HomeMy WebLinkAbout2006-10-11 CC
ervi{{e
CITY COUNCIL & WORK
SESSION MEETING
Wednesday, October 11,2006
6:30 p.m.
'Estaf,[isfietf 1857
COUNCIL MEETING
I. CALL TO ORDER
1. Roll Call
D. PUBLIC HEARINGS
ID. APPROVALOFAGENDA
IV. APPROVAL OF COUNCIL MINUTES
1. September 27,2006 City Council Meeting Minutes (Pages 1 - 6)
V. CONSENT AGENDA
1. City of Centerville September 28, 2006 through October 4, 2006 Claims
(Page 7)
2. Change Order - 21st A venue/Backage Road (Pages 8 - 9)
3. Authorize Staff and Council Members to Attend League of Cities Regional
Meeting in St. Paul. (fee $35 per person) (Page 10)
VI. A W ARDSIPRESENTA TIONS/APPEARANCES
VD. OLD BUSINESS
VDI. NEW BUSINESS
1. Proposed Ordinance #XX, Second Series - Amending Chapter 111 of the
Centerville Code Insurance Requirements (Page 11)
2. Proposed Ordinance #XX, Second Series - Amending Chapter 93 of the
Centerville Code by Amending Section 93.01 Relating to Maintenance of
Sidewalks (Pages 12 - 13)
3. Proposed Ordinance #XX, Second Series - Amending Chapter 93 of the
Centerville Code by Inserting Section 93.04 Relating to Adjoining Right of
Way (Page 14)
4. Acceptance of Resignation - Mr. Jeff Banzai from Planning & Zoning
Commission (Page 15)
5. Purchase of a New 6 Mega Pixel Digital Camera
6. Paving Public Works Entrance Area (Pages 16 -19)
IX. ANNOUNCEMENTSIUPDA TES
1. City Administrator, Mr. Dallas Larson
2. CSAB14 (Update)
3. Downtown Redevelopment
4. Centerville Sesquicentennial
x. ADJOURNMENT
COUNCIL WORK SESSION
L CALL TO ORDER
1. Roll Call
IT. DISCUSSION ITEM
1. Anoka County Response to the City's Comments Regarding the
Memorandum of Understanding
m. ADJOURNMENT
* * REi\,il1NDERS * *
City Council Meeting October ,200(, () 30 pm Council Chambers
EDA Public Hearing
Park and Recreation Committee Meeting NCHcmber L 2U06 (, 'H) p.1l1 Cound Chambers
GENERAL ELECTION - November 7, ,~006 7.00 a m. to 800 p.In SL Gcne\ieve's Parish
C\l1nmunit\ Center
City Council Meeting ..... November 8, 2006 6.30 P m Council Chambers
Delinquent Utilities/Garbage Public Hearing
Westview Special Assessments Public Hearing
Hunters Crossing, 3rd Addition Special Assessments Public Hearing
7111 Brian Drive Special Assessment Public Hearing (Grass Cutting)
Consideration of2007 Liquor/Tobacco Licenses (Deadline to receive paperwork from
establishments at City Hall November 3,2006)
Planning and Zoning Commission Meeting- November 14,2006 - 630 pm. Council
ChambcT~;
CITY OF CENTERVILLE
CITY COUNCIL MEETING
SEPTEMBER 27, 2006
6:30 p.m.
Pursuant to due call and notice thereof, the City of Centerville held their regularly scheduled
meeting on September 27,2006, at City Hall, 1880 Main Street.
PRESENT:
STAFF:
Mayor Mary Capra
Council Member Tom Lee
Council Member leffPaar
Council Member Richard Terway t'
:::Cil Member Michelle Lakso NOll
City Engineer Statz
City Administrator Larson
.... .............
.... .........
. ............ ..... ...
.. ........ d' .
... ... ". d' ..
.. .. 'u d' .
... ..... .", ..... ..
.., ... ... "..... .
.....,:,::,:!"ii?::iQ,
:.,' p..."...'.'..... :'.,.,.:"'::/:. '.:... , >,"'"
... ..,.,...,...,...... ...:.:."...",0...... ....... ......
:!n!:iniQi :i,,!"" .i....
...d.. ......... .
................. .......,...... "
.......... d."... .
........... ...d,.. .
......u..u udo.. .
............... .......... .
..... .... .... ..
.. .... ... ..
. ... ... .
. ..."" ..... ..."
. . , . , - . . . . . .
. . ... '..
'"' ..
...., .....
ABSENT:
I. CALL TO ORDER
Mayor Capra called the September 27,2006, City Council meeting to order at 6:30 p.m.
II. PUBLIC HEARINGS
None.
III. SET AGENDA
Council Added: Fairview Avenue, Center Street Trail, and extend prepayment for
Westview. Council removed the closed executive session.
Motion by Council Member Paar. seconded by Council Member Lee to approve the
Al!enda as amended. All in favor. Motion carried unanimously.
IV. APPROVAL OF COUNCIL MINUTES
1. September 13,2006 City Council Meeting Minutes
Motion bv Council Member Lakso. seconded by Council Member Terway. to
approve the September 13. 2006 City Council meetinl! minutes as presented. All in
favor. Motion carried unanimously.
2. September 13,2006 City Council Closed Session Meeting Minutes
/
City of Centerville
Council Meeting Minutes
September 27, 2006
Motion by Council Member Lakso. seconded by Council Member Terwav to
approve the September 13. 2006 City Council Closed Session meetine: minutes as
presented. All in favor. Motion carried unanimous Iv.
V. CONSENT AGENDA
1. City ofCenterville September 14,2006 through September 27,2006 Claims
2. Centennial Fire District Claims through September 30,2006
3. Centennial Lakes Police Department Claims through September 14,2006
4. Interstate Power Systems Proposal for Generator Inspection - Not to Exceed $650
Motion by Council Member Lee. seconded bv Council Member Paar. to approve the
Consent Ae:enda as presented. All in favor. Motion carried unanimouslv.
VI. A W ARDS/PRESENTATIONS/APPEARANCES
None.
VII. OLD BUSINESS
1. Bonestroo Recommendation to Delay Pavement, Curb & Gutter Until 2007 -
Backage Road & 21 st Avenue Utility & Street Improvement
City Engineer Statz provided an update on the recommendation regarding the paving of
21 st Avenue Backage Road. The Contractor has asked for permission to delay
bituminous paving and concrete curb and gutter as they are having issues meeting
densities in compaction because the soils are really wet and time is needed to allow it to
sit through a freeze thaw cycle. The recommendation is for a gravel access on 21 st
Avenue to allow for access to Sheehy and the lift station.
City Engineer Statz indicated that the proposal is to do the paving and concrete curbing in
June 2007 and have the backage road closed until then.
City Administrator Larson suggested a change order increasing the time allowed for
completion of the project.
Council Member Lee indicated that he would like a date certain for the paving to be
completed.
Council asked for a withholding of funds until the work is done.
Council Member Terway asked that the contractor pay for the barriers to close the road.
City Engineer Statz will inform the contractor of that requirement.
Page 2 of6
c2
City of CenterviIle
Council Meeting Minutes
September 27,2006
Motion bv Council Member Terwav. seconded bv Council Member Lakso to
Authorize Preparation of a Chane:e Order to Extend the Terms of the Proiect to be
completed bv June 30. 2007. All in favor. Motion carried unanimous Iv.
2. Approval of Grant Agreement & Authorization of Closing on Land Purchase - St.
Paul Regional Water Services
City Administrator Larson clarified that the property must be used for public park open
space for the portion that the grant covers. The property cannot be sold for housing or
another purpose in the future.
Mayor Capra indicated that the grant allows the City to pay this property off without any
financing.
Motion bv Council Member Lakso. seconded bv Council Member Lee. to approve
the Grant Ae;reement & Authorization of Closine: on Land Purchase - St. Paul
Ree:ional Water Services. All in favor. Motion carried unanimously.
3. Fairview Avenue
City Administrator Larson explained that the property owners adjoining Fairview Avenue
have asked whether the City could add that street to the backage road project and that was
not an option at the time because Old Mill Road was being considered. He then said that
due to that dropping off and the timing of this project being changed Fairview could
again be considered and the amount would be approximately $260,000. The property
owners would like to do an expedited process and have it specially assessed to them.
City Administrator Larson indicated that the frontage runs past Ebensteiner and Rehbein
and it will be assessed approximately 60% to Rehbein and 40% to Ebensteiner with no
cost to the City.
Council agreed to add Fairview to the project provided the property owners will agree.
Motion bv Council Member Lee. seconded bv Council Member Terwav. authorizine:
Staff to Prepare Assessment Ae:reement. All in favor. Motion carried unanimously.
VIII. NEW BUSINESS
1. Mountain Enterprises, Inc., Request for 2:00 a.m. Closing Renewal
Mayor Capra indicated that she would like to arrange the renewals to run with the license
renewals.
Staff will look into that to ensure compliance and ease in keeping track of the situation.
Council Member Paar suggested one date that all renewals are due.
Page 3 of6
3
City of Centerville
Council Meeting Minutes
September 27, 2006
City Administrator Larson indicated that the insurance should run concurrent with the
license year to eliminate the need to deal with this every few months.
Council would like to discuss this with the business owner at license renewal time.
Motion by Council Member Paar, seconded by Council Member Lee, to approve
renewal of the 2:00 a.m. closine: for Mountain Enterprises, Inc., dba Trio Inn. All in
favor. Motion carried unanimously.
Mayor Capra asked Staff to look at the ordinance to see if it can be amended to assist
Staff with enforcement of these types of issues and notify Centennial Police of the
. .
msurance Issue.
2. Resolution #06-045 - Expressing Support & Congratulations to the Town of
Columbus
Mayor Capra noted that Columbus Township has incorporated to become a City.
Motion by Council Member Terway, seconded by Council Member Paar, to
approve Resolution #06-045 - Expressine: Support & Cone:ratulations to the Town
of Columbus. All in favor. Motion carried unanimously.
3. Center Street
City Administrator Larson indicated that the City is in the process of building a trail
through Outlot E of Pheasant Marsh Third Addition and the trail stops short of Center
Street. Staff has found that there is an outlot that the State of Minnesota owns due to tax
forfeit and there is an easement across it, however the easement doesn't provided for a
trail. He then suggested that the City should acquire the property to allow for the trail to
cross it and connect with Center Street. He further indicated that there is an adjoining
property owner that has extended a fence over to a portion of it and he could claim that he
owns the property now by adverse possession.
Council Member Lee indicated he would like to have City Attorney Glaser look into
having the fence removed to allow room for the trail.
City Administrator Larson suggested pursuing a restricted deed and then work out getting
the unrestricted deed and work out the specifics with the adjoining property owner.
Motion by Council Member Lakso, seconded by Council Member Terway, to
approve aCQuirine: the parcel. All in favor. Motion carried unanimously.
Council Member Terway asked for legal interpretation of the unrestricted and restricted
deed and ability to look into the adverse possession situation.
4. Extend Prepayment for Westview
Page 4 of6
4
City of CenterviIle
Council Meeting Minutes
September 27,2006
City Administrator Larson explained that in the agreement the property owners have until
November 1, 2006, to prepay without interest but it took an extra month to get the project
going and the property owners have asked to extend prepayment to December 1,2006.
Motion by Council Member Lee. seconded by Council Member Lakso. to approve
an extension to prepay to December 1. 2006. All in favor. Motion carried
unanimously.
IX. ANNOUNCEMENTSIUPDATES
1. City Administrator, Mr. Dallas Larson
City Administrator Larson reported that the County is considering bump outs at
Centerville Road. He also reported that Staff is still waiting for comment on the MOD
submitted by the City.
City Administrator Larson explained that the demo of buildings in Block 7 will begin as
soon as the response is received from the PCA. He also indicated that the City has asked
to use a garage for the squads and Staff will continue to negotiate that arrangement with
the County.
City Administrator Larson indicated that he received a call from Ronnie Burque and he
would like to purchase the Studebaker fire truck as his grandfather was Mayor at the time
the fire truck was purchased.
Council asked Staff to work with him regarding a purchase agreement.
2. CSAH 14 (Update)
Nothing further.
3. Downtown Redevelopment
City Administrator Larson indicated that the East Block 7 project has a spend down
requirement by the end of the year and the City is a little behind where they should have
been on that and Staff will work on getting the funds spent down. Staff is also looking at
using remaining funds to buy the parcel next to the land that the City owns to build the
pond.
Mayor Capra asked if the City can apply for the funds not spent this year.
City Administrator Larson indicated it may be possible.
Motion bv Council Member Lee. seconded by Council Member Terway. to
authorize securine: proposals for construction of utilities to serve Block 7 and to look
Page 5 of6
5
City of Centerville
Council Meeting Minutes
September 27,2006
at purchasine: adioinine: property for runoff holdine: pond. All in favor. Motion
carried unanimously.
4. Centerville Sesquicentennial
Mayor Capra informed Council that Mr. & Mrs. L' Allier would be servmg on the
Committee and invited anyone else interested to contact her.
Council Member Paar asked about fireworks for Fete des Lacs next summer because of
the sesquicentennial and asked whether the City can increase the funds to do more.
Mayor Capra indicated that Council put $5,000 toward the sesquicentennial and Council
can revisit the issue if desired.
x. ADJOURNMENT
Motion by Council Member Lakso. seconded by Council Member Paar to adiourn
the September 27. 2006 City Council Meetine: at 7:18 p.m. All in favor. Motion
carried unanimously.
Transcribed by:
Joan Lenzmeier, Recording Secretary
TimeSaver Off Site Secretarial, Inc.
Page 60f6
to
CITY OF CENTERVILLE
10/04/06 9:00 AM
Page 1
'E<talifi.41<'d: lB.:;?
