HomeMy WebLinkAbout2026-07-01 P & R Packet
CITY OF CENTERVILLE
PARKS & RECREATION MEETING AGENDA
Wednesday, July 1, 2026
6:30 p.m.
City Hall, 1880 Main Street
MEETING
I.CALL TO ORDER
1.Roll Call
II.APPROVAL OF AGENDA
1.Call for Changes to the Agenda
III. AWARDS/PRESENTATIONS/APPEARANCES
1. 2027 Trail Project
2. Laurie LaMotte Memorial Park Study
3. Park Signage
IV. PUBLIC HEARINGS
1.None
V.COMMITTEE BUSINESS (UNFINISHED)
1. None
VI.COMMITTEE BUSINESS (NEW)
1. Park Facility Use Requests
a. Hidden Spring Park – Ms. Julie Rose, Troop 136 Award Ceremony
VII.APPROVAL OF MINUTES
1.None
VIII.ANNOUNCEMENTS/UPDATES
1.Staff Updates (Fiore Tree Compliment & Volunteers Needed)
2.Committee Member Update (Music in the Park & Fete des Lacs Events)
3.Council Liaison Update
IX.ADJOURNMENT
INFORMATION
Fete des Lacs
1
Parade
REMINDERS
Planning & Zoning Commission – Tuesday, July 7, 2026 – Meeting Cancelled
Economic Development Authority – Wednesday, July 15, 2026
City Council Meeting – Thursday, July 9, 2026
City Council Work Session & Meeting – Thursday, July 23, 2026, Work Session 5 p.m./6:30 p.m.
Regular Meeting
Parks & Recreation – Wednesday, August 5, 2026
2
CITY OF CENTERVILLE
REQUEST FOR
COUNCIL ACTION
Agenda Item # Department: Requested Council Meeting Date:
July 1, 2026
Public Works
III.1
TITLE OF ISSUE:
2027 Trail Project
BACKGROUND AND SUPPLEMENTAL INFORMATION:
At their June 22, 2026 meeting, the City Council approved a p2027 trail project that would include
many of the city's trails that are in "poor to very poor" and those with more favorable surfacing
conditions in reference to anasphalt index rating scale. The city of Centerville has an extensive trail system
that connects to Anoka County's regional trail system, and provides good connection to many neighborhoods
and adjoining roadways. The proposed project (see exhibit A), includes trails to be reclaimed in full and those
that require seal-coating and crack sealing. The proposed project will coincide with a mill and overlay project
on the north side of town. The project is also being presented to the Met Council for consideration for an Active
Transportation grant that would help offset construction costs. The trails on the project plan would most likely
be closed for a duration of timeweather dependent for individual segments and corresponding road work.
COST AND SOURCE(S) OF FUNDING:
Capital Improvement Plan
REQUESTED COUNCIL ACTION:
Discussion and presentation of proposed trail reconstruction and maintenance for the city in 2027.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Vote Record: Aye Nay
_____
Other (specify)
__________
___
_____
_____
_________________________________________________________________________
Administration Department Use:
