HomeMy WebLinkAbout2005-09-07 P&R Packet
CITY OF CENTERVILLE
PARKS AND RECREATION AGENDA
Wednesday, September 7, 2005 - 6:30 P.M.
I. CALL TO ORDER
1. Roll Call
ll. SET AGENDA
ID. APPEARANCES
IV. CONSIDERA TION OF MINUTES
1. July 6, 2005 Parks and Recreation Committee Meeting Minutes
VI. COMMITTEE BUSINESS
1. Oath of Office -Ms. Linda Merkel
2. 2006 Budget
3. Centennial Youth Hockey Association - Use of Laurie LaMotte
Memorial Park Hockey Rink for the 2004-2005 Season
4. St. Paul Water Utility Property on Centerville Lake
VII.UPDA TES
1. Laurie LaMotte Memorial Park Play Structure
2. Frozen Fete des Lacs - Parks & Recreation Possibly Taking Over Friday Night
Event of Skating, Horse Drawn Hayride & Bonfire
3. Additional Lights at Laurie LaMotte Memorial Park
4. Federal Transportation Enhancement Fund Application
5. Church of St. Genevieve Trail
6. Pheasant Marsh, Phase Three - Trail
IX. ADJOURNMENT
,
Parks & Recreation Committee
Meeting Minutes August 3, 2005
PARKS AND RECREATION COMMITfEE
MEETING MINUTES
Wednesday, August 3,2005 - 6:00 p.m.
Pursuant to due call and notice thereof, the Parks and Recreation Committee of the City of Centerville
held the regularly scheduled meeting on August 3, 2005, at City Hall, 1880 Main Street.
Present:
Committee Member Suzanne Seeley
Committee Member Kathy Peil
Committee Member Mr. Kevin Amundsen
Absent:
Chairperson Tedd Peterson
Vice-Chairperson Wayne LeBlanc
Committee Member Linda Merkel
M[Ji)@~~[f@W@@1
Council:
Absent - City Council Work Session being held at the same time.
Staff':
Kim Stephan
I. CALL TO ORDER
1. RoD Call
Committee Member Peil called the August 3, 2005 Parks & Recreation Committee Meeting to
order at 6:40 p.m.
IT. SET AGENDA
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
set the August 3, 2005 Parks & Recreation Committee Agenda as is. All in favor. Motion
carried unanimously.
IV. APPEARANCES
Mr. John Meyer, Finance Director, made an appearance to discuss a Federal Transportation
Enhancement Fund Application Draft with the committee. The committee discussed the
advantages of the sidewalk connections being proposed by the grant and the concern that these
sidewalks/trails tie in to the existing trail plan. Committee Member PeU questioned whether the
outcome will line up with the trail extensions planned on the S1. Genevieve property. Mr. Meyer
assured the committee that the Parks & Recreation Committee's Trail Plan was reviewed when
the grant application was drafted and the final outcome would eventually connect all the trails
lof5
.
Parks & Recreation Committee
Meeting Minutes August 3, 2005
and sidewalks as proposed. Mr. Meyer did state however, that the sidewalk connection on the
east side of Centerville Road from Heritage Street to the sidewalk in front of Chauncey Barett
Gardens will probably not be possible due to the drainage ditch located on that property and the
steep ditch involved. Committee Member Peil asked for the time frame on the grant application.
Mr. Meyer stated it was due to be submitted by August 19,2005 and would be going before City
Council at the next scheduled City Council Meeting. The decision process is lengthy and it
would probably be six (6) months before a decision was made by the Grant Committee. Mr.
Meyer also stated that the funds would not be available until 2009. One of the issues in the
City's favor is that this particular grant application connects all the trail systems, as well as the
proposed County Road 14 trail and the regional trail.
Motion was made by Committee Member Seeley, seconded by Committee Member Peil to
recommend to City Council accepting the Federal Transportation Enhancement Fund
Application Draft as presented to the Parks & Recreation Committee as presented by Mr.
John Meyer, Finance Director. All in favor. Motion carried unanimously.
IV. CONSIDERATION OF MINUTES
Consideration of Julv 6. 2005 Parks and Recreation Committee Meetine Minutes
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
approve the July 6, 2005 Parks & Recreation Committee Meeting Minutes as is. All in
favor. Motion carried unanimously.
VL COMMITTEE BUSINESS
Oath of Office - Ms. Linda Merkel & Mr. Kevin Amundsen
Committee Member Amundsen was sworn in as a Parks & Recreation Committee Member. Ms.
Linda Merkel was not present.
2006 Budeet
The Committee looked at previous budget information supplied by Vice-Chairperson LeBlanc
and briefly discussed the modifications that will need to be modified before submitting the
budget to City Council. Due to the absence of Chairperson Peterson and Vice-Chairperson
LeBlanc, the majority of the items need to be tabled until the full committee is present.