*Check Summary Register@
Name
10100 MAIN STREET BANK
Paid Chk# 021737 AFLAC
Paid Chk# 021738 AVLlC
Paid Chk# 021739 CENTENNIAL LAKES POLICE
Paid Chk# 021740 CITY OF CIRCLE PINES
Paid Chk# 021741 DAVE KICHLER INSPECTIONS,
Paid Chk# 021742 IMAGE PRINTING & GRAPHICS
Paid Chk# 021743 LEAGUE OF MN CITIES
Paid Chk# 021744 METROPOLITAN COUNCIL
Paid Chk# 021745 MMUA
Paid Chk# 021746 NATIONWIDE RETIREMENT
Paid Chk# 021747 NCPERS LIFE INSURANCE
Paid Chk# 021748 ON SITE SANITATION
Paid Chk# 021749 PALZER, PAUL
Paid Chk# 021750 PERA
Paid Chk# 021751 PRESS PUBLICATIONS
Paid Chk# 021752 TIME SAVER
Check Date
OCTOBER 2006
Check Amt
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
10/11/2006
Total Checks
$129.22 ACCIDENTAL VOL INS. - AFLAC
$624.07 DEF COMP 10-5-06
$35,217.58 OCTOBER POLICE SERVICES
$3,307.13 POLICE BLDG DEBT SERVICE - OCT
$2,609.20 ELECTRICAL INSPECTIONS
$77.71 BUILDING PERMITS
$20.00 ANNUAL DUES FOR MN MAYORS ASSO
$1,534.50 SEPTEMBER 2006 SAC CHARGES
$1,375.00 4TH QTR 2006 SAFETY COMPLIANCE
$356.38 DEF COMP W/H 10-5-06
$32.00 T BENDER & J MEYER LIFE INS
$971.92 6970 LAMOTTE DR - LAMOTTE PARK
$561.94 REIMBURSEMENT FOR AM WATER WOR
$2,296.03 PERA W/H 10-5-06
$104.75 ORD #152 AMEND. 81657
$144.00 9-13-06 CITY COUNCIL MEETING
$49,361.43
Note: There will be an updated list of disbursements for approval on 10-11-06.
7
.11. Bonestroo
.... Rosene .
R AnderJik&
'\11 Associates
engineers" Archlrecu
Owner: CilV ofCcnlcnille. ISIlO Main St., Ccnlt.'t'Villc, MN 550311 Date October 6, 2006
Contrlll:lor: BUTschvillc COllstlllclioll. Inc., 114./011111 St Nfl, P. O. Box 65, HUnlwcr, MN 55341
BUild CUIl1Puny; Weslern SurelYConlllanv, P. O. Bul' 1068, Houston, IX 77:!51 Bond No: 929 3979% I
CHANGE ORDER NO. 3
BACKAGE ROAD AND 21 ST AVENUE
UTILITY AND STREET IMPROVEMENTS
BRA FILE NO 000616w05143-0
Description of' Work
This Change Order extends the subslantial completion date for concrete curb and gutter and the bituminous b:lse course
only to June 30,2007 The contractor shall, at no lIdditional cost., provide necessmy tranic control devices to keep the
Backage Road closed over the winter months 21st Ave must remain open and drivellble during the winter mont.hs to
provide access to the Sheehy property illld the Lift Station in Lino Lakes This change order does not affect the overall
completion date for the project, nor does it alfect the contmet price
(,H,".II.lJCI-IOJ ,xl,
2
Origimll Contract Amount
Previous Change Orders
This Change Order
Revised Contract Amount (including this change order)
$1,118,25190
$13,103 16
$0.00
$1,131,35506
CHANGE IN CONTRACT TIMES
Original Contract Times:
Subst~mlial Completion (days or date):
Ready for final Payment (days or date):
June 30, 2007 for
concrete curb and guller and the
bituminous base course only
Increase ofthis Change Order:
Substantial Completion (days or date):
Ready for final Payment (days or date):
Contract Time with all approved Change Orders:
Substantial Completion (days Of date);
Ready for final Payment (days or date):
Recommended for Approval by:
BONESTROO, ROSENE, ANDERLlK & ASSOCIATES, INC.
Date:
Approved by Contractor:
BURSCHVILLE CONSTRUCTION, INC.
Approved by Owner:
CITY OF CENTERVILLE
Date
Dale
CL llwncr
( '\lIltrJclOI'
Il\mding COlllpill1Y
Illlnl.'Slroo & A~$OC
1"1,1151...":1-10.1 "Is
9
City staff and councilme1nbers:
REGISTER ONLINE AFTER AUG. 18 FOR THE CLOSEST MEETING TO YOUR CITY
LEAGUE OF MINNESOTA CITIES
DATES & LOCATIONS
Benson
Oct. 3
Ottertail
Oct. 4
Newfolden
Oct. 5
Heron Lake
Oct. 24
St. Peter
Oct. 25
St. Charles
Oct. 26
METRO MEETING
St. Paul
Nov. 16
WE'RE COMING TO YOUR BACKYARDI
Join the League to discuss timely, important
issues affecting cities.
Meet your neighbors to share city stories and
learn from one another.
Explore workforce development-one of
many topics of interest-to make sureY9urcity
has the in theJuture. Learn
how to continuity and....
state
c/\
Preview the
about2006
h~lpshape ~Q07
lO
CITY OF CENTERVILLE
ANOKA COUNTY, MINNESOTA
ORDINANCE#-,
SECOND SERIES
AN ORDINANCE AMENDING CHAPTER 111 OF THE CENTERVILLE CITY CODE
BY AMENDING INSURANCE REQUIREMENTS
THE CITY OF CENTER~LE ORDAINS:
Section 1. Code Section 111.10 (E) shall be amended to read as follows:
(E) INSURANCE CERTIFICATE REQUIREMENTS. Whenever an insurance certificate is
required by this Chapter the applicant shall file with the City Clerk a certificate of insurance showing (1)
that the limits are at least as high as required, (2) that coverage is effective for at least the license term
approved, and (3) that such insurance will not be canceled or terminated without thirty days' written
notice served upon the City Clerk. Cancellation or termination of such coverage shall be grounds for
license revocation.
Section 2. Effective Date. This ordinance shall be effective immediately upon its passage
and publication according to law.
PASSED AND DULY ADOPTED this _ day of
Council of the City of Centerville.
, 2006 by the City
CITY OF CENTERVILLE
BY:
Mary Capra, Mayor
ATTEST:
Teresa Bender, City Clerk
1
I I
CITY OF CENTERVILLE
ANOKA COUNTY, MINNESOTA
ORDINANCE #
SECOND SERIES
AN ORDINANCE AMENDING CHAPTER 93 OF THE CENTERVILLE CITY CODE
BY AMENDING SECTION 93.01 RELATING TO MAINTENANCE OF SIDEWALKS
THE CITY OF CENTERVILLE ORDAINS:
Section 1. Code Section 93.01 shall be amended by inserting the following as section (C)
the following:
(C) SIDEWALK MAINTENANCE AND REPAIR.
(1) Primary Responsibility. It is the primary responsibility of the owner of property
upon which there is abutting any sidewalk to keep and maintain such sidewalk in safe and serviceable
condition.
(2) Construction, Reconstruction and Repair Specifications. All construction,
reconstruction or repair of sidewalks shall be done in strict accordance with specifications on file in the
office of the Public Works Director.
(3) Notice - No Emergency. Where, in the opinion of the Public Works Director, no
emergency exists, notice of the required repair or reconstruction shall be given to the owner of the
abutting property. Such notice shall require completion of the work within ninety days, and shall be
mailed to the owner or owners shown to be such on the records of the County Officer who mails tax
statements.
(4) Notice - Emergency. Where, in the opinion of the Public Works Director, an
emergency exists, notice of the required repair or reconstruction shall be given to the owner of the
abutting property. Such notice shall require completion of the work within ten days, and shall be mailed
to the owner or owners shown to be such on the records of the County Officer who mails tax statements.
(5) Failure of Owner to Reconstruct or Make Repairs. If the owner of the abutting
property fails to make repairs or accomplish reconstruction as herein required, the Clerk shall report such
failure to the Council and the Council may order such work to be done under its direction and the cost
thereof assessed to the abutting property owner as any other special assessment.
(6) Duty to Inspect. In order to accomplish the purpose of this Section, it shall be the
duty of the Public Works Director to inspect sidewalks within the City, or cause the same to be inspected
under his/her direction.
Section 2. The existing section 93.01 (C) shall be relabeled as (D).
/~
Section 3. Effective Date. This ordinance shall be effective immediately upon its passage
and publication according to law.
PASSED AND DULY ADOPTED this _ day of
Council of the City of Centerville.
, 2006 by the City
CITY OF CENTERVILLE
BY:
Mary Capra, Mayor
ATTEST:
Teresa Bender, City Clerk
G
CITY OF CENTERVILLE
ANOKA COUNTY, MINNESOTA
ORDINANCE #
SECOND SERIES
AN ORDINANCE AMENDING CHAPTER 93 OF THE CENTERVILLE CITY CODE
BY INSERTING SECTION 93.04 RELATING TO ADJOINING RIGHT OF WAY.
THE CITY OF CENTERVILLE ORDAINS:
Section 1. Code Section 93 shall be amended by inserting section 93.04 as follows:
93.04 MAINTENANCE OF ADJOINING RIGHT OF WAY.
(A) Duty of Property Owners to Cut Grass and Weeds and Maintain Trees and
Shrubs. Every owner of property abutting on any street shall cause the grass and weeds to be cut from
the line of such property nearest to such street to the center of such street. If the grass or weeds in such a
place attain a height in excess of eight (8) inches it shall be prima facie evidence of a failure to comply
with this Section. Every owner of property abutting on any street shall, subject to the provisions herein
requiring a permit therefor, trim, cut and otherwise maintain all trees and shrubs in unhazardous and
healthy condition, from the line of such property nearest to such street to the center thereof.
(B) Failure of Owner. If the owner of the abutting property fails to maintain adjoining
right of way as required by this section, the city may secure compliance in the same manner as abatement
of nuisance violations and may order such work to be done under its direction and the cost thereof
assessed to the abutting property owner as any other special assessment.
Section 2. Effective Date. This ordinance shall be effective immediately upon its passage
and publication according to law.
PASSED AND DULY ADOPTED this _ day of
Council of the City of Centerville.
, 2006 by the City
CITY OF CENTERVILLE
BY:
Mary Capra, Mayor
ATTEST:
Teresa Bender, City Clerk
/y
City of Centerville,
It is with my deepest regrets that I must resign form the Planning and Zoning
Commission effective immediately following October 3rds meeting due to family
obligations.
~!;
/~
MEMO
3 October 2006
To: Dallas Larson, City Administrator
From: Paul Palzer, Public Works DirectorlBuilding Officia~
Re: Paving Public Works entrance area
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
I have received two quotes to pave a portion of the public works entrance and parking
area and garage door access areas. The work consists of removing the old asphalt and
concrete pads, lowering the catch basins and grading the area to provide for positive
drainage. Install 3" of compact asphalt over a total area of 7400 square feet.
I recommend the Council accept the quote from Arcade Asphalt for the amount of
$13,500.00.
J(p
A~A~, 9.e.
6433 20th Ave. So. · Lino Lakes, MN 55038. (651) 429-7005
MATT VESEL
Black Topping · Resurfacing · Patching · Bob Cat Grading
Crushed Rock · Snow Plowing & Removal
Work to ~ performed at \\;W, l W 0<<\)
Name ~\r dbl..... S',." 3
Address
<S l+~~ dO fY' 5'1
~ .Ldq_vr;'d-" 9'.
Telephone ('1'-2--- 1 r.~" OI.:J_
City
We hereby propose to complete the job to the satisfaction of our customers. All material is guaranteed. Our price
includes all excavating, grading, gravel and blacktop. It includes only the finest quality materials; Limerock
[Dolomite) for base, and blacktop which meets Highway Specifications of 2341 or 2331 Wear, Hot AC 5%-6%
oil with 112"-3/4" rock used in the blacktop. This product will be used unless stated above.
5 YEAR GUARANTEE ON
WORKMANSHIP AND MATERIALS.
DUE TO THE EXTREME TEMPERATURE
CHANGES IN MINNESOTA, WE CAN NOT
GUARANTEE AGAINST FRCET CRACKS.
Area to be blacktopped, graveled, excavated-
Total square feet:
Inches of gravel: 2 3 4 5 6 or as needed
Inches of blacktop after compaction:
1
2
3
Complete price for above work:
$
Full payment to be made on completion of work,
unless other arrangements have been made.
Prices are subject to change after 60 days.
::::~~: M~W
Date 1 {J~ + \OIG~J ,
Special Instructions:
A~V\J '7400 (J Fi
~~M+ ~,\~ Jtl
G~l'vJ{ ~ ~ I~ /\/eRJ(?~~
'\~'- n\,0.J.C" fl q' ') ~ ' .
d L ,,,~ ~(j >\ -J 0 'j ,{*A- ~A'jt\~
ll/~SSO
--/ '
~
Jl
MUELLNER
BLACKTOP INC.
Parking lots
Driveways
Patch work
Seal Coating
Snow Plowing & Removal
7007 20TH AVENUE SOUTH
CENTERVILLE, MN 55038
(651) 482-0731 · FAX: (651]'426-4500
S~5
DATE I{)"-d--{)~ MAP
:~::E~7;~~b-
CITY . ?~~~ ZIP
. . ,,~~
.\~~ .
~ll
~/. . .
n ""~:'i,t''''''' P
",~Y'. . .
'~ '7A11<;
~:
HOME
PHONE
Approx. sq. ft.
Homeowner to provide permit 0 Yes 0 No
o Asphalt --3 Inches Compacted
o Overlay Existing Asphalt
o Overlay Existing Concrete
o Remove One Layer Asphalt
o Remove One Layer Concrete __
o Use Your Base and Add to Establish ~ Inches
o Dig Out, if necessary, and Add -S- Inches Base
WORK
PHONE
j,.. () vV'Tfl,
"OM/IV
~
oIi.Aijv~rc'
NO~fft~
JOB QUOTE $
CITY PERMIT $
$
TOTAL $
$
BALANCE DUE UPON COMPLETION $ /_"7/ 7ff~ ~l
t PAYMENT IS DUE UPON COMPLETION OF JOB. Finance charge of21% will be assessed on unpaid balance.
, THIS PROPOSAL IS GOOD FOR 30 DAYS FROM DATE.
t ACCEPTANCE OF PROPOSAL. The above prices, specifications, terms and conditions herein and on the reverse side ofthis
contract are hereby accepted. You are authorized to do the work as specified. Payment will be made as stated above. Should
conditions unforeseen when estimated be discovered at the time the job is started, including but not limited to underground
concrete barriers, extended garage supports, concrete or asphalt layers under surface thicker than layers estimated, concrete or
other debris required to be removed and/or discovered during excavation, owner authorizes contractor to proceed with job and
agrees to pay contractor for additional labor costs. Contractor shall not be responsible for the disruption of service or cost of repair
caused by cut telephone wires or television cable wires.