Refer to: _________________________________
Consent
Tabled Until: ______________________________
Regular
Other: ___________________________________
3
4
2027 Trail Project Estimated Construction Costs PROJECT A.1
June 23, 2026
TrailIndexEstimated Cost PerEstimated Construction Cost (With
ImprovementFromOverall LengthWidthCost per LF
Segment IDRateSegment15% Construction Contigency)
LFLF$$$
193
1A43Crack Seal & Seal Coat Duz!Se/!65!-!Tpvui!pg!Dfoufs!Tu/104.05$$781.75%9::/12
777
1B41Crack Seal & Seal Coat Duz!Se/!65-!Opsui!pg!Dfoufs!Tu/!up!Fbhmf!Usbjm 104.05$$3,147.24%4-72:/43
1471
1C41Crack Seal & Seal Coat Duz!Se/!65-!Opsui!pg!Tupsbhf!cvjmejoht!up!Nbjo!Tu/104.05$$5,958.28%7-963/13
1G 69 Crack Seal & Seal Coat Duz!Se/!65-!up!xftu-!up!Fbhmf!Usbjm!Dvm.ef.Tbd 260104.05$$1,053.13%2-322/21
2F 71 Crack Seal & Seal Coat Tfhnfou!gspn!3E!dpsofs!hpjoh!xftu!up!dspttjoh!bu!Evqsf!Spbe 235104.05$$951.87%2-1:5/76
2G 72 Crack Seal & Seal Coat Mpoh!tfhnfou!gspn!Evqsf!dspttjoh!xftu!up!Dfoufswjmmf!Spbe 1441104.05$$5,836.77%7-823/39
4C 84 Crack Seal & Seal Coat Tfh/!gspn!O/!Csjbo!Es/!uispvhi!Bdpso!Ql/!up!uif!Vqqfs!Qbsl!cpvoebsz 1048104.05$$4,244.92%5-992/77
4D 98 Crack Seal & Seal Coat Tfh-!O/!Bdpso!Qbsl!bmpoh!Mbsbnff!voujm!ju!uvsot!Opsui/392104.05$$1,587.79%2-936/:7
4E 9:Crack Seal & Seal Coat Tfh/!Mbsbnff!Tu/!Opsui!voujm!ju!cfdpnft!dpodsfuf!usbjm 220104.05$$891.11%2-135/89
5A 83 Crack Seal & Seal Coat Dfoufswjmmf!Spbe!up!Cfbwfs!QpoeXbz!Usbjm!Tfhnfou!Fbtu0Xftu 1048104.05$$4,244.92%5-992/77
5D 83 Crack Seal & Seal Coat Tipsufs!tfh/!Gspn!6D!up!Cfbwfs!Qpoe!Xbz!Fbtu0Xftu 240104.05$$972.12%2-228/:5
5F 69 Crack Seal & Seal Coat Dfoufswjmmf!Spbe!up!Mbnpuuf!Esjwf!Fbtu0Xftu!uispvhi!Mbnpuuf!Qbsl 1232104.05$$4,990.21%6-849/85
6B 63 Crack Seal & Seal Coat Tfh/!Jo!Mbnpuuf!Qbsl!Opsui0Tpvui!bmpoh!qbsljoh!mpu!pgg!6G 340104.05$$1,377.17%2-694/85
6C 64 Crack Seal & Seal Coat Tfh/!Tuvc!gspn!gjfme!efbe!foe!up!tuvc!up!uif!qmbzhspvoe!fbtu0xftu 327104.05$$1,324.51%2-634/2:
6D 71 Crack Seal & Seal Coat Tfh/!Tuvc!gspn!gjfme!efbe!foe!up!tuvc!up!uif!qmbzhspvoe!fbtu0xftu 50104.05$$202.52%343/:1
6E 59 Crack Seal & Seal Coat Tfh/!gspn!Xbsnjoh!Ipvtf!#U#!fbtu0xftu0!up!tuvc!up!tlbuf!qbsl 270104.05$$1,093.63%2-368/79
6F 84 Crack Seal & Seal Coat Tfh/!gspn!7F!opsui0tpvui!up!uif!tlbuf!qbsl 191104.05$$773.64%99:/7:
7C 97 Crack Seal & Seal Coat Tfh/!Po!Tpsfm!gspn!Dfoufswjmmf!spbe!Fbtu0Xftu!up!8C 147104.05$$595.42%795/85
7D 68 Crack Seal & Seal Coat Qsphsftt!Se/!Opsui!pg!Nbjo!Tu/!Fbtu0Xftu!up!Fmfnfoubsz!Tdippm!8F 273104.05$$1,105.79%2-382/76
7G 67 Crack Seal & Seal Coat Tfh/!Gspn!Nbjo!Tu/!up!Xftuwjfx!Tu/140104.05$$567.07%763/24
8A 96 Crack Seal & Seal Coat Tfh/!pg!Usbjm!bmpoh!Njdibve!Xbz 635104.05$$2,571.75%3-:68/62