Chairperson Peterson discussed the budget prior to leaving on vacation with Committee Member
Peil who shared his input with the committee. The concern is the Parks & Recreation Committee
has limited funds available to them in upcoming years with the city nearing being built out and
the end of Park Dedication Fees. With the possible purchase of the property at 1601 LaMotte
Drive, the renovation of Tracie McBride Memorial Park when the old water tower comes down,
the addition of trail connections on the St. Genevieve property and connecting the Pheasant
Marsh, 3rd Addition Trail to Center Street and the desire to have a play structure at Laurie
LaMotte Memorial Park, the committee feels it needs to request funs from the General Fund.
The committee has not receiver, nor requested funds from the General Funds in 3-4 years.
20f5
Parks & Recreation Committee
Meeting Minutes August 3, 2005
The proposed budget will be supplied to the City Council following the September 7, 2005 Parks
& Recreation Committee Meeting.
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
request $25,000 from the General Fund to be transferred to Parks & Recreation Committee
on an annual basis with this year's requested amount to be used for a play structure at
Laurie LaMotte Memorial Park. The Parks & Recreation Committee will submit a final
budget proposal for the September 14, 2005 City Council Meeting.
Laurie LaMotte Memorial Park Play Structure
This item was discussed under the 2006 Budget. The committee would like to begin planning for
a play structure to be installed in 2006.
Frozen Fete des Lacs - Parks & Recreation Possibly Takini! Over Friday Nii!ht Event of
Skatini!. Horse Drawn Hayride & Bonfire
With the Economic Development Committee in the process of reviewing what direction the
committee will take and their role in the community, it is a possibility there will not be a Frozen
Fete des Lacs in 2006. EDC has discussed in the past whether the Parks & Recreation
Committee would be willing to take over the Friday night event of Frozen Fete des Lacs since
that has been well attended in the past. Committee Member Peil stated, in her opinion, having
the lake flooded was a waste of time, energy and funds when all the facilities are already
available at Laurie LaMotte Memorial Park.. Ms. Stephan reminded the committee that at the
time of year Frozen Fete des Lacs has been held there has not still been ice available on the rinks
at Laurie LaMotte Memorial Park. Another reason Friday night's activities were moved to the
Anoka County Park was to use the bonfire pit available at the regional park. In the past the
bonfire at Laurie LaMotte Memorial Park was held in the parking lot, but once the parking lot
was paved the fire had to be moved to another location.
Committee Member Peil stated she would like to have the bonfire & hayride at one of the
committee's annual Skate Nights at Laurie LaMotte Memorial Park and suggested the soccer
fields might work for a bonfire. The committee will discuss this further at the next scheduled
meeting.
VB. UPDATES
Acorn Creek Park Satellite
There were no residents in attendance to verbalize concerns in this matter. This item will be
removed from the agenda and the satellite will remain where it is currently placed.
Tracie McBride Memorial Park Renovation
The committee previously budgeted $30,000 for renovations at this park. A clarification needs to
be made as to when the old water tower will come down and a timeline for when renovations can
start at the park.
30f5
.
Parks & Recreation Committee
Meeting Minutes August 3, 2005
Park Dedication Fees for Centerville Redi-Mix
This information was included in the packet as an FYI to the committee members. Mr. Dennis
Shudy addressed City Council at the June 22, 2005 City Council Meeting concerning
Commercial Park Dedication Fees for Centerville Redi-Mix. Mr. Shudy asked Council to
consider reducing the park fee for his building as when he started this process there were no fees
for commercial park dedication. Council Member Lee indicated that after Mr. Shudy purchased
his property, but before he obtained the permit, the fees were created. Council Member Lakso
indicated she is concerned with reducing park fees as the City needs the money to fund park
maintenance. Council Member Lee also stated the park fees are important to the City. Mayor
Capra commented that there was an exception for the town home development because the
process was in the works. City Attorney Hoeft indicated that the fee structure is set and if the
City is going to deviate :from that then it needs to be a unique situation. Council Member Paar
indicated this is a unique situation as the fees were raised and created for commercial
development during Mr. Shudy's development. Mayor Capra agreed under these circumstances
to reduce the park fee to $2,100. Council Member Terway indicated the City has a schedule of
fees and asked whether this would set a precedent for reducing fees upon request. City Attorney
Hoeft indicated that unique circumstances could justify the fee reduction and then said that the
fact that this project was underway when the park fees were created for commercial development
could be found to be a unique circumstance.
Motion by Council Member Terway. seconded by Council Member Lee. to aoorove a
reduction in Dark dedication fees and require Mr. Shudy to oay $2.100 and the rest of the
fees remain the same. The reduction is based on the fact that the olans for the orooertv
were submitted orior to the creation of the commercial Dark dedication fees. All in favor.
Motion carried unanimously.
