Loading...
HomeMy WebLinkAbout2026-05-05 P & Z Packet bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:2 In addition to the building expansion, the projectwould alsoincludesite improvements toparking and loading areas, landscaping, and anewoutdooramenity space. Two conditions on the approved CUP require buildingand siteimprovements to be consistent with approved plans. For this proposal to move forward, the Applicant is requestingapproval ofa CUP Amendment and Site Plan Reviewwith updated plans. Site Plan Review Required Centerville City Code, Sec. 156.108(A) states the following: For all land use applications or permit applications for commercial or industrial structures, or whenever a site plan review is required by this ordinance, a site plan review is required by the Planning and Zoning Commission. The CUP amendment requestfor an industrial building expansion requires formal site plan review. The Planning Commission may recommend findings and conditions of approval to ensure consistency with the intent of the zoning ordinance. Conditional Use Permit (CUP) Analysis The applicant is requesting an amendment to the current CUP toexpand the existing industrial building. As proposed, the project includes other site improvements related to parkingand loading, landscaping, and a new outdoor accessory structure. Zoning The currentzoning for the subject property is Industrial District (I-1). The purpose of the Industrial District is stated in Centerville City Code, Sec. 156.040(A) as follows: It is intended that the I-1 District provide opportunities for light manufacturing and industrial uses, trade businesses, machine shops and other more extensive land uses. Comprehensive Plan The future land use of the subject property is industrźğƌ ĬğƭĻķ ƚƓ ƷŷĻ /źƷǤ͸ƭ ЋЉЍЉ /ƚƒƦƩĻŷĻƓƭźǝĻ tƌğƓ͵ Chapter 9 of the Comprehensive Plan establishes goals for industrial development: Expand the non-residential tax base. Encourage clean and attractive industrial uses in the community. Staff find the proposal to be consistent with these goals. Land Use Thecurrentand proposedland use is for a truck terminal, which was approved with a CUP in 2021. The application statesthat the owners will continue to operate and maintain the truck terminal useon the subject property.Surrounding land uses are also industrial. Principal Use A truck terminal is allowed as principaluse inthe I-1 Districtwith a CUP, as outlined in Table 156-A.1of the City Code. Expansion of a conditional use triggers the need for a CUP amendment. 12 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:3 Accessory Uses City Code Sec. 156.006 requires that accessory uses are customarily incidental and subordinate to the principal use and located on the same lotas the principal structure. For the Sutton Transportation site, these include: Outdoor storage of trailers, equipment, and materials Loading and staging service areas Accessory structures These accessory uses are permitted in the I-1 District if they meet all applicable zoning standards, including but not limited to screening for outdoor storage and meeting required setbacks. Accessory uses related to Truck Terminals can be managed through the CUP. Proposed Uses The applicant proposes to continue operating the truck terminal and associated activities under a Conditional Use Permit(CUP), as may be amended. The proposalincludesan expansion to the building and associated modifications to outdoor parking and loading areas,screening, landscaping, and a new outdoor amenity areafor employees. Existing CUP Conditions The2021 CUPallowsthe property ownerto develop, construct, maintain, and operate a truck terminal on the subject property. The CUP includes requirements related to site layout, designated parking areas, outdoor storage areas, lighting, landscaping, and compliance with all applicable local, state, and federal agency standards. The CUP also requires compliance with approved site and building plans, limits commercial vehicle parking to marked areas, restricts employee parking to the northern lot, and includes performance standards to mitigate noise, emissions, and nuisances. The CUP issued for the subject property in 2021is provided as an attachment to this report. CUP Amendment Overview According to the applicant, the expansion request is driven by an increase in freight processing at the truck terminal, due to regional consolidation to CentĻƩǝźƌƌĻ͸ƭ ƒƚķĻƩƓ ğƓķ ĭĻƓƷƩğƌƌǤ ƌƚĭğƷĻķ ŅğĭźƌźƷǤ͵ ŷĻ applicant does not anticipate an increase in vehicle or truck