement $250
Subdivision $750
Subdivision escrow $1,000 - $10,000 (at the discretion of the City
Administrator)
Subdivision (reapproval fee) $100
Text amendment, Zoning Code $400
Text amendment, other City Code $400
Variance, administrative R-1 or R-2 $100 (additional $300 if formal variance is
required)
Variance, formal R-1 or R-2 $400
Variance, all other districts $400
Wetland alteration permit, R-1 or R-2 $200
Wetland alteration permit, all other districts $350
Wetland buffer permit, R-1 or R-2 $30
Wetland buffer permit, all other districts $100
Zoning Code review $200
Zoning letter $100 per letter
III. MISCELLANEOUS FEES
III. MISCELLANEOUS FEES
Type Fee
III. MISCELLANEOUS FEES
Type Fee
Certified copy $5 plus copy charges if any
Data request generating over 100 pages Staff time (plus copying charges, if any)
Data requests with an estimated cost over $25 will require a $25 deposit. The remainder of payment
will be requested at the time of pickup. Once the data request has been fulfilled and the actual total
cost is under $25, the difference will be refunded at the time of pickup. Data pickup requests will
expire in 30 days from completion of the request. If expired, a new request and deposit would need
to be submitted.
Filing fee for public office See Mounds View Charter
Insufficient funds (NSF) check $30
Municipal/City Code, copy $200
Notary public (Mounds View residents only) Free of charge
Photocopy/map, B/W 8'/2 x 11 Under 10 copies free, additional copies $0.25
per side
Photocopy/map, B/W 11 x 17 Under 10 copies free, additional copies $0.50
per side
Photocopy/map, color 8% x 11 Under 10 copies free, additional copies $1.00
per side
Photocopy/map, color 11 x 17 Under 10 copies free, additional copies $2.50
per side
City map, 24 x 36 B/W $5
City map, 24 x 36 color $10
Pending assessment search $10
Copy data to flash drive (customer provides new Free
unopened flash drive)
V. LICENSES
(All licenses are subject to 20% late fee)
V. LICENSES (All licenses are subject to 20% late fee)
Type Fee
V. LICENSES (All licenses are subject to 20% late fee)
Type Fee
Adult establishment $2,500 per year
$500 per person identified on the application as
an owner, operator or manager. (If it appears
that the investigative costs will exceed $500, the
Adult establishment, investigation fee City Administrator shall notify the applicant and
give the applicant an estimate of costs. The
applicant either shall make an additional deposit
equal to the difference between $500 and the
total estimate or may withdraw the application)
Automobile sales (Chapter 112) $225 per year
Amusement rides, carnivals, circuses (Chapter
111 ) $133 first day plus $21 for each additional day
Bowling alleys (Chapter 111) $21 per alley per year
Christmas tree sales $204 per season
Cigarette and tobacco (Chapter 118) $330 per year
Contractor license $60 per year
Donation collection bin $100 per bin per year
Garbage/recycling/rubbish hauler (Chapter 50) $120 plus $50 per vehicle per year
Gasoline stations (Chapter 112) $75 plus $25 per pump per year
Chickens/ducks, keeping of (Chapter 90) $100 first year
Chicken/ducks, renewal $30 per year
Honeybees, keeping of (Chapter 90) $50 (one time license)
Kennel, dog (5 or more dogs/breeding/training $80 per year
and/or boarding)
Gambling, lawful (premises permit investigation $100 per permit
fee)
Gambling, lawful (§ 111 .128) 10% contribution of net profits per year
Liquor (Chapter 110)
Bottle club $330 per year
Club $330 per year
Investigation fee, renewal license $50 per year
Investigation fee, single person $350 (new application)
Investigation fee, partnership $385 (new application)
Investigation fee, corporation $450 (new application)
On-sale, brewer taproom $800 per year
Off-sale, brewer malt liquor $200 per year
$0.65 per square foot for that space used
primarily as bar area and $0.53 per square foot
On-sale, intoxicating for that space used primarily as dining area with
a minimum fee of$3,000 and a maximum fee of
$10,000
On-sale, intoxicating (movie theaters only) $3,000 base fee plus $100 per theater room
allowing alcohol
On-sale malt liquor/3.2 beer $800 per year
Off-sale malt liquor/3.2 beer $200 per year
On-sale microdistillery $800 per year
Off-sale microdistillery $200 per year
On-sale, Sunday sales $200 per year
On-sale wine $800 per year
Off-sale intoxicating $260 per year
Set ups $330 per year
State of MN AGED buyer's card $20 (new application only)
Sunday growler sales $200 per year
Temporary liquor $120 per event (includes background check)
Rental Dwelling (Chapter 119)
Administrative fee (multi-family dwelling) $30 (active license with no renters)
Single-family dwelling $100 per year
New single family rental $100 per year plus conversion fee
Multi-family rental $100 plus $25 per unit per year
Renewal late fee 10% of license fee (minimum $100)
Reinstatement of a revoked rental license 5x rental fee (maximum $3,000) plus rental fee
License fee discount, Certification Level C 20% fee reduction
License fee discount, Certification Level B 33% fee reduction
License fee discount, Certification Level A 50% fee reduction
Transfer of license $100 per building
Conversion fee (conversion from unlicensed $375 in addition to annual license fee.