St. Paul Water Utility Prooertv on Centerville Lake
The 2006 DNR Local Initiatives Grant Application for the Outdoor Recreation Grant Program for
the purchase of 1601 LaMotte Drive was not approved for funding per notice the City received
July 18, 2005. Mayor Capra is pursuing assistance for the purchase of this property with the
Metropolitan Council and has a meeting arranged with Ms. Hilker, the City's local Metropolitan
Council representative prior to the August 3, 2005 City Council Work Session.
Wheels Skate Park Equioment
Chairperson Peterson was unavailable for an update.
Additional Liehts at Laurie LaMotte Memorial Park
Per Chairperson Peterson, Rivard Electric has ordered the parts to install the additional lighting.
The parts are unavailable for 4-6 weeks. The lights will be installed when the parts are available.
40f5
Parks & Recreation Committee
Meeting Minutes August 3, 2005
Church of St. Genevieve Trail
Added to the packet were the recommendations to City Council from the Parks & Recreation
Committee regarding the trail easements on the S1. Genevieve property and excerpts from the
City Council Meeting Minutes with Council's responses. This was included as information for
new members, but also as review. This will be added to the next committee agenda to be
discussed as to when and how the committee would like to proceed with this item.
Pheasant Marsh, Phase Three - Trail
Added to the packet for review was information regarding the Parks & Recreation Committee's
recommendation to City Council for the trail in Pheasant Marsh, Phase Three. This development
was put on hold due to litigation in October 2003. The development is now moving forward,
though a timeline is not currently available. In preparing a budget for 2006, the cost of the trail
extension from the Pheasant Marsh, Phase Three Trail to Center Street along the west side of
Outlot A, Center Oaks 2, will need to be added.
IX. ADJOURNMENT
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
adjourn the August 3, 2005 Parks & Recreation Committee Meeting at 7:22 p.m. All in
favor. Motion passed unanimously.
Transcribed by Kim Stephan
50f5
..1
TO: Parks & Recreation Committee Members
FROM: Kim Stephan
SUBJECT: Parks and Recreation Committee Request for General Funds - Not to
Exceed $25,000 AnnuaUy
DATE: August 31, 2005
The following recommendation was made by the Parks & Recreation Committee at the
August 3, 2005 regularly scheduled committee meeting. Following is Council's response.
2006 Bud2et
The Committee looked at previous budget information supplied by Vice-Chairperson LeBlanc and briefly
discussed the modifications that will need to be made before submitting the budget to City Council. Due
to the absence of Chairperson Peterson and Vice-Chairperson LeBlanc, the majority of the items need to
be tabled until the full committee is present. Chairperson Peterson discussed the budget with Committee
Member Peil prior to leaving on vacation and Committee Member Peil shared his input with the
committee. The concern is the Parks & Recreation Committee has limited funds available to them in
upcoming years with the city nearly built out and the end of Park Dedication Fees. With the possible
purchase of the property at 1601 LaMotte Drive, the renovation of Tracie McBride Memorial Park when
the old water tower comes down, the addition of trail connections on the St. Genevieve property,
connecting the Pheasant Marsh, 3rd Addition Trail to Center Street and the desire to have a play structure
at Laurie LaMotte Memorial Park, the committee feels it needs to request funds from the General Fund.
The committee has not received, or requested funds from the General Fund in 4-5 years and would like to
request $25,000 annually beginning in 2006. The $25,000 requested for 2006 would be used for a play
structure at Laurie LaMotte Memorial Park. The proposed budget will be supplied to the City Council
following the September 7, 2005 Parks & Recreation Committee Meeting.
Motion was made by Committee Member Peit, seconded by Committee Member Seeley to request
$25,000 from the General Fund to be transferred to the Parks & Recreation Committee on an
annual basis, with the $25,000 budgeted for 2006 to be used for a play structure at Laurie LaMotte
Memorial Park. The Parks & Recreation Committee will submit a final budget proposal for the
September 14,2005 City Council Meeting. AU in favor. Motion carried unanimously.
Excerpt from the August 10, 2005 City Council Meeting Minutes.
NEW BUSINESS
Parks and Recreation Committee Request for General Funds - Not to Exceed $25.000 Annuallv
Council discussed the request and expressed interest in funding it but asked that the request be discussed
as part of the budgeting cycle with the Finance Director.