AUTHORIZED
SIGNATURE
DATE
AGENT
AGENT
PHONE
o Newspaper
o Yellow Pages
o Referral
ICZ
MAIL SIGNED PROPOSAL TO: 7007 20th Ave. South · Centerville, MN 55038
CUSTOMER: RETURN WHITE COPY WITH SIGNATURE
KEEP YELLOW COPY FOR YOUR RECORDS
PINK-OFFICE COpy
.,&,
INSTALLATION
The hot asphalt is applied with a paving machine. This machine operates on the same principle of those used
on freeways. It lays a mat of asphalt of uniform consistency. The mat is then rolled to density while hot
(2500F). To gain this density the roller "squeezes" the mat to a thickness of 3 inches. It is important to note
that even at a maximum density, the aggregate or stones may be seen near the surface. In areas where the
material is installed by hand, the aggregate can be seen more prominently. This situation is certainly a
normal one. In fact the more coarse aggregate in the asphalt mix, the stronger it is, the longer it will stand up
and the less maintenance it will require.
CRACKING
In Minnesota, the frost penetrates the ground as deep as 3 to 4 feet. The ground, when frozen this deep, will
heave sometimes as much as 1 or 2 inches. An asphalt mat will give or move to a certain extent, then it will
crack and separate. These cracks are generally quite straight and go clear across the surface of the lot or
driveway. The crack can be seen continuing into the lawn away from the pavement. No matter how strong
the asphalt pavement is constructed, Mother Nature is stronger. Even our best highways acquire many
expansion cracks. We suggest that these cracks be left alone as they will close up to a certain extent in the
spring. The highway department fills them because of the extreme level of high speed traffic. In past years
we have not had a problem with breakup due to these expansion cracks.
GUARANTEE
We guarantee all of our driveways for two years against defective materials and workmanship, including:
1. Excessive cracking due to faulty installation or materials. Note: asphalt driveways
will acquire expansion cracks due to severe freezing like Minnesota's best asphalt
highways acquire. This is a normal situation in this climate and is not essentially
detrimental to the life expectancy of a residential driveway. When a new mat is laid
over an existing asphalt or concrete driveway, cracks from the existing driveway may
reappear on the new drive.
2. Chuckholes and breakup.
3. Faulty mix.
Our guarantee does not cover inconsistencies in asphalt texture; settling due to previous excavation or back
filling; holes due to asphalt enemies such as gas, oil, antifreeze, turpentine, or other petroleum products
spilled on the asphalt; tire marks, bicycle kick stands, heel indents, ladders or other sharp objects.
Guarantee does not cover water puddles without a 1.5% grade for drainage.
Salt will not harm asphalt in any way.
NOTICE OF LIEN RIGHTS
PERSONS OR COMPANIES FURNISHING LABOR OR MATERIALS FOR THE IMPROVEMENT OF REAL PROPERTY
MAY ENFORCE A LIEN UPON THE IMPROVED LAND IF THEY ARE NOT PAID FOR THEIR CONTRIBUTIONS, EVEN
IF SUCH PARTIES HAVE NO CONTRACTUAL RELATIONSHIP WITH THE OWNER. MINNESOTA LAW PERMITS THE
OWNER TO WITHHOLD FROM HIS CONTRACTOR AS MUCH OF THE CONTRACT PRICE AS MAY BE NECESSARY
TO MEET DEMANDS OF ALL LIEN CLAIMANTS, PAY DIRECTLY SUCH LIENS AND DEDUCT THE COST OF THEM
FROM THE CONTRACT PRICE, OR WITHHOLD AMOUNTS FROM HIS CONTRACTOR UNTIL THE EXPIRATION OF
ONE HUNDRED TWENTY (120) DAYS FROM THE COMPLETION OF SUCH IMPROVEMENTS UNLESS THE CON-
TRACTOR FURNISHES TO THE OWNER WAIVERS OF CLAIMS FROM MECHANICS' LIENS SIGNED BY PERSONS
WHO FURNISHED LABOR OR MATERIALS FOR THE IMPROVEMENT AND WHO PROVIDED THE OWNER WITH
TIMELY NOTICE. THE OWNER HEREBY WAIVES ALL FURTHER REQUIREMENTS OF NOTICE UNDER MINNESOTA
STATUTE 514.011.
Grade Date
Blacktop Date
;
INSTALLATION
The hot asphalt is applied with a paving machine. This machine operates on the same principle of those used
on freeways. It lays a mat of asphalt of uniform consistency. The mat is then rolled to density while hot
(2500F). To gain this density the roller "squeezes" the mat to a thickness of 3 inches. It is important to note
that even at a maximum density, the aggregate or stones may be seen near the surface. In areas where the
material is installed by hand, the aggregate can be seen more prominently. This situation is certainly a
normal one. In fact the more coarse aggregate in the asphalt mix, the stronger it is, the longer it will stand up
and the less maintenance it will require.
CRACKING
In Minnesota, the frost penetrates the ground as deep as 3 to 4 feet. The ground, when frozen this deep, will
heave sometimes as much as 1 or 2 inches. An asphalt mat will give or move to a certain extent, then it will
crack and separate. These cracks are generally quite straight and go clear across the surface of the lot or
driveway. The crack can be seen continuing into the lawn away from the pavement. No matter how strong
the asphalt pavement is constructed, Mother Nature is stronger. Even our best highways acquire many
expansion cracks. We suggest that these cracks be left alone as they will close up to a certain extent in the
spring. The highway department fills them because of the extreIl)e level of high speed traffic. In past years
we have not had a problem with breakup due to these expansion cracks.
GUARANTEE
We guarantee all of our driveways for two years against defective materials and workmanship, including:
1. Excessive cracking due to faulty installation or materials. Note: asphalt driveways
will acquire expansion cracks due to severe freezing like Minnesota's best asphalt
highways acquire. This is a normal situation in this climate and is not essentially
detrimental to the life expectancy of a residential driveway. When a new mat is laid
over an existing asphalt or concrete driveway, cracks from the existing driveway may
reappear on the new drive.
2. Chuckholes and breakup.
3. Faulty mix.
Our guarantee does not cover inconsistencies in asphalt texture; settling due to previous excavation or back
filling; holes due to asphalt enemies such as gas, oil, antifreeze, turpentine, or other petroleum products
spilled on the asphalt; tire marks, bicycle kick stands, heel indents, ladders or other sharp objects.
Guarantee does not cover water puddles without a 1.5% grade for drainage.
Salt will not harm asphalt in any way.
NOTICE OF LIEN RIGHTS
PERSONS OR COMPANIES FURNISHING LABOR OR MATERIALS FOR THE IMPROVEMENT OF REAL PROPERTY
MAY ENFORCE A LIEN UPON THE IMPROVED LAND IF THEY ARE NOT PAID FOR THEIR CONTRIBUTIONS, EVEN
IF SUCH PARTIES HAVE NO CONTRACTUAL RELATIONSHIP WITH THE OWNER. MINNESOTA LAW PERMITS THE
OWNER TO WITHHOLD FROM HIS CONTRACTOR AS MUCH OF THE CONTRACT PRICE AS MAY BE NECESSARY
TO MEET DEMANDS OF ALL LIEN CLAIMANTS, PAY DIRECTLY SUCH LIENS AND DEDUCT THE COST OF THEM
FROM THE CONTRACT PRICE, OR WITHHOLD AMOUNTS FROM HIS CONTRACTOR UNTIL THE EXPIRATION OF
ONE HUNDRED TWENTY (120) DAYS FROM THE COMPLETION OF SUCH IMPROVEMENTS UNLESS THE CON-
TRACTOR FURNISHES TO THE OWNER WAIVERS OF CLAIMS FROM MECHANICS' LIENS SIGNED BY PERSONS
WHO FURNISHED LABOR OR MATERIALS FOR THE IMPROVEMENT AND WHO PROVIDED THE OWNER WITH
TIMELY NOTICE. THE OWNER HEREBY WAIVES ALL FURTHER REQUIREMENTS OF NOTICE UNDER MINNESOTA
STATUTE 514.011.
Grade Date
Blacktop Date
J9
::= 10/05/2006 THU 16:30
:::1 Certificate of Insurance
FAX 763 694 9955 THE INTERAGENCY
~001/001
~
10/4/2006
PRODUCERS' Beulke Agency, Inc 902240
4782 Washington Avo
White Bear Lake, MN 55110
The InterAgency/Blackburn, Nickels & Smith, Inc.
Box 47248
Plymouth, MN 55447
THIS CERTIFICATE IS ISSUED AS A MATTER OF
INFORMATION ONLY AND CONFERS NO RIGHTS UPON
THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES
NOT AMEND, EXTEND OR ALTER THE COVERAGE
AFFORDED BY THE POLICIES BELOW.
INeVRED:
Company Providing Coverage:
Trio Inn, Mountain Enterprises, Inc. DBA:
6510 Centerville Road
Lino Lakes. MN 55038
:::.::B9Y~[~~S!:'!:i.:::~:
Capitol Specialty Ins Co.
This is to certify that the policies of insurance listed below have been issued to the insured named above for the policy
period indicated, not withstanding any requirement, term or condition of any contract or other document with respect to
which this certificate may be issued or may pertain, the insurance afforded by the policies described herein is subject to all
the terms, exclusions and conditions of such policies. Limits shown may have been reduced by paid claims.
Type of Insurance Policy Number Policy Effective Policy Expiration Limits
Dale Date
General Liability General Aggregate
Products - CompOp Agg
Comm'l Gen. Liab. Personal 8. Adv Injury
Each Occurrence
Fire Damage (Any One Fire)
Med Exp (Any One Person)
Liquor Liability CS00330517 1 0/5/2006 10/5/2007 Aggregate Limit $500,000
Ea. Common Cause Limit $500,000
PROPERTY Limils: Coinsurance: Form; Deductible:
Building:
Business Personal Property
Business Income:
LOCATION( OF RISK
DESCRIPTION OF RISK
7082 Centerville Road, Centerville, MN 55038
Tavern. Liquor Liability
I Certificate Holder
Cancellation
: ___I
City of Centerville
1880 Main Street
CEnterville. MN 55038
Should any of lhe described policies be cal'1celled before the expiration dale
thereof, lho Issuing company will endeavor 10 mail 10 days wrinen nolice of
oanoellation to the eer1ifieateholder named to the left. but failure to mail sueh
notice lOhall impoee no obligation ility of an'!,Jiri/lJn the company. its
agents or representatives. ~ Jf""'"~
Authorized Representative im Holm bnsmn@aol.eom
tervi[[e
'Esta611sfled 1857
1880 :Main Street, Centerviffe, :MW 55038
651-429-3232 or 'FaJ( 651-429-8629
September 26, 2006
Chad Pranke
Heather Fischer
7154 Mill Road
Centerville, MN 55038
Re: Halloween Signs
Dear Mr. Pranke and Ms. Fischer:
I wish to point out to you that the City has adopted new signage rules that regulate lawn
signs. I have attached a copy of the pertinent sections for your use. Basically, lawn
message signs are limited by city law to one sign, not exceeding six square feet (2 x 3 or
similar) per residential property. This does not cover political candidate/issue lawn signs
during the weeks leading up to the General Election on November 7, 2006. Please make
sure that if you put up any sign for Halloween, that you observe these limitations. Please
contact me if you should have any questions.
Yours truly,
Dga~~
Centennial Lakes Police Department
54 North Road, Circle Pines, MN 55014 (763) 784-2501 Fax (763) 784-0082
October 03, 2006
Wendy Kellogg Brilowski
7124 Main Street.
Centerville, MN 55038
Dear Mrs. Brilowski,
On September 22, 2006, your dog, "Greta" a German Shepherd was involved in a bite
incident. (Centennial Lakes Police Department ICR #06-227592). You are hereby
notified pursuant to CenterviIle City Ordinance 90.30, that your dog Greta is designated a
POTENTIALLYDANGEROUSA~.
Pursuant to City Ordinance 90.30 an owner of a potentially dangerou~ animal shall be
registered by the City stating your dog is potentially dangerous. Additionally, per
ordinance 90.30 you are required to license the dog with the city and provide proof of
vaccinations to the city.
Pursuant to City Ordinance 90.30 you must obtain microchip identification for your
dog. Please make arrane:ements to ree:ister.license and microchin your doe: within
two weeks. If the animal is to be relocated from its current address or given or sold to
another person, the notification must be given in writing at least fourteen (14) days prior
to relocation or transfer of ownership. The notification must include the current owner's
name and address, the relocation address, and the name of the new owner, ifany.
I have enclosed a copy ofCenterville Ordinance 90.30 (Designation as Dangerous or
Potentially Dangerous Animal), 90.31 (Notification of New Address), and 90.32
(Dangerous Animal or Potentially Dangerous Animal Requirements) for your review.
Please contact me at the above listed number or the City ofCenterviIle at 651-429-3232
should you have any questions regarding these ordinances.
Sincerely,
Robert A. Makela
Chief of Police
Emily Kirchner
Community Service Officer
RABIES VACCINATION CERTIFICATE
ADAPTED NASPHV FORM 51
Print - use ball point pen or type
Owner's Name & Address
PRINT LAST
(
NO.
SPEClpy SEX:
Dog ~ Male
Cat 0 . Female,
Other 0 ' Altered
(Specify)
SIZE:
Under 20 Ibs.
20 - 50 Ibs.
Over 50 Ibs.
DATE VACCINATED:
'8 ~Jf-Dh
Month Day Year
PRODUCER:
~
VACCINATION EXPIRES:
g-~/-Dq
(First 3 Letters)
1 yr. Uc.Nacc. ~
3 yr. LicNacc~
/~soIA
Vacc. Serial (Lot) No.
Month Day Year
FDPC0129C
GY~b-
Tag fee $:
Tag#: d.- 3'7.5C:;
M.1.
Cert. Serial #:
TELEPHONE
tf J/j.; q 3 'J--3
ZIP
STATE
PREDOMINANT BREED:
o n ~ L
o Gr~r .:jlu:~
NAME:
iJ /j I
(;rr ~-Ia ~
COLORS:
h/~elc
oJ..- -ftl4'J
Veterinarian's #
License No.
V''''ri",rii
Signature V ,,0 ~
'St.''!: - X i;;AL ~S;;ITAl
SteHwcter, Minn.