rental to licensed rental, if 3 or fewer units in one $100 if owner presents proof of participation in
building). Buildings owned by nonprofits are an applicable education or hires a management
exempt from conversion fee. company for at least a year
Pawn shop (Chapter 115), non-refundable $500
application fee (includes investigation fee)
Pawn shop, new manager investigation fee $150
Pawn shop, license $10,000 per year (pro-rated in 30-day
increments after June 30)
Pawn shop, billable transaction $1.50 per transaction
Pawn shop, performance bond $10,000
Pawn shop, failure to provide daily report to city $100 per day
$65 per day
Peddler/transient merchants/solicitor (Chapter $225 per month
113) permits
$600 per year
$15 each person/year
Registered person (under the main applicant) $10 each person/month
$5 each person/day
Peddler investigation fee, per person No charge (included in permit fee)
Peddler ID card, per person No charge (included in permit fee)
Recuperation/half way house (Chapter 114) less
than 10 beds $33 per year
Recuperation/halfway house, 10-49 beds $55 per year
Recuperation/halfway house, 50-99 beds $82 per year
Recuperation/halfway house, over 100 beds $110 per year
Restaurant, Class A (occupancy load greater
than 100) (Chapter 111), operating 16 hours per $320 per year
day or less
Restaurant, Class A (occupancy load greater
than 100), operating more than 16 hours per day $560 per year
Restaurant, Class B (occupancy load of 100 or
less), operating 16 hours per day or less $204 per year
Restaurant, Class B (occupancy load 100 or
less), operating more than 16 hours per day $337 per year
Therapeutic massage (Chapter 114), enterprise $255 per year (pro-rated in 30-day increments
after June 30)
Therapeutic massage, each therapist $102 per year (pro-rated in 30-day increments
after June 30)
Therapeutic massage investigation, individual $100 new application; $50 per year renewal
Therapeutic massage investigation, partnership $350 per year
or corporation
Therapeutic massage, temporary $100
VII. PUBLIC WORKS RELATED FEES
VII. PUBLIC WORKS RELATED FEES
Type Fee
VII. PUBLIC WORKS RELATED FEES
Type Fee
Call-Out Rate Schedule Based on Current Wages
Normal business hours for call-out rates 7:00 am to 3:30 pm, Monday through Friday
After hours call-out rate, specified time
conducted outside normal business hours $100/hr. (minimum 2 hours)
Holiday call-out rate, specified time conducted
on holidays $150/hr. (minimum 2 hours)
Right-Of-Way Management Fees (Chapter 54). Additional fees may be required for legal and
engineering costs incurred by the city). All issued right-of-way permits will include a $200
administrative fee.
Excavation, hole fees, boulevard areas $100 per hole
Excavation, hole fees, pavement areas $200 per hole
Excavation, underground utility work, open
trenching - boulevard areas open $50 per 100 lineal feet (requires hole fee)
Excavation, underground utility work, open
trenching - pavement areas $70 per 100 lineal feet (requires hole fee)
Excavation, trenchless installation $35 per 100 lineal feet (requires hole fee)
Excavation, overhead installation $25 per 100 lineal feet
Obstruction, new pavement $100 per obstruction
Obstruction, replace existing obstruction (in-
kind) $50 per obstruction
Temporary obstruction, dumpster, portable
restroom, and the like $25 per obstruction
Temporary obstruction, equipment used for
excavation No charge
Miscellaneous ROW Management Fees and Costs (discount for work done pertaining to city
project; additional fees may be required for legal and engineering costs incurred by the city)
Street opening permit (requires deposit) $200
Street opening deposit To be determined by the Director of Public
Works
Registration fee (ROW users and registrants) $30
Permit extension $30
Delay penalty 10% of ROW permit
Degradation fee Calculated at time of permit
Restoration cost Calculated at time of permit
Overhead utility line repair No charge
Penalty for work done without a permit Double fee 50%
Municipal Water System Fees (Chapter 51)
Water Availability Charge (WAC), residential $500 per unit
WAC charge, commercial/industrial $1,000 per acre of developable land ($1,000
minimum charge)
Residential water usage base charge $28.60 per quarter
Residential water - 0 to 12,000 gallons $2.85 per 1,000 gallons per quarter
Residential water - 12,001 to 24,000 gallons $3.14 per 1,000 gallons per quarter
Residential water - over 24,000 gallons $3.61 per 1,000 gallons per quarter
Commercial water usage base charge $28.60 per quarter
Commercial water - 0 to 125,000 gallons $2.85 per 1,000 gallons per quarter
Commercial water - 125,001 to 700,000 gallons $3.14 per 1,000 gallons per quarter
Commercial water - 700,001 to 1 ,100,000
gallons $3.61 per 1,000 gallons per quarter
Commercial water - Over 1,100,000 gallons $4.51 per 1,000 gallons per quarter
Water quality testing charge (state) $2.43 per connection per quarter
Water service line repair insurance charge $13 per connection per quarter
Failure to participate or grant access regarding
Public Works ordinance programs $175 per connection per quarter
(installation/repair/inspect/ replace)
Utility bill late payment 10% of delinquent bill amount
Utility bill assessment search $10
Water service connection/repair/disconnect
$100 plus surcharge
size less than 4 inches
Water service connection/repair/disconnect
$150 plus surcharge
size over 4 inches
Water service inspection or reinspection after After hours call-out rate per visit (minimum 2
hours hours)
Manual water meter read After hours call-out rate per visit
Hydrant meter deposit $2,500
Hydrant meter rental (one week minimum) $50 per week
$150 per month
Water shut-off/turn-on No charge during normal business hours,
otherwise one hour at call-out rate per visit
Water shut-off/turn-on (snowbirds) $50 per shut-off
$50 per turn-on
Water meter testing Call-out rate per visit (minimum 2 hours)
Water testing One hour at call-out rate
Water meter City cost plus 10% administrative fee
Curb stop - valve cover City cost plus 10% administrative fee
Municipal Sanitary Sewer System Fees (Chapter 52)
I/I application fee - H2OPP program $150 per lateral line
Sewer Service Availability Charge (SAC) $2,485 per Metropolitan Council Environmental
Services
Sewer usage rate $3.75 per 1,000 gallons water sold per quarter
Sewer service charge, residential $47.06 per residential equivalent unit (REU)
connection per quarter
Sewer service charge,
commercial/industrial/public buildings and $115.58 per REU connection per quarter
churches
Sewer connection/repair/disconnect $100 plus surcharge
Sewer unit charge (new connection only) $150 per connection
Sewer inspection or re-inspection after hours Call-out rate per visit (minimum 2 hours)
Surface Water Management (SWM) Utility Fees (Chapter 53)
SWM new construction, R-1 $212 per lot
SWM new construction, R-2 $1,038 per acre
SWM new construction, R-3, R-4, R-O $1,500 per acre
SWM new construction, B-1, B-2, B-3, B-4 $1,500 per acre
SWM new construction, I-1, PUD $2,096 per acre
SWM utility rate charge, R-1 Single-Family and
R-2 Single and Two-Family Residential $18.50 per unit per quarter
SWM utility rate charge, R-3 Medium Density
Residential $101.02 per acre per quarter
SWM utility rate charge, R-4 High Density
Residential, R-5 Mobile Homes and R-O $119.79 per acre per quarter
Residential Office
SWM utility rate charge, B-1 Neighborhood
Business, B-2 Limited Business, B-3 Highway $156.91 per acre per quarter
Business and B-4 Regional Business
SWM utility rate charge, I-1 Industrial $127.14 per acre per quarter
SWM utility rate charge, PUD Planned Unit
Development $138.94 per acre per quarter
SWM utility rate charge, CRP Conservancy,
Recreation and Preservation $18.50 per acre per quarter
SWM utility rate charge, school or church, public $56.38 per acre per quarter
or private
Illicit discharge fee To be determined by the Public Works Director
on a case-by-case scenario.