~'f/~~
Centerville Park and Recreation Funds and Budget
August 15, 2005
Cash and Investments
The Shores $ 20,000
Pheasant Marsh I $ 39,600
Woods of Clearwater Creek $ 7,500
Pheasant Marsh II $ 54,000
Peltier Preserve $ 57,000
Hunters Crossing II $ 108,000
Lions Shave the Mayor $ 500
Andre Ziegler $ 120
Lions Gambling Donation (for warming house) $ 25,229
Dead Broke Saddle Club (over purchase of bike racks 500->561) $ (61 )
Spring Lake Park Lions (Bleacher overpurchase 1000->1070) $ (70)
Bonestroo Donation $ 250
2004 Sping Lake Park Donation $ 500
2004 Dead Broke Saddle Club Donation $ 1,500
Interest on Investments $ 2,105
Total Cash and Investments $ 316,173
Assets, Current
Cash and Investment (from above) $ 316,173
Sedona Homes Park Dedication $ 2,400
Trail fund (from Centerville Lake Dev) $ 12,500
Total Current Assets $ 331,073
Liabilities, Current
Parking lot for Lamotte Park (completed 2004) Due to GF $ 52,519
Warming House (roof and interior paint done 2004) Due to GF $ 4,256
Skate Park/TraiJ (completed 2004) Due to GF $ 8,625
Total Current Liabilities $ 65,400
Fund Balance, Current $ 265,673
Assets, Projected
Receivable: Pheasant '" (approval expected 2006-2007) $ 84,000
Receivable: Sedona Homes (expected 2005) $ 2,400
Receivable: Downtown Redevelopment (expected 2007-2008) $ 108,000
Receivable: Hunters III (approval expected 2005) $ 132,000
Total Projected Assets $ 326,400
Liabilities, Projected
St Paul Water Property on Centerville Lake - 2005 $ 315,000
Additional Skate Park Equipment (chairitab/e gambling funds 2005) $ 6,000
Playground Equipment - Lamotte Park (2006 & 2007) $ 45,000
Renovate Warming House (2006) $ 20,000
Renovation of McBride Park - 2006 $ 45,000
Parking Lot for Lamotte Park (completed 2005) $ 18,000
TE Trail Grant Match - 2007 $ 146,250
(TE includes Meadow Lane & Chauncy Barrott to Lamotte Pk & Clearwater Creek)
Total Projected Liabilities $ 595,250
Total - All Assets $ 592,073
Total - All Liabilities $ 660,650
Total - All Fund Balance $ (68,578)
. I
TO: Parks & Recreation Committee Members
FROM: Kim Stephan
SUBJECT: Centennial Youth Hockey Association's Request for the Use of Laurie
LaMotte Memorial Park Hockey Rink for the 2005-2006 Season
DATE: September 1,2005
Attached is a request from the Centennial Youth Hockey Association for the use of Laurie
LaMotte Memorial Park Hockey Rink for the 2005-2006 season. Also attached for your review
is the recommendation to City Council from the Parks & Recreation Committee for the 2004-
2005 season, Council's approval and a copy of the waiver that was signed by the association.
e entennial Youth Hockey Association
www.centennialhockey.org
To: Tedd Peterson, City of Centerville, Park & Recreation Chairman
Centerville City Hall, 1880 Main Street, Centerville, MN 55038
From: Laurie Powers, Outdoor Ice Coordinator
1870 Quebec St., Centerville, MN 55038
Date: August 15, 2005
Re: Centennial Youth Hockey Association (CYHA), Outdoor Ice
The CYHA would like to formally request to use laMotte Park outdoor hockey rink for
the upcoming 2005-2006 hockey season. As the Outdoor Ice Coordinator, I will take care
of the initial scheduling of the rinks for outdoor practices and scrimmages. I will pass that
information on to you, as well as the final coaches list, once the scheduling is complete.
The scheduling should be completed by mid Uecember. Also, the coaChes/parents vvm
once again be asked to help shovel the ice surface before and/or after using it.
If at all possible, we would like to extend the time available for CYHA, aDowing whole
sheets of ice for both hours. At a minimum, we would like to reserve the same hours at
LaMotte Park for the 2005-2006 season, as we did in 2004-2005. Any additional ice time
CYHA can schedule would be much appreciated. The days and times from the 2004-2005
season are as follows:
Rink
Days of the Week Time
LaMotte Park
Mondays - Thursdays 7:00 p.m. - 8:00 p.m.
(half sheet ice)
8:00 p.m. - 9:00 p.m.
(whole sheet ice)
CYHA would also like to request to use LaMotte Park for fall dry land practices. Dry
land training begins in October and runs until the start of outdoor ice. We use two
other city parks for dry land season, and were hoping we could offer a third choice. Should
this request be approved by the City, the memo for CYHA coaches regarding the fall dry
land practice schedule will be faxed to you the end of September, for your approval.
Please inform me as soon as possible, if there are any changes to this procedure
and/or the schedule above. Thanks for your continued support of the Centennial Youth
Hockey Association and the youth we serve. I look forward to hearing from you. I can be
reached at #651407-9557 or glenlauriepowers@comcast.net.