traffic, but states that the objective of the project is to increase freight layout space to improve operational efficiency for existing truck deliveries within the terminal. The proposal includes plans to construct a 16,560 sq. ft. additionto the existing 55,000 sq. ft. industrial facility. The expansion would also include additionalsurface parking stalls anddocks at the truck terminal, landscaping improvements, and a new outdoor amenity area. The existing CUP regulates standards related to land use, zoning, and site design. Any building expansion or layout changes require a formal CUP amendment. The Planning Commission may recommend changesor additions to the conditions of approval to ensure consistency with zoning and CUP requirements. 13 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:5 Site Design Landscaping and Screening Sec. 156.040(G) creates requirements for green space and landscaping. The project plans are consistent with the landscaping and screening approved for the first phase of the project on this site. Outside of grass lawn areawhere the building expansion is located, nolandscaping or green spaces are proposed for removal. Trees that may be impacted by construction will be moved or replaced.No additional screening appears to be necessary on the site as existing plantings and site design were planned for this expansion. Storage At present,60 stalls are provided for on-sitestorage of trailers, with 30trailer stallsfound on either side of the existing building. The design proposes an additional32 trailer storage stallscontinuing south along either side of the building.The use of these stalls is considered incidental to the principal use. Parkingand Loading There are currently 93surface parking stalls (including 4 ADAspaces) along the north property boundary abutting Fairview St. An additional 13 stalls will be provided with the expansion, providing atotal of 106 stalls. When taken with the trailer storage stalls, there are 198 spaces available on site. This is consistent ǞźƷŷ ƷŷĻ /źƷǤ͸ƭ ƩĻƨǒźƩĻƒĻƓƷ ƚŅ Ћ ƭƷğƌƌƭ ŅƚƩ ĻǝĻƩǤ ЊЉЉЉ ŭƩƚƭƭ ƭƨ ŅƷ ƚŅ ĬǒźƌķźƓŭ ğƩĻğ͵ ŷĻ ƭǒĬƒźƷƷĻķ ƦƌğƓƭ 15 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:6 note that typical vehicle parking stalls are 9 ft by 20 ft in size. Trailer storage stalls appear to be roughly 10 ft by 60 ft in size. Section 156.040(L) requires that loading facilities be located on the side of rear yards and adequately screened from adjacent public streets.This expansion is consistent with that standard. The applicant stated that there are at least four designated areas for snow storage during the winter. The terminal manager is responsible for maintaining parking and drive areas and contracting with snow haulers when necessary.In winter months, snow storage appears to be partly in the building expansion area. With more impervious area, Staff expectsnow storage be managed by the property owner such that the site can still meet applicable parking requirements. Staff propose a condition that snow storage cannot take place in anypublic rights of way and snow piles may take up no more than 10 percent of the required parking on site. Access,Circulation, and Traffic st There are several access points including two driveways on the east property frontage on21Ave S and a driveway on the north frontage fromFairview St.No changes are proposed to current access locations. The design proposes concrete paving throughout expansion areas, including the replacement of some existing curb and pavement. Sidewalks are 4 ft in width. Per the applicant, traffic is not expected to increase meaningfully as a result of the expansion. The expansion is primarily intended to increase the indoor freight laydown space. 16 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:7 Lighting An electrical plan was submitted with the application as part of the interior improvements. New lighting is not proposed on site outside of what is affixed to the new building. is required to be downcast, cutoff type fixtures that do not produce glare onto adjacent properties. Signage The Centerville City Code allows a ground or monument sign up to 200 sq ft, maximum 15 ft in height, and setback at least 15 ft from property lines. Wall signs are allowed up to 10% of the wall surface area. There is currently a wall sign shown above the office entrance in the plans, but a signage plan was not submitted. If new signage is proposed on site, a sign plan and permit will be required. Fencing Fencing is proposed and allowed as an