43~1618
~ ~o-:F\=- oCo 8
VACCI~A1!ON 'RECORD
It f- 1.>-,") -h: "-
Name , -:r 1 ~o/ to\'
-B" RABIES
.....-EJ LYME DISEASE
~ CANINE DISTEMPER
.-EJ CANINE PARAINFLUENZ
~ CANINE ADENOVIRUS 2
~ CANINE PARVOVIRUS'
, 0 CANINE CORONAVIRUS
o CANINE BORDETELLA
o LEPTOSPIROSIS
o CAN./FEL. GIARDIA
o FELINE LEUKEMIA
0' FEliNE PANLEUKOPEf\il,
o FELINE RHINOTRACHEIl
o FELINE CALlCIVIRUS
o FELINE CHLAMYDIA
o FELINE RINGWORM
o FELINE lMMUNODEFICIEN
VIRUS
~
\fV\Gvl~ ~ ~ ~V~ \0 LJj;(Ct '
1-\OZ Ll ~CA(~ S~
L~vt\RA! 0~ \~ ~
~\\~d \Dl~.lo~
t:.~? ~~ rf'Or~rl;\;.[~~ j""!1
,.,.- ,. ." ,'-, G\,d
'\..:.k=.=:.~~'~ll'" -
[,t"\7 0 p t-~tl~'~~~
.:t/l j ~ Lu~tl
---.' "LLr- . ~ fld
CENiH-<.VI C,1\,'"
~
10/2/06
,.----
t
\
\
f.
r
-----1
\
\
\
~J
To Whom It May Concern:
We moved to Centerville, 7124 Main Street, on August 12,2004. Since moving here we
have had had to deal with a variety of issues that have caused us great inconvenience and
aggravation.
When we purchased out home we called the city to ask about being hooked up to the city
water system because we had a concern over the existing well. At that time we were told
that all water concerns would be taken up by the city council when the road construction
issue on County Road 14 was settled. As the problem with our well grew worse we
called on 3 more occasions. We were repeatedly told that this matter would wait for the
road construction and that we could get on city water when the road in front of our house
was dug up sometime in 2008.
This spring we lost almost all water pressure. Our situation was grave. We called again
and demanded that something be done because the lack of water had become a quality of
life issue and a potential health hazard. This is when we found out that our being hooked
up to city water actually had nothing what so ever to do with the road construction in the
front of our home and that water would come in through the back. We have waited for
over 5 months since reporting our situation and we still do not have city water.
We have been given all kinds of erroneous information and spent hours on the phone
trying to find out about the bidding process, how we could be hooked up to a hydrant if
need be, what the assessment would be, who would be responsible for acquiring and
paying for a check valve, etc. etc. When a contractor was finally hired they gave us a
date and were ready to start work immediately. The day that the contractors were to
begin it was discovered that no one from the city had acquired the appropriate permits
from the health department. This meant another 3-week delay. Not only was this
inconvenient for us, it also cost the contractors lost time and money.
On Tuesday Sept. 19th the contractor began work on the project. It was discovered at the
end of the day that the wrong fittings had been used. The inspector sent by the city did
not catch the problem when he made his inspection. The job had to be re-done leading to
another delay.
We still are not able to hook up to city water because we are waiting for a chloroform test
and a hydro stat test to be run. This was not contracted with Olson's sewer service. We
do not even know if anyone plans on doing this test. Therefore, even though the water
lines have been installed, we STILL do not have city water.
.
..
Another aggravation for us has been the city redevelopment plan. We spent many hours
at meetings. We continually expressed our concern about being included in the
redevelopment plan. Why should we even be considered for a commercial zoning when
there is no access to our property for a business concern? In the end the city council did
agree and maintained our residential zoning. However, it should have been clear from
looking at a map that there would never be a commercial interest in our property. We
should not have had to speak at a council meeting in order to express this concern.
The next item that we have had to deal with is the fact that the City never appropriately
recorded the road abandonment of West view Street back in the 1970's. We have no
record of this transaction in our abstract. We are currently responsible for maintaining
this property but no one is certain as to the actual ownership of this property. Again, I
have had to call the county, my title company, and the City of Centerville because the
appropriate actions were not taken by the city. The matter is still being considered by the
city attorney.
Over the weekend we received a certified letter stating that our dog is not licensed. Our
dog has license number 068 and our cat has license number 067 for the year 2006-2007.
It was only by contacting the Centennial Lakes Police Department that I have learned that
the actual concern is regarding up to date vaccination records. This matter can be easily
cleared up. The letter I received stated that the dog is unlicensed; it said nothing about
vaccination records. I would think that at the very least the city should be able to make
the appropriate request from us.
Weare still waiting for our street to be cleaned and the black top to be replaced. Weare
greatly frustrated by all of these incompetencies and miscommunications.
Path: H:\Projects\4994-F\H I-M U\DRAI NAGE\
File: H :\Projects\4994-F\H I-MU\DRAI NAGE\4994-F-Drainage Systems(60% ).xls
CSAH 14 Reconstruction
Drainage Cost Split
Outfall
Mound Trail
Grit Chamber
Peltier
Lakeland N.
Lakeland S.
Untreated
Clearwater N.
Clearwater S.
C.H.
Ditch 55 W.
Ditch 55 E.
42" & 27"
Totals
Total System Cost Total ~ CA
$13,452.00 0.85
$79,616.00 3.70
$28,122.00 1.59
$48,003.00 2.46
$75,317.00 2.16
$33,774.00 13.19
$128,374.00 5.25
$86,602.00 4.01
$278,756.00 8.58
$152,502.00 4.94
$218,459.00 4.41
$122,686.00 1.00
$1,265,663.00 52.14
Total ~ CA Cent.
0.53
2.05
1.34
1.03
0.54
0.79
3.46
2.61
4.39
1.02
0.99
o
18.75
Total ~ CA Lino Total ~ CA County Total Cost Cent. Total Cost Lino Total Cost County
o 0.32 $8,387.72 $0.00 $5,064.28
o 1.65 $44,111.57 $0.00 $35,504.43
o 0.25 $23,700.30 $0.00 $4,421.70
o 1.43 $20,098.82 $0.00 $27,904.18
o 1.62 $18,829.25 $0.00 $56,487.75
o 12.40 $2,022.86 $0.00 $31,751.14
o 1,79 $84,604.58 $0.00 $43,769.42
o 1.40 $56,366.89 $0.00 $30,235.11
o 4.19 $142,626.90 $0.00 $136,129.10
o 3.92 $31,488.27 $0.00 $121,013.73
1.8 1.62 $49,041.82 $89,166.94 $80,250.24
o 1,00 $0.00 $0.00 $122,686.00
1.80 31.59 $481,278.98 $89,166.94 $695,217.08
Participation Breakout (%)
38.03%
7.05%
54.92%
Notes:
Costs based on 60% Estimate to all relevant storm sewer costs.
Mound Trail
Grit Chamber
Peltier
Lakeland N.
Lakeland S.
Untreated
Clearwater N.
Clearwater S.
C.H.
Ditch 55 W.
Ditch 55 E.
42" & 27"
offsite nodes
5031,5032
5049,5299
5060,5070
5086
5102
5115
5136,5144,5142,5140
5145,5148,5153,5163,5166,5172,5174,5177 ,5180,5183,5188,5189
5201,5202,5216
5249,5251,5268,5269
all county
By: CMT
Date:5/2I2OO6
EXHIBIT A
60% ENGINEER'S ESTIMATE
ANOKA COUNTY
C.S.A.H. 14 RECONSTRUCTION
DATE PRINTED: 1014/2001
C.SA.H. 14 RECONSTRUCTION
UNIT TOTAL PROJECT S,P,02..tl14-24
C.SA.H.14 C.SA.H. 64 C.SA.H.21
S.P.210-020-005 S,P. 02-6&4-001 S.P.02--621-009 NON-PARTICIPATING
ANOKA COUNTY CITY OF L1NO LAKES CITY OF CENTEfMLLE ANOKA COUNTY CITY OF CENTERVIlLE ANOKA COUNTY CITY OF CENTERVlL.LE ANOKA COUNTY CITY OF UNO LAKES CITY OF CENTERVlUE
ITEM NO. ITEM DESCRIPTION UNIT COST QUANTITIES COST RONJWAY RONJWAY RONJWAY ROAaWAY ROKJWAY RONJWAY ROKJWAY STORM
DUANTITES SEGMENT QUANTITIES SEGMENT QUANTITES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT Ot.IANTITIES SEGMENT QUANTITIES SEGMENT
ESTIMATE ESTIMATE ESTIMATED COST ESTIMATED CeST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST
2021.501 MOBILIZATION LUMP SUM $700,000,00 1 $700.000.00 0.95 $666.000.00 0.05 $36.000.00
2031.501 FIELD OFFICE. TYPE 0 EACH $15,000.00 1 $15.000.00 0,95 $14.26ll.00 0,05 $760.00
2101.501 CLEARING ACRE $1.500.00 33 M9.600.00 32.9 $49.360.00 01 $160.00
2101.502 CLEARING TREE $200.00 169 $33.800.00 164 $32.800.00 3 $600.00 2 $400.00
2101.506 GRUBBING ACRE $1.500.00 " $49.600.00 32.9 $49.360.00 01 $160.00
2101.507 GRUBBING TREE $200.00 169 $33.800.00 164 $32.800.00 3 $600.00 2 $400.00
2102.50'\ PAVEMENT MARKING REMOVAL sa FT $1.50 33000 $49.600.00 33000 $49.600.00
2104.501 REMOVE BITUMINOUS CURB lINFT $1.50 2000 $3.000.00 2000 $3.000.00
2104.501 REMOVE CURB AND GUTTER L1NFT $2.50 1672 $3.930.00 1572 $3.930.00
2104.501 REMOVE FENCE UN FT $2.50 3267 $6.1".60 3257 $6.142_60
2104.501 REMOVE FORCE MAIN L1NFT $15.00 1061 $16.766.00 1051 $16.766.00
2104.501 REMOVE PIPE CULVERTS lINFT $10.00 3938 $39.380.00 3360 $33.600.00 152 $1,520.00 426 $4.260.00
2104.501 REMOVE SEWER PIPE (STORM) UNFT $10.00 2765 $27.660.00 2755 $27.660.00
2104.501 REMOVE WATER MAIN lINFT $10.00 1001 $10.010.00 570 $S,700.DO 25 $260.00 406 M,060.00
2104.501 REMOVE GUARD RAIL lINFT $10,00 431 $4.310.00 431 $4.310.00
2104.505 REMOVE BITUMINOUS PAVEMENT savo $200 90879 $181,358.00 82084 $114.168.00 3175 $6.360.00 5420 $10.&10.00
2104.505 REMOVE BITUMINOUS WALK sa FT $1,50 4347 $6.620.60 4347 $6.620.60
2104.505 REMOVE CONCRETE WALK sa FT $2.00 2760 $6.600.00 2150 $6.600.00
2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SaYD $5.00 360 $1.800.00 360 $1.800.00
2104.509 REMOVE CULVERT APRON EACH $250.00 134 $33.600.00 116 $29.000.00 6 $1 ,SOD.OO 12 $3.000.00
2104.509 REMOVE DELINEATOR EACH $25,00 10 $290.00 10 $260.00
2104.509 REMOVE CURB STOP & BOX EACH $500,00 6 $2.600.00 5 $2.500.00
2104.509 REMOVE GATE VALVE & BOX EACH $500.00 4 $2.000.00 4 $2,000.00
2104.509 REMOVE MANHOLE OR CATCH BASIN EACH $250,00 22 $6.600.00 " $6.600.00
2104,509 REMOVE MARKER EACH $25.00 26 $620.00 25 $620 .00
2104.509 REMOVE PIPE APRON EACH $250.00 9 $2.260.00 , $2.260.00
2104.509 REMOVE SIGN TYPE C EACH $30,00 176 $6.340.00 173 $6.190.00 5 $150.00
2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) L1NFT $5,00 73 $366.00 73 $366.00
2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) UN FT $2.00 3090 $6.180.00 1928 $3.866.00 641 $1.282.00 521 $1.042.00
2104.523 SALVAGE CASTING EACH $250.00 16 $4,800.00 16 $4.600.00
2104.523 SALVAGE GATE VALVE EACH saco,oo 17 $13.600.00 12 $9.600.00 3 $2.400.00 1 1800 .00 1 $6DO.OO
2104.523 SALVAGE HYDRANT EACH $800.00 21 $16.800.00 16 $12,800.00 3 $2,400.00 1 $6DO.OO 1 $800.00
2104.523 SALVAGE LIGHT POLE EACH $500.00 1 $600.00 1 $600.00
2104.523 SAlVAGE PIPE APRON EACH $5,000.00 2 $10,000.00 2 $10.000.00
2104.523 SALVAGE PIPE PLUG EACH $200,00 4 $6DO_OO 4 $6DO.OO
2104.601 HAUL SALVAGED MATERIAL LUMP SUM $5.000.00 1 $6.000.00 1 $6.000.00
2104.602 SALVAGE MAILBOX EACH $100.00 08 $6.900.00 55 $6.600.00 2 $200.00 2 $200.00
2105,501 COMMON EXCAVATION (P) CUYD $6,00 153635 $921.810.00 138345 $130.070.00 5394 $32.314.00 9896 $&9.376.00
2105.505 MUCK EXCAVATION (P) cuvo $4,00 31378 $126.612.00 31378 $12S,612.OO
2105.507 SUBGRAOE EXCAVATION (P) CUYD $3.50 62722 $219.827.00 57113 $201.998.$0 2165 $7.677.60 ".. $9.964.00
