August 27, 2025
Centerville Project Updates
Nick Tomczik, Administrator
Matt Kocian, Lake and Stream Manager
Tom Schmidt, Drainage and Facilities Manager
David Petry,Project Manager
Chris Otterness, PE, Houston Engineering, Inc.
Overview
¤What is a ǞğƷĻƩƭŷĻķ?
¤Peltier and Centerville Lake Water Quality
¤Public Drainage Systems
¤Clearwater Creek Stabilization Project
Watershed Districts
\[ƚĭğƌͲ ƭƦĻĭźğƌΏƦǒƩƦƚƭĻ ǒƓźƷƭ ƚŅ ŭƚǝĻƩƓƒĻƓƷ ƷŷğƷ ǞƚƩƉ
Ʒƚ ƭƚƌǝĻ ğƓķ ƦƩĻǝĻƓƷ ǞğƷĻƩΏƩĻƌğƷĻķ ƦƩƚĬƌĻƒƭ͵ ŷĻ
ĬƚǒƓķğƩźĻƭ ƚŅ ǞğƷĻƩƭŷĻķ ķźƭƷƩźĭƷƭ ŅƚƌƌƚǞ ƷŷƚƭĻ ƚŅ ğ
ƓğƷǒƩğƌ ǞğƷĻƩƭŷĻķ ğƓķ źƓĭƌǒķĻƭ ƷŷĻ ƌğƓķ ǞŷĻƩĻ ğƌƌ
ǞğƷĻƩ ŅƌƚǞƭ Ʒƚ ƚƓĻ ĭƚƒƒƚƓ ǞğƷĻƩ ĬƚķǤ͵
Water knows no political boundaries. Coordination across multiple
jurisdictions is critical to manage water resources such as Rice Creek.
185 square
miles of urban,
suburban, and
rural lands
Anoka,
Hennepin,
Ramsey, and
Washington
Counties
28 communities
w/5ƭ aźƭƭźƚƓ
ƚ ƒğƓğŭĻͲ ƦƩƚƷĻĭƷͲ ε źƒƦƩƚǝĻ ƷŷĻ ǞğƷĻƩ
ƩĻƭƚǒƩĭĻƭ ƚŅ ƷŷĻ 5źƭƷƩźĭƷ ƷŷƩƚǒŭŷ Ņƌƚƚķ ĭƚƓƷƩƚƌ
ε ǞğƷĻƩ ƨǒğƌźƷǤ ƦƩƚƆĻĭƷƭ ε ƦƩƚŭƩğƒƭ͵
RCWD was established in 1972 when
county boards petitioned the MN Board of
Water and Soil Resources.
Political boundaries and funding issues
limited city and county efforts to manage
drainage issues, flood control activities,
and water quality concerns.
Peltier and Centerville Lake Water Quality
and
Centerville Lake Alum Project
Matt Kocian
Rice Creek Watershed District
Peltier and Centerville Lake Water Quality
Meet the lakes:
Peltier and Centerville Lake Water Quality
The Problem: Too much algae! Driven by too much phosphorus.
Peltier and Centerville Lake Water Quality
CentervilleWater Quality Update
Where does phosphorus come from?:
Internal recycling
External (watershed) sources
Centerville Water Quality Update
Past watershed projects have helped to control external phosphorus
e.g. shoreline restoration and LaMotte pond / ballfield water reuse
Centerville Lake Internal Load Study (2019)
Internal phosphorus recycling is a problem in Centerville
Centerville Lake Alum Project
Centerville Lake
Alum Project,
1998
¤How do we mitigate internal phosphorus loading?
¤Most common tool: Aluminum Sulfate (ÐAlumÑ)
¤Recently used (successfully) in Bald Eagle Lake
Bald Eagle Lake Alum
Project, 2016
What is Alum?
¤Used to control sediment phosphorus release
(internal phosphorus loading)
¤Aluminum Sulfate (liquid)
¤Permanently binds phosphorus in the sediments
¤Aluminum phosphate complexation (Al(OH)PO)
34
¤!ƌǒƒ ͻƌƚĭƉƭΏǒƦͼ ƦŷƚƭƦŷƚƩǒƭͲ ƉĻĻƦźƓŭ źƷ ŅƩƚƒ ğƌŭğĻ
The Centerville Lake Alum Project: Photos from May 2024
Centerville Lake Alum Project
Key Project Details:
¤Alum carries VERY low environmental risk
¤No swimming or fishing restrictions
¤No permit needed from DNR/MPCA
¤Estimated longevity: 15 years
¤Water will be noticeably clearer soon after application
¤Clear water means more plants ÎthatÓs good!
Centerville Lake Alum Project
Clear water = more aquatic plants
Native aquatic plants are necessary
for a healthy lake!