encroachment on setbacks along property lines. Plans for fencing must be approved by the City Council. Thesubmitted ALTA survey notes that fences currently lie on or ƓĻğƩ ƦƩƚƦĻƩƷǤ ƌźƓĻƭ ΛǞźƷŷźƓ Љ͵Џ͸ ƚŅ ƭƚǒƷŷ ĬƚǒƓķğƩǤΜ͵ It is the responsibility of the property owner to maintain the fence and ensure it is located on or within property lines. Outdoor Amenity Area There is a proposed outdoor amenity area which includes a pavilion structure with tables and seating. The pavilion structure wouldhave a peak height of 13 feet, which is below the maximum height of 15 ft for accessory structures.The pavilion area as proposed is approximately 24 by 30 feet. The applicant provided an example photograph but noted that the color has not been finalized yetand will match the principal structure. Given what was proposed, Staff find the accessory structure to be of similar type and appearance as the principal structure, as required by Sec. 156.040(H) and the CUP. StaffReview Comments City Engineer& Public Works The City Engineerand Public Works Departmenthave had an opportunity to review the plans. The full review comments are provided as an attachment to this report. Key comments are summarized as follows: The proposed building and parking expansions are not expected to impact traffic on adjacent City streets; however, if construction activities affect public roadways, a Traffic Control Plan and City approval will be required prior to disturbance. The project is required to comply with the Stormwater Pollution Prevention Plan (SWPPP), and the applicant must submit a copy of the NPDES Construction Permit to the City prior to the start of construction. 17 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:8 City Building Official ŷĻ /źƷǤ͸ƭ .ǒźƌķźƓŭ hŅŅźĭźğƌƦƩƚǝźķĻķ ĭƚƒƒĻƓƷƭ ƚƓ setbacks, accessory structure height, snow storage, and ADA stalls. Increasing the number of parking stalls from 93 to 106, as proposed, requires one additional ADA space. City Fire Chief The Fire Chief did not provide comments. Rice CreekWatershed District (RCWD) Apermit will be required bythe RCWD prior to construction beginning on site. The applicant is required to coordinate as needed. Findings for Approval CUP Standards City Code Sec. 156.320(B) outlines the standards and conditions for conditional uses as follows: (1)A Conditional Use Permit may be granted for the following uses only: a.Any use specifically listed as a Conditional Use in the regulations applicable to the district in which it is to be located or otherwise stated in this Chapter to be a conditional use; b.Any use which is the same or similar, and consistent with, a conditional use specified in the use district, the Planning Commission may consider and allow such conditional use. (2)A Conditional Use Permit shall be granted only if evidence is presented to establish: a.That the proposed building or use at the particular location requested is necessary or desirable to provide a service or a facility which is in the interest of the public convenience and will contribute to the general welfare of the neighborhood or city; b.That the proposed building or use will not have a substantial or undue adverse effect upon adjacent property, the character of the neighborhood, traffic conditions, utility facilities and other matters affecting the public health, safety and general welfare; and c.That the proposed building or use will be designed, arranged and operated so as to permit the development and use of neighboring property in accordance with the applicable district regulations. CUPAmendment and Site Plan Approval Findings Staff suggest the following regarding the CUP Amendmentand Site Plan Reviewrequests: 1.That the applicant has submitted requests to the City of Centerville for a Conditional Use Permit (CUP) Amendmentand site plan reviewin accordance with the procedures as established by /ĻƓƷĻƩǝźƌƌĻ͸ƭ /źƷǤ /ƚķĻ ğƓķ tƌğƓƓźƓŭ ğƓķ œƚƓźƓŭ /ƚƒƒźƭƭźƚƓͳ ğƓķ 2.That the request isto allow for modifications to the current conditions of approval in order to permit abuilding expansion and associated site improvements; and 3.That the proposed use will remain a truck terminalͲ Ǟŷźĭŷźƭ ğƓ ğƦƦƩƚƦƩźğƷĻ ǒƭĻ ǞźƷŷźƓ ƷŷĻ /źƷǤ͸ƭ Industrial District; and 4.The city has standards for parking, landscaping, lighting, building materials, and other elements in the zoning code which are reasonably appropriate to encourage high quality development in the City; and 18 bğƒĻʹ{ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓΑ/ tAmendment, Site Expansion Date:May 