2105.511 COMMON CHANNEL EXCAVATION (P) cuvo $8.00 2720 $21,600.00 2125 $21.600.00
2105.522 SELECT GRANULAR BORROW (LV) cuvo $7.00 180S60 $',263.920.00 171400 $1,199,900.00 4700 $32.900.00 4460 $31.220.00
2105.525 TOPSOIL BORROW (CI/) CUYD $8.00 10000 $60.000.00 7500 $60.000_00 2500 $20.000.00
2105.601 DEWATERING LUMP SUM $50,000,00 1 $60.000.00 1 $60.000.00
2105.602 SETTLEMENT PLATES EACH $300,00 90 $27.000.00 90 $27.000.00
2105,604 GEOTEXTlLE FABRIC TYPE IV SaYD $3.00 6460 $16,470.00 5490 $16"70.00
2105.604 GEOTEXTILE FABRIC TYPE V savo $1.25 113926 $142,407.&0 91100 $113,87&.00 17120 $21.400.00 5706 $7,132.50
2105.607 EXCAVATION SPECIAL 1 (P) cuvo $6.00 34731 $208.396.00 34731 $208.386.00
2105.607 FILL SPECIAl (LV) CUYD $5.00 132678 $663,390.00 95936 $479.660.00 21928 $'39.140.00 8814 &14.070.00
2130.501 WATER MGAL $25.00 600 $16.000.00 400 $10.000.00 100 $2.600.00 100 $2.600.00
2211.503 AGGREGATE BASE (CV) CLASS 5 (P) cuvo $16.00 159292 $948.672.00 50439 $607.024.00 856 $13.696.00 1501 $24,112.00 3739 $&9,824.00 2654 M2,464.00 97 $1,552.00
2221.502 AGGREGATE SHOULDERING (CV) CLASS 5 (P) cuvo $16.00 414 $7,744.00 439 $7.024.00 18 $288.00 27 "32_00
10F15
EXHIBIT A
60% ENGINEER'S ESTIMATE
ANOKA COUNTY
C.S.A.H. 14 RECONSTRUCTION
DATE PAINTED: 101412008
C.SA.H. 14 RECONSTRUCTION
UNIT TOTAL PROJECT S.P. 02-614-24-
C.IA.H.1. C.IA,H. 54 C.SA.H.21
S.P.210-020-oo5 S.P. 02-654-001 S.P.02.621.009 NON-PARTICIPATING
ANOKA COUNTY CITY OF L1NO LAKES CITY OF CENTERVlLLE ANOKA COUNTY CITY OF CENTERVlLLE ANOKA COUNTY CITY OF CENTERVILLE ANOKA COI.JolTY CITY OF L1NO LAKES OTY OF CENTERVIllE
ITEMNQ. ITEM DESCRIPTION UNIT COST QUANTITIES COST ROADWAY ROADWAY RONJWAY RO/IDWAY RONJWAY ROICWAY RONJWAY STORM
QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT CUANTfTES SEGMENT QUANmlES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES seGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT
ESTIMATE ESTIMATE ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIfMTED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATI!:D COST
2301.553 BRIDGE APPROACH PANELS SQYD $80.00 193 $15,440.00 193 $15,440.00
2350.501 TYPE LV 3 WEARING COURSE MIXTURE (8) TON $42.00 elI1 $2"'02.00 547 $22.91".00 34 $1,428.00
2350.501 TYPE LV 4 WEARING COURSE MIXTURE (8) TON $40.00 2221 $88,840.00 773 $30,920.00 1365 $&4,600.00 83 $3,320.00
2350.502 TYPE LV 4 BITUMINOUS MIXTURE FOR DRIVEWAYS, 3 INCH SOVO $15.00 .,.. $71.160.00 4148 $65,220.00 396 $0.940.00
2350.502 TYPE M't/ 3 NON WEARING COURSE MIXTURE (B) TON $45.00 51&7 $232.066.00 3907 $175,81&.00 769 $34.60&.00 481 $21.&10.00
2350.502 TYPE LV 3 NON WEARING COURSE MIXTURE (8) TON $42.00 elI1 $24,402.00 547 $22.914.00 34 $1,428.00
2357.502 BITUMINOUS MATERIAl FOR TACK COAT GALLON $1.50 18510 $21.1".00 16243 $24.)&1.00 1260 $1.890.00 1007 $1.O10~0
13tO.W1 TYPE SP 12.5 WEl\RlNG COURSE MIX (4,F) TON $50.00 28809 $1....,400.00 25189 $1,2159..4&0.00 2013 $100.6&0.00 1687 $14.300.00
2360.502 TYPE SP 12.5 NON WEAR COURSE MIX (4.B) TON $47.00 1314& $800.110.00 12059 $6".113.00 980 $46.060.00 806 $31.882.00
BRIDGE SOFT $100.00 0..3 $866.300.00 5411.78 $141.116.00 251,22 $25,122.00
2411.603 CONCRETE RETAINING WAlL UNFT $1,400.00 160 $252.000.00 180 $202.000.00
2411.603 RET AlNfNG WALL SOFT $40,00 6646 $261.840.00 6546 $261.&10.00
2442.501 REMOVE OLD BRIDGE LUMP SUM $10.000.00 1 $10.000.00 1 $10.000.00
2452.618 STEEL SHEET PILING (TEMPORARY) SOFT $25.00 ..00 $110.000.00 4400 $110.000.00
2501.511 12- CS PIPE CULVERT LtNFT $24,00 66 $1.0<Cl.00 65 $1.080.00
2501.511 12- RC PIPE CULVERT DES 3006 L1N FT $25.00 78 $1,960.00 7B $1.900.00
2501.511 15" CS PIPE CULVERT lINfT $26.00 368 $S.3CI8.00 358 $1.308.00
2501.511 15" RC PIPE CULVERT DES 3006 UN FT $27.00 36ll $1.963.00 369 $1.963.00
2501.511 21" CS PIPE CULVERT UN FT $30.00 120 $3.800.00 120 $3.600.00
2501.511 24" CS PIPE CULVERT UN FT $32.00 82 $2.....00 82 $2.624.00
2501.511 24" RC PIPE CULVERT DES 3006 UN FT $34,00 10 $2.380.00 70 $2.380.00
2501.511 36" CS PIPE CULVERT UNFT $45,00 88 $3.060.00 6B $3.080.00
2501.515 12- CS PIPE APRON EACH $225.00 2 $480.00 2 $400.00
2Ml1.515 12-RC PIPE APRON EACH $400.00 1 $2.800.00 2 $800.00 5 $2.000.00
2501.515 15- CS PIPE APRON EACH $250,00 8 $1.500.00 6 $1.000.00
2501.515 15" RC PIPE APRON EACH $500.00 12 $8.000.00 6 $3.000.00 6 $3.000.00
2501.515 18" RC PIPE APRON EACH $550.00 2 $1, tOO.DO 2 $1.100.00
2501.515 21. CS PIPE APRON EACH $275,00 4 $1.100.00 4 $1,100.00
2501.515 21"RCPIPEAPRON EACH $600.00 0 $3.000.00 5 $3.000.00
2501.515 24" CS PIPE APRON EACH $300.00 4 $1.200.00 4 $1.200.00
2501.515 24" RC PIPE APRON EACH $700.00 8 $8.800.00 2 $1.400.00 6 $4.200.00
2501.515 27" RC PIPE APRON EACH $800.00 2 $1.800.00 2 ".'00.00
2501.515 30. RC PIPE APRON EACH $900,00 4 $3.800.00 4 $3.800.00
2501.515 33" RC PIPE APRON EACH $1.000.00 3 $3.000.00 3 $3.000.00
2501.515 36" CS PIPE APRON EACH $450.00 4 $1.800.00 4 $1.800.00
2501.515 36" RC PIPE APRON EACH $1,100,00 2 $2.200.00 2 $2.200.00
2501.515 42" RC PIPE APRON EACH $1.200,00 1 $1,200.00 1 $1,200.00
2501.521 122" SPAN RC PIPE-ARCH CULVERT UNFT $750,00 ell $42,000.00 56 $42,000.00
2501.573 INSTAlL PIPE APRON EACH $5.000.00 2 $10.000.00 2 $10.000.00
2501.601 DRAINAGE IMPRVMNTS & REPAIR PIPE CULV LUMP SUM $2,000.00 1 $2.000.00 1 $2.000.00
2501.602 TRASH GUARD FOR 12- PIPE APRON EACH $650.00 0 $3.200.00 5 $3.200.00
2501.602 TRASH GUARD FOR 15- PIPE APRON EACH $700,00 12 $8.400.00 12 $1,400.00
2501.602 TRASH GUARD FOR 18" PIPE APRON EACH $750,00 2 $1.800.00 2 $1.600.00
2501,602 TRASH GUARD FOR 21" PIPE APRON EACH $800.00 0 $4.000.00 5 $4.000.00
2501.602 TRASH GUARD FOR 24" PIPE APRON EACH $900.00 8 $1.200.00 8 $1.200.00
2501.602 TRASH GUARD FOR 27" PIPE APRON EACH $1,000.00 2 $2.000.00 2 $2.000.00
2501.602 TRASH GUARD FOR 30" PIPE APRON EACH $1,100.00 4 $4,400.00 4 $4,400.00
2501.602 TRASH GUARD FOR 33- PIPE APRON EACH $1,200.00 3 $3.800.00 3 $3.800.00
2501.602 TRASH GUARD FOR 36" PIPE APRON EACH $1,300.00 2 $2.600.00 2 $2.800.00
2501.602 TRASH GUARD FOR 42- PIPE APRON EACH $1.500,00 1 $1.1500.00 1 $1.600.00
2502.521 4" TP PIPE DRAIN LtNFT $7.50 8200 $4"'00.00 5200 $39.000.00 500 $3.100.00 500 $3.100.00
2502.604 4-INSULATION SOYD $30.00 3&0 $10.800.00 350 $10,6oo.QQ
2503.541 12- RC PIPE SEWER DES 3006 LtNFT $25.00 4288 $101.200.00 4288 $101.200.00
2503.541 15- RC PIPE SEWER DES 3006 LtNFT $27,00 2840 $16.810.00 2845 $18.816.00
2503.541 18" RC PIPE SEWER DES 3006 LtNFT $30.00 2069 $61.770.00 2059 $81.170.00
2OfO
EXHIBIT A
60% ENGINEER'S ESTIMATE
ANOKA COUNTY
C.SAH. 14 RECONSTRUCTION
DATE PRINTED: 10141200t
C,SA.H. 14 RECONSTRUCTION
UNIT TOTAL PROJECT SP.02-El14.-24
C,SA.H.1. C.SAH. &4 C.SA.H.21
S.P.210-020-oo5 S.P.02-654-oo1 S.P. 02-621-009 NON-PARTlCIPATlNG
ANOKACOUNTY CITY OF L1NO LAKES CITY OF CENTERVlLLE ANOKA COUNTY CITY OF CENTERVA.LE MlOKA COUNTY CITY OF CENTERVlLLE ANOKACOUNTY CITY OF UNO LAKES CITY OF CENTEFMLLE
ITEM NO. ITEM OESCRJPTJON UNIT COST QUANTITIES COST ROADWAY Rf>>DWAY ROADWAY RON:JWAY RONJWAY ROADWAY ROADWAY STORM
QUANTITES SEGMENT QUANTITIES SEGMENT QLW4T1TfES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGM:NT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT
ESTIMATE ESTIMATE ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTiMATED COST
2503.541 21" RC PIPE SEWER DES 3006 L1NFT $32.00 1878 $80.128.00 1679 $60.128.00
2503.541 24- RC PIPE SEWER DES 3006 L1NFT $34.00 10001 $34.136.00 1004 $3oto,136.00
2503.541 27" RC PIPE SEWER DES 3006 L1N FT $38.00 883 $32.794.00 863 $32,794.00
2503.541 30" RC PIPE SEWER DES 3006 L1NFT $45,00 1661 $T5.106.oo 1669 $76.10e.ao
2503.541 33" RC PIPE SEWER DES 3006 L1NFT $50,00 1113 $&5.6&0.00 1113 *.6eo.00
2503.541 36- RC PIPE SEWER DES 3006 L1NFT $55.00 70 $3.8&0.00 70 $3.850.00
2503.541 .2" RC PIPE SEWER DES 3006 L1NFT $65.00 804 $158.760.00 904 $&8,760.00
2503.602 CONNECT TO EXISTING STORM SEWER EACH $500.00 4 $2.000.00 4 $2.000.00
2503.602 RECONSTRUCT LIFT STATION (SANITARY) L1NFT $2,000.00 7.4 $14.800.00 7.4 $14.800.00
2503.603 4" PVC FORCE MAIN UNFT $25.00 1060 $2UOO.OO 1060 $28.500.00
2503,G03 6" PVC SANITARY SERVICE PIPE UN FT $25.00 93 $2.325.00 93 $2.325.00
2503.G03 21" PVC PIPE SEWER SDR 35 L1NFT $500.00 25 $12.500.00 25 $12.500.00
2504.G02 ADJUST CURB BOX EACH $60,00 28 $1.680.00 28 $1.880.00
2504.G02 ADJUST HYDRANT EACH $1.000.00 2 $2.000.00 2 $2.000.00
2504.602 ADJUST VAlVE BOX EACH $200.00 46 $9.200.00 1 $200.00 30 $8.000.00 11 $2~00.00 4 $800.00
2504.G02 CONNECT TO EXISTING WATERMAlN EACH $1,000.00 25 $25.000.00 14 $14.000.00 7 $T.DDO.OO 2 $2.000.00 2 $2.000.00
2504.G02 HYDRANT EACH $2.500.00 2 $5.000.00 2 $5.000.00
2504.602 INSTAll GATE VALVE & BOX EACH $400.00 17 $8.800.00 12 $4.800.00 3 $1,200.00 1 $400.00 1 $400.00
2504.602 INSTALL HYDRANT EACH $1.100.00 21 $23.100.00 16 $17.800.00 3 $3.300.00 1 $1.100.00 1 $1.100.00
2504.602 INSTAlL PLUG EACH $250.00 4 $1.000.00 4 $1.000 .00
2504.G02 1" CURB STOP AND BOX EACH $80000 21 $16.800.00 5 $4.000.00 16 $1'.800.00
2504.602 6" GATE VAlVE AND BOX EACH $900.00 , $1.600,00 2 $1.800.00
2504.602 6" MEGAlUG EACH $50.00 101 $5.080.00 67 $3.3&0.00 20 $1.000.00 4 $200.00 10 $000.00
2504.602 e" MEGALUG EACH $75,00 20 $1.500.00 20 $1.800.00
2504 ,602 10" MEGALUG EACH $85,00 ,. $1.360.00 8 $880.00 8 $880.00
2504.602 12" MEGALUG EACH $100.00 13 $1.300.00 8 $800.00 5 $800.00
2504.602 S"X6"WET TAP EACH $1.500,00 1 $1.500.00 1 $1.&00.00
2504,602 10-XS-WET TAP EACH $1.800,00 1 $1.800.00 1 $1.800.00
2504.602 12"XG"WET TAP EACH $2,000.00 , $4.000.00 2 $4.000.00
2504.603 1- PVC WA TERMAlN UN FT $20.00 855 $19,100.00 273 $&.480.00 682 $13.640.00
2504.603 6" PVC WATERMAlN L1NFT $25.00 180 $4.500.00 120 83.000.00 60 $1.800.00
2504,603 6" WA TERMAlN DUCTILE IRON Cl 50 L1N FT $35,00 480 $1'.800.00 480 "'.&00.00
2504.603 e- PVC WA TERMAIN UN FT $35.00 m $27.896.00 797 $27.896.00
2504.603 10" PVC WATERMAlN L1NFT $38,00 800 $22.800.00 150 $&.700.00 450 $17.100.00
2504,603 12" PVC WA TERMAlN UN FT $40.00 9110 $38.000 .00 516 $20.840.00 434 $17.360.00
2504.60e WA TERMAlN FITTINGS LBS $5,00 23&3 $11.76&.00 1162 $&.810.00 408 $2.040.00 783 $3,91e.00
2506,501 CONST DRAINAGE STRUCTURE DES 48-4020 UNFT $250.00 112 $28.000.00 112 $28.000.00
2506.501 CONST DRAINAGE STRUCTURE DES 54--4020 LlNFT $300,00 84 $18.200.00 64 $19.200.00
2506.501 CONST DRAINAGE STRUCTURE DES 60-04020 llN FT $350.00 6 $1,7&0.00 5 $1,760.00
2506,501 CONST DRAINAGE STRUCTURE DES 66-4-020 L1NFT $400.00 4' $16.8DO.00 42 $1..600.00
2506.501 CONST DRAINAGE STRUCTURE DES 72-4020 LlNFT $450,00 23 $10.3&0.00 23 $10.350.00
2506.501 CONST DRAINAGE STRUCTURE DES &4-4020 LlN FT $600.00 12 $7 ,200.00 12 $T .200.00
2506.501 CONST DRAINAGE STRUCTURE DES 90-4020 UN FT $700.00 12 68.400.00 12 $8.400.00
2506,501 CONST DRAINAGE STRUCTURE DES 96-4020 UNFT $900.00 7 $&.800.00 7 $&.800.00