1880 :Main Street . Centervi[[e, :M:J{ 55038
(651) 429-3232 . 'Fa:t (651) 429-8629
September 13, 2004
Jodi McGregor, Outdoor Ice Coordinator
6979 Black Duck Drive
Lino Lakes, MN 55014
Dear Ms. McGregor,
Attached you will find a copy of the memo sent to Centerville City Council regarding the
Centennial Youth Hockey Association's use of the rink at Laurie LaMotte Memorial Park
for the upcoming 2004-2005 hockey season as well as the portion of the City Council
Meeting Minutes where the use was approved. Also included is a waiver the Parks &
Recreation Committee and the Public Works Staff requested be signed and returned to
the city. Please forward a copy of the usage schedule to the city for both dry land
practice and ice usage when it becomes available. Mt:. Tedd Peterson, Public Works will
work with the coaches to ensure access to both the lights and the nets.
Have a Great Season!
Kim Stephan
City of Centerville Staff
E~."' "O\j
1 ,"..,.-,.i;J . - ~ ~ ~
1 ,,' '. . . · J
,2 ;, : "-,~,,,,'/9"'-
" :J .~_ ,:>-0;;] -.~.~~.
....:."')~~-~~ ~~ ~ -,-'"
TO: Honorable Mayor & City Council Members
FROM: Kim Stephan
SUBJECT: Parks & Recreation Committee's Recommendation to Council
Centennial Youth Hockey Association - Use of Laurie LaMotte
Memorial Park Hockey Rink for the 2004-2005 Season
DATE: September 2,2004
Attached is a request from Jodi McGregor, Outdoor Ice Coordinator for the Centennial
Youth Hockey Association, requesting the use of Laurie LaMotte Memorial Park for the
2004-2005 season.
The committee discussed the use of the facilities for dry land practice and agreed to the
usage with the following conditions:
1. A schedule of usage, as well as a contact list of coaches responsible during the
time it is being used will be provided by the association,
2. There will be no use of the facilities after 9 p,m. daily.
3. The nets will be padlocked when not in use. The key to the lights and padlock
will be supplied in a lock box by Public Works.
4. The Centennial Youth Hockey Association will sign a waiver releasing the City of
Centerville from any liability and will take responsibility for any damage
occurring while the association is using the facilities.
The following recommendation was made by the Parks & Recreation Committee at the
September 1, 2004 Parks & Recreation Committee Meeting.
Motion was made by Chairperson Peterson, seconded by Committee Member Peil to
recommend to City Council approving the Centennial Youth Hockey Association's
use of dry land time with the use of the park lights at Laurie LaMotte Memorial
Park with the above conditions. All in Favor: Motion passed unanimously.
r
The committee discussed the association's request for additional ice time and opted to
keep the days and hours the same as in the past seasons allowing Centerville residents
access to the ice with the exception of8:00 - 9:00 p.m. Monday through Thursday.
Motion was made by Chairperson Peterson, seconded by Committee Member Peil to
recommend to City Council approving the Centennial Youth Hockey Association's
use of the hockey rink for the 2004-2005 season with a dedicated half sheet of ice
from 7:00 - 8:00 pm. and a dedicated full sheet of ice from 8:00 - 9:00 p.m. Monday
through Thursday. All in Favor: Motion passed unanimously.
The following excerpt is from the City Council Meeting Minutes of September 8,
2004.
IV. CONSENT AGENDA
1. City of Centerville August 26 through September 8, 2004 Claims
2. Centennial Fire District Claims through September 3,2004
3. Dresel Contracting, 2004 Utility & Street Improvement, Pay Estimate #4
$500,333.24
4. Larson Excavating, Buechler Estates Final Pay Estimate $19,794.61
5. Allied Blacktop, 2004 Seal Coat $74,036.22
6. Parks and Recreation Recommendation for Centennial Hockey Association
Use of Hockey Rink for Upcoming Season
Motion by Council Member Paar. seconded by Council Member Capra to approve
the Consent Aeenda as presented. AU in favor. Motion carried unanimously.
'Estab[ishea 1857
1880 ']v[ain Street _ CenterviI[e; '}y['J{ 55038
(651) 429-3232 _ 'Ja;c (651) 429-8629
The following waiver is in regards to the use of the Laurie LaMotte Memorial Park ice
rink and access to the utility room for the purpose of using the rink lights. The
Centennial Youth Hockey Association (CYHA) will take all responsibility for any
damages which may occur to the above mentioned property and/or equipment during the
scheduled usage. The coach responsible for each designated time period will ensure the
lights are off and the building and nets are secure. The City of Centerville requests the
CYHA notice the city at the termination of the dry land portion of time so a walk through
can be done and both parties will agree on the condition of the property at the end of the
usage. The CYHA will provide a schedule of use and a list of coaches using the property
to the city before use begins.