5, 2026 Page:9 5.The proposed use by the Landowner provides for reasonable and adequate parking, landscaping, building design, lighting, screening of outdoor parking and storage, and other issues; and 6.The project as proposed meets the criteria for granting a Site Plan Review approval in Section 156.108 of the Zoning Code and a Conditional Use Permit in Section 156.320 of the Zoning Code; and 7.That the proposed CUP Amendmentand Site Plan Reviewisconsistent with the overall goals and objectives of the Centerville Comprehensive Plan. CUP Amendment Conditions Staff recommend the following conditions of approval for a CUP Amendment: 1.All conditions established inthe CUP for a Truck Terminal use as approved by the City of Centerville on October 27, 2021 for the subject property shall remain in complete effect. 2.Property Owner shall revise the project plansand provide any additional informationas required by the City Engineering Memo dated March 25, 2026, as may be amended, prior to issuance of a building permit for the improvements. 3.Property Owner shall construct and maintain the Subject Property and improvements contained thereon in accordance with the approved plans, which are attached to this report, and hereby incorporated as conditions of this Permit. 4.Snow storage cannot take place in any public rights-of-way,and snow piles may take up no more than 10 percent of the required parking on site. 5.The Landowner is responsible for all of the conditions set forth in this Permit. 6.In addition to all civil penalties and remedies for violation of this Permit, violation of this permit is a misdemeanor criminal offense. Required Approvals and Next Steps The City has the following general options regarding the requests: 1.Approval 2.Approval with conditions 3.Denial 4.Table Staff Recommended Action Staff find that the proposed site expansion is geƓĻƩğƌƌǤ ĭƚƓƭźƭƷĻƓƷ ǞźƷŷ ƷŷĻ /źƷǤ͸ƭ ƚƩķźƓğƓĭĻ ğƓķ requirements for industrial uses. Therefore, staff recommend approval with certain conditions through the following example motion: ͻaƚǝĻ Ʒƚ ƩĻĭƚƒƒĻƓķ ƷŷĻ /źƷǤ /ƚǒƓĭźƌ ğƦƦƩƚǝĻ ƷŷĻ ƩĻƨǒĻƭƷƭ ŅƩƚƒ {ǒƷƷƚƓ ƩğƓƭƦƚƩƷğƷźƚƓͲ ŅƚƩ ğ Conditional Use Permit (CUP)Amendment and Site Plan Review with the findings and conditions ƦƩƚƦƚƭĻķ ĬǤ ƭƷğŅŅ͵ͼ Resources: 1.Application Documents (attached) 2.Conditional Use Permit, approved 10-27-2021. 3.City Code (link only)& Citywide Zoning Map (link only) 4.2040 Comprehensive Plan (link onlyΑ\[ğƓķ ƭĻ ĭŷğƦƷĻƩ ĬĻŭźƓƭ ƚƓ Ʀŭ͵ ЌЉΜ 19 DOHRN TRANSFER COMPANY PROJECT DESCRIPTION March 4, 2026 The project is a 16,560 SF expansion of the existing 55,000 SF facility locatedon14.75acres at 6855 21st Ave Southin Centerville, MNoriginally constructed in 2021. The FAR is 0.11. The expansion will be of precast concrete wall construction to match the existing building. Work Includes: Site work, including modifications/expansion to the existing parking for additional 13 spaces, additional site lighting, landscaping and new amenity patio area with prefabricated pavilion structure. Construction of new building expansion including concretefoundation, flooring and wall panels, steel columns, joists and roof deck, electrical power and lighting, and heating. 20 Stantec Consulting Services Inc. 733 Marquette Avenue, Suite 1000 MinneapolisMN55402-2314 March 25, 2026 Athanasia Lewis Î City Administrator City of Centerville 1880 Main Street Centerville, MN 55038 Dear Ms. Lewis, Reference: Site Plan Review and Conditional Use PermitÎ Sutton Transportation Expansion We have reviewed the site plan dated December 12, 2025 and received March 6, 2026 for the proposed st building and parking lot expansion for the Sutton Transport facility located at 6855 21 Avenue South. The following are our initial engineering comments for the proposed expansion: Comments General 1. It does not appear that the proposed improvements will impact traffic on the adjacent city streets. If this were to change, the applicant shall prepare a Traffic Control Plan and obtain City approval prior to any impacts to local roadways. 2. Final approval by the Rice Creek Watershed District must be attained before any site grading or activity may commence. Erosion Control/SWPPP 1. Compliance with the SWPPP shall be required for construction. Application shall submit a copy of the NPDES Construction permit to the City prior to the start of construction activities. Site Plan 1. The plans should clarify where the standard duty and heavy duty bituminous pavement sections shall be used. 2. Applicant shall confirm that the proposed concrete pavement section matches the existing concrete pavement section. 