Storm Water Management (The permit fee schedule adopted 12/08/2021 by the Rice Creek
Watershed District Board. The fee for a permit is the cumulative total of all individual aspects
of a project. Government entities are exempt from the permit fees).
Rule C (Storm Water Management):
Residential, commercial, industrial, institutional $3,000 non-refundable fee due at time of
development that proposes less than 5 acres of application.
new and/or reconstructed impervious surface
Once application review costs (district engineer
and legal counsel) exceed $9,000*, any
additional cost must be reimbursed by the
applicant before the permit can be issued.
$5,400 non-refundable fee due at time of
Residential, commercial, industrial, institutional application.
development that proposes 5 or more acres of Once application review costs (district engineer
new and/or reconstructed impervious surface and legal counsel) exceed $9,000*, any
additional cost must be reimbursed by the
applicant before the permit can be issued.
Notes: An application subject to a Rule C fee is exempt from the non-Rule C fee of $300.
The following is exempt from the Rule C fee and subject to only the non-Rule C fee of $300: single-
family residential subdivision that creates seven or fewer lots and establishes no new public
roadway or a private roadway/driveway serving three or more lots
Non-Rule C fee: A$300 non-refundable fee is due at the time of application for a project subject to
one or more of the following Rules:
Rule D (Erosion and Sediment Control Plans)
Rule E (Floodplain Alteration)
Rule F (Wetland Alteration)
Rule G (Regional Conveyance Systems)
Rule I (Public Drainage Systems)
Rule J (Appropriation of Public Waters)
Rule L (Variances): Variable. See district permit variance guidance
policy
* Review cost is calculated according to the consultant hourly rate, which the District will publish
annually. The review cost incurred between the non-refundable fee amount and $9,000 will be
absorbed by the District and will not be the responsibility of the applicant. District staff will notify the
applicant of the incurred cost to date once the total review cost exceeds $7,500, and at subsequent
$3,000 intervals. A delay in notice, however, will not affect the applicant's reimbursement
responsibility
Surface Water Management (SWM) Utility Fees (Chapter 53) (Cont'd)
Storm water connection/repair/disconnect $100 plus surcharge
Storm water inspection or re-inspection after Call-out rate per visit (minimum 2 hours)
hours. Percolation tests during work hours only.
Street Lighting Utility Fees (§ 152.018)
Residential (single-family homes, duplexes,
fourplexes, condominium and townhomes) $5.25 per unit per quarter
Commercial/industrial $24.58 per acre per quarter
Institutional/charitable $24.58 per acre per quarter
Apartments $24.58 per acre per quarter
Construction Site and Land Disturbance Fees (§ 156.006). Additional fees may be required
for legal and engineering costs incurred by the city.
50 to 1,000 cubic yards $150
1,001 to 10,000 cubic yards $250 base fee plus $35 for each 1,000 cubic
yards
10,001 to 100,000 cubic yards $500 base fee plus $100 for each 10,000 cubic
yards
100,001 cubic yards or more $1,500 base fee plus $250 for each 100,000
cubic yards
Other Miscellaneous Public Works Fees
Load limit waiver (must be authorized by the
Public Works Director) $175 per trip
Call-out rate per visit (minimum 2 hours) plus
Call-out charge for contractor negligence (lack of cost(s)* of any materials required to remedy the
maintenance, traffic signs, and the like) issue. *TBD by the Director of Public
Works/Parks and Recreation
Water tower telecommunications maintenance No charge if during normal business hours,
or repair access fee otherwise 2 hour minimum charge for each after
hours call-out
Water tower telecommunications plan review Actual legal and consulting engineering costs
and inspections plus $200 for administration costs and $2,500
escrow.
RPZ annual inspection violation See property based violations, Section IV,
Police/Administrative Offenses
Appeal of public improvement bond $250 (M.S. § 429.036)
mDEPARTMENT
OF HEALTH
Safe Drinking Water Fee
Also known as the public water supply fee
When customers receive their water bill from their water supplier,they may notice that one of the items in the list of
charges is"water testing fee"or"state test fee."This fee is called the safe drinking water fee.It is also known as the
service connection fee.
The fee helps ensure that all public water systems get the support needed to provide safe drinking water
everywhere in Minnesota.
The 2025 Minnesota State Legislature passed a bill raising the safe drinking water fee from$9.72 to$15.22 per water
service connection,effective January 1,2026.This fee increase reduces the state's reliance on federal infrastructure
funds,making more dollars available for local drinking water infrastructure projects.
I low the fee protects drinking water statewide
The fee funds Minnesota Department of Health's(MDH)regulatory and technical assistance services for public
drinking water systems.Our staff across the state build relationships with drinking water operators that result in
extensive knowledge,trust,and a willingness to take action to prevent a violation of the safe drinking water
standards.This cost-effective assistance results in over 97%compliance with federal Safe Drinking Water Act(SDWA)
standards year after year.