2506.501 CONST DRAINAGE STRUCTURE DES 108-<4020 L1NFT $900,00 8 $T ~oo .00 8 $T.'OO.OO
2506.501 CONST DRAINAGE STRUCTURE DES 120-4020 UN FT $1,000.00 10 $10.000.00 10 $10.000.00
2506.501 CONST DRAINAGE STRUCTURE DESIGN G UNFT $250.00 430 $107.eoo.00 430 $107,&00.00
2506.501 CONST DRAINAGE STRUCTURE DESIGN H UNFT $250,00 88 $22.000.00 88 $22.000.00
2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $30.000,00 1 $30.000.00 1 $30.000.00
2506,502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 2 EACH $3.500.00 4 $14.000.00 4 $1..000.00
2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL 3 EACH $4.000.00 3 $12.000.00 3 $12.000.00
2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAl.. 4 EACH $4.000.00 1 $4.000.00 1 $4.000.00
2506,516 CASTING ASSEMBLY EACH $450.00 211 $94.850.00 211 $94.850.00
2506.523 INSTAll CASTING EACH $250.00 18 $4.800.00 18 $4.500.00
2506.522 ADJUST FRAME & RING CASTING EACH $300.00 18 $&.400.00 16 $4,800.00 1 S3OO.oo 1 8300.00
2506.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH $500.00 4 $2.000.00 4 $2.000.00
30F15
EXHIBIT A
60% ENGINEER'S ESTIMATE
ANOKA COUNTY
C.S.A.H. 14 RECONSTRUCTION
DATE PRINTED: ,0N2006
C.SAH. 14 RECONSTRUCTION
UNIT TOTAL PROJECT S.P. 02-614-:U
C.S.A.H.14 C,SAH.54 C.SA.H.21
S.P.21l).02lH05 S.P. 02-654-001 SP.02-621-009 NOr+PARTICIPATING
ANOKA COUNTY CITY OF LINO LAKES CfTY OF CENTERVlLLE ANOKA COUNTY CITY OF CENTERVILLE ANOKA COUNTY CITY OF CENTERVILLE ANOKA COUNTY CITY OF L1NO LAKES CITY OF CENTERVlLLE
ITEM NO. ITEM DESCRIPTION UNIT COST QUANTITIES COST ROADWAY ROADWAY ROADWAY RON>WAY RON:fWAY ROADWAY ROADWAY STORM
QUANTJTES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT OUANTlTIES seGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT OUANTlTlES SEGMENT QUANTITIES SEGMENT OUANTITlES SEGMENT QUANTITIES SEGMENT
ESTIMATE ESTIMATE ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTiMATED COST ESTIMATED COST
2506.603 RECONSTRUCT SANITARY MANHOLES UN FT $300,00 72 $21.600.00 60.5 $18.'00.00 6.6 $1.1180.00 .., $1~70.00
2511.501 RANDOM RIP RAP CLASS II CUYD $40.00 340 $13.600.00 340 $13,600.00
2511.501 RANDOM RIP RAP ClASS Ul CUYD $50,00 2925 $146.200.00 2684 $134.200.00 2., $12,050.00
2511.501 RANDOM RIP RAP CLASS N CUYD $60.00 970 $66.200.00 970 $66.200.00
2521.501 4" CONCRETE WALK SOFT $3.25 42626 $'36,634.00 21162 $68,841.60 16503 $63.634.76 2553 $6,291.26 "8 $2.6&8.&0 1570 $&,102.60
2521.501 6" CONCRETE WAlK sa FT $4.00 293 $1.172.00 195 $780.00 56 $224 .00 .2 $'66.00
2521.511 2" BITUMINOUS WAlK sa FT $3.00 181651 $844.983.00 63280 $189,840.00 111621 $334.863.00 6750 $20.200.00
2531.501 CONCRETE CURB & GUTTER DESIGN 6412 lINFT $11.00 330 $3.630.00 125 $1.375.00 125 $1.37&.00 40 ~O.OO 40 $440.00
2531.501 CONCRETE CURB & GUTTER DESIGN 8424 L1NFT $9.00 ,- $143.082.00 8823 $79.407.00 437 $3.933.00 4164 $37 ~76.oo 734 $7.'''.00 486 $4.374.00 710 $6.390.00 .84 $4.361.00
2531.501 CONCRETE CURB & GUTTER DESIGN 8612 UN FT $11.00 1042 $"~2.oo 497 $6~67.00 497 $6~7.oo 24 $264.00 2. $264.00
2531.501 CONCRETE CUR8 & GUTTER DESIGN 8618 UN FT $12.00 306 $3,672,00 153 $1.636.00 153 $' ,636.00
2531.501 CONCRETE CURS & GUTTER DESIGN 8624- LlNFT $9.00 1268<1 $113.220.00 6290 $66.610.00 6290 $66.610.00
2531.501 CONCRETE CURB & GUTTER DESIGN 5512 UN FT $12.00 .04 $6,048.00 252 $3.024.00 252 $3.024.00
2531.507 6" CONCRETE DRIVEWAY PAVEMENT saye $40,00 712 $26,480.00 657 $26,280.00 55 $2.200.00
2531.602 PEDESTRIAN CURB RAMP EACH $500.00 .3 $26,600.00 , 64.000.00 .2 $21.000.00 3 $1,500.00
2351.618 TRUNCATED DOMES SOFT $45.00 4" $20.020.00 92 $4. '40.00 364 $16.360.00
2533.504- CONCRETE MEDIAN BARRIER DESIGN 8337 UNFT $10.00 2046 $20......00 2048 $2O~80.00
2540.602 MAIL BOX SUPPORT EACH $150.00 .9 $6.600.00 59 $6,seo.oo
2545.602 INSTAll L1GH! POLE EACH $500,00 , $600.00 1 $600.00
255Hi01 TRAFFIC BARRIER DESIGN BS33S UN FT $20.00 417 $6,340.00 417 $6.340.00
2554,509 GUIDE POST TYPE B EACH $35,00 ,. $626.00 15 $626 .00
2554.521 ANCHORAGE ASSEMBLY - PLATE BEAM EACH $350.00 6 $2,100.00 6 $2.100.00
2554.523 END TREATMENT. ECCENTRIC LOADER BCT EACH $1.700,00 6 $10,200.00 6 $10.200.00
2554.602 IMPACT A TTENUA TOR BARRELS EACH $250.00 60 $'..000.00 36 $9.000.00 24 $6.000.00
2557.501 WIRE FENCE DESIGN 6l).9322 UN FT $12.00 1966 $23,616.00 1968 $23.616.00
2557,501 WIRE FENCE DESIGN 60V-9322 UNFT $12,00 79 $S4S.OO 79 $S4S.00
2563,601 DETOUR SIGNING LUMP SUM $5.000.00 1 $6.000.00 1 $6.000.00
2563.601 TRAFFIC CONTROL STAGE 1 LUMP SUM $50,000,00 , $00.000.00 D':!' $47,&00.00 0.05 $2,500.00
2563.601 TRAFFIC CONTROL STAGE 2 LUMP SUM $20,000.00 1 $20.000.00 OT, $19.000.00 0,05 $1,000.00
2563,601 TRAFFIC CONTROL STAGE 3 LUMP SUM $15,000,00 1 $16.000.00 ,y $14.200.00 0.05 $760.00
2563.601 TRAFFIC CONTROL STAGE 4 LUMP SUM $10.000.00 1 $10.llClO.00 'J9" $6.600.00 005 $000.00
2564.531 SIGN PANELS TYPE C sa FT $25.00 1241 $31,026.00 1061 $26.626.00 69 $1.726.00 111 $2.776.00
2564,531 SIGN PANelS TYPE D SO FT $100,00 ." $51.100.00 511 $61.100.00
2564.1:;02 PAVEMENT MESSAGE (LEFT ARROW) PAINT EACH $125,00 37 $U26.00 30 $3.7.0.00 2 $200.00 5 $62&.00
2564.602 PAVEMENT MESSAGE (L T ARROW) PREFORMED THERMOPlASTIC EACH $325.00 63 $26,17&.00 76 $24.700.00 2 $860.00 5 $1.626.00
2564.602 PAVEMENT MESSAGE (L T - THRU ARROW) PREFORMED THERMOPL EACH $500.00 1 $600.00 1 _.00
2564,602 PAVEMENT MESSAGE (RIGHT ARROW) PAINT EACH $125,00 21 $2.62&.00 17 $2.126.00 2 $260.00 2 $2&0.00
2564.602 PAVEMENT MESSAGE (RT ARROW) PREFORMED THERMOPLASTIC EACH $325.00 37 $12,02&.00 36 $11.37&.00 2 _.00
2564 ,602 PAVEMENT MESSAGE (RT- THRU ARROW) PREFORMED THERMOPL EACH $500.00 2 $1,000.00 2 $1.000.00
2564.602 PAVEMENT MESSAGE (SCHOOL XING) PERFORMED THERMOPLAS EACH $500.00 2 $1,000.00 2 $' .000.00
2564,603 4- BROKEN LINE WHITE. EPOXY L1N FT $0,40 1744 $697.60 1151 $460.40 471 $188.40 122 646.80
2564.603 4" BROKEN LINE YELLOW - EPOXY L1NFT $0.40 1984 $181.60 1954 $781.60
2564.603 4- DOUBLE SOLID LINE YELLOW - EPOXY UN FT $0,90 16302 $14.671.80 13077 $11,769.30 1659 $1,4i3.10 1566 $1,409.40
2564.603 48 DOUBLE SOLID LINE YEllOW - PAINT UNFT $0.50 26937 $13~66.00 22477 $11.236.00 2116 $1.0&8.00 234. $1.172.00
2564.603 4" SOLID LINE WHITE. EPOXY lINFT $0.40 37439 $14,978.60 3464' $13.869.60 1269 s007.60 1521 $60UO
2564.603 4" SOLID LINE WHITE - PAINT lIN FT $0,25 269&0 $6.737.00 22484 $6.621.00 2119 $&29.7!I 2347 $&86.7&
2564.603 4" SOLID LINE YELLOW. EPOXY LlNFT $0.75 6978 $6,733.00 8978 $6,733.00
2564.603 4- SOLID LINE YELLOW. PAINT LlN FT $0.25 271&6 $6,789.00 22738 $6,684.00 2155 $&38.7& 2263 $666.7!I
2564.603 S" BROKEN LINE WHITE - EPOXY lINFT $7.00 166 $1.092.00 156 $1.092.00
2564.603 24" SOLID LINE WHITE. PAINT lINFT $7.00 '63 $1.261.00 80 $680.00 5. $378.00 ., $343.00
2564.603 24" SOLID LINE YELLOW - EPOXY UNFT $5.00 888 $4.440.00 207 $1.036.00 461 $2.30&.00 220 $'.'00.00
2564.603 24" SOLID LINE WHITE - PREFORMED THERMOPlASTIC lINFT $6,00 181 $1.086.00 181 $1.088.00
2564.603 248 SOLID LINE YELLOW. PREFORMED THERMOPlASTIC UN FT $6.00 '296 $7.770.00 1295 $7.770.00
25&t-.61S ZEBRA CROSSWAlK- WHITE PREFORMED THERMOPlASTIC sa FT $10.00 11&2 $11,&20.00 1152 $11,e20.QO
40F a
EXHIBIT A
60% ENGINEER'S ESTIMATE
ANOKA COUNTY
C.S.A.H. 14 RECONSTRUCTION
DATE PRINTED: 10I4l2OO6
C.SA.H. 14 RECONSTRUCTION
UNIT TOTAL PROJECT SP.024i1...2-io
C.SA.H.14 C.SA-H.54 C.SA.H.21
S.P. 21~02o.005 S.P. 02-654-001 S.P. 02-621~009 NON-PARTICIPATING
ANOKA COUNTY CITY OF LINO LAKES CITY OF CENTERVlLLE ANOKA COUNTY CtTY OF CENTER\II.LE .MICKA COUNTY CITY OF CENTERVLLE ANOKA COUNTY CITY OF L1NO LAKES CITY OF CENTERVlLLE
ITEM NO. ITEM DESCRIPTION UNIT COST QUANTITIES COST ROADWAY ROADWAY ROK)WAY RON:INAY RO/IDWAY ROADWAY ROADWAY STORM
OUANTIT1ES SEGMENT QUANTITES SEGMENT ~TJTIES SEGMENT QUANTITIES SEGMENT OUANTITES SEGtoENT Ql.IANTITIES SEGMENT otJANTlTIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT QUANTITIES SEGMENT
ESTlMTE ESTIMATE ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTIMATED COST ESTNATEO COST ESTIMA.TEO COST ESTtMATED COST ESTIMATED COST ESTIMATED COST
2565.511 FULL TACT T CONTROL SIGNAL SYSTEM BIG SYS $180,000.00 1 $180,000.00 0.5 $90.000.00 0.25 $4&.000.00 0.25 $45,000.00
2565.602 PEDESTRIAN PUSH BUTION AND SIGN EACH $3.750.00 2 $7,&00.00 2 $7 ,&00.00
2565.602 PVC HANDHOLE (METAL FRAME AND COVER) EACH $850.00 8 $6.800.00 , $6.800.00
2565.603 2 INCH NON-METALLIC CONDUIT UNFT $6,00 800 $4.&00.00 eoo $4.800.00
2565.603 4 INCH NON-METAlLIC CONDUIT UNFT $8,00 200 $1.600.00 200 $1.600.00
2573.502 SILT FENCE, TYPE MACHINE SLICED UN FT $2.50 18000 $46.000.00 18000 $4&.000.00
2573.505 FLOTATION SILT CURTAIN TYPE STILL WATER lINFT $12.00 84. $10.116.00 ." $10.116.00
2573.505 FLOTATION SILT CURTAIN TYPE MOVING WATER lINFT $15.00 7&0 $11.2&0.00 750 $11.280.00
2573.601 EROSION CONTROL SUPERVISOR LUMP SUM $10.000,00 , $10.000.00 1 $10.000.00
2573.602 INLET PROTECTION EACH $300.00 23& $70.&00.00 235 $70.&00.00
2573.603 BIOROLL lINFT $10.00 1&00 $1&.000.00 1500 $1&.000.00
2575.501 SEEDING (P) ACRE $250.00 38.T ,",67&.00 35,5 ,",&7&.00 '5 $3T&.OO 17 $42&.00
2575,505 SODDING TYPE LAWN SaYD $2,25 46107 $103.7010.76 42063 ....1141.7& 3198 $7.196.&0 646 $1.90'.80
2575.511 MULCH MATERIAl. TYPE 3 TON $200,00 n.. $1&.480.00 71 $14.200.00 , $llOO.oo ,.4 S680.00
2575.519 DISK ANCHORING (P) ACRE $150.00 38.7 $6.80&.00 35.5 $6.'2&.00 1.5 $22!.00 1.7 $2&&,00
2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SOVC $1.25 ...9281 $&1.601,26 45293 $66,61626 1600 $2.000.00 2388 $2.'&&.00
2575.523 EROSION CONTROL BlANKETS CATEGORY 4 SaYD $1.50 4840 $7,2<0,00 .640 $7.2<0.00
2575,532 COMMERCIAL FERTILIZER ANALYSIS 22-5-10 POUND $0,50 1&480 $7.740.00 14200 $7.100.00 600 $300.00 660 $340.00
2575.608 SEEDING. MIXTURE 310 POUND $30,00 82 $2.480.00 " $2.4&0.00
2575.608 SEEDING. MIXTURE 350 POUND $35.00 .1&3 $110.3156.00 2882 $100.870.00 121 $4.44&.00 144 $6,....00
STREETSCAP1NG LS $500,000.00 1 $llOO.ooo.oo 1 $llOO.OOD.OO
SUBTOTALS $1....230.856.10 9.869.167.90 "'84.7&1.00 _.080.2& 440,764.86 $32,993.00 .06.....80 $43.148.60 , ,3&8.844.00 30,122.00 16.600.00 670.97&.00
TOTALS $14,230,856.10 9,869,167.90 "'84,761,00 _.0&0.2& 440.7&4.86 $32.993.00 "'06.449.60 $43,1"'8,60 1.368......00 30.122.00 16.600,00 670.976.00
Fuming Gnlup: Qroup 1 Gnlup 2 Qroup 3 Qroup 4 Group 5 Group 8 Group 7 Group 8 Group D Group 10 Group 11
ToIlls: $14.230.856.10 $9,859.157.90 $484,751.00 $888.050.25 $440.784.85 $32.993.00 $408,449.60 $43.148.50 $1,358.844.00 $30.122.00 $15.600.00 $870.975.00
ToIal Federal EUglbIe Items: $13.514.159.10 $9.859.157.90 $484,751.00 $888.050.25 $440.784.85 $32.993.00 $405.449.80 $43,148.50 $1.358,844.00
Federal Funde Available: $8.523.550.00 $4,759.209.14 $233.998.83 $428.679.30 $212.785.85 $15,926.37 $198.201.20 $20.828.63 $655.940.68
% Federal Funding 48.27% Rounded to: $4.759.210.00 $234,000,00 $428,880.00 $212.770.00 $15.930.00 $196.200.00 $20.830.00 $6&5.930.00