35 March 25, 2026 Athanasia Lewis Î City Administrator Page 2 of 2 Reference: Site Plan Review and Conditional Use PermitÏ Sutton Transportation Expansion Grading/Stormwater 1. It appears that the existing contours shown on Sheet C2 do not match the existing contours shown on Sheet C5. Plans should be updated accordingly. The existing grading should reflect as-built conditions. 2. It appears that the proposed improvements will disturb slightly more than 1 acre and create additional impervious area. The application shall obtain a permit from the watershed for the proposed improvements and provide a copy of the permit to the city prior to approval. 3. A stormwater management plan shall be provided to confirm that stormwater management is in accordance with City of Centerville and Rice Creek Watershed District Standards. a. If the proposed expansion was accounted for under the stormwater management plan submitted with the initial development, please submit that plan to the City for review. 4. All walls higher than 4Ó shall be designed by a certified engineer and the design and certification of those walls shall be provided to the city. Other Comments 1. The applicant shall provide the City a detailed work schedule. The City shall be provided at least 48 hours notice prior to any work commencing, including grading and utility work. Regards, Stantec Consulting Services Inc. Kellie Schlegel, PE City Engineer Phone: (612) 712-2125 kellie.schlegel@stantec.com Cc: Nathan Fuerst, City Planner 2 36 37 38 39 41 CITY OF CENTERVILLE PLANNING AND ZONING COMMISSION Pursuant to due call and notice thereof, the Regular Meeting of the Planning and Zoning Commission was held in Council Chambers on Tuesday, April 7, 2026, at 6:30 p.m. REGULAR COMMISSION MEETING I. CALL TO ORDER The meeting was called to order at 6:30 p.m. Not Approved 1. Roll Call Present: Chair Dawn Kalina Commissioner DJ Olson Commissioner Bruce Thompson (Via Zoom) Commissioner Jeannie Seppala Commissioner Jim Carciofini Commissioner Bruce Thompson Commissioner Jon Krueger Absent: Commissioner Rebecca Oldenburg-Downing Council Liaison Russ Koski Staff: City Administrator Athanasia Lewis City Planner Nathan Fuerst II. PLEDGE OF ALLEGIANCE III. APPROVAL OF AGENDA There were no changes to the agenda. Motion by Commissioner Seppala, seconded by Commissioner Olson, to approve the agenda as presented. All in favor. Motion carried. IV. PUBLIC HEARINGS (6:30 p.m. or shortly thereafter) V. AWARDS, PRESENTATIONS, APPEARANCES st 1. 7075 21 Avenue Î Conditional Use Permit City Planner Nathan Fuerst reviewed the staff report, noting that this is a request for a conditional use permit to allow flexibility with parking. The property is in the B-1 Commercial district, and the building is more industrial in nature. The use for this space is retail, primarily online, with a store front. Parking standards for the site require 72 stalls, and the applicant only needs 28 spaces for the proposed use, based on using 2,872 sq. ft. of the 12,000-sq. ft space. The bulk of the building will be used for warehousing, so staff are comfortable with fewer parking stalls. A condition of approval is site improvements to the existing parking lot. Page 1 of 4 43 City of Centerville Planning and Zoning Commission April 7, 2026 Discussion ensued about the size of the parking stalls, striping and drainage. City Planner Fuerst noted that site improvements to the existing parking lot would be completed in coordination with our city engineer. Lukas Peters, the property owner, introduced himself to the Commission and confirmed that everything that was presented is accurate. Kale Haluptzok, the buyer, introduced himself and spoke about their current operations. The public meeting was opened and there were no public comments. The public meeting was closed. Motion by Commissioner Olson, seconded by Commissioner Carciofini, to close the public hearing. All in favor. Motion carried. VI. OLD BUSINESS 1. None VII. NEW BUSINESS st 1. 