Loading...
HomeMy WebLinkAbout2001-08-08 CC Handouts " . ' August 2, 2001 Ms. Karen Varian Centennial Lakes Police Commission 200 Civic Heights Circle Circle Pines, MN 55014 Dear Ms. Varian: Per your request dated July 19, 2001, we are providing the following documents: 1. Copy of the Power Point presentation prepared for the Lino Lakes City Council which is the proposal Lino Lakes made for a quad cities police force. 2. Police Department budget for years 1998 (actual), 1999 (actual), 2000 (budgeted), 2001 (budgeted), all on one sheet. 3. Calls generated for years 1996 through 2000 from our latest annual report from the Police Department. 4. A breakdown of calls for 1998, 1999 and 2000 by category from the Minnesota Crime Information Manuals, BCA Annual Statistics. 5. A roster of personnel in our Police Department, along with start dates. 6. Our Public Services Director's best estimate of the costs of operation and utilities for the Police Department. (These expenditures are not tracked by department.) 7. Insurance costs for the Police Department are included in document #2, the department Dudget. 8. Pages from our Comprehensive Annual Financial Reports for years ended 1998, 1999 and 2000. The City's annual independent audit does not look at departments individually and departments are not charged for a portion of the audit: 9. Weare unable to provide labor relations and legal fees specific to the Police Department other than the information contained in the budgets provided in #2. These services are centralized in Administration and not charged to individual departments. ' 10. An itemized list of grants currently in effect in the Police Department and the status of each, according to our Finance Department records. 11. A list of C.O.P. and M.O.R.E. grants including hire dates of all COPS officers, according to our Finance Department. 600 Town Center Parkway, Uno Lakes, Minnesota 55014-1182 Phone: 651-982-2400 · Fax: 651-982-2499 · TOO: 651-982-2410 Although I am providing copies of this letter for each of the quad cities, I am only sending the documents to you at this time. I would be happy to provide the identical documents to any of the cities upon request. Sincerely, \..,r'" t. ~ ~~ ...::J-adi- r4n~ Linda Waite Smith City Administrator cc: Lino Lakes Mayor and City Council Circle Pines City Administrator and Mayor Centerville Acting City Administrator and Mayor Lexington City Administrator and Mayor ~:j ~ "' '''1 "~ .~ ',' .'i tV, ~ J TO: Honorable Mayor and Council Members FROM: Teresa Bender, Clerk/Treasurer SUBJECT: Hiring of a Temporary Part-Time Clerical Employee DATE: August 8, 200 1 Ms. Kim Stephan has accepted the position of Temporary, Part-Time Clerical for $10 a hour and no benefits and will commence work Thursday afternoon if scheduling allows. Centennial Girls Swimming and Diving Dear Local Business Owner, The Centennial Dive & Swim Team Parents Group is asking for your support of the Centennial High School Girls Dive & Swim Team. We are currently raising funds to purchase a new"timing/scoreboard system for our pool. The projected cost of this project is $20,000. The Parents Group and the team have taken on this project as our goal for this year. Our current system is 11 years old, obsolete and prone to breakdown. In the past two years, we have experienced an increasing number of equipment failures during swim meets. A new timing system should last approximately 15 years and would greatly enhance our ability to host swim meets and improve the accuracy of scores. Individual times and results would assist in avoiding frustrating delays throughout the swim meet. Last year we had approximately 80 swimmers and set numerous team records in both diving and swimming. We have been conference champions for the past 3 years. We are confident that we will continue to do well in our conference and section. We have various contribution levels. Each level offers rewards and added appreciation. Your time and consideration are very appreciated. All- Conference $150 - $299 Your name and/or business will be published in our team program for the entire season. All - S ta t e $ 3 0 0 - $ 9 9 9 Your name and / or business will be given free ad space in our team program for the entire year. Your name and/or business will be placed on a Plaque for display in the pool area. All-America $1,000 and up. Your name and/or business will be placed directly on the advertising placard on the Scoreboard or a sign adjacent to it for the life of the scoreboard. You will receive free ad space in our team program for the entire year, plus a hyper-link from our swim team web site to your web site for one year. Your contribution of any size is greatly appreciated. Your check can be made out to the Centennial Swim Team and sent to: Centennial High School Attn: Swim/Dive Team 4707 North Rd. Circle Pines, Mn. 55014 Questions/ Contacts Athletic Director Brian Hegseth 763-792-5017 Head Swim Coach Wayde Mulhern 763-784-7020 Parent Volunteer Cheri Thompson 651-483-1168 Thank you, Centennial Diving and Swimming Team Team website http://www.centennial.kI2.mn.us/chs/swim/index.htrnl IT' 08/07/2~21 15:38 6514~79523 l:.l8.l~7 t'01 i 6: ~4 SFlTHE .,. 55:. 407'3523 SIMP~V BOOKKEEPING PAGE 01 1'10.008 [;102 ~ Sathe Executive. Search CITY OF CENTERvnJLE CITY ADMlNISTRATOR POSITION PROFILE "Final Draft ',f'lf CENTERVILLE - COMMUNiTY OVER\'lEW Two bcaurifulltk.es stand out as Centerville'c gre~test features, Our city of 3,202 people thrives here, not only because we e~oy th~ la.k~ InIt aJso becauSi we work hard to blend tradition and progreis. We invite you to see why wo celebrate all thoae thing!! tagecher IS Out Festival ofLak.!J$. Centerville.js a quiet little town. Located between tht sb.cris ofP;ltiQt Lab and Centervtlle Lake, it is easy to feel you. are miles away from a metropolitan area, When you want to go to the Twin Cities, downtown SI.Paul is a $lfaight 2().mlnuce d.rlve. amd Minl1eli\PQ(i~)$ a 3o..minute drive. CeJllervme is B strong community. TtJii is a wonderful place to ralse a family, work and retIre. We care about one anothor. You can same this feeling when ~ou enter a local business OT attend a City Council meeting. You can see it when people pitch in together to 'ooild park equipment, plant flowers at the school, or clean up the toWTI. on Earth Day. Our low crimcflltc and exceUentemergency services give \L5 1UI added sct1.sc of security. Our community is more than, people who live 1\ear one another; CentC'rVille is a c~mmunity of friOlJd& llInd neijhbors. Centervm~ honors its history and heritage. This was the main rest atop between Stillwater and. Arloka in the earliest days orthe Minnesota. territory. Today, we celebrate Cantl!nttllc9" rich French-Canadian heritage at the annual Sumtl'lcr eelebT"ation called Fete des Lacs, "which js French for festival of lakes." R.es\dent$ and v{i1itOf5 gather at festival actlvities all 01,'& town to catj dance, watch f1 parade, play softball and watch