SP 02-614-24 (RECONSTRUCTION OF CSAH 14 MAIN STREET) FROM 1-35E TO 1-35W\. FUNDING SPLITS
ANOKA ANOKA ANOKA CITY OF CITY OF CITY OF CITY OF LINO CITY OF UNO CITY OF LINO
PROJECT ANOKA COUNTY COUNTY COUNTY STATE COUNTY CENTERVILLE CENTERVILLE CENTERVlLLE CITY OF UNO LAKES LAKES STATE LAKES LOCAL
TOTALS TOTALS FEDERAL F~~~~L LAKES TOTALS FEDERAL
.'INn" AID FUNDS LOCAL FUNDS TOTALS LOCAL FUNDS F'lNM AID FUNDS FUNDS
ROADWAY $12,872,012.10 510,7:1e,494.35 $5.168,180.00 $5.538.192.35 $30,122.00 $1.635.166.75 $485.440.00 $1.169,726.75 $500.351.00 $234,000.00 $250.761.00 $15.600.00
DRAINAGE (55% County, 7% LINO LAKES. :Ie% $1,358.844.00 $747.364.20 $380.761.50 $386.802.70 $516,380.72 $249.253.40 $267.107.32 $95,119,08 $45.915.10 $49.203.95
SIGNAL CABINET A 100% County) $15.000,00 $15,000.00 $15.000.00
CONSTRUCTION TOTAL $14.245.856.10 $11.498.858.55 $5,528.941.50 $5.939,795.05 530.122.00 $2,151.527.47 $714.693.40 $l,4:1e,834.D7 $595.470.08 $279.915.10 $298.954.95 $15.600.00
8% CONSTRUCTION ENGINEERING $1.139.668.49 $919,908.88 $917.498.92 $2.408.76 $172.122.20 $172,122.20 $47,637.61 $46,389.61 $1,246.00
PROJECT CONSTRUCTION TOTAL $15.395,524.59 $12,418.767.23 $5.528.941.50 $6,857.293.97 $32.531.76 $2,323,649,67 $714.693.40 $1,808,968.27 $643.107.69 $279,915,10 $346,344.69 $16,848.00
Percentage of Total Construction Cost eo,72'IL
$l.808,956.27IPayable to Anoka County from CENTERVILLE
$363,192.89 PIYlbIe to Anoke County from LINO LAKES
ITEMS IN RED WERE CHANGED FROM PREVIOUS VERSION
15,10"
....1ft.
e OF6
COUNTY OF ANOKA
Public Services Division
HIGHWAY DEPARTMENT
1440 BUNKER LAKE BLVD. NW, ANDOVER, MINNESOTA 55304
(763) 862-4200 FAX (763) 862-4201
Douglas W. Fischer P.E., County Engineer
August 11, 2006
Dallas Larson
City Administrator
City of Centerville
1880 Main Street,
Centerville, MN 55038
Dear Mr. Larson:
We have reviewed the City's comments to the draft joint powers agreement (JPA) for the
CSAH 14 reconstruction project (SP 02-614-24). Following is a response to each concern you
raised in your August 11, 2006 letter as well as a response to proposed revisions you
highlighted in the JP A itselfthat was not mentioned in your letter.
1) The first item and perhaps of greatest concern is the inclusion of storm drainage system
costs in the JP A. The memorandum of agreement did not include this item and the cost
estimate didn't give a hint that you might be looking for participation. This recent addition
represents almost 60% of the MOU estimate of City share. We cannot accept this afterthought.
It is outrageous to expect to now allocate these costs-we will not pay for drainage system
costs.
Response: The cost split shown in the joint powers agreement is based on our standard cost
share policy. The MOD did in fact estimate a City cost share at 20% that was an assumption
made at a 30% design level. The 38% in the JP A is a refined number based on a detailed
design level. The spreadsheet used to calculate the split is attached for your information.
2) We have inserted on Page 4 the same language that was in the MOU that indicates Anoka
County's intention to secure reimbursement for the trail costs from Metro Parks Trail
Program.
Response: We have added the language from the MOD and clarified that the potential
reimbursement is limited to 50% of the local match.
Page 1 of 5
3) We deleted city participation in the mobilization andfield office. These items were not
contemplated by the MOU and infact were specifically allocated to the County in Exhibit C of
the MOU
Response: We have modified the cost split for mobilization and field office such that the City
will only be responsible for its share of these items for work that is not eligible for federal
funding such as streetscaping and new water and sewer construction.
4) We deleted city participation in traffic control for the same reason as mobilization.
Response: We have modified the cost split for traffic control such that the City will only be
responsible for its share of this item for work that is not eligible for federal funding such as
streetscaping and new water and sewer construction.
5) We have inserted language that says that the value of City contributed land or easements
in excess of remnant property purchased by the City, will be applied to the city share of the
project cost.
Response: We have added section "IX. RIGHT OF WAY" to the IPA with the wording from
the MOD.
6) Because the City's share is so high, we have offered an alternative schedule for payment
of the City's share.
Response: The IP A has been modified to incorporate the requested alternative payment
schedule.
7) We deleted the engineering reimbursement for considering alternative designs on CSAH
54. If you expected to be reimbursed, you should have indicated that at the time those
discussions were taking place.
Response: All revisions to CSAH 54 have been discussed at the Project Management Team
meetings. The design iterations on the west side were a direct result of the office park
development there and on the east side were a direct result of the proposed Northern Lights
Boulevard. Both required changes from the MOD Exhibit A layout and are City costs.
8) We inserted in section V B that the City would receive credits of $300,000 and $150,000
for providing alternative pond locations (andfor efficiencies created by construction of
"Backage Road") The changes to pond locations only happened because of the City's
insistence, thus saving the county at least double the proposed credit.
Response: Item III. B. 4. has been deleted from the IPA. The County will pay for all design
costs to relocate the ponds from the north side of CSAH 14 (Rehbein property). We thank the
City for being a good project partner and recommending this design but cannot credit the City
Page 2 of 5
any funding for this. The new pond locations save on land cost but are more expensive to
construct and require CD 55 to be piped. The redesign is one of the reasons the project has
been delayed. Hopefully without the ponds on the north side of CSAH 14, the City will be able
to generate more tax base.
CSAH 14 will be constructed under traffic and will not detour onto the backage road (Northern
Lights Blvd). The County has no funds to credit the City for constructing the backage road.
9) You have the City involved in providing the power source for the traffic signal (Item IX).
This was not mentioned in the MOU, infact the MOU Exhibit D stated that all traffic signal
costs in cities under 5000 population would be County responsibility. Since all legs of the
intersecting roadways are County, there is no reason for the city to be involved This is a
County expense.
Response: It is standard County policy for Cities to provide for power for signals regardless of
City population.
10) Item X Maintenance provides that the storm sewers are the maintenance responsibility of
the City. Nowhere in the MOU was this indicated and in all afthe meetings we had, this was
never mentioned I do remember you stating that the City would be asked to maintain the grit
chambers but this was because you didn't have vactor equipment. We have deleted reference
to the City maintaining the storm sewer system and ponds.
Response: It is standard County policy for Cities to be responsible for storm sewer trunkline,
ponding, grit chamber and outlet structure maintenance. The MOD is not intended to outline
all maintenance responsibilities. The MOD states this would be formalized in the lP A.
Other Items Redlined in the lP A:
11) The City requested copies of updated spreadsheets showing calculations of cost share.
Response: The 60% plans submitted to the City show the design details of the project used to
generate the lP A. The Exhibit A attached to the lP A shows the cost splits. The drainage cost
split table is attached.
12) The City added language to 11 METHOD concerning calling of bids responsibility.
Response: The language has been added.
13) Item III A. 1. was deleted as duplicate.
Response: Item deleted.
14) The City added language to Item III A. 3a. (formerly 4a.) concerning its right to take
recourse for deficiencies associated with relocation and reconstruction of its utilities.
Page 3 of 5
Response: The language has been added with the exception of "or other party".
15) The City requested a definition of the term "non-eligible" in item IIlA.4 (formerly 5)
concerning storm sewer.
Response: Non-eligible means not eligible for State Aid funding. And to further clarify, non-
participating means not eligible for Federal funding.
16) The City added" as requested by the City" to item IlIA. 9. concerning driveways.
Response: The language has been added. Concrete aprons have also been included as stated in
the MOD.
17) The City changed the language of item IlIA. 1 O. concerning driveways to match the MOU
Response: The language has been revised to match the MOO.
18) The City changed "City" to "County" in item IlIA. 16. (formerly 17) concerning EVP
costs.
Response: The language has not been revised. It is standard County policy for Cities to pay for
EVP.
19) The City added language to item VIII TERMINATION concerning payment of its share of
project costs if upon termination of the agreement.
Response: The language has not been revised. It is not necessary to revise the language.
20) The City added language to item XIV(formerly XII). ENTIRE AGREEMENT
REQUIREMENT OF A WRITING concerning superceding ofprevious agreements.
Response: The language has been revised to add MOD references.
Other Revisions made to lP A:
21) Former Item III A.14. concerning street lighting has been deleted as street lighting is
included with the streetscaping for this project
22) Items IILA.8. and 8a. concerning steetscaping have been added to clarify responsibilities
for construction observation and deficiencies.
A redlined version of the revised lP A is attached highlighting the changes that have been
made. A new Exhibit A and the drainage cost split calculations are also attached.
Page 4 of5
Please feel free to call me at 763-862-4213 or Lyndon Robjent at 763-862-4237 with any
questions you may have.
Sincerely
Douglas W. Fischer P.E.
County Engineer
Encs.
Cc: Rhonda Sivarajah, County Commissioner
Mary Capra, Mayor of Centerville
Lyndon Robjent, Assistant County Engineer
Page 5 of 5
Anoka County Contract NO.2006-0558
JOINT POWERS AGREEMENT
FOR THE RECONSTRUCTION OF COUNTY STATE AID
HIGHWAY NO. 14 (MAIN STREET) FROM l-35W to 1-35
(COUNTY PROJECT NO. 02-614-24)
This Agreement made and entered into this day of
of Anoka, State of Minnesota, a political subdivision of the
Avenue North, Anoka, Minnesota 55303, hereinafter ref err
Centerville, 1880 Main Street, Centerville, MN 55038, herei
the County
2100 Third
the City of
'City".