Annually,$22 million is collected through the fee.About$3 million is spent on lab costs for drinking water tests.
Much of the rest is used to support staff who conduct inspections,collect and analyze required water samples,and
provide technical assistance,training,and support to enhance water systems'capacity to meet SDWA requirements.
For past budgetary information,visit How the Safe Drinking Water Fee Supports Drinking Water Protection Efforts
,O_[LINK http://www.health.state.mn.us/communities/environment/water/does/fee p. f]:
MDH services are especially helpful to small,rural water systems,which have more difficulty meeting water
standards.Because of smaller customer bases,these systems have fewer resources for testing,investigations,and
physical improvements.
This work helps ensure that everyone,everywhere in Minnesota has access to safe and sufficient drinking water.
Investing in technical support for drinking; water
safety
The safe drinking water fee increase will go into effect on January 1,2026.It accounts for several changes since the
last fee increase in 2019:
• Significant inflationary pressures.
• Increased lab costs for drinking water testing.
• Projected and potential deep reductions in federal funding.
• Numerous SDWA changes that have occurred and are on the horizon.
• Need for drinking water data system updates and improvements.
While federal funding from the Infrastructure Investment and Jobs Act(IIJA)has enabled increased capacity and
technical support to be provided to public water systems,this funding is set to expire.The fee increase provides
stability to maintain the current level of support to water systems during a time of uncertain federal funding.
Reducing MDH program dependence on IIJA for technical support will make more funding available for local
drinking water infrastructure.
The fee increase also supports existing staff that were hired to meet increased expectations and expansions of
SDWA requirements for drinking water.These include regulation of per-and polyfluoroalkyl substances(PFAS),
cybersecurity requirements,enhanced lead and copper regulations,increased consumer reporting,increased
regulation of microbial and disinfection by products,and increased oversight of public water system operation and
maintenance.The staff will continue to administer new federal rules,to conduct sampling and inspections at public
water systems,and provide technical assistance,particularly to smaller systems that have fewer resources.
1/2
Date: August 1, 2025
To: Metropolitan Council Environmental Services (ES) Customer Communities
Re: 2026 Municipal Wastewater Charge
Attachment: Municipal Wastewater Charge Breakdown by Community
On July 23, 2025, the Metropolitan Council adopted the 2026 ES wastewater rates and charges. This
included the Municipal Wastewater Charge in the amount of$314,622,000. This is an increase of 5.8%
from the 2025 charge of$297,360,000.
ES continues to use an allocation method to calculate each municipality's charges. The method uses
the 2024 calendar year flow to allocate the $314.6 million total municipal wastewater charges to
customer communities. ES bills two years following flow data in accordance with a 2016 customer
community taskforce recommendation.
Your municipality's percentage of the overall system flow during that period is the percentage of the
Municipal Wastewater Charge that will be charged to your community in 2026. We have included the
calculation on the attached table and will bill your municipality in equal monthly amounts in 2026. There
were no material changes to the estimated MWC allocations provided to you in May 2025.
Additional information regarding the 2026 ES wastewater rates and charges is available here:
Council Approved Rates and Charges: 2025-157: ES Wastewater Rates and Charges
(metrocouncil.org)
Please note that the ES Sewer Availability Charge (SAC) will be $2,485 in 2026, which is no change
from the prior year.
As always, ES welcomes your comments, questions, and suggestions on our services. Feel free to
contact me, Deb McKinley, at (651) 602-1035 or e-mail me at deb.mckinley(c�metc.state.mn.us. Please
contact Kyle Colvin with questions about your community's wastewater flows at (651) 602-1151 or
kyle.colvin(a)metc.state.mn.us. Thank you!
Sincerely,
Deb McKinley
Assistant General Manager,Strategic Performance Support Services
390 Robert Street North I Saint Paul, MN 551 01-1 805 211
P 651.602.1000 117Y.651.291.0904 I metrocouncil.org METROPOLITAN
COUNCIL
2026 Community Flow Data and Municipal Wastewater Charge
2026 Metropolitan Wastewater Charge to be allocated: $ 314,622,000
Community Flow data: Flow data: MWC 2026 MWC 2026
Flow(mg) %of Total Annual Monthly
Andover 525.29 0.5792% $ 1,822,355.21 $ 151,862.93
Anoka 621.38 0.6852% $ 2,155,714.14 $ 179,642.85
Apple Valley 1,187.02 1.3089% $ 4,118,053.04 $ 343,171.09
Arden Hills 304.57 0.3358% $ 1,056,625.34 $ 88,052.11