7075 21 Avenue Î Conditional Use Permit Administrator Lewis introduced this item, noting that discussion ensued during the public hearing portion of the meeting. City Planner Fuerst reviewed the findings of fact and conditions for the CUP. These are listed in the staff report; an excerpt from the staff report is shown below: Findings for Approval - CUP Standards City Code Sec. 156.320(B) outlines the standards and conditions for conditional uses as follows: ΛЊΜ A Conditional Use Permit may be granted for the following uses only: ğ͵ Any use specifically listed as a Conditional Use in the regulations applicable to the district in which it is to be located or otherwise stated in this Chapter to be a conditional use; Ĭ͵ Any use which is the same or similar, and consistent with, a conditional use specified in the use district, the Planning Commission may consider and allow such conditional use. ΛЋΜ A Conditional Use Permit shall be granted only if evidence is presented to establish: ğ͵ That the proposed building or use at the particular location requested is necessary or desirable to provide a service or a facility which is in the interest of the public convenience and will contribute to the general welfare of the neighborhood or city; Ĭ͵ That the proposed building or use will not have a substantial or undue adverse effect upon adjacent property, the character of the neighborhood, traffic conditions, utility facilities and other matters affecting the public health, safety and general welfare; and ĭ͵ That the proposed building or use will be designed, arranged and operated so as to permit the development and use of neighboring property in accordance with the applicable district regulations. Page 2 of 4 44 City of Centerville Planning and Zoning Commission April 7, 2026 CUP Amendment Findings Staff recommend the following findings supporting approval of the CUP: 1. That the applicant has submitted requests to the City of Centerville for a Conditional Use Permit (CUP) in accordance with the procedures established by CentervilleÓs City Code; and 2. A Conditional Use Permit is required under City Code Section 156.166 (E) for property owners to receive flexibility to the number of required parking stalls in City Code; and 3. That the request for flexibility is consistent with the overall goals and objectives of the Centerville Comprehensive Plan; and 4. That the proposed flexibility is necessary to reasonably establish a new commercial retail use on the property, and the use is expected to contribute to the general welfare of the City; and 5. That the request would allow for flexibility to parking standards which will not have a substantial or undue adverse effect on adjacent property, the character of the surrounding neighborhood and the general health, safety, and welfare of the City; and 6. That the proposed flexibility, with conditions as imposed by the City, will allow for establishment of a retail use which is arranged and operated in accordance with applicable regulations. CUP Conditions Staff recommend the following conditions of approval for the CUP: 1. This Conditional Use Permit is intended to allow flexibility to the standards for retail uses only. Should another use requiring flexibility to the parking code be proposed, an amendment to the CUP is required. 2. The Retail use may include a maximum of 30% of the floor area for walk in customer sales. If a higher amount of floor area is desired for walk in sales, an amendment to the CUP is required. Discussion ensued about what would happen if the business wanted to expand. City Planner Fuerst noted that if they wanted to have more walk-in sales, they could amend their CUP. The proposed CUP is based on 30% of gross retail floor space for walk in business. The Commission is in favor of recommending that council approve the CUP, along with the findings of fact and conditions. Motion by Commissioner Thompson, seconded by Commissioner Seppala, to recommend the Council approve the request by FSG properties, LLC for a conditional use permit amendment allowing flexibility to parking standards with the findings and conditions proposed by staff. All in favor. Motion carried. VIII. APPROVAL OF MINUTES 1. April 7, 2026, Planning and Zoning Commission Meeting Administrator Lewis introduced this item as presented in the packet. Motion by Commissioner Thompson, seconded by Commissioner Seppala to approve the minutes as presented. Commissioners Kalina, Olson, Thompson, Seppala, Carciofini in favor. Commissioner Krueger abstained. Motion carried. Page 3 of 4 45 City of Centerville Planning and Zoning Commission April 7, 2026 IX. ANNOUNCEMENTS/UPDATES 1. Council Member Liaison No Report Given. 2. AdministratorÓs Report Administrator Lewis reviewed the report as presented. X. ADJOURNMENT Motion by Commissioner Seppala, seconded by Commissioner Krueger, to adjourn the meeting at 7:06 p.m. All in favor. Motion carried. Page 4 of 4 46