WHEREAS, the parties of this agreement ha
condition and traffic capacity of County State
WHEREAS, the parties of this agr
State Aid Highway No. 14 (Main
safety ofthe intersections incl
WHEREAS, the parties
Highway 14 (Main Street
sewer system and other ut
desirable to construct a new
Aid Highway 54 (20th Avenue
sirable to construct conduit and
for possible future signalization:
WHERE
Highwa
funds through the Surface Transportation Program
(Main Street); and,
hat t e County shall cause the construction of County State Aid
WHERE
the impr
13 whic
a ounty Highway Department has prepared plans and specifications for
County State Aid Highway 14 (Main Street) under Project No. S.P. 02-614-
specifications are on file in the office of the County Engineer; and,
e parties have an existing Memorandum of Understanding ("MOD") dated
3,2005, regarding said project; and,
Anoka County Contract No.2006-0558
WHEREAS, the parties agree that any extra work performed beyond that shown in th lans as
bid shall be the responsibility of the requested party; and,
WHEREAS, the parties agree that it is in. their best interest that the cost of said shared;
and,
WHEREAS, Minnesota Statute 471.59 authorizes political subdivisio
joint powers agreements for the joint exercise of powers common t
NOW, THEREFORE, IT IS MUTUALLY STIPULATED
I. PURPOSE
The parties have joined together for the
trail/concrete sidewalk, streetscape, drainage,
portions of County State Aid Highway No.
specifications numbered S.P. 02-614-24 on
Department (hereinafter collective rred t
, bituminous
utilities on
e plans and
ty Highway
II.
contracted, the cost of all labor,
required to complete the work, shall
referred to herein. "Estimated" costs are
incurred for the Project. Actual costs may vary
t parties will be responsible.
e project (including County furnished materials) is
e for the Project are capped at $6,523,550.00. The
d e ratio of eligible cost incurred by each party to the total
osts are the costs of items that can participate in federal funding
ation in the construction costs is as follows:
The City shall pay one hundred percent (100%) of the hydrant and curb
box relocation and gate box adjustment as well as water and sewer
relocation and construction. The estimated City cost of these items is
$397,050.00.
2
Deleted: The City shall provide
constmction observation for the
relocation and reconstruction of their
utilities and approve for acceptance the
work as it is
Formatted: Bullets and
Anoka County Contract No.2006-0558
L--The City shall furnish and deliver to the construction site replacement
hydrants for any hydrants, which are being relocated as a pa of this
project, which they want replaced.
1-- The City shall provide construction observation for t
reconstruction of their utilities and approve for accept
completed.
,Ja. The City shall be responsible for any detk
-----------------
relocation and reconstruction of the utilities th
completion of the Project but retains its right
contractor or subcontractor for lleolioence mi
malfeasance. or any issue arisino outs'. e of a
participating.
a percentage
torm sewer
, manholes,
ponds and
d a portion
fined in the
t ~et:'Ye~ lhe_ Ci!y ~n~ C...9u.!lty_
by the product of contributing
tage of contributing flow from
al eligible estimated cost of the
estimated cost to the City is
imated cost of the storm sewer is $0.00 of which
0.00 (100%).
fly percent (50%) of the cost of concrete curb and.
n curb and gutter) in Centerville. The estimated total
urb d gutter including medians is $281,114.00, of which the
imated cost is $115,222.00.
Th lty shall pay one hundred percent (100%) of the cost of decorative
median above the cost of concrete median. The City's estimated cost for
decorative median is $0.00.
The City shall pay one hundred percent (100%) of the cost of streetscape
items including but not limited to: median plantings, trees, tree grates,
street lights, stamped concrete and other aesthetic treatments the City
3
Deleted: 4
,......._.....__.______________________________mm...mmm...............___________________.__.__m....
-l Formatted: Bullets and Numbering
Deleted: 5
Deleted: 5
Deleted: 5
Formatted: Bullets and
Anoka County Contract No.2006-0558
chooses to include with the Project. The streetscape items shall be
designed by a licensed landscape architect and meet the Anok
Highway Department Landscape/Streetscape Guidelines.
estimated cost for streetscape items is $500,000.00.
8. The Cit 'shall Irovide construction observation for tl
::;Jr.9~t::;gll?\LjJ~m::;.Im~:L:,J,PPLQv(;ioril-"g9.pJ.'1..!l9..~ the w
~'!)
9.
The City shall pay on
concrete includin" concr
for all upgraded drivew
cost for driveway pave
10.
the County at no cost to the
ent (100%) of the cost of new
des pavement, aggregate base, soil
fill and geotextile fabric if applicable)
nt work necessary to construct the trail as well as
ences that are required due to the trail that would
he trail. The City's estimated cost for the trail is
~ounty a~~L..t('Lj!lll2LL for funditH! th~!ugh the
il Metro Parks Trail Program for u to finy . ercent
st of the local match for the trail construction for ossib1e
ment to the City after construction. The local match is estimated
75.40 of which $125387.70 will be a). lied for under the Metro
rIl!L..P.!:.9gn:tI:n,/\nQli'!J;Qtdl.]ty,!gr~9.::;mt.9pJ'!9.~Jhi~x~jrDPllI~gillgIE
among the County's list of priorities for fundinQ in the first biennium of
the capital improvement plan to be funded from the Metropolitan Regional
Parks Capital Improvement Program. County statT will do everythinQ
within its power to secure such funding including pursuing special
~!l?I?I.9..P.Ji ati O!l~..J'!:"Q)l~Jh~!~g[::;.L'!.t..lJ..r9.jf..i..L?.pp..~'!r'i..f~i!l?.ilik
4
Formatted
Formatted
Deleted: 6.345.00
...! Deleted: Any in place driveway
~ pavement disrupted by the construction
. WIll be replaced
Anoka County Contract NO.2006-0558
~As the City of Centerville has a population of less than 5000
City shall pay zero percent (0%) of the cost of co
installation of the whole traffic actuated signal syst
(including County supplied materials).
~The County shall pay one hundred percent
costs.
~ The City shall pay one hundred perc
Pre-emption (EVP) costs. The City'
(Not in cost estimate at this time)
1L- The City shall pay their s
non-participating items,
$35.750.00,
atina
Construction
Utilities
2 Grading, B
3 Storm S
4 Dete
Sewe
5 Conc
6 Deco
7 S tree
8 Driv
9 Conc
10 Trail
11 Stree
12 Traffi
13 EVP
14 Mobi
15 Traf
Total
Cost
Esti
City
Total
Total
.25
484,777.50
$0.00
$0.00
$0.00
$}5-J5.!ULO..
$4.750.00
Construction $,J,JjtJ.ll-,iZ_
al Funds available to the$.714.693:40
$.1.436:834.07
$.1,436,834.07
s Federal Funds
nstruction Cost to City
5
/ Deleted: The City shall pay one
hundred percent (100%) of the cost of
any street lighting included in the project.
The design and installation of ornamental
streetlights shall be in accordance with
the County's specifications. The City's
estimated cost for street lighting is $
0.00.
Formatted: Bullets and
Deleted: as detennined
Deleted: 85,800.00
,) Deleted: as detennined by Mn/DOT
IS
..~ Deleted: 6,345.00
Deleted: 85,800.00
Deleted: 11,400.00
Deleted: 2,245,352.47
Deleted: 759,985.20
: Deleted: 1,485,367.27
Deleted: 1,485,367.27
Anoka County Contract No.2006-0558
The total estimated construction cost to the City (less Federal Funds) for the
$.,ldlgJni.Ol a~ s.ho~n -,?n Jh~ a!!.acJ1e~ E.~hj!:>i~, 1\ a,!d !:3. ],h.~ ~it),P'!l1i~ip~ti~n .
engineering will be at a rate of eight percent (8%) of their designated share.
to the City for construction engineering is $172_122.20~m The grand total
cost to the City for the Project is $ $1 ,608.956.27~ _ _ _ _ _ _ _
Upon final completion of the project,
based upon actual construction costs. If neces
(95%) charged will be made in the form of cre
the remaining five percent (5%) of the City's p
cost will be
five percent
share. Also,
paid.
B. Design
The City shall be r
requested following the a
changes/additions have be
of CSAH 14 using a rural
ide ofCSAH 54. The City's
hem Lights Blvd south of
r this design is $5,200.00
The City's
computations to relocate two ponds on north
perty) to south side ofCSAH 14. The design cost
Ich the City's cost is $0.00.
County,
18,550.0
engineer'
tract, the City shall pay to the County, upon written demand by the
rce (100%) of its portion of the design cost of the project estimated at $
ty's share of the design cost of the project shall include only design
e and does not include administrative expenses incurred by the County.
6
Deleted: 1,485,367.27
--' Deleted: 179,628.20
." Deleted: 1,664,995.47
Deleted: five
Deleted: 9 5
Deleted: 1,581,745.69
Anoka County Contract No.2006-0558
This Agreement shall continue until terminated as provided hereinafter.
V. DISBURSEMENT OF FUNDS
All funds disbursed by the County or City pursuant to this Agreement shall be
entity pursuant to the method provided by law.
VI. CONTRACTS AND PURCHASES
All contracts let and purchases made pursuant to this Agreement
conformance to the State laws.
VII. STRICT ACCOUNTABILITY
A strict accounting shall be made of all funds and
be made upon request by either party.
VIII. TERMINATION
This Agreement may be terminated b
less than thirty (30) days writte
notice is delivered by mail, it
termination shall not be ef
services or goods which 0
rata share of costs which t
se, upon not
er party. If
iling. Such
urchases of
I pay its pro
pense, install or cause the installation of an adequate electrical
cabinet for the intersection of Main Street and CSAH 54 (20th
g essary extension of power lines. The City shall be the lead agency
completion of said traffic control signal installation, the ongoing cost of the
he signal shall be the sole cost and expense of the City.
7
Formatted: Bullets and
<. Formatted: Bullets and Numbering
--: Formatted: Bullets and Numbering
Anoka County Contract No.2006-0558
1. Maintenance of the completed watermain, sanitary sewer, storm sewer (except catch
basins and catch basin leads), detention basins (including ponds and th outlet
structures and any grit chambers and/or collectors) shall be the sole obli of the
City.
6.
the sole
2. Maintenance of all trails and sidewalks, including snow plowi
responsibility of the City.
3. Maintenance of streetlights and cost of electrical power
sole obligation of the City.
4. The City shall be responsible to maintain all st
Project. Maintenance shall be performed in a
Highway Department landscape/Streetsca e Gui
5. Maintenance of the completed
obligation of the County.
7.
Any
8.
minaries, luminaire relamping,
completed by the County. The City
asis for all incurred costs.
led on and used only by Emergency Vehicles
med in Minnesota Statutes 9169.01, Subdivision 5,
rovide a list to the County Engineer, or the County's
e, of all such vehicles with emitter units on an annual
EVP Systems shall be immediately reported to the County.
of said EVP Systems shall be determined by the County.
ent said EVP Systems or components are, in the opinion ofthe County, being
ed, or the conditions set forth are violated, and such misuse or violation
ntinues after receipt by the City, written notice thereof from the County, the County
shall remove the EVP Systems. Upon removal of the EVP Systems pursuant to this
8
Anoka County Contract No.2006-0558
IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the
dates written below.
COUNTYOFANOKA
CITY OF CENTERVI
By:
Margaret Langfeld, Chair
Anoka County Board of Commissioners
Dated:
ATTEST
By:
Dated:
By:
By:
By:
Kurt Glascl;
City Attorney
Dated:
10
Deleted: James Hoeft
Anoka County Contract NO.2006-0558
paragraph, the field wiring, cabinet wiring, detector receiver, infrared detector heads
and indicator lamps and all other components shall become the prope of the
County.
XU. NOTICE
For purposes of delivery of any notices hereunder, the notice shall be e
County Administrator of Anoka County 2100 Third Avenue North,
behalf of the County, and the City of Centerville, 1880 Main
behalf of the City
XHl. INDEMNIFICATION
The City and the County mutually agree to inde
claims, losses, costs, expenses or damages resu
officers, agents, or employees relating to a
Agreement.
It is understood and agreed t
this Agreement supersedes
the subject matter thereo
parties to the subject ma
~:1c;lrLQE.tl}9.Jlm of 1 e.!:~I
alterations, v or
when they du
ein and that
s relating to
between the
lade to the
m_,~~lQ';;. Any
all be valid only
9
..t Formatted: Bullets and Numbering
"'l~()rllliltt!~:_B_ul!~~i1ndfljurTlb!r!':l~m.. j
Formatted: Bullets and
S.P. 02-614-24
EXHIBIT B
COST-SHARING AGREEMENT
FOR PROJECTS CONSTRUCTED IN ANOKA COUNTY
USING COUNTY STATE AID FUNDS OR LOCAL TAX LEVY DOLLARS
ITEMS
COUNTY SHARE
o
CITY SHARE
100%
50%
100%
Bikeways
Concrete Curb & Gutter
Concrete Sidewalk
Concrete Sidewalk Replacement
Concrete Curb & Gutter for Median Construction
Concrete Median
Construction or Adjustment of Local Utilities
Grading, Base and Bituminous
Storm Sewer
Driveway Upgrades
Traffic Signals (communities larger than 5,000)
50%
o
100%
100%
100%
o
o
O*@
o
100%
100%
based on state aid letter*@
0*1
o
based on state aid letter*@
100%
'12 the cost of its
legs of the intersection
the cost of its legs of
the intersection plus '12
the cost of the County legs
of the intersection
Traffic Signals (communities less than 5,000)
Engineering Services
Right-of-Way
Street Lights
O*TM
100%
*2:
100%
*2:
0*(
100%
o
*@
The County pays for 100% OF A Standard Median Design such as plain concrete. If a local unit of government requests decorative
median such as red brick, stamped concrete, or exposed aggregate concrete, the local unit will pay the additional cost above the
cost of standard median.
*@
In the event no State Aid is being used, or in the event the state aid letter does not determine cost split percentages, drainage
cost shares will be computed by the proportion of contributing flow outside the County right of way to the total contributing flow.
*TM
In cities less than 5,000 people the County pays for 100% of the cost of the traffic signal effective March 1986. The County
collects on behalf of the cities (less than 5,000) "Municipal State Aid Dollars" since they do not themselves qualify for state aid
funds. These funds are used to pay the City Share.
*2:
Engineering shall be paid by the Lead Agency except that any participating agency will pay construction engineering in the amount
of 8% of the construction costs paid by that agency.
*(
In the event that the Township or City requests purchase of right-of-way in excess of those right-of-ways required by County
construction, the Township or City participates to the extent an agreement can be reached in these properties. For instance, a
Township or City may request a sidewalk be constructed alongside a County roadway which would require additional right-of-way,
in which case the Township or City may pay for that portion of the right-of-way. Acquisition of right-of-way for new alignments
shall be the responsibility of the Township or City in which the alignment is located. This provision may be waived by agreement
with the County Board if the roadway replaces an existing alignment and the local unit of government takes jurisdiction of that
existing alignment. In addition, any costs, including right-of-way costs, incurred by the County because a Township or City did not
acquire sufficient right-of-way during the platting process or redevelopment process shall be paid by the Township or City.
*1
The County will replace all driveways in-kind. Upgrades in surfacing (Le., gravel to bituminous, bituminous to concrete shall be at
100% expense to the Township or City).