69
7FCrack Seal & Seal Coat Tfh/!pg!Usbjm!uibu!svot!qbsbmmfm!up!tdippm!uibu!hpft!pvu!up!Mblfmboe!Ds/1315104.05$$5,326.40%7-236/47
Subtotal 23356%5:-6:9/12%68-148/82
3A 73 Reclaim, Shape and Pave Tfh/!Gspn!Qfmujfs!Ml/!Es/!Tpvui!up!84se!po!Fbtu!tjef!pg!Njmm!Se/3601048.42$$17,431.20%31-156/99
3B 69 Reclaim, Shape and Pave Tfh/!Gspn!84se!hpjoh!up!Qsbjsjf!Es/!Fbtu!tjef!pg!Njmm!Spbe/2551048.42$$12,347.10%25-2::/28
3C 61 Reclaim, Shape and Pave Tfh/!Gspn!Qsbjsjf!Es/!up!Ibzgjfme!Es/!po!Fbtu!tjef!pg!Njmm!Spbe/8201048.42$$39,704.40%56-771/17
3D 66 Reclaim, Shape and Pave Tfh/!Gspn!Ibzgjfme!Se/!up!Nbjo!Tu/!po!Fbtu!tjef!pg!Njmm!Spbe/cz!dfnfu/8801048.42$$42,609.60%5:-112/15
2H 65 Reclaim, Shape and Pave Tfh/!gspn!Nfbepx!Du/!up!Fbhmf!Qbsl!Fbtu!up!usbjm!#tuvc#!up!upxoipnft 7501048.42$$36,315.00%52-873/36
2I 79 Reclaim, Shape and Pave Tuvc!gspn!nbjo!Fbhmf!Qbsl!usbjm!svot!opsui!boe!tpvui!F/!pg!Ufoojt!Dut/501048.42$$2,421.00%3-895/26
2J 81 Reclaim, Shape and Pave Tfh/!Evqsf!Spbe!Fbtu!boe!Xftu!cz!Fbhmf!Qbsl!Qmbzhspvoe!up!tuvcTfh/!Evqsf!Spbe!Fbtu!boe!Xftu!cz!Fbhmf!Qbsl!Qmbzhspvoe!up!tuvc 3001048.42$$14,526.00%27-815/:1
1F 26 Reclaim, Shape and Pave Duz/!Se/65!Xftu!up!#U#-!Tpvui!pg!Dfoufs!Tu/-!ujft!up!3B!boe!3C 12431048.42$$60,189.80%7:-329/38
2A 53 Reclaim, Shape and Pave Tfhnfou!Tpvui!pg!Dfoufs!Tusffu!up!#U#!jo!Usbjm!hpjoh!tpvui 2451048.42$$11,863.64%24-754/29
2B 55 Reclaim, Shape and Pave Tfhnfou!Tpvui!pg!3B!bu!#U#!hpjoh!tpvui!up!usbjm!dpsofs!hpjoh!Xftu 6861048.42$$33,218.18%49-311/:2
2C 46 Reclaim, Shape and Pave Tfhnfou!gspn!3C!hpjoh!xftu!up!Evqsf!Spbe!dpsofs 8951048.42$$43,338.59%5:-94:/49
2D 51 Reclaim, Shape and Pave Tfhnfou!gspn!Evqsf!Spbe!tpvui!up!Qifbtbou!Mo/!Usbjm!dpsofs 4831048.42$$23,388.31%37-9:7/67
2E 56 Reclaim, Shape and Pave Tfhnfou!gspn!3E!A!Qifbtbou!Mo/!hpjoh!tpvui!up!usbjm!dpsofs!hpjoh!xftu 3001048.42$$14,526.90%27-816/:5
4A 54 Reclaim, Shape and Pave Usbjm!uispvhi!Spzbm!Nfbepxt!Qbsl-!Spcjo!Mo/!up!Csjbo!Xbz 2771048.42$$13,413.17%26-536/26
5B 67 Reclaim, Shape and Pave Cfbwfs!Qpoe!Xbz!Tpvui!up!Xftu!up!tfhnfou!6D!uibu!svot!opsui0tpvui!up 2251048.42$$10,895.18%23-63:/56
1D 68 Reclaim, Shape and Pave Csjbo!Esjwf!up!Fbhmf!Usbjm!Tpvui!pg!Nbjo!Tu/3501048.42$$16,947.00%2:-59:/16
1 E 67 Reclaim, Shape and Pave Xftu!tjef!Csjbo!Esjwf!-!Tpvui!pg!Nbjo!Tu/-!!up!Csjbo!Dpvsu 8731048.42$$42,270.66%59-722/37
5G 39 Reclaim, Shape and Pave Opsui0Tpvui!Tfhnfou!gspn!6D!up!6F!bmpoh!SDXE!mboe!up!Xftu 4701048.42$$22,758.81%37-283/75
Subtotal9462$458,164.56$526,889.24
CONSTRUCTION COSTS SUMMARY
TOTAL ESTIMATED CONSTRUCTION COSTS - CRACK SEAL AND SEAL COAT$57,037.71
TOTAL ESTIMATED CONSTRUCTION COSTS - RECLAIM, SHAPE AND PAVE$526,889.24
TOTAL ESTIMATED CONSTRUCTION COSTS (CS/SC + RECLAIM)$583,926.95