Bayport 172.61 0.1903% $ 598,824.90 $ 49,902.08
Birchwood 17.88 0.0197% $ 62,029.95 $ 5,169.16
Blaine 1,652.99 1.8227% $ 5,734,613.15 $ 477,884.43
Bloomington 2,748.13 3.0303% $ 9,533,912.74 $ 794,492.73
Brooklyn Center 946.68 1.0439% $ 3,284,256.75 $ 273,688.06
Brooklyn Park 2,278.42 2.5123% $ 7,904,377.69 $ 658,698.14
Burnsville 1,844.27 2.0336% $ 6,398,208.69 $ 533,184.06
Carver 138.70 0.1529% $ 481,183.09 $ 40,098.59
Centerville 97.92 0.1080% $ 339,707.63 $ 28,308.97
Champlin 519.37 0.5727% $ 1,801,817.33 $ 150,151.44
Chanhassen 985.42 1.0866% $ 3,418,654.97 $ 284,887.91
Chaska 1,258.38 1.3876% $ 4,365,617.75 $ 363,801.48
Circle Pines 91.26 0.1006% $ 316,602.52 $ 26,383.54
Columbia Heights 471.84 0.5203% $ 1,636,924.52 $ 136,410.38
Columbus 21.06 0.0232% $ 73,062.12 $ 6,088.51
Coon Rapids 1,378.42 1.5199% $ 4,782,064.90 $ 398,505.41
Corcoran 99.48 0.1097% $ 345,119.64 $ 28,759.97
Cottage Grove 885.17 0.9760% $ 3,070,864.02 $ 255,905.34
Crystal 617.17 0.6805% $ 2,141,108.65 $ 178,425.72
Dayton 204.87 0.2259% $ 710,742.47 $ 59,228.54
Deephaven 220.24 0.2429% $ 764,064.63 $ 63,672.05
Eagan 2,179.44 2.4032% $ 7,560,992.67 $ 630,082.72
East Bethel 23.90 0.0264% $ 82,914.75 $ 6,909.56
Eden Prairie 1,397.84 1.5414% $ 4,849,437.47 $ 404,119.79
Edina 1,973.04 2.1756% $ 6,844,942.27 $ 570,411.86
Elko New Market 105.22 0.1160% $ 365,033.06 $ 30,419.42
Empire 65.39 0.0721% $ 226,853.37 $ 18,904.45
Excelsior 65.21 0.0719% $ 226,228.91 $ 18,852.41
Falcon Heights 213.69 0.2356% $ 741,341.14 $ 61,778.43
Farmington 678.79 0.7485% $ 2,354,883.00 $ 196,240.25
Forest Lake City 562.56 0.6203% $ 1,951,653.65 $ 162,637.80
Fridley 1,888.73 2.0826% $ 6,552,450.95 $ 546,037.58
Gem Lake 13.80 0.0152% $ 47,875.46 $ 3,989.62
Golden Valley 826.49 0.9113% $ 2,867,289.23 $ 238,940.77
Greenfield 2.96 0.0033% $ 10,268.94 $ 855.74
Greenwood 21.74 0.0240% $ 75,421.20 $ 6,285.10
Hastings 515.74 0.5687% $ 1,789,224.00 $ 149,102.00
Hilltop 35.41 0.0390% $ 122,845.66 $ 10,237.14
Hopkins 583.46 0.6434% $ 2,024,160.69 $ 168,680.06
Page-2 I August 1,2025 I METROPOLITAN COUNCIL
Community Flow data: Flow data: MWC 2026 MWC 2026
Flow(mg) A of Total Annual Monthly
Hugo 314.86 0.3472% $ 1,092,323.79 $ 91,026.98
Independence 18.90 0.0208% $ 65,568.57 $ 5,464.05
Inver Grove Heights 712.81 0.7860% $ 2,472,906.43 $ 206,075.54
Lake Elmo 239.44 0.2640% $ 830,673.97 $ 69,222.83
Laketown Township 20.85 0.0230% $ 72,333.58 $ 6,027.80
Lakeville 1,754.72 1.9349% $ 6,087,538.57 $ 507,294.88
Landfall 18.91 0.0209% $ 65,603.26 $ 5,466.94
Lauderdale 52.20 0.0576% $ 181,094.14 $ 15,091.18
Lexington 49.90 0.0550% $ 173,114.90 $ 14,426.24
Lilydale 24.01 0.0265% $ 83,296.37 $ 6,941.36
Lino Lakes 400.29 0.4414% $ 1,388,700.66 $ 115,725.05
Little Canada 431.28 0.4756% $ 1,496,212.29 $ 124,684.36
Long Lake 125.28 0.1381% $ 434,625.94 $ 36,218.83
Loretto 23.52 0.0259% $ 81,596.44 $ 6,799.70
Mahtomedi 160.34 0.1768% $ 556,257.37 $ 46,354.78
Maple Grove 1,903.46 2.0989% $ 6,603,552.80 $ 550,296.07
Maple Plain 81.84 0.0902% $ 283,922.31 $ 23,660.19
Maplewood 1,516.37 1.6721% $ 5,260,646.06 $ 438,387.17
Medicine Lake 12.82 0.0141% $ 44,475.61 $ 3,706.30
Medina 159.84 0.1763% $ 554,522.75 $ 46,210.23
Mendota 7.00 0.0077% $ 24,284.66 $ 2,023.72
Mendota Heights 544.55 0.6005% $ 1,889,172.70 $ 157,431.06
Minneapolis 17,295.89 19.0716% $ 60,003,531.89 $ 5,000,294.32
Minnetonka 1,632.00 1.7996% $ 5,661,793.87 $ 471,816.16
Minnetonka Beach 17.95 0.0198% $ 62,272.79 $ 5,189.40
Minnetrista 145.95 0.1609% $ 506,335.06 $ 42,194.59
Mound 298.50 0.3291% $ 1,035,567.08 $ 86,297.26
Mounds View 364.60 0.4020% $ 1,264,883.61 $ 105,406.97
New Brighton 693.28 0.7645% $ 2,405,152.24 $ 200,429.35
New Hope 741.27 0.8174% $ 2,571,640.90 $ 214,303.41
Newport 116.13 0.1281% $ 402,882.43 $ 33,573.54
North Oaks 27.97 0.0308% $ 97,034.54 $ 8,086.21
North St Paul 372.09 0.4103% $ 1,290,868.19 $ 107,572.35
Oak Park Heights 168.91 0.1863% $ 585,988.73 $ 48,832.39
Oakdale 848.30 0.9354% $ 2,942,953.27 $ 245,246.11
Orono 221.81 0.2446% $ 769,511.34 $ 64,125.94
Osseo 72.91 0.0804% $ 252,942.03 $ 21,078.50
Plymouth 2,446.96 2.6982% $ 8,489,082.80 $ 707,423.57
Prior Lake 623.28 0.6873% $ 2,162,305.69 $ 180,192.14
Ramsey 403.16 0.4446% $ 1,398,657.36 $ 116,554.78
Richfield 758.02 0.8358% $ 2,629,750.61 $ 219,145.88
Robbinsdale 315.08 0.3474% $ 1,093,087.02 $ 91,090.58
Rogers 426.83 0.4707% $ 1,480,774.19 $ 123,397.85
Rosemount 569.00 0.6274% $ 1,973,995.54 $ 164,499.63
Roseville 1,076.17 1.1867% $ 3,733,488.18 $ 311,124.02
Savage 770.50 0.8496% $ 2,673,046.68 $ 222,753.89
Shakopee 929.94 1.0254% $ 3,226,181.74 $ 268,848.48
Page-3 I August 1,2025 I METROPOLITAN COUNCIL
Community Flow data: Flow data: MWC 2026 MWC 2026
Flow(mg) % of Total Annual Monthly
Shoreview 734.21 0.8096% $ 2,547,148.09 $ 212,262.34
Shorewood 345.96 0.3815% $ 1,200,217.04 $ 100,018.09
South St Paul 1,081.73 1.1928% $ 3,752,777.14 $ 312,731.43
Spring Lake Park 186.27 0.2054% $ 646,214.67 $ 53,851.22