fireworks, CenterviHe continues to grow. According to tbe1990 censul, Cente:rville had the fourth highest rate of populatiol1 growth in Minnesota. And it's not slowing down. In 1993, we dedicated OU'I'new City Hall and Fire Station. While celebrating our progress at the &1'~ opa1in.i. W~ abo enjoyed some good old- fashioned nostalgia. Old timen and. new residellt! came to&cther to reTl1iniace and learn about CenterviJIe's past !it a history exhibit in the Council Chambers. BefO're the French-Canadiil.11 settlers establi9hed the town of CentarviUe in the mid-1800's, Dakota In.dians lived here in the 1600s and ] 7009. At that ttmt, this area WaB eo'Vered with denle WQQdlands and many sqU2.!e m.iles ()f marshes, lakes; and waterways. The natural haoitat pr6vidad tilt Dakota. with an abi.lndant food $upply, including wild nee and a wide variety ofgarrn: a.nd fish. They traveled the waterways by canoe, reaching tl'le St. Croix River to the east alld the Mississippi River to the we~t. The Dakotas abandoned their settlem,ent in the late 1700's; but retl.lrn.~d ar.nl,.lally to harvest wild rice, The French-Canadian settlers found burial mounds and artif~cts, Many items were excavated and rem<J\I~t.Ill'um tlle area before they !;Duid be !tuUitd, Ths Sath8 Buik#rJg' )821 Cular Lake Road. Minneapolis, MN · 55416 Pbol1,e (952) j4Q.2 J 00 . FIiX (252) 546~69JO · (800) 84f3..4!J12 c.:1. 38.17. WW!I.J.;;l.ths, ;;Ol7l BuiUlng Better ital'lt.i Si/Ut 197" ... 08/07/2021 15:38 6514079523 08?07/01 18:~4 SRTHE .~ 6514079523 SIMPL v EOO<kEEPIHG : PAGE 02 NO.OO8 1;11213 " PQge 2 Po.ritioll Profttt - Ciry of Cll1lt/2'fViUe Cily JtbIl/lIf'tI'aro, In the 1940s. archaeologist Hatold Kohlepp examined and recorded over a thousand artlfllcu that still remained in Ct.ttterVUle. il'\Cluding pottery, tools, an.d arrowheads. He publisl1ed his findings in an archeology j(HWal, with Centervin. featu1'Qd on. me cover. The abondance ofwildlifr ittra~tod m.ny trappers and hunrers in the e-arly 18oos. In 1850, F,W,Tmvea bUilt the rirst house here. Soon after, falT'Jlies from Canada arrived and settled bere bect.use it reminded them of their fonnertlorneifU'ld, Stveral descendants of these original Frenc..'t.Canadian settlers still livo in Cenrerville, In 1854, settlers Peltier, La.Valle, and LaMoLte laid oul !md. platt.eld the town. They eboae the name CenterviUe beetUlfl ofits cennllooarlon from St. Paul, Stillwater, and Mob. The ~ity was otncialty established on August 11. 1857> when Minnesota. wag stille. territory. ~ doWt1.to~ area of Cetl.tet'ViIle was originally known as the French Section. Gmnan immi~ts settled farthe,r to the we&l in whit iJi now pflrt of the city of Uno Lakes. The pioneers cleared the land for fanning and agriculture soon followed. Residen~ fonned the Church of 51. Gene";e\'e of Paris, REPORTING RELA l'IONSHIPS Cenrenrille is a Plan A fonTI of government with the City Administrator repOIting to the itv~ member City Council consisting ohhe Mayor lmd four coun~ilpers{)n9. The M~)iQf and two ~o\ll'l~i\peTSQn. wer~ recently elected while the remainini two coun~i1personli have served two to three years each. BACKGROUND AND EXPERmNCEREQumxn The su::;ct8sful candidate snould have tbe followiJli $>tperi,ance iUtd knowledge: . A Maw'. degfce is l)rofern:~ but a.B~helorts degree 15 required. .. Five phu )'e~ experience in city govenmullnt lIS CItY Manager, City Administrator, Assistant City Manager, or .AsSIl!tant City Administrator. .. W orkini! knowledge of st;..te and loca! lawiA concern ing land Il~ planning~ zomne, subdivision planning, and lot splits. .. Experience worldng with economic development proces,cs. . Experience with special assessment laws and ~ ti.narlc,ini of pUblic improvements as well as firumcing for new development9. . Must have experience dealing wtth budgeting, long-range t1nanc~al planning, municipal finance, .. Must have experienQe hirini~ managing, training atld developin.g staff. . 11 ve in a commutabl~ distance to CenterviHe. MAl"'lAGEMENT CAP.ABILITIES &: QIJALITIJ:S .. Consistently :.itrotlg slcills in written and verbal ~nU:ll\ll1jcatjon. ... Organizational skills to tl\crease efficiencies in City .Hall. + Etbica.l., honest, and hi@h integrity, ... Collaborative management nyle with council, stair, and t.he community, ... Recognize his/her role il.S tbe provider of public services ro Centcrvillc o;tl%Ws, . Abllil to develop s hiS" leve.! Clfi.1'U8t witn Council members, Mayor and citi~ens. . Project a "user friendli' ~harismaQe penoau.Hty witll B. biaa for getting things done - results oriented. . Be able to delegate work to departl'l'lem: haa.::il;, employeei, and VOlunteers. . Cultivate a teamwork atmosphere among all related parties. 08J~7/2021 15:38 6514079523 VJ$f'07/01 18: 04 SATHE ~ 65i40'i'9523 SIMPL 'f BOOKKEEPING PAGE 03 NU . lOlatJ lA:.1"4 pgg'l J POJilwn Profile - CUy at CenJl?rviUl1 Clr,v Admtnistrator . Be supportive of employees rm.d ac:t as liaison between =mployees and the City Council, . Possess the skill co help citiKns fairly and equitably while worcing City oMinan(:cs, . Cap.sbmdes to assist COUJ\cil 2nd Mayor with ~lCarch on spetlfic issues.. . Able to make professional recommendations andjudsmenu on ISSues. . \.Indentand that Centervme is interested in nW%italning its individual iciendty wolle coping with growth issues as part of the greater metropolitan ma, . Ability to deal with eApccutlOns of long-time Centervillo~!:iti;tens at! well as me new arriva.ls 1:0 the community. . Able to assist the Council in identifying priorities and developing a system to monitor the pro1;JTCSS of those prioritiel; with agreed ~ft timeftames. . Resolve with CoUl'lcH llltld use planning iS5ues fOr I'tlllidential and commc:<<:ial property development. DUlBS &; RESPONSIBILITIES Oealetrec,tively with members oftha CeJ1tcrvHle community including citizens, b\1Sinesse~.1nleres' grOUpi, etc. in the day-ta-day conduct of Centerville'll business at City Hall, Respond tc concerns, issuc:s. (:omplaintsl and questions from the public. and employees; mediate diiputes, and reitOlve issue" as appropriate. Assist the City Council in coorC.inating, administering, and i.mpl.m.e:oting @cisicns regarding municipal ~on~et'M, ;. Condu.ct res~h to Q.SSi3t the City Council in develgpins reeommended solutions. . Be responsible for coordinating ala.ffs' ctYor'.s to complete directlvell in illl departmt:o.ts. . Be the Human Resources Officer for Centerville and is responsible for helping to deveklp a...d implement human resource policies. Make reeommtmdations to the Council regarding toe hirini. prom.oting, demoting, Oit dismissal of all full-ti.me and pan-time empJoyee$_ All final determinations regiU'ding the persOnnel matters are tnade by the City Council. Be responsible for budgeting and planning inciudin.g the operatil1~ budgen and capital expenrl1wre plaMing. Be Tespllnsible for negotiating labor contrtcta 8.l1d making tecommendatlQm, to CounciL . Attend and participat~ in discussions at all meetings of the City Council. . Assume the respotlsibility to assure thM CenttNill~ i~ in compliance with federal, state. coun\y, ~nd loca! Jaws. . In the absence of depamn&nt heads tor functional areas inchlding, b\lt not limited tl), ecooomh: development, city pla'rtrtir.g, engineerina, p'.