5
CITY OF CENTERVILLE
REQUEST FOR
COUNCIL ACTION
Agenda Item # Department: Requested Council Meeting Date:
July 1, 2026
Administration/Public Works
3.2
TITLE OF ISSUE:
Laurie LaMotte Memorial Park Study
BACKGROUND AND SUPPLEMENTAL INFORMATION:
At their May 14, 2026 meeting, the City Council approved the Capital Improvement Plan for 2026. Of those
items, was a park study for Laurie LaMotte Memorial Park. This study is an all encompassing study of current
park assets and infrastructure, and activities. The study will include various options for park improvements in
the context of maximizing park space and patron recreational opportunities. Oertel Architects is the hired
consultant for this project. This entity has much experience in municipal public work and parks projects in the
greater Twin Cities and will be working with staff to bring new concepts and trending recreational possibilities
for our community to consider. These concepts will be brought forward to various community groups and the
Committee will have an opportunity to provide feedback regarding the future proposed projects for the park.
This process of design will last approximately 60 days before the information will be presented.
COST AND SOURCE(S) OF FUNDING:
Capital Improvement Plan
REQUESTED COUNCIL ACTION:
Presentation and Discussion of information to the Parks & Recreation Committee.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Vote Record: Aye Nay
_____
Other (specify)
__________
___
_____
_____
__________
Administration Department Use:
Refer to: _________________________________
Consent
Tabled Until: ______________________________
Regular
Other: ___________________________________
6
CITY OF CENTERVILLE
REQUEST FOR
COUNCIL ACTION
Agenda Item # Department: Requested Council Meeting Date:
July 1, 2026
Administration/Public Works
3.3.1
TITLE OF ISSUE:
Park Signage
BACKGROUND AND SUPPLEMENTAL INFORMATION:
At their May 14, 2026 meeting, the City Council approved a line item for new signage for the park system.
Staff is presenting options for new signage in the park system to replace old and weathered signs that are past
their useful life and to bring a vibrant new look that is consistent to all the parks in Centerville. The proposed
type of signs are manufactured with HDPE (High Density Polyethylene) to resist sun and weather fading over
the years, while maintaining their colors and intensity with twenty years or more for longevity. These signs
resist warping and color loss, while continuing a strong integrity as a sign structure. These signs are often
placed with cedar posts in the park system again for duration and anti-decay. Staff recommends looking at
samples from Vacker Signs and other vendors.