Spring Park 82.76 0.0913% $ 287,114.01 $ 23,926.17
St Anthony 281.32 0.3102% $ 975,965.60 $ 81,330.47
St Bonifacius 95.30 0.1051% $ 330,618.23 $ 27,551.52
St Louis Park 1,640.66 1.8091% $ 5,691,837.46 $ 474,319.79
St Paul 10,151.95 11.1942% $ 35,219,514.90 $2,934,959.57
St Paul Park 120.27 0.1326% $ 417,245.07 $ 34,770.42
Stillwater 646.58 0.7130% $ 2,243,138.90 $ 186,928.24
Tonka Bay 73.81 0.0814% $ 256,064.34 $ 21,338.70
Vadnais Heights 413.71 0.4562% $ 1,435,257.81 $ 119,604.82
Victoria 319.94 0.3528% $ 1,109,947.51 $ 92,495.63
Waconia 393.51 0.4339% $ 1,365,179.23 $ 113,764.94
Wayzata 210.16 0.2317% $ 729,094.73 $ 60,757.89
West St Paul 795.15 0.8768% $ 2,758,563.36 $ 229,880.28
White Bear Lake 619.54 0.6831% $ 2,149,330.75 $ 179,110.90
White Bear Township 348.69 0.3845% $ 1,209,688.05 $ 100,807.34
Willernie 19.44 0.0214% $ 67,441.96 $ 5,620.16
Woodbury 1,776.52 1.9589% $ 6,163,167.92 $ 513,597.33
Totals 90,689.12 100.00% $314,622,000.00 $26,218,500.00
Charge per million gallons =$3,469
Page-4 I August 1,2025 I METROPOLITAN COUNCIL
G park dedication fees, mn \ X
Al Mode All News Images Maps Shopping Videos More - Tools -
Al Overview
Park dedication fees in Minnesota vary by city and are based on development type, such as
residential, commercial, or industrial. These fees are typically calculated based on factors
like a flat rate per unit (e.g., a residential unit), a percentage of the land's value, or a rate per
acre. Cities use the collected fees to acquire or develop parks and recreational facilities, and
the specific rates are set by each municipality and may be updated annually.
How fees are calculated
• By unit: For residential developments, a flat fee per unit is common (e.g., Maple Grove's
residential fee is $4,177/unit, while Minneapolis charges $1,948.50/unit).
• By acreage: Commercial and industrial developments are often charged per acre (e.g.,
Maple Grove charges $11,000/acre for commercial and $6,500/acre for industrial).
• By land value: Some cities may require a fee based on a percentage of the land's fair
market value (e.g., 10% of the land's value).
How fees are used
• Park development: Fees are used for park and recreation purposes, including acquiring
land, developing facilities, and building trails.
• Capital fund: The money is typically held in a separate capital fund and cannot be used
for ongoing maintenance or operational costs.
How to find specific fees
• Check local ordinances: Since fees are determined by each city, you must check the
specific ordinance or fee schedule for the municipality where your development is
located.
• Look for city websites: Look for "park dedication fees" or similar terms on your city's
official website or in its planning and zoning department.
• Contact the local planning department: The local planning or parks and recreation
department can provide the most accurate and up-to-date fee information.
Other considerations
• Administrative fees: Some cities may charge an additional administrative fee, though
this is often capped at a certain amount.
• Appeals: Developers can appeal park dedication fees if they believe they are not
proportionate to the need created by their development, as Minnesota Statutes section
462.361 allows for disputes.
Park Dedication Fee Proportional to Development?
Jun 26, 2024 — In addition,the Collis decision noted "a percentage requirement
could be problematic because it does not consider the...
.-,. National Recreation and Park Association ,
2024 Park Dedication rates - Maple Grove, MN
Feb 4, 2024 —*2024. Residential. $4,177/unit. $4,332/unit. $4,236/unit. $4,156/unit. *
$4,092/unit. Commercial. $11,000/acre. $11,0...
• City of Maple Grove (.gov) ,
2023 Park Dedication Rates Residential Unit Fee ... - Maple Grove, MN •
Feb 5, 2023 — On February 7, 2022 the City Council established the per acre fee of
$6,500 per acre for industrial subdivisions and $1...
f City of Maple Grove (.gov)
Show all
Dive deeper in Al Mode
Al responses may include mistakes. For legal advice,consult a professional. Learn more
U ;u
City of Minneapolis (.gov)
https://www.minneapolismn.gov>permits-overview>fees
Parkland Dedication Fee •
Jun 9, 2025 —The administrative fee will not exceed $1,000 per project. Refunds and
appeals. Refund for parkland dedication fees are handled by Minneapolis ...
s American Legal Publishing
https://codelibrary.amlegal.com>latest>weststpaul_mn
§ 152.06 PARK DEDICATION FEE.
The city shall use park dedication fees only for acquisition and development or improvement of parks,
recreational facilities, playgrounds,trails, wetlands or ...
League of Minnesota Cities
https://www.lmc.org>jan-feb-2024>ftb-jan-2024
Court Finds City's Park Dedication lee Complied With ...
The fee may be "based on the average fair market value of the unplatted land for which park fees have
not already been paid."The subdivision statute also ...
Cottage Grove, MN (.gov)
11411 https://www.cottagegrovemn.gov>View>2025-...