~ 8f1d recreation, law enforcement, finano(3, human resources; etc'l the City Admmistrator Hi responsible for the management ofa.1l areas ofCentmiUe'g city government. Be responsible for represe1'\tinj the city directly or as iiaj.on with oth..;r government bodie$ ~t all levels. Work to the best ofhlsJher abilities in eonjunct1Gn with the City Council to identify and ~t'ltact persons, companies, etc, to the Centcrvi11c area. for thi p\U'J)oses of economic development and teaidcntitll aN,!. commcr;;iAl arowth. Assist the Cou.ncil with identiJrina priorities i!l'Id developing a iy&te'.n to monitor their prosress in ttlc desired tlmdrames. 'Be responsible for t"e efficient management of the City Han facility and aU oth"r Cmtcrville comnlL11tity l'rol'~. 08/07/2021 15:38 f514S79523 \18.r07/~1 16:04 SATHE ~ 6514079523 SIr.1PL Y BOOKKEEPli'IG PAGE 04 "10.008 ~ Page" POIilioll Profit,... eu)' ofCe1I.teY\'ilJe Cit)i MmJf/.i.sfrtl.tor · The City Administrator, at presel~ will have direct responsibility for the supervision of Centcrvillc's city cmplQyees including, but.not Umited to, the foUowing: Clerk/treasurer, Accoul1t ClerkJR.eceptioni5i. A1;count Clerk lJ, Intorn, Ca.b~ OperatoT, iIDd Public Works Director. DireGt draft ordinances. resolutions. a,nd policies for City Council lIppro\lal utilizing the City Atton,ey anti others. as needed. .. Oversee and invest all city :fundi! in ioooroance with CenterviUelll investment poli~y. .. Prepare a.l)d analyze quotes and bids for produtl:8 SlId seNiQ'e.s and ret;ommend the selection "f finn5 or individuals to provide tM!Jle prodij~ta Of services and recom.mend !be execution of certain contracts to the City Council for approval. Cootdlnate insurance matters including employee il'o:.q; in$\lrance programs and oversee risk mmagement issues on btb.alf of thi City of Centerville. Identity risk! ~o the City ofCen.tenrllle and implement programs a..'1d policies using best praeticc&. · Ce.ni1'; aCXnowledsements as required or ~El.ncrloned by 11"-. t Be r~ODSible for the corporate seal and cvmee tbe maintenance of all records. and documents or the city and issue :ill cit'jHccnses in accordance with guidelines established by the City Council. The City Adtnlni~trator shall perl'om'l oth<< duties when assigned or when necessary !itS :situations arise. Enlllgemact TeRm: Mark Sathe Tom Wese ty Sathe Executive Search SS2I Cedar Lake Road Mirmeapo1is, MN 55416 PHONE; 952~546-2100 FAX; 95Z.546-69~O tw'~~ ly@Sathe.com - City of Blaine 9150 Central Avenue N.E., Blaine, Minnesota 55434-3499 (763) 784-6700 FAJC(763) 785-6156 DATE: August 6,2001 TO: Mayors, City Councilmembers, City Managers, City Administrators withiH Anoka COUllty FROM: Mayor Tom Ryan, City of Blaine SUBJECT: Housing Opportunities for Anoka County The Mayors and representatives of several cities have met to discuss housing options for our community. The Housing Summit last April presented several options. We have an opportunity to review the LAND TRUST option on August 29, 2001. Kris Matson from Minnesota Housing Resources, Inc. will give us more details on how the Land Trust works and benefits our communities. Bob Streetar from the City of Minnetonka will be there to provide us with specific information about how this is working and benefiting the City ofMinnetonka and the surrounding west metro suburbs. Join us at St. Timothy's Catholic Church Parish Center Room #224, 707 - 89th Avenue NE, in Blaine on Wednesday. AU2ust 29. 2001. We will start at 6:00 p.m. and go to 8 :00 p.m. Light refreshments will be provided by the City of Blaine. You are welcome to bring other interested staff. RSVP's are not necessary, but will be helpful in planning refreshments. For additional information, please contact Mary Petron at (763) 785-6120 or by email at mpetron@ci.blaine.mn.us .J AUG 6 = 2001 City of Lexington 4175 Lovell Rd. · Suite 140 · Lexington, MN 55014 · (612) 784.2792 · Fax (612) 785.8951 August 6, 2001 Mayor Tim Swedberg 7293 Clear Ridge Centerville, MN 55038 City Administrator City of Centerville 1880 Main St. Centerville, MN 55038 Karen Varian, Chair Police Commission 1817 121st Ave. NE Blaine, IvIN 55449 Chief Joel Heckman 200 Civic Heights Circle Circle Pines, MN 55014 Mayor John Bergeson City of Lino Lakes 600 Town Center Pkwy. Lino Lakes, MN 55014 Linda Waite Smith, Adm. City of Lino Lakes 600 Town Center PkWy Lino Lakes, MN 55014 Chief David Pecchia Lino Lakes Police Dept 640 Town Center Pkwy. Lino Lakes, MN 55014 Mayor Lee Ann Osbun 276 Nottingham Dr. Circle Pines, MN 55014 Mr. James Keinath City of Circle Pines 200 Civic Heights Cirde Circle Pines, MN 55014 I am responding at the request of Mayor John Bergeson, regarding Lexington's interest in pursing a "Quad City" police department. At a recent workshop meeting, the Lexington City Council, by consent, directed the City Manager and myself to continue to be involved in the examination of the possibility of forming a Quad City Police Department. Our discussion focused on the following issues: · That the exploration process includes participation from multiple sources including representatives from the different cities Mayors/councils, police administrations, officers, Centennial Lakes Police Commission members, business owners and citizens at large. . That a clearly defi:ned process be agreed upon prior to its implementation. · Ensuring that a realist timcline allows tor adequate and sufficient review and evaluation ,/ · That the gcyemanceof any new organization remains objective and nOB- po litical ,,~ . That there would be an on-going savings to the Lexington taxpayers over the long term . That there is a continuity in the level of coverage and that it meets the communities needs · That the draft proposals from the different police departments be a starting point/tool for a "committee/s" to utilize. · That the committee defines an unbiased departmental structure, job descriptions and position filling process. Since over the past several years, there has been multiple attempts at forming a combined police department we are intrigued to learn of the circumstances that will make this proposal succeed, We look forward to receiving the Centennial Lakes proposal and will continue to participate in the exploration process. Sincerely, ..f\ ' AU/lk Dot Heifort, Mayor - -- -- - - \ - t ~ t nf> ,r 1 n frtl i II { l e" "\ ," t::- l/ ~u J L' , .. l' h .. .4 RI\?' E1 stab :1;S edu 1 Lv Report for PHEASANT MARSH Utility and Street Improvements Centerville, l\1innesota May 2001 r-~~~~~~!c~.~"~"".-~l!:!!~~-!J'S~QQJ} ~mended""AugustJ,2001 File No. 616-00-117 Jfj Bonestroo - _ ~; Rosene ~ Anderlil< & 1J ~ 11 Associates Engineers &. Architects ~ f1 ~ Bonestroo .... Rosene i-i Anderlil< & . ~ . Associates Engineers & Architects Bonestroo. Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer and Employee Owned Principals: Otto G. Bonesrroo, P.E . Marvin L. Sorvala, P.E. . Glenn R. Cook, P.E. . Robert G. SChunicht, !'E . Jerry A. Bourdon, !'E. Senior Consultants: Robert W. Rosene. P,E. . Joseph C. Anderlik, P.E. . Richard E. Turner, f'E. . Susan M. Eberlin, C.P.A Associate Principals: Howard A Sanford. P.E. . Keith A Gordon, 'f'E, . Robert R. Pfefferle, f'E. . Richard W. Foster, f'E. . David O. Loskota, P.E. . Robert C. Russek, AI.A . Mark A Hanson, P.E. . Michaei TRautmann, f'E. . Ted K.Field, P.E. . Kenneth P. Anderson, P,E. . Mark R. Rolfs, f'E. . David A. Bonestroo, M.B.A. . Sidney f' Williamson, P.E., L.S. . Agnes M. Ring, M.BA . Allan Riel< Schmidt, f'E. Offices: St. Paul, St. Cloud, Rochester and Willmar, MN . Milwaukee. WI Website: www.bonestroo.com August 3, 2001 Honorable Mayor and Council City of Centerville 1880 Main Street Centerville, MN 55038 Re: Pheasant Marsh Street and Utility Improvements Our File No. 616-00-117 Dear Mayor and Council: Attached is our Amended Report for construction of sanitary sewer, water main, storm sewer and streets to serve the Pheasant Marsh residential subdivision. Sanitary Sewer and Water Main construction along Centerville Road were eliminated. The report provides detailed descriptions, cost estimates, and sketches of the proposed work. We will be pleased to meet with the City Council and other interested parties to discuss this report at a mutually convenient time. Yours very truly, BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INe. (~rl14() W~~ Thomas W. Peterson, P,E. TWP/crw I hereby certify that this report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under- the laws of the State of Minnesota. '-1~~~ Thomas W. Peterson Date: August 3,2001 Reg. No. 16610 2335 West Highway 36. St. Paul, MN 55113. 651-636-4600. Fax: 651-636-1311 REPORT FOR PHEASANT MARSH Street and Utility Improvements File No. 616-00-117 TABLE OF CONTENTS Letter of TransmittaL........ ........ ................ ........ ......................... .................... 1 Table of Contents ......... ............................... .............. .................................... 2 Introduction................................................................................................... 3 Proposed Improvements............ .................................................................... 3 Sanitary Sewer................................................................................... 4 Water Main.... ................................................................................... 4 Storm Sewer.. . ....... ........................... .............. ..................................5 Street and Trail Improvements.......................................................... 6 Permi ts........................................................................................................... 6 Easements...................................................................................................... 7 Funding.......................................................................................................... 7 Water Main ............................... .................. .................. ...... ............... 7 Services..................................................................................;.......... 8 Project Costs... ....... ........ ........ ............ ............ ....... ............... ...... ............. ....... 8 Project Schedule ............. ... ............ ...... .......... ..... .... .......................................9 Conclusions and Recommendations.............................................................. 9 Appendix A - Cost Estimates Appendix B - Preliminary Assessment Roll Figures 1 - 6 2 FEASIBILITY STUDY FOR PHEASANT MARSH Street and Utility Improvements File No. 616-00-117 INTRODUCTION This Feasibility Report is for the construction of sanitary sewer, water main, storm sewer and streets to serve Pheasant Marsh. As shown on Figure 1, this 77-lot residential subdivision is located on the east side of Centerville Road (CSAH 21), approximately 1200 feet south of Center Street. The property is bounded by Centerville Road on the west, Center Oaks development on the north, the Rehbein property on the east and the Broussard-Vickers property on the south. Ground Development Incorporated is developing the 54.734-acre parcel. This report includes descriptions of the proposed improvements, cost estimates, timetables, easements, permits, assessments, and detailed drawings. Pheasant Marsh is proposed to be constructed in three phases, as shown in Figure 2. Phase 1, which will consist of 22 lots and be built in 2001, is located on the east side of Centerville Road, just south of the Hunters Crossing development. A MUSA land swap and Comprehensive Plan amendment are required to implement the Phase 1 improvements. Phase 2 and 3 are the northwest and northeast parts of the overall project, which abut the south line of Center Oaks. It is projected to build Phase 2 in 2002 and Phase 3 in 2005. PROPOSED IMPROVEMENTS Sanitary sewer to serve the project is 10Eated on the east side of Centerville Road and within the Center Oaks plat. Water main is available along the east side of Centerville Road, across from- Hunter's Crossing. Stormwater will be routed generally north and west for Phase I and 2, and to the east for Phase 3. Dupre Road will extend through the development with connection to Centerville Road and Center Oaks. In addition to the 77 lots within Pheasant Marsh, utility 3 service will be provided to two exception lots at the end of Partridge Place and one property on the east side of Centerville Road. 1. SANITARY SEWER: A deep trunk sanitary sewer exists on the east side of Centerville Road at Hunters Trail. It is proposed to construct a manhole at the northwest corner of the project (where the 50' permanent easement abuts Centerville Road) and install 12-inch diameter pipe to the east, as shown on Figure 4A at the back of the report. The pipe would be extended approximately 700 feet to Partridge Place cul-de-sac. Within the development, 8-inch and 12-inch diameter pIpe would be extended along the centerline of Partridge Place, Pheasant Lane and Dupre Road. This pipe will serve all of Phase 1 and most of Phase 2. The final sewer extension to serve Phase 3 will be an 8-inch connection to an existing manhole on Dupre Road in the Center Oaks plat. Four-inch diameter service pipe would extend 10 feet past the right-of-way line for each lot. Figures 4A, 4B and 4C at the back of the report show the proposed sanitary sewers. 2. WATER MAIN: Currently, the closest water main to Pheasant Marsh is located on the east side of Centerville Road from Hunters Trail to the north. It is proposed to connect to this system at the 50' permanent easement on the north side of the Vanderbeek property. 12" PVC trunk water main will be extended from Centerville Road to the east, then through the development on Partridge Place, Pheasant Lane and Dupre Road. The main will terminate at Centerville Road for future extension south and west. Eight inch and six inch PVC mains will be installed throughout the remaining streets. All necessary valves and hydrants will be provided for fire protection and maintenance of the system. Water services to the 77 lots will consist of 1" copper pipe extended from the main to 1 0 feet beyond the right-of-way line. Services to the Center Oaks exception parcels will also be 1" diameter, with exact locations dictated by property owners. 4 A water and sewer service line will be extended between Lots 12 & 13 on Mallard Way to service the Eide property at 6882 Centerville Road. 3. STORM SEWER: Storm water drainage will be directed via catch basins and storm sewers to ponding areas within the plat. Ponding locations are shown on Figures 5A, 5B and Sc. Treatment ponds will discharge to existing wetlands or drainage ditches. Total runoff from the site after all construction is complete will not exceed existing runoff amounts. In Phase 1, runoff from Grouse Hollow, Mallard Way and most of Dupre Road will be directed to two treatment ponds. Discharge will be through a controlled outlet structure, allowing water to enter a shallow ditch that flows north to the south line of Center Oaks. The ditch then flows west to Centerville Road, before entering the deep county ditch. Drainage from Dupre Road, north of Grouse Hollow, will be collected by catch basins and directed in a temporary ditch to the north and east. Future phasing will eliminate the ditch and direct the water to a permanent treatment pond. The storm sewer in Phase 2 (shown on Figure SB) consists of catch basins and piping along Pheasant Lane and Partridge Place. Discharge will be to a ponding area located in Phase 3. Thi~ pond will need to be constructed during the Phase 2 project, with a temporary ditch outletting to the east. A low spot on Pheasant Lane, within Center Oaks, will be picked up with catch basins. Phase 3 storm sewer improvements are shown on Figure Sc. Low points on Partridge Lane and Dupre Road will drain to a large treatment pond in the backyards, built as part of Phase 2. A second pond will be constructed to the east of Dupre Road, acting as a final treatment of runoff before discharge to a large wetland to the east of Pheasant Marsh. The intersection of Dupre Road and Center Street, approximately 200 feet north of the plat line, has experienced drainage problems in the past. Storm sewer will be stubbed to the north property line for extension in a future City project. 5 4. STREET AND TRAIL IMPROVEMENTS: Streets in Pheasant Marsh, except Dupre Road, will be built to typical 7-ton residential street standards for the City of Centerville. The streets include Pheasant Lane, Quail Court, Partridge Lane, Partridge Place, Grouse Hollow and Mallard Way. Dupre Road is considered a collector street and will be built to a 9-ton standard. The new roads will consist of the following parameters: 1. 60-foot wide right-of-way 2. 33-foot back to back surmountable concrete curb and gutter (37' on Dupre) 3. Geo-textile fabric and 20" select granular borrow 4. 6" class 5 aggregate base (8" on Dupre) 5. I Y2" bituminous base and wear courses (2" base on Dupre) 6. 4" drain tile behind all curb 7. 45-foot radius cul-de-sacs As shown on Figure 2, a 3900-lineal foot bituminous trail is proposed, extending from Centerville Road and meandering through the plat to the northeast corner of Outlot E. The trail consists of a 10-foot wide, 2" thick bituminous mat over a 12-foot wide, 6" thick aggregate base. PERMITS Centerville Road is Anoka County State Aid Highway 21. A permit is required to .install utilities within the county right-of-way and to connect a new street (Dupre Road). Permits are also required from MPCA (Minnesota Pollution Control Agency) for sanitary sewer extensions, and MDH (Minnesota Department of Health) for water main extensions. The developer has applied for the necessary permits from Rice C;:eek Watershed and the DNR (Department of Natural Resources) for construction activities within wetlands. The proposed water main in the Partridge Place cul-de-sac will cross MCES (Met Council) sanitary force mains as will utilities at the connection to existing Dupre Road. MCES plan review and approval will be necessary. 6 EASEMENTS Permanent and temporary easements will be necessary along the north property line of Vanderbeek Small temporary easements will also be necessary to extend service pipes to the right-of-way line for several existing property owners. Parcel Description Permanent Temporary Total SW lAl and SE lAl Property Easement Easement Estimated Section 23 Owner SF Cost SF Cost Easement Cost 6904 CenterviI1e Rd. Lundblad ----- ----- 3,500 $350 $350 6906 Centerville Rd. Schoeberlein ----- ----- 1,000 $100 $100 6892 Centerville Rd. Vanderbeek 4,500 3,375 9,000 $900 $4,275 6756 Centerville Rd. Broussard- Vickers 340 $255 1,000 $100 $355 TOTAL $5,080 FUNDING All project costs, except City costs for 12" diameter trunk water main, will be paid by Ground Development. A preliminary assessment roll is included in Appendix B located at the back of this report. 1. WATER MAIN Trunk water main is being extended through the Pheasant Marsh development as shown on figures at the back of the report. The additional cost for increasing the pipe size should be funded through the City's trunk water main fund. 12" PVC vs. 6" PVC 12" valve vs. 6" valve 12" Fittings vs. 6" Fittings 4380 LF x $9.00 7 EA x $600.00 -. 5000 LBS x $1.00 Subtotal 5% Contingency 30% Indirect Total 7 $39,420.00 4,200.00 5,000.00 $48,620.00 2,430.00 $51,050.00 15,315.00 $66,365.00 2. SERVICES The two properties at the end of Partridge Place (Phase 2) will have water service lines extended 10' into their property, at a cost to be absorbed by the development. The cost to extend sewer and water to the Eide Property will be worked out between the developer and homeowner. PROJECT COSTS Detailed cost estimates of the proposed utilities and streets to serve Pheasant Marsh are included in Appendix A at the back of the report. Unit prices are estimated based on recent, similar type projects in the north metro area of the Twin Cities. The Total Project Cost is $1,938,007.00, which includes 5% contingencies, and 30% indirect costs. Indirect costs include administrative, engineering, interest, testing, inspection, and legal expenses. A summary of the estimated total project costs is as follows: Pheasant Marsh Total Sanitary Sewer Water Main Services Storm Sewer Streets Total Project Phase 1 $186,978 191,783 35,572 93,242 287,356 794,931 Phase 2 $23,041 43,121 46,505 64,592 303,221 $480,480 Phase3 $69,225 96,824 47,147 123,240 326,160 $662,596 $279,244 $331,728 $129,224 $281,074 $916,737 $1,938,007 Estimated easement costs, which are not included in the summary above, are shown on Page 7. 