COST AND SOURCE(S) OF FUNDING:
Capital Improvement Plan
REQUESTED COUNCIL ACTION:
Discussion and presentation of concepts and plans.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Vote Record: Aye Nay
_____
Other (specify)
__________
___
_____
_____
_________________________________________________________________________
Administration Department Use:
Refer to: _________________________________
Consent
Tabled Until: ______________________________
Regular
Other: ___________________________________
7
8
9
10
Vackersign.com Wbdlfstjho/dpn
!Qbhf!2!Qbhf!2
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
U SBDJF!K PZ!N D C SJEF
N FNPSJBM!Q BSL
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
Direction 1
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
11
Vackersign.com Wbdlfstjho/dpn
!Qbhf!3!Qbhf!3
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
Usbdjf!Kpz!NdCsjef
Fbhmf!Qbsl
Nfnpsjbm!Qbsl
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
Direction 2
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
12
Vackersign.com Wbdlfstjho/dpn
!Qbhf!4!Qbhf!4
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
GspouCbdl
Direction 3
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
13
Vackersign.com Wbdlfstjho/dpn
!Qbhf!5!Qbhf!5
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
U SBDJF!K PZ!N D C SJEF U SBDJF!K PZ!N D C SJEF
N FNPSJBM!Q BSL N FNPSJBM!Q BSL
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
GspouCbdl
Direction 4
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
14
Vackersign.com Wbdlfstjho/dpn
!Qbhf!6!Qbhf!6
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
Usbdjf!Kpz!NdCsjef
Fbhmf!Qbsl
Nfnpsjbm!Qbsl
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
Direction 5
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
15
Vackersign.com Wbdlfstjho/dpn
!Qbhf!7!Qbhf!7
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
Fbhmf!QbslFbhmf!Qbsl
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
GspouCbdl
Direction 6
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
16
Vackersign.com Wbdlfstjho/dpn
!Qbhf!8!Qbhf!8
nkriegler@vackersign.com olsjfhmfsAwbdlfstjho/dpn
Centerville
1/2" Thick PlasticNavy / White / Navy*
Flat-Routed*Digital representation of color is approximate. Contact us for a material color sample if needed
Installation: Sign features 2" extensions for mounting purposes.
Usbdjf!Kpz!NdCsjefUsbdjf!Kpz!NdCsjef
Nfnpsjbm!QbslNfnpsjbm!Qbsl
2345!Beesftt!Tusffu2345!Beesftt!Tusffu
82/6#82/6#
GspouCbdl
Direction 7
|
PROPRIETARY This design is the property of Vacker Inc.. Any reproduction or use, in part or as a whole, without the written permission of Vacker Inc. is prohibited.
|
EXPANSION AND CONTRACTION HDPE sign board should be allowed to move freely with expansion and contraction. Any thru holes should be oversized by 1/8"–1/4" and care should be taken to
not over-tighten fasteners.
17
CITY OF CENTERVILLEREQUEST
FOR ACTION
Agenda Item # Department: RequestedMeetingDate:
July 1, 2026
Administration
6.1
TITLE OF ISSUE:
Request for Park Facility Usage - Hidden Spring Park, Troop 136
BACKGROUND AND SUPPLEMENTAL INFORMATION:
This has been an annual request for several years. The Troop are wonderful stewards of the parks and a huge
asset to the community.
COST AND SOURCE(S) OF FUNDING:
N/A
REQUESTED ACTION:
Motion to recommend to council the approval of Troop 136's use of Hidden Spring Park.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Aye
Vote Record: Nay
__________
Application
Other (specify) ____________
__________
__________
_______________________________________________________________
__________
_______________________________________________________________
__________
_____
_____
_____
_____
Refer to: _________________________________
Tabled Until: ______________________________
Consent
Other: ___________________________________
Regular
18
19
CITY OF CENTERVILLEREQUEST
FOR ACTION
Agenda Item # Department: RequestedMeetingDate:
July 1, 2026
Administration
8.1
TITLE OF ISSUE:
Staff Update (Fiore Tree Compliment & Volunteers Needed)
BACKGROUND AND SUPPLEMENTAL INFORMATION:
Mr. Jim Williamson forwarded a comment regarding the Fiore Tree - See Attached.
Volunteers are needed for the 5/8K Runs and Main Street Market.