2025 Development Fees & Charges PDF
Jan 7, 2025 — PARK DEDICATION FEES. Park dedication for residential and commercial subdivisions is a
minimum of 10 percent of the net area/buildable area ...
® stpaul.gov
https://www.stpaul.gov>DocumentCenter>View5
PARKLAND DEDICATION - StPaul.gu� F
Oct 3, 2015 — Application forms and fees. . . . b. Fee schedule. Fees for the following zoning control
applications shall be as follows: 1. Site plan ...
3 pages
National Recreation and Park Association
https://www.nrpa.org>parks-recreation-magazine>july
Park Dedication Fee Proportional to Development?
Jun 27, 2024 — Stat. § 462.358, subd. 2c(a). While the park dedication fee of$37,804
in this case was based upon a 5 percent dedication formula found ...
People also ask
How much is the Minneapolis park dedication fee?
Are MN state parks still free?
How much does a permit cost in MN?
Feedback
i City of Maple Grove (.gov)
https://www.maplegrovemn.gov>ViewFile>Item
2024 Park Dedication rates - Resiut uaI 'unit fee and ...
Feb 5, 2024 — Motion to continue the park dedication rate of$6,500/acre for an industrial subdivision
and. $11,000/acre for a commercial subdivision filed ...
City of Brooklyn Park
https://www.brooklynpark.org>development-costs
Development Costs - Brooklyn Park
Residential park dedication, $4,600 per unit (single family and townhomes) ; Multi-family residential,
10% of average land value; Commercial park dedication ...
Sherburne County
https://www.co.sherburne.mn.us>View>Ordinan...
Ordinance 033 - Park Dedication (PLI-5F- Sherburne County
WHY IS A FEE OF $600 PER UNIT OR 10% OF THE LAND AREA A REASONABLE. AMOUNT? 1. This fee is
comparable to park land dedication fees imposed by counties, cities,.
City of Roseville, MN
GIP
https://www.cityofroseville.com>ViewFile> Item
PARK DEDICATION: A. Authority: N PDF iesbta Statutes
Mar 30, 2021 — Park Dedication Amount: The portion of land to be dedicated in all residentially zoned
areas shall be 10%and 5% in all other areas. Park.
1 2 3 4 5 6 7 8 9 10 Next
Results are not personalized
55113, Minnesota- From your IP address -Update location
Help Send feedback Privacy Terms
Reference Chapter FEE
Private Fire Hose Connection Rates(§51.09, G)
Water Test Fee $9.72 $15.22 Annually
$2.54 Bi-monthly
Water Usage Rates (§51.02)
Private Fire Hose Connection Rates(§51.09 (G))
Private Fire Hose Connection Access Charge $1,850.00/REU*
Private Fire Hose Connection Water System Management Fee $14.85/REU*
*Where sanitary sewer service is not provided, and therefore no MCES SAC Unit determination has
been made, the City shall make a determination of the number of REUs based on same or similar
building usage based on the MCES SAC Procedure Manual for usages which do not rely on a fixture
count as a basis for calculation. These fees are waived for fire connections made in conjunction with
a building which is fully served by domestic sewer and water,and therefore,pays standard SAC/WAC
charges.
Water Charges will include two components. The first is a flat fee,generally covering the City's fixed
costs for operation and maintenance of the supply, treatment, storage and distribution system (Water
System Management Fee). The second fee is a variable rate to generally cover the cost of producing
water(Variable Rate). For residential properties,the Water System Management Fee shall be charged
to each home at the rates and intervals shown below, whether the home is connected to city water or
not. For Commercial properties, a fee shall be charged at the rates and intervals shown below,
multiplied by the number of Residential Equivalency Units (REUs) assigned to that property as
determined through a SAC Unit evaluation from the Met Council. If the property does not have
municipal sewer service or has not had a SAC Unit determination completed, the REUs shall be
determined by the Public Works Director using the same methodology outlined in the Met Council's
SAC Manual.
The total Water System Management Fee for Institutional Properties shall be capped at a maximum
of 5x the Water System Management Fee,regardless of how many REUs are assigned to the property.
Residential
Water System Management Fee/Bi-Monthly Billing Period $13.38
Variable—Rate Per Thousand Gallons/Qtr. (0- 15,000) $2.08
Variable—Rate Per Thousand Gallons/Qtr. (15,001- 30,000) $2.38
Variable—Rate Per Thousand Gallons/Qtr. (30,001-XXX) $2.71
Commercial/*
Water System Management Fee/Bi-Monthly Billing Period $13.38 (1 Unit)
$26.76 (2 Units)
$40.14 (3 Units)
$53.53 (4 Units)
$66.90 (>4 Units)
Page 11 of 23
Reference Chapter FEE
Variable—Rate Per Thousand Gallons/Qtr. (0-500,000) $2.08
Variable—Rate Per Thousand Gallons/Qtr. (500,001-XXX) $2.71
*Multi Family buildings which do not have individual meters for each unit will be treated as
commercial buildings (Capped at 5 REUs). Their tiered rate structure will be based on multiplying
the residential tier thresholds by the number of units.
Sewer/Wastewater fee(bi-monthly)
Sewer Charges will include two components. The first is a flat fee covering the City's fixed and
variable costs for sewer collection (Collection Rate). The second fee is to cover the variable charge
for wastewater treatment (Treatment Fee). The Treatment charge will be the Treatment Fee rate
multiplied times the water meter use for the billing period. To account for summer irrigation water not
being treated, the charge for the July and through November billings shall not exceed the average
use during the first billing period of that year and the final billing period of the prior year (winter
average). If the home is unoccupied during a significant part of the winter period, the average
shall be manually calculated using other reasonable means to determine the anticipated sewer
treatment volume.
Collection Rate Treatment Fee
Residential charge $20.15/SAC Unit $ 3.6 8c/1,000 gal.
Commercial/Institutional $29.95/SAC Unit $ 3.4586/1,000 gal.