Ms. Kim Moore-Sykes
City Administrator, City of Centerville
Centennial Youth Hockey Association
'L.;tabllsIiCt{ 18S7
1880 :Main Street, Centervi[fe, :M:N 55038
651-429-3232 or <I'lL( 651-429-8629
August 30, 2005
Memo to Park Board
At the last meeting, the City Council discussed the S1. Paul Water property near Laurie LaMotte
Memorial Park. You are aware that discussion has gone back and forth about the purchase of the
property and the Water Board seems to think it's appraisal is better than ours. The City has
looked for grant funds to buy the parcel, but has not been successful in that regard.
The Council passed a motion to prepare a purchase agreement to buy the S1. Paul Water parcel
for park use at the City's appraised value. The Purchase Agreement will be prepared by the City
attorney and presented to the Council at the next meeting to authorize that it be signed and sent
to the S1. Paul Water Board. The purchase agreement would not have any contingencies. It is
expected that the cost will be paid from park fees charged to developments. It is the Council's
belief that the Park Board would concur with the decision to buy the property. If that is not the
case, please provide a response before the next City Council meeting on September 14, 2005.
Dallas Larson, Administrator
The foUowing excerpt is from the Unapproved August 24, 2005 City Council Meeting
Minutes:
1601 LaMotte Drive
Mayor Capra asked legal staff if the City could utilize eminent domain as the property has been
listed as surplus.
City Attorney Hoeft indicated that is an option but the Water Utility would have the option of
taking the property off the surplus property list at any time.
Legal Staff and Council discussed the pros and cons of an eminent domain proceeding to obtain
the property.
Mr. Meyer suggested Council consider authorizing the City Attorney to present a purchase
agreement for the City's appraised amount of $285,000 to the Water Utility.
Council discussed it and agreed.
Motion by Council Member Lakso. seconded by Council Member Terway to direct the City
Attorney to prepare a Purchase A2reement for the appraised value as recommended by
StafT. All in favor. Motion carried unanimously.
Federal Trans ortation Enhancement Fund A lication
INSTRUCTIONS: Complete and return to Kevin Roggenbuck, Transportation Coordinator, Transportation Advisory
Board, Mears Park Centre, 230 E. Fifth Street, St. Paul, Minnesota 55101. (651) 602-1728.
Applications must be received by 5:00 PM or postmarked on August 19, 2005. *Be
sure to com lete and attach the Pro "ect Information form.
Office Use Only
1. APPUCANT: City of Centerville
2. JURISDUcnONAL AGENCY (IF DIFFERENT)
3. MAIUNG ADDRESS: 1880 Main Street
CITY: Centerville
STATE: MN
ZIP CODE: 55038
4. COUNTY: Anoka
PHONE NO.
(651) 429-3232
5. CONTACT PERSON: John Meyer
TITLE: Finance Director
CONTACT E-MAIL ADDRESS:jmeyer@centervillemn.com
6. PROJECT NAME: Centerville Re ional Local Pedestrian - Bi c1e Trail Link
7. BRIEF PROJECT DESCRIPTION (Include location, facility name, type of improvement, etc... A more complete description must be
submitted separately as described in Specific Requirement #3 on p. 5)
The City of Centerville is proposing to construct pedestrian/bicycle trial linkages that complete the regional/local trail system
by linking the downtown, the elementary school, the proposed CSAH 14 pedestrian-bicycle trail, the Rice Creek Chain of
Lakes Regional Park Reserve Trail, Chauncey Barett Gardens and Centerville Lake. More precisely, 8,770 lineal feet of trail
will be constructed with appurtenances beginning at the existing trail on Lamotte Drive; continuing northeast on Lamotte
Drive; intersecting at Heritage Street; continuing east on Heritage Street; intersecting with Centerville Road; proceeding
north on Centerville Road; connecting and crossing CSAH 14; continuing north to Westview Street; and, ending at
elementary school trail. Additional trail segments will be constructed adjacent to the City Hall site with a pedestrian bridge
crossing the Clearwater Creek and adjacent to 20th Avenue from Fairview Street to CSAH 14. A trail rest parK is also planned
as a component of these linkages.
8. TE PROJECT CATEGORY - Check only one project grouping in which you wish your project to be considered (see p. 85).
o Scenic/Environmental [K] Bicycle/Pedestrian 0 Historic/Archaeological
9. TRANSPORTATION INVESTMENT PLANNED ECONOMIC DEVELOPMENT DISTRICTS (TIPEDD)
D Check here if project is being submitted as part of a TIPED District. If it is, the applicant must also submit the TIPEDD application
form (found on p. 10) and list this project on that form.
10. Are you applying or have you applied for funds from another source(s) to implement this project? Yes No
If yes, please identify the source(s):
11. FEDERAL AMOUNT $ 588,750.00
14. SOURCE OF MATCH FUNDS Local & CDBG
12. MATCH AMOUNT $ 196,250.00
15. MATCH % OF PROJECT TOTAL 25%
13. PROJECT TOTAL $ 785,000.00
16. REQUESTED PROGRAM YR (ORCLE ONE) 1200~ 2010
17. SIGNATUR~>> tL
I
18. TITLE Mayor
PROJECT INFORMATION
(To be used to assign State Aid Project Number after project is selected)
Please fill in the following information as it pertains to your proposed project. Items that do not apply to your project,
please label N/A. Do not send this form to the State Aid Office. For project solicitation package only.