Centerville Lake Alum Project
Alum financial summary:
¤Clean Water Fund grant$954,500 (86%)
¤Project Partners:
¤Rice Creek Watershed District $50,000 (5%)
¤Anoka County$35,000 (3%)
¤City of Centerville $35,000 (3%)
¤City of Lino Lakes$35,000 (3%)
Total$1,109,500
Public Drainage Systems
Tom Schmidt dt ΑΑΑDrainage & Facilities Manager
ACD #55 tile outlet in Centerville
Public Drainage Basics
¤What is Public Drainage? Drainage systems established by
petition to a Drainage authority (historically a county
Board) (CD), or District court (JD), multiple counties. The
drainage system was paid for and is owned by the
property owners it serves.
¤RCWD, in its capacity as Drainage Authority, is the
custodian and administrator of the drainage system. It
does not own the ditch or the associated right-of-way,
but does exercise a property interest in those lands on
behalf of the other benefited parties that utilize the ditch.
Public Drainage Basics
¤ Originally designed for Agricultural
Drainage, to allow the land to be used for
Haying and Pasture, not intended to
convert a wetland into dry upland.
¤Most drainage systems in the district now
serve as regional stormwater conveyance
systems (stormwater outlets). Carrying
peak flow beyond the original design,
leading to more rapid degradation.
Types of Public Drainage
Systems in RCWD
Traditional Systems
¤Open Ditch
¤Agricultural Drain
Tile
Drainage Characteristics of the RCWD
¤22 Public Drainage Systems
¤Flat topography
¤114 miles of Public ditch
¤High water table
¤Rapidly urbanizing areas
¤Urban and rural components
Public Drainage In Centerville
Anoka County Ditch #55 (ACD#55)
and Anoka Washington Judicial Ditch
#3 (AWJD#3). The last major repair
of AWJD#3 through Centerville was
in 1959. (ACD#55 IN 2015).
Anoka County Ditch #47 (ACD #47)
has been abandoned and is now
under private management.
Example of a Repair project Before
Ramsey Count Ditch #4
in Roseville.
Example of completed Repair project
Ramsey Count Ditch #4
in Roseville.
Clearwater Creek (AWJD #3)
¤Hugo, Lino Lakes, Centerville
¤Outlets to Peltier Lake
o Impaired for excess nutrients
¤Heavily scoured and sloughing banks
o Increased sediment and nutrients
downstream
Between 21st Ave and 20th Ave
Clearwater Creek Project Area
Straightened Channel near the school
Clearwater Creek (AWJD #3)
Stabilization Feasibility Study (2023-2024)
GOALS
Sediment plume into Peltier Lake
¤Stabilize creek banks and reduce
the instream erosion
¤Reduce channel velocities,
establish deep rooted vegetation
¤Reduce nutrient and sediment
delivery to Peltier Lake
¤Assess a variety of potential
solutions to achieve these goals
Clearwater Creek (AWJD #3)
Stabilization Feasibility Study (2023-2024)
RESULTS
¤PRELIMINARY Design
¤2-Stage Ditch
o I-35E to 20th Ave
¤Ditch Repair
o 20th Ave to Main St
¤Re-meander
o Main St to natural stream
I-35E to 20th Ave
Two-Stage Ditch
20th Ave to Main St
Ditch Repair
Main St to natural stream
Re-meander
Clearwater Creek (AWJD #3) Stabilization
TIMELINE and FUNDING
¤2023-2024 Feasibility
o$75,000
¤2025-2026 Final Design and Permitting
o$121,000
¤?? Construction
o$1.1M -$1.9M
Clean Water Fund -Watershed Based Implementation Fund
Board of Water and Soil Resources
Clearwater Creek (AWJD #3) Stabilization
NEXT STEPS
¤Collaboration with Centerville
and Lino Lakes City staff
o Identify specific properties, landowners,
and existing easements
¤Landowner engagement
though town hall meeting
¤Final design and permitting
Thank you! Questions?
Nick Tomczik, Administrator
Matt Kocian, Lake and Stream Manager
Tom Schmidt, Drainage and Facilities Manager
David Petry,Project Manager
Chris Otterness, PE, Houston Engineering, Inc.
¤Extra slides
¤9Ë?϶¤ŗňđŹ
¤MS 103B
¤Water planning and projects
¤MS 103D
¤Watershed Districts
¤MS 103E
¤Drainage
¤Chapter 8420
¤Wetland Conservation Act
Junction manhole on ACD #55
Near Water Mark
Peltier Centerville Backflow Feasibility Study
Project Results
Summary: On average, backflow
phosphorus loading from Peltier to
Centerville is very low
Common Carp Population Assessment (2022)
54 kg/ha
2022 Estimate
Peltier and Centerville Lake Water Quality
Shallow Lakes ~16ft deep max.
Peltier and Centerville Lake Watershedske Watersheds
Watershed : Lake Area RatioWWWWWWW
Peltier 140:1
Centerville0.9:1
Average Phosphorus
Concentrations
Peltier 150-200 ug/L
Centerville75 ug/L
Centerville Lake Internal Load Study (2019 & 2023)
Study Results:
Most phosphorus in
Centerville Lake
comes from lake
sediments
AKA
ÐInternal loadingÑ, or
recycling
Centerville Lake TMDL (2013) and Backflow Loading Assessment (2022)
RCWD is examining cost-effective options for limiting backflow
Peltier and Centerville Lake Water Quality