Sewer-only customers shall be charged a flat rate per SAC unit or may purchase a city water meter
and install it on their well in order to be billed at the lower fixed and variable rates above. Otherwise
sewer-only customers shall be billed at the following rates:
Collection Rate Treatment Fee
Residential rate per SAC $20.15/SAC $20.15/SAC
Commercial/Institutional $29.95/SAC Unit $29.95/SAC
Storm Water Management Fee(bi-monthly): (§51.11)
Residential(Fixed) $10.26
Comm./Industrial/Multi-Family $.0028/sq. ft.
impervious with minimum $10.26
Utilities/(Water/Sewer/Garbage Billing)Penalties& Late Fees
Residential/Commercial Penalty/Late Payment 3%Bi-Monthly
On Delinquent
Balance
Page 12 of 23
Reference Chapter FEE
Utilities/(Water/Sewer/Garbage Certification) 5%of Outstanding Balance or$50.00 whichever is
greater(§50.03)
Utility billing is billed on a bi-monthly basis for the previous two months of service
Use of Meter& Hydrant(§51.09, J)
Meter Rental $50.00 per 1st day or one day
use
$5.00 each Additional day
$1,000.00 Deposit
$25.00 Conn. Fee
$4.00/1,000 Gallons
Page 13 of 23
RESIDENTIAL ELECTRICAL PERMIT FEES(SINGLE FAMILY HOMES,APARTMENTS,
ASSISTED LIVING, and CONDOMINIUMS) Effective: 1/1/2026
HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections
Division.Add$1.00 for State surcharge to total cost of each permit.The fee is the total of the listed fees or the total number
of inspection trips x$50.00($60.00),whichever is greater.
Residential panel replacement is $110.00($125.00), sub
panel $50.00 ($75.00). New service or power supply is: Circuits and Feeders
0 to 300 Amp $55.00($75.00) 0-100 Amp $9.00($12.00)
400 Amp $71.00($100.00) 101-200Amp $15.00($20.00
Add$16.00 ($25.00)for each additional 100 Add$6.00 ($10.00)for each additional 100 amps
amps
Maximum Fee: (Dwelling Fees:)
Minimum Fee: Fee for single family dwelling or
Minimum permit fee is$50.00 ($60.00)plus townhouse not over 200 amps (and up to
$1.00 State surcharge.This is for one 25 circuits)(Additional circuits are
inspection only. $12.00/ea)
Minimum fee for rough-in and final inspection is 200Amps) is $200.00 plus(is $225.00
$100.00 ($120.00)plus$1.00 State surcharge. plus)
$1.00 State surcharge. Maximum of 2 rough-in's and 1 final
Apartment Buildings inspection. (Failed inspections are an additional $50.00
each)($60.00/each)
Fee per unit of an apartment or condominium complex is$90.00
($110.00).This does not cover service, unit feeders or house
panels, (and includes up to 15 circuits per unit)
Swimming Pools and Hot Tubs Additions, $100.00 ($120.00)plus circuits at$9.00/each ($12.00/each).This
includes 2 inspections.
Remodels or Basement Finishes
$100.00 ($120 00)this include up to 10 circuits and 2 inspections
Residential Accessory Structures
The Greater of$55.00($75.00)for panel plus$9.00($12.00)per
circuit or$100($120.00)for 2 inspections.
Street and Parking Lot Lights $5.00($10.00)per each standard
Transformers and Generators $5 up to 10kva,$45($55)11 to 74kva,$60($70)75kva to 299kva,
over 299kva is$165($175)
Retrofit Lighting $0.85 cents($1.00) per fixture
Low voltage fire alarm, low voltage $1.00 per device
heating and air conditioning control wiring
Residing jobs
$50($60.00)
Re-Inspection Fee in addition
to all other fees $50.00($60.00)
Solar fees:
0kw to 5kw=$90($100) 5.1kw to 10kw=$150($165)
10.1kw to 20kw=$225($245) 20.1kw to 30kw=$300($330)
30.1kw to 40kw=$375($410) 40.1kw and larger is$375($410)plus$25 for each additional 10kw
Electronic inspection fee for these items only;furnace, air conditioning, bath fan,fireplace or receptacle for water
heater vent is$40.
Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities handling fee.
THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED.
Minimum fee permits expire in 6 months.
Dnrmilc n,,nr thn minim,ern foo nnrl i in#n QOC.n/Q 4 nnn\ ovnirn in 4 .ionr
Commercial Electrical Permit: Effective: 1/1/26
$50 ($60) per trip or the fees below,whichever is greater—Solar fees are the same as residential solar
fees
Description Fee Calculation Permit Fee
Valuation$1 to$1,000 $50.00 ($60.00) Per trip
Valuation$1,001 to$2,000 $50.00 ($60.00)for the first$1,000 plus
$3.25 for each additional $100 or
fraction thereof, to and including $2,000
Valuation $2,001 to$25,000 $82.00 for the first$2,000 plus$14.85 for
each additional$1,000 or fraction
thereof,to and including$25,000
Valuation $25,001 to $50,000 $423.55 for the first$25,000 plus$10.70
for each additional $1,000 or fraction
thereof,to and including$50,000
Valuation $50,001 to $100,000 $691.05 for the first$50,000 plus $7.45
for each additional $1,000 or fraction
thereof,to and including$100,000
Valuation $100,001 to$500,000 $1,063.55 for the first$100,000 plus$6
for each additional $1,000 or fraction
thereof,to and including$500,000
Valuation $500,001 to $1,000,000 $3,463.55 for the first$500,000 plus$5.10
for each additional $1,000 or fraction
thereof,to and including$1,000,000
Valuation $1,000,001 and up $6,013.55 for the first$1,000,000 plus$4
for each additional$1,000 or fraction thereof
Reinspection fee (in addition to all other fees) $50.00 ($60.00)
Investigative fee (working without permit)the fee is doubled
Refunds issued only for permits over: $100.00 ($120.00)
State Surcharge is.0005 times the project value:$
Total Permit Fee Submitted:$
Minimum fee permits expire in 6 months.Permits over the minimum fee and up to$250.00($1.000)expire in 12 months from the
filing date.A service charge of$35.00 will be added for all dishonored checks.