COST AND SOURCE(S) OF FUNDING:
N/A
REQUESTED ACTION:
Motion to recommend to council the approval of Troop 136's use of Hidden Spring Park.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Aye
Vote Record: Nay
__________
Other (specify) ____________
__________
__________
_______________________________________________________________
__________
_______________________________________________________________
__________
_____
_____
_____
_____
Refer to: _________________________________
Tabled Until: ______________________________
Consent
Other: ___________________________________
Regular
20
Get Outlook for iOS
From: Teresa Bender <TBender@centervillemn.com>
Sent: Wednesday, 17 June 2026 18:00:12
To: James Williamson <jameswilliamson8632@yahoo.com>
Subject: Re: Sculpture Tree
Thank you soooo much , Mr Williamson. Great to hear you love it!
Teresa
Get Outlook for iOS
From: James Williamson <jameswilliamson8632@yahoo.com>
Sent: Wednesday, 17 June 2026 17:34:34
To: Teresa Bender <tbender@centervillemn.com>
Subject: Sculpture Tree
I absolutely love our new tree, with the beautiful hanging Ǐ owers ϼ϶fƂЪŹ϶êňƜêƢŹ϶ê϶ŵđêň϶ƂŵđêƂ϶
to drive around that corner.
Jim Williamson
21
CITY OF CENTERVILLEREQUEST
FOR ACTION
Agenda Item # Department: RequestedMeetingDate:
July 1, 2026
Administration
8.2
TITLE OF ISSUE:
Committee Member Update (Music in the Park & Fete des Lacs Events)
BACKGROUND AND SUPPLEMENTAL INFORMATION:
On Tap was cancelled due to rain and North Suburban Chorus cancelled due to heat. Committee Member
Peterson will give an update.
Committee Member Peterson will give an update of Safety Night and the Canoe, Kayak/Paddle event.
COST AND SOURCE(S) OF FUNDING:
N/A
REQUESTED ACTION:
Motion to recommend to council the approval of Troop 136's use of Hidden Spring Park.
For Clerk’s Use:
SUPPORTED DOCUMENTS ATTACHED
Motion By: ____________________________________
Resolution Ordinance Contract Minutes Plan Map
Second By: ____________________________________
Aye
Vote Record: Nay
__________
Other (specify) ____________
__________
__________
_______________________________________________________________
__________
_______________________________________________________________
__________
_____
_____
_____
_____
Refer to: _________________________________
Tabled Until: ______________________________
Consent
Other: ___________________________________
Regular
22
23
Notice to Residents Regarding Fete des Lacs Parade
Dear Residents,
This notice is to inform you that Main Street, Dupre Road and Meadow Lane will be part of the
th
parade route for the Fete des Lacs on July 18
. Brian Drive and Fox Run will once again serve
as the parade's staging area, with staging expected to begin around 9:30 AM.
Details:
Date: July 18th
Parade Time: The parade will take place from 11am to 12pm
Parade Route: Main Street, Dupre Road and Meadow Lane are part of the parade route.
Staging Area: Please note that the staging area for the parade will be located at Brian
Drive and Fox Run.
What to Expect:
Temporary Street Closures: Main Street, Dupre Road and Meadow Lane and
potentially surrounding streets will be temporarily closed to vehicular traffic during the
parade. We anticipate closures will begin at 10:30am and conclude by 12pm. Please note
Brian Drive will be temporarily closed at 9:30am.
Increased Pedestrian Traffic: You can expect increased pedestrian traffic along the
parade route.
Parking Restrictions: There will be temporary parking restrictions on these streets and
possibly adjacent streets. We will do our best to minimize disruption.
Noise: You may experience increased noise levels due to music, announcements, and
parade participants.
We understand this may cause some inconvenience, and we appreciate your cooperation
and patience as we organize this community event. We are working to ensure the parade route
is managed efficiently and safely.
Additional Information:
Emergency vehicle access will be maintained at all times.
For any questions or concerns, please contact Athanasia Lewis at Centerville City Hall
Thank you for your understanding and support.
Sincerely, Centerville Parade Committee
24
25