8 PROJECT SCHEDULE City Council order Feasibility Study Present Feasibility Report & order Public Hearing Public Hearing, Council order Plans/Specs Submit Plans for Council approval, order advertisement Open bids Award Contract - Phase 1 Begin Construction - Phase 1 Complete Construction - Phase 1 Assessment Hearing March 14,2001 May 23, 2001 July 25, 2001 August 22, 2001 September 11, 2001 September 12, 2001 September 200] November 200] November 200] CONCLUSIONS AND RECOMMENDATIONS The project is feasible from an engineering standpoint and is in accordance with the City's Comprehensive Plans. The following recommendations are presented for the City Council's consideration: ]. This Revised Report be adopted as a guide for improvements to the Pheasant Marsh Utility and Street Improvements. 2. Permanent and temporary construction easements should be obtained from property owners. 3. Revise the Developers Agreement to reflect that all costs be borne by Ground Development. 9 terville Establi.sh,ed 1857 Appendix A APPENDIX A COST ESTIMATE PHEASANT MARSH Item Unit Qty Unit Price Part 1 - Sanitary Sewer - Phase I 12" PVC sanitary sewer, SDR 35, 8'-10' deep 12" PVC sanitary sewer, SDR 35, 10'-12' deep 12" PVC sanitary sewer, SDR 35,12'-14' deep 12" PVC sanitary sewer, SDR 35,14'-16' deep 8" PVC sanitary sewer, SDR 35, 8'-10' deep 8" PVC sanitary sewer, SDR 35,10'.12' deep 8" PVC sanitary sewer, SDR 35,12'-14' deep 4" PVC riser pipe 4" PVC forcemain 12" x 4" PVC wye 8" x 4" PVC wye Improved pipe foundation, per 6" increment Closed circuit TV inspection 4' diameter sanitary MH, 8' deep 4' diameter sanitary manhole overdepth LF 150 $26.00 LF 665 $28.00 LF 615 $30.00 LF 259 $34.00 LF 1,180 $17.00 LF 420 $18.00 LF 250 $20.00 LF 50 $12.00 LF 100 $15.00 EA 30 $80.00 EA 7 $70.00 LF 3,500 $2.00 LF 3,500 $1.00 EA 19 $1,600.00 LF 90 $100.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs Total Part 1 Part 2 - Water Main - Phase I 12" PVC water main 6" PVC water main 12" gate valve and box, in place 6" gate valve and box, in place Hydrant Ductile iron fittings Improved pipe foundation, per 6" increment LF 3300 $25.00 LF 600 $16.00 EA 6 $1,500.00 EA 2 $700.00 EA 6 $1,500.00 LB 10,000 $2.50 LF 2,000 $2.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs Total Part 2 Part 3 - Services - Phase I 1" corporation stop 1 " curb stop and box 1 " Type "K" copper water service 4" PVC, Sch. 40 service pipe EA 22 $100.00 EA. 22 $130.00 LF 900 $10.00 LF 1,000 $12.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs Total Part 3 Total Price $3,900.00 $18,620.00 $18,450.00 $8,500.00 $20,060.00 $7,560.00 $5,000.00 $600.00 $1,500.00 $2,400.00 $490.00 $7,000.00 $3,500.00 $30,400.00 $9,000.00 $136,980.00 $6,849.00 $143,829.00 $43,149.00 $186,978.00 $82,500.00 $9,600.00 $9,000.00 $1,400.00 $9,000.00 $25,000.00 $4,000.00 $140,500.00 $7,025.00 $147,525.00 $44,258.00 $191,783.00 $2,200.00 $2,860.00 - $9,000.00 $12,000.00 $26,060.00 $1,303.00 $27,363.00 $8,209.00 $35,572.00 Item Unit Qty Unit Price Total Price Part 4 - Storm Sewer - Phase I 18" RCP storm sewer, Class 5 LF 155 $26.00 $4,030.00 15" RCP storm sewer, Class 5 LF 990 $24.00 $23,760.00 12" RCP storm sewer, Class 5 LF 260 $22.00 $5,720.00 4' diameter storm MH EA 2 $1,500.00 $3,000.00 4' diameter storm CBMH EA 10 $1,400.00 $14,000.00 2' x 3' catch basin EA 5 $1,000.00 $5,000.00 18" RCP flared end section EA 1 $800.00 $800.00 15" RCP flared end section EA 7 $700.00 $4,900.00 12" RCP flared end section EA 1 $600.00 $600.00 Class III random riprap CY 35 $70.00 $2,450.00 Improved pipe foundation, per 6" increment LF 700 $1.00 $700.00 Seeding, incl seed, mulch and disk anchor AC 0.5 $2,000.00 $1,000.00 Silt fence, regular LF 500 $2.00 $1,000.00 Hay bales LF 200 $3.00 $600.00 Protection of catch basin in street EA 15 $50.00 $750.00 Subtotal $68,310.00 5% Contingency $3,415.00 Total Construction Costs $71,725.00 30% Indirect Costs $21,517.00 Total Part 4 $93,242.00 Part 5 - Street Improvements -Phase I Mill bituminous strip LF 100 $4.00 $400.00 Subgrade preparation SY 9,100 $0.40 $3,640.00 Geotextile fabric, Type IV SY 9,100 $1.25 $11,375.00 Select granular borrow (modified) (CV) CY 5,500 $10.00 $55,000.00 Aggregate base, Class 5 TN 3,100 $8.00 $24,800.00 Type 31 bituminous base course TN 870 $32.00 $27,840.00 Bituminous wear course, Type 41 TN 690 $35.00 $24,150.00 Bituminous material for tack coat GAL 400 $1.50 $600.00 D418 surmountable concrete curb and gutter LF 4,200 $8.00 $33,600.00 Water MG 100 $5.00 $500.00 4" PVC drain tile, Schedule 40 LF 4,200 $4.00 $16,800.00 Type III barricade EA 6 $200.00 . $1,200.00 Skidster (bobcat) with operator HR 10 $80.00 $800.00 Street Sweeper with operator HR 10 $100.00 $1,000.00 Blvd seeding, incl seed, mulch and disk anchor AC 1.5 $1,000.00 $1,500.00 Subgrade preparation - trail SY 820 $1.60 $1,312.00 Aggregate base, Class 5 - trail TN 250 $12.00 $3,000.00 Bituminous wear course, Type 41 A, trail TN 75 $40.00 $3,000.00 Subtotal $210,517.00 5% Contingency $10,526.00 Total Construction Costs $221,043.00 30% Indirect Costs $66,313.00- Total Part 5 $287,356.00 Item Unit Qty Unit Price Part 6 - Sanitary Sewer - Phase 2 Connect to existing manhole 8" PVC sanitary sewer, SDR 35, 8'-10' deep 8" x 4" PVC wye Improved pipe foundation, per 6" increment Closed circuit TV inspection 4' diameter sanitary MH, 8' deep 4' diameter sanitary manhole overdepth EA 2 $500.00 LF 560 $17.00 EA 14 $70.00 LF 560 $2.00 LF 560 $1.00 EA 2 $1,600.00 LF 5 $100.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs Total Part 6 Part 7 - Water Main - Phase 2 Connect to existing 8" water main 8" PVC water main 6" PVC water main 8" gate valve and box, in place 6" gate valve and box, in place Hydrant Ductile iron fittings Improved pipe foundation, per 6" increment EA 3 $500.00 LF 520 $20.00 LF 350 $16.00 EA 2 $1,000.00 EA 3 $700.00 EA 3 $1,500.00 LB 1,500 $2.50 LF 870 $2.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs Total Part 7 Part 8 - Services - Phase 2 1" corporation stop 1" curb stop and box 1" Type "K" copper water service 4" PVC, Sch. 40 service pipe EA 29 $100.00 EA 29 $130.00 LF 1,300 $10.00 LF 1,200 $12.00 Subtotal 5% Contingency Total Construction Costs 30% Indirect Costs' Total Part 8 Total Price $1,000.00 $9,520.00 $980.00 $1,120.00 $560.00 $3,200.00 $500.00 $16,880.00 $844.00 $17,724.00 $5,317.00 $23,041.00 $1,500.00 $10,400.00 $5,600.00 $2,000.00 $2,100.00 $4,500.00 $3,750.00 $1,740.00 $31,590.00 $1,580.00 $33,170.00 $9,951.00 $43,121.00 $2,900.00 $3,770.00 $13,000.00 $14,400.00 $34,070.00 $1,703.00 $35,773.00 $10,732.00 $46,505.00 . Item Unit Qty Unit Price Total Price Part 9 - Storm Sewer - Phase 2 21" RCP storm sewer, Class 4 LF 220 $30.00 $6,600.00 18" RCP storm sewer, Class 5 LF 330 $26.00 $8,580.00 15" RCP storm sewer, Class 5 LF 405 $24.00 $9,720.00 12" RCP storm sewer, Class 5 LF 60 $22.00 $1,320.00 5' diameter storm CBMH, inc 2' sump EA 1 $2,000.00 $2,000.00 4' diameter storm CBMH EA 8 $1,400.00 $11,200.00 Connect to existing pipe EA 1 $500.00 $500.00 2' x 3' catch basin EA 2 $1,000.00 $2,000.00 21" RCP flared end section EA 1 $1,000.00 $1,000.00 Class III random riprap CY 10 $70.00 $700.00 Improved pipe foundation, per 6" increment LF 500 $1.00 $500.00 Seeding, incl seed, mulch and disk anchor AC 0.25 $2,000.00 $500.00 Silt fence, regular LF 300 $2.00 $600.00 Hay bales LF 200 $3.00 $600.00 Protection of catch basin in street EA 10 $50.00 $500.00 Skimmer structure EA 1 $1,000.00 $1,000.00 Subtotal $47,320.00 5% Contingency $2,366.00 Total Construction Costs $49,686.00 30% Indirect Costs $14,906.00 Total Part 9 $64,592.00 Part 10 - Street Improvements .Phase 2 Mobilization LS 1 $7,500.00 $7,500.00 Traffic control LS 1 $2,000.00 $2,000.00 Remove bituminous pavement SY 170 $3.00 $510.00 Sawing Bituminous Pavement LF 200 $5.00 $1,000.00 Subgrade preparation SY 9,300 $0.40 $3,720.00 Geotextile fabric, Type IV SY 9,300 $1.25 $11,625.00 Select granular borrow (modified) (CV) CY 5,200 $10.00 $52,000.00 Aggregate base, Class 5 TN 3,200 $8.00 $25,600.00 Type 31 bituminous base course TN 700 $32.00 $22,400.00 Bituminous wear course, Type 41 TN 700 $35.00 $24,500.00 Bituminous material for tack coat GAL 390 $1.50 $585.00 0418 surmountable concrete curb and gutter LF 4,100 $8.00 $32,800.00 Water MG 100 $5.00 $500.00 4" PVC drain tile, Schedule 40 LF 4,000 $4.00 $16,000.00 Type III barricade EA 2 $200.00 $400.00 Skidster (bobcat) with operator HR 10 $80.00 $800.00 Street Sweeper with operator HR 10 $100.00 $1,000.00 Blvd seeding, incl seed, mulch and disk anchor AC 1.2 $1,000.00 $1,200.00 Subgrade preparation - trail SY 1850 $1.60 $2,960.00 Aggregate base, Class 5 - trail TN 620 $12.00 $7,440.00 Bituminous wear course, Type 41 A - trail TN 190 $40.00 $7,600.00- Subtotal $222,140.00 5% Contingency $11,107.00 Total Construction Costs $233,247.00 30% Indirect Costs $69,974.00 Total Part 10 $303,221.00 ~ Item Unit Qty Unit Price Total Price Part 11 - Sanitary Sewer - Phase 3 Connect to existing manhole EA 2 $500.00 $1,000.00 Connect to existing sanitary sewer 8" PVC pipe EA 1 $300.00 $300.00 8" PVC sanitary sewer, SDR 35, 0'-8' deep LF 745 $16.00 $11,920.00 8" PVC sanitary sewer, SDR 35, 8'-10' deep LF 925 $17.00 $15,725.00 8" x 4" PVC wye, SDR 26 EA 28 $70.00 $1,960.00 Improved pipe foundation, per 6" increment LF 1,670 $2.00 $3,340.00 Closed circuit TV inspection LF 1,670 $1.00 $1,670.00 4' diameter sanitary MH, 8' deep EA 9 $1,600.00 $14,400.00 4' diameter sanitary manhole overdepth LF 4 $100.00 $400.00 Subtotal $50,715.00 5% Contingency $2,535.00 Total Construction Costs $53,250.00 30% Indirect Costs $15,975.00 Total Part 11 $69,225.00 Part 12 - Water Main - Phase 3 Connect to existing 8" water main EA 1 $500.00 $500.00 Connect to existing 12" water main EA 1 $500.00 $500.00 12" PVC water main LF 1060 $25.00 $26,500.00 8" PVC water main LF 500 $20.00 $10,000.00 6" PVC water main LF 338 $16.00 $5,408.00 12" gate valve and box, in place EA 2 $1,500.00 $3,000.00 8" gate valve and box, in place EA 1 $1,000.00 $1,000.00 6" gate valve and box, in place EA 6 $700.00 $4,200.00 Hydrant EA 5 $1,500.00 $7,500.00 Ductile iron fittings LB 3,410 $2.50 $8,525.00 Improved pipe foundation, per 6" increment LF 1,900 $2.00 $3,800.00 Subtotal $70,933.00 5% Contingency $3,547.00 Total Construction Costs $74,480.00 30% Indirect Costs $22,344.00 Total Part 12 $96,824.00 Part 13 - Services - Phase 3 1" corporation stop EA 28 $100.00 $2,800.00 1" curb stop and box EA 28 $130.00 $3,640.00 1" Type "K" copper water service LF 1,250 $10.00 $12,500.00 4" PVC, Sch. 40 service pipe LF 1,300 $12.00 $15,600.00 Subtotal $34,540.00 5% Contingency $1,727.00 Total Construction Costs $36,267.00 30% Indirect Costs $10,880.00 Total Part 13 $47,147.00- .. Item Unit Qty Unit Price Total Price Part 14 - Storm Sewer - Phase 3 24" RCP storm sewer, Class 5 LF 155 $35.00 $5,425.00 18" RCP storm sewer, Class 5 LF 300 $26.00 $7,800.00 15" RCP storm sewer, Class 5 LF 985 $24.00 $23,640.00 12" RCP storm sewer, Class 5 LF 785 $22.00 $17,270.00 5' diameter storm MH, inc sump EA 1 $2,000.00 $2,000.00 4' dia storm sewer CBMH EA 10 $1,400.00 $14,000.00 2' x 3' catch basin EA 6 $1,000.00 $6,000.00 24" RCP flared end section EA 1 $1,400.00 $1,400.00 18" RCP flared end section EA 1 $800.00 $800.00 15" RCP flared end section EA 3 $700.00 $2,100.00 12" RCP flared end section EA 3 $600.00 $1,800.00 Class III random riprap CY 40 $70.00 $2,800.00 Improved pipe foundation, per 6" increment LF 1,000 $1.00 $1,000.00 Seeding, incl seed, mulch and disk anchor AC 0.7 $2,000.00 $1,400.00 Silt fence, regular LF 500 $2.00 $1,000.00 Hay bales LF 300 $3.00 $900.00 Protection of catch basin in street EA 19 $50.00 $950.00 Subtotal $90,285.00 5% Contingency $4,515.00 Total Construction Costs $94,800.00 30% Indirect Costs $28,440.00 Total Part 14 $123,240.00 Part 15. Street Improvements -Phase 3 Mobilization LS 1 $7,500.00 $7,500.00 Traffic control LS 1 $2,000.00 $2,000.00 Remove bituminous pavement SY 35 $10.00 $350.00 Sawing Bituminous Pavement LF 100 $5.00 $500.00 Subgrade preparation SY 9,100 $0.40 $3,640.00 Geotextile fabric, Type IV SY 9,100 $1.25 $11,375.00 Select granular borrow (modified) (CV) CY 5,600 $10.00 $56,000.00 Aggregate base, Class 5 TN 3,200 $8.00 $25,600.00 Type 31 bituminous base course TN 830 $32.00 $26,560.00 Bituminous wear course, Type 41 TN 700 $35.00 , $24,500.00 Bituminous material for tack coat GAL 400 $1.50 $600.00 D418 surmountable concrete curb and gutter LF 4,270 $8.00 $34,160.00 Water MG 100 $5.00 $500.00 4" PVC drain tile, Schedule 40 LF 4,150 $4.00 $16,600.00 Skidster (bobcat) with operator HR 10 $80.00 $800.00 Street Sweeper with operator HR 10 $100.00 $1,000.00 Blvd seeding, incl seed, mulch and disk anchor AC 1.3 $1,000.00 $1,300.00 Subgrade preparation - trail SY 2625 $1.60 $4,200.00 Aggregate base, Class 5 - trail TN 880 $12.00 $10,560.00 Bituminous wear course, Type 41 A - trail TN 280 $40.00 $11,200.00- Subtotal $238,945.00 5% Contingency $11,947.00 Total Construction Costs $250,892.00 30% Indirect Costs $75,268.00 Total Part 15 $326,160.00 I ' COST SUMMARY Total Part 1 - Sanitary Sewer - Phase 1 Total Part 2 - Water Main - Phase 1 Total Part 3 - Services - Phase 1 Total Part 4 - Storm Sewer - Phase 1 Total Part 5 - Street Improvements - Phase 1 Total Phase 1 $186,978.00 $191,783.00 $35,572.00 $93,242.00 $287,356.00 $794,931.00 Total Part 6 - Sanitary Sewer - Phase 2 Total Part 7 - Water Main - Phase 2 Total Part 8 - Services - Phase 2 Total Part 9 - Storm Sewer - Phase 2 Total Part 10 - Street Improvements - Phase 2 Total Phase 2 $23,041.00 $43,121.00 $46,505.00 $64,592.00 $303,221.00 $480,480.00 Total Part 11 - Sanitary Sewer - Phase 3 Total Part 12 - Water Main - Phase 3 Total Part 13 - Services - Phase 3 Total Part 14 - Storm Sewer - Phase 3 Total Part 15 - Street Improvements - Phase 3 Total Phase 3 $69,225.00 $96,824.00 $47,147.00 $123,240.00 $326,160.00 $662,596.00 Total Phase 1 Total Phase 2 Total Phase 3 $794,931.00 $480,480.00 $662,596.00 TOTAL PROJECT $1,938,007.00 " , j I -I- ierville Rstablished 1857 Appendix B , , , APPENDIX B PRELIMINARY ASSESSMENT ROLL CITY OF CENTERVILLE PHEASANT MARSH UTILITY AND STREET IMPROVEMENTS PARCEL ADDRESS FRONT PHEASANT TOTAL ID NUMBER (CENTERVILLE RD) OWNER FOOTAGE MARSH ASSESSMENT 23-31-22-31-0002 6906 Schoeberlein 200.00 $0.00 23-31-22-31-0001 6904 Lundblad 200.00 $0.00 23-31-22-34-0002 6892 Vanderbeek 264.32 $0.00 23-31-22-34-0003 6882 Eide 264.32 $0.00 23-31-22-33-0004 6849 Wilharber 208.70 $0.00 23-31-22-33-0005 vacant Wilharber 208.70 $0.00 23-31-22-33-0003 6813 Wilharber 241.00 $0.00 23-31-22-34-0001 vacant Ground Development 745.38 $1,871,642 $1,871,642.00 26-31-22-21-0005 6756 Broussard-Vickers 0.00 $0.00 TOTAL $1,871,642 $1,871,642.00 Cost Summary Ground Development City of Centerville Pheasant Marsh $1,871,642.00 $66,365.00 . % of Project 96.58% 3.42% $1,938,007.00 100.00% . trunk water main on Dupre Road, Pheasant Lane, Partridge Place and permanent easement. J 'l 1 terville T.1 f 7--'l' h rI 181:'"'7 .E S Iv a...9 /1.,51 ue~, J . Figures ) I, .. CH/..,U:'-JCE ,( bt~RE=T-; :'~~.r\ :~~~ U !:: I'~ :-~) ((LD PHASE 3 (2005) DUPRE RD. PROPOSED TRAil (OPTION 2) ~ 07 ,0/ i/ ".' j / / / / / j N :i ..( vi U // ~ ( I o 250 ~ Scale in feet 500 , I I CENTERVILLE, MINNESOTA PHEASANT MARSH FIGURE 2 JOJ Bonestroo Rosene 8 Ander/ik d . \j. Associates PHEASANT MARSH - PHASES 61600117R01.dwg MAY 2001 COMM.: 616-00-117 I I I . " TE EM 12" PRIV ATE SYSTEM 8" PRIVA TE SYSTEM E ,1 Q ot:: O. ~. W ..J ..J > tL III I- Z \A U E ~ CONNEC TO EXISTIN SEWER ND WATER --- - -- -------- ~-- ------- --~-- ------ ~---- -"':""--=-- --=--~--=---=--- =--=-~ DUPRE ',' 1 PHASE 1 o 100 .......- Scale in feet SANITARY SEWER & WATERMAIN PHASE 1 n Bonestroo Rosene 8 Anderlik & . u. Associates CENTERVILLE, MINNESOTA PHEASANT MARSH 61600117R01.dwg FIGURE 4A MAY 2001 COMM.: 616-00-117 . l t . J ~ =-=-__n___u ___ _ _ _":""_ _":""_-_-=-_-=-___ -=-_::-_":'""_-=-_-::"___":"'_"'::"'_-=-_"":'"_ _"":'"_-=_-=_-__ -=_-=_-=_-= LN. 'Z- PROPOSED WA TERMAIN o <( --.l --.l :2 Scale in feet N ~j PHASE 2 o 100 Io......"j SANITARY SEWER & WATERMAIN PHASE 2 ~ 8onestroo .:=II Rosene ~ Anderlik & .~. Associates CENTERVILLE. MINNESOTA PHEASANT MARSH FIGURE 48 61600117R01.dwg MAY 2001 COMM.: 616-00-117 . I. . "----- --- - ----------- ------- ------------------ _-=-_-=-_ _-::_-::_-:_~___ -::_~_~-::_-::"" n-:_~_-::_-:_ _~__=__-=_~____=__=__=__=:: _:::::=:==._ ==.:-:.=:.=:.::-:. _ 0::: U ~ o ~ CEN ER S . W 0::: Il. o 5 2 PR POSED WA ERMAI PART lOGE LN. PR POSE SA ITARY SE R UPR RD. PROPOSED SANITARY SEWER PHASE 3 o 100 ~ Scole in feet j ~o j SANITARY SEWER & WATERMAIN PHASE .3 J[JJ Bonestroo -=- Rosene ~ Anderlik & . \j. Associa tes CENTERVILLE, MINNESOTA PHEASANT MARSH FIGURE 4C 6160011 7RO 1 .dwg MAY 2001 COMM.: 616-00-117 . l. II: EXISTING DITCH PROPOSED OUTLET -' / I { , \ \ \ MITIGATED J / I 1 \ , \ " " .......--, /" I I I " "- " "- "- "- "- " I WETLAND // ;,' I " PROP " 1\ / , \ '\ DUPRE ROAD - J7' B-B CONC. CURB'" GUTTER MALLARD WAY - JJ' B-B CONC. CURB & GUTTER ., GROUSE HOLLOW - JJ' 8-B CONC. CURB & GUTTER PHEASANT LANE - JJ' B-8 CONC. CURB & GUTTER o 100 ~ Scale in feet 1 PHASE 1 200 , STORM SEWER & STREET IMPROVEMENTS PHASE 1 j f1 j Bonestroo ~ Rosene 8 Anderlik &. .~. Associates CENTERVILLE, MINNESOTA PHEASANT MARSH FIGURE 5A F; 1 F;nn 11 7Rn 1 riw,-, ~AAY ?nnl rnMM. F.1 F.-nn_11 7 It '.: W CENTER OAKS o Q: ---- ---- ----- ---- PROP. POND -- ---- --- ---- --~ o PRE RD. PHEASANT LANE - 33' 8-8 CONC. CUR8 & GUTTER MALLARD WAY - 33' 8-8 CONC. CUR8 & GUTTER PARTRIDGE PLACE - 33' 8-8 CONC. CUR8 & GUTTER PARTRIDGE LANE - 33' 8-8 CONC. CUR8 & GUTTER N ,I / /' PHASE 2 0 100 200 , ~ . .,/ Scale in feet STORM SEWER & STREET IMPROVEMENTS PHASE 2 · (]. Bonestroo ~ Rosene 8 Anderlik <<$ . ~. Associa tes CENTERVILLE, MINNESOTA PHEASANT MARSH FIGURE 58 c::. 1 ~f"'\f"\ 1 1 I'Oil1 ..f..._ U^V ")1"\1"'\1 f'f"\UU. 1:::1C::_"''''~117 . .I. .'. ._, 0:::: U CENT R S . ----- ---- ---- ----- ---- I- U >- > i ;.... ,~. /" ---- --------------- t.__-, PROPOSED STORM SEWER DUPRE ROAD - 37' 8-8 CONC. CUR8 & GUTTER PARTRIDGE LANE - 3J' 8-B CONC.CURB & GUTTER QUAIL COURT - JJ' B-8 CONC. CURB & GUTTER PHASE 3 STORM SEWER & STREET IMPROVEMENTS PHASE CENTERVILLE, MINNESOTA PHEASANT MARSH FIGURE 5C 61600 117RO l.dwa MAY ?OOl C:OMM.: fi1fi-OO-117 PROPOSED OUTLET ",/' .~?/-- ~o/,- R:- "',. 0/ ~/ 0" <:/ ~/ cs/ .::...1 . f...... ' 1'0 100 ..::J .....- o Scale in feel CJ: 1 2~ I , 3 ~ (] ~ Bonestroo ~ Rosene 8 Anderlik & . ~. Associates - ;~ August 2, 2001 Ms. Karen Varian Centennial Lakes Police Commission 200 Civic Heights Circle Circle Pines, MN 55014 Dear Ms. Varian: Per your request dated July 19,2001, we are providing the following documents: 1. Copy of the Power Point presentation prepared for the Lino Lakes City Council which is the proposal Lino Lakes made for a quad cities police force. 2. Police Department budget for years 1998 (actual), 1999 (actual), 2000 (budgeted), 2001 (budgeted), all on one sheet. 3. Calls generated for years 1996 through 2000 from our latest annual report from the Police Department. 4. A breakdown of calls for 1998, 1999 and 2000 by category from the Minnesota Crime Information Manuals, BCA Annual Statistics. 5. A roster of personnel in our Police Department, along with start dates. 6. Our Public Services Director's best estimate of the costs of operation and utilities for the Police Department. (These expenditures are not tracked by department.) 7. Insurance costs for the Police Department are included in document #2, the department cudgel. 8. Pages from our Comprehensive Annual Financial Reports for years ended 1998, 1999 and 2000. The City's annual independent audit does not look at departments individually and departments are not charged for a portion of the audit. 9. We are unable to provide labor relations and legal fees specific to the Police Department other than the information contained in the budgets provided in #2. These services are centralized in Administration and not charged to individual departments. . 10. An itemized list of grants currently in effect in the Police Department and the status of each, according to our Finance Department records. 11. A list of C.O.P. and M.O.R.E. grants including hire dates of all COPS officers, according to our Finance Department. 600 Town Center Parkway, Lino Lakes, Minnesota 55014-1182 Phone: 651-982-2400. Fax: 651-982-2499. TOO: 651-982-2410 -. J Although I am providing copies of this letter for each of the quad cities, I am only sending the documents to you at this time. I would be happy to provide the identical documents to any of the cities upon request. Sincerely, \..,r~ , ~ o:r~ ...::J--~ ~n~ Linda Waite Smith City Administrator cc: Lino Lakes Mayor and City Council Circle Pines City Administrator and Mayor Centerville Acting City Administnl.tor and Mayor Lexington City Administrator and Mayor