COUNTY, OTY, OR LEAD AGENCY
FUNCTIONAL CLASS OF ROAD
ANOKA
COUNTY OR OTY NO.
ROAD SYSTEM_CSAH, CITY_ (TH, CSAH, MSAS, CO. RD., TWP. RD., CITY STREET)
ROAD NO. _21_
NAME OF ROAD HERITAGE SlREET. CENTERVILLE ROAD (Ex; 1st sr., MAIN AVE)
LOCATION:
From: TRAIL ENDING ON LAMOTTE ORNE
To: TRAIL ENDNING AT CENTERVILLE ROAD AND WESfVIEW SlREET
(DO NOT INCLUDE LEGAL DESCRIPTION)
SEC1l0N- TOWNSHIP-RANGE OF ONE END OF PROJECT
lYPE OF WORK _BIKE TRAIl/SIDEWALK
Examples: GRADE, AGG BASE, BIT BASE, BIT SURF, SIDEWALK, CURB AND GUTTER, srORM SEWER, SIGNALS,
LIGHTING, GUARDRAIL, BIKE PATH, PED RAMPS, ETC.
BRIDGE/CULVERT PROJECTS
OLD BRIDGE /CULVERT NO.
SlRUCTURE IS OVER
NEW BRIDGE/CULVERT NO.
NAME OF TWP.
VI
TRANSPORTATION ENHANCEMENTS PROGRAM FUNDING
CENTERVILLE PEDESTRIAN/BICYCLE TRAIL REGIONAL- LOCAL LINKAGE
I. Proiect Overview
The City of Centerville is proposing to construct pedestrian/bicycle trial linkages that complete the
regional/local trail system by linking the downtown, the elementary school, the proposed CSAH
14 pedestrian-bicycle trail, the Rice Creek Chain of Lakes Regional Park Reserve Trail, Chauncey
Barett Gardens and Centerville Lake. More precisely, 8,770 lineal feet of trail will be constructed
with appurtenances beginning at the existing trail on Lamotte Drive; continuing northeast on
Lamotte Drive; intersecting at Heritage Street; continuing east on Heritage Street; intersecting
with Centerville Road; proceeding north on Centerville Road; connecting and crossing CSAH 14;
continuing north to Westview Street; and, ending at elementary school trail. Additional trail
segments will be constructed adjacent to the City Hall site with a pedestrian bridge crossing the
Clearwater Creek and adjacent to 20th Avenue from Fairview Street to CSAH 14. A trail rest park
is also planned as a component of these linkages.
Design and construction of the pedestrian/bicycle trial linkages will be coordinated with the CSAH
14 reconstruction and the downtown redevelopment. The pedestrian/bicycle trial linkages will
allow trail users to travel between recreational areas, residential areas and employment centers.
The City of Centerville currently has plans for the addition of new park amenities that will be
complemented by the pedestrian/bicycle trial. The planned amenities include lake access and a
fishing pier.
The proposed pedestrian/bicycle trial segments, in combination with the new trail along CSAH 14,
will provide access to the County trail system, including the Rice Creek Chain of Lakes Regional
Park Reserve trails, as well as the existing and proposed system in the City of Centerville (see
Map 1). The City of Centerville participated in the completion of a North Metro Trail Plan in 2003
that proposes an overpass to I-35E. Implementation of the overpass will allow access from the
CSAH 14 trail system to trails in Washington County. Within Washington County, in the City of
Hugo, trail users will eventually be able to access a trail that will extend as far north as Duluth,
Minnesota. The continuity of the trail system will enhance multi-modal travel between residential
areas and employment centers in the project area.
This application is being submitted for federal funding under the Transportation Enhancement
category. The proposed project will:
. Provide a safe/secure crossing for pedestrians/bicyclists utilizing city and county trail
corridors for recreation and access to local and regiollal parks.
· Conform to the Transportation Enhancements Purpose and Vision that trail corridors are
designed to proVide for recreational opportunities within a metropolitan area.
· Conform to the Metropolitan Council's 2030 Regional Development Framework. This policy
promotes the implementation of fully interconnected arterial and local street, pathway and
bikeway systems by local governments.
· Conform to the Anoka County 2015 Transportation Plan and regional trail corridor plan
(approved by the Metropolitan Council).
· Conform to the Rice Creek Chain of Lakes Regional Park Reserve - Master Plan approved by
the Metropolitan Council.
. Consistent with trail plan for the City.
2
DIRECT RESPONSES TO QUALIFYING AND PRIORITIZING CRITERIA
II. Oualifvinq Criteria
1. The proposed pedestrian/bicycle trial segments are eligible for Transportation Enhancement funds as
defined in 23 U.s.e. !Ol(a) (35) of TEA-21. The proposed project qualifies under the following activity:
Provision of facilities for pedestrian and bicvcles.
The proposed project will encourage pedestrian/bicycle transportation by completing a key links
in the City of Centerville trail system that will improve safety and convenience for bicyclists and
pedestrians. The benefit of these links will extend to the local/region's existing and proposed
continuous trail system, which is intended to provide residents and visitor's access and safe travel
between residential areas and employment centers as well as access and safe travel to regional
public lands, including the Rice Creek Chain of Lakes Regional Park Reserve.
The activities described above constitute at least 70 percent of the project costs. The project
resulting from these funded activities will be accessible to the general publiC and is targeted to a
broad segment of the general public, including all pedestrians and bicyclists.
2A. The proposed project involves one of the twelve qualifying activities in the Transportation
Enhancement definition in TEA-21. This activity is provision of facilities for pedestrians and
bicycles.
28. The proposed project relates to surface transportation and is designed to serve
transportation needs of pedestrians, bicyclists and motorists. The proposed project will
decrease conflicts between motorized and non-motorized traffic, improving safety and
efficiency of travel for all three modes of transportation.
3. The proposed project is consistent with the planned trail system proposed in the City of
Centerville Trail Plan and the Anoka County 2015 Transportation Plan. The proposed project is
also identified in the 2005-2009 City of Centerville Capital Improvement Plan.
4. The proposed project is eligible for Transportation Enhancement fund, because it includes the
construction of vital links as part of a local and regional pedestrian/bicycle trail system and
improves safety for pedestrians and bicyclist crossing CSAH 14 and other local streets. The
proposed project is not part of any mitigation activities required to implement another
transportation project.
5. The proposed pedestrian/bicycle trial will be operated and maintained by the City of Centerville
through its useful life.
The City of Centerville will not change the use of right-of-way without prior approval from the
Minnesota Department of Transportation and Federal Highway Administration.
6. The proposed project has an estimated cost of $785,000. This exceeds the $125,000 minimum.
7. The City of Centerville is requesting $588,750 in Transportation Enhancement funds (75 percent
of the total project cost). The amount does not exceed the $1,000,000 maximum.
8. The City of Centerville will provide the remaining 25 percent of the total project cost. Refer to
Appendices, Capital Improvement Program for 2005-2009. The project is included in the City's
CIP for construction in 2005 -2006.
1
9. The proposed project will meet Mn/DOT State Aid Standards and AASHTO gUidelines as well as
the Mn/DOT Bicycle Transportation Planning and Design Guidelines.
10. The proposed project is being coordinated with the Anoka County and the City of Lino Lakes.
Written letters from the Anoka County and the City of Lino Lakes documents their full support for
this project. Refer to Appendices for the support letters.
III. Prioritizinq Criteria
Transportation Enhancement Category Criteria - Bike and Pedestrian Group
1. Urgency
Takes advantage of a time-sensitive opportunity, e.g., a willing landowner, cost savings,
affiliation with another project, competing development opportunities.
The proposed pedestrian/bicycle trial project takes advantage of the current design and
review work being completed by the Anoka County Highway Department for the
reconstruction of CSAH 14: I-35W to I-35E. As part of the CSAH 14 project, the City of
Centerville is also working with the County to coordinate the addition of trail links along
CSAH 14 to community parks, residents and employment centers. The two projects can be
simultaneously and efficiently considered by the County and the City.
Significantly addresses a strong un-met need or area of concern/problem associated with
the development of an integrated bicycle or pedestrian transportation network or providing
a safe bicycle or pedestrian route.
Centerville does not have a safe roadway pedestrian/bicycle routes and crossings between
amenities, employment centers and residents. A safe crossing is particularly important on
this roadway between the residential neighborhoods and the elementary school. The
posted speed limit as high as 45 miles per hour, as well as high traffic volumes, does not
afford pedestrians and bicyclists a safe opportunity to cross CSAH 14. The absence of a
safe crossing affects the use of the proposed CSAH 14: I-35W to I-35E trail and the use of
the extended system of existing and future Anoka and Washington County pedestrian and
bicycle trails. The pedestrian/bicycle trial will provide a continuous connection between the
portions of parkland east and west of CSAH 14, including existing and future park
amenities.
2
2. Readiness
· Evidence of community support for project
The City of Centerville is supportive of the pedestrian/bicycle trial linkages and trail system,
proposed in this project. Refer to Appendices for the support letters. In 2004, the city
began meeting with other local government officials form the City of Lino Lakes and Anoka
County to discuss and receive input for the proposed reconstruction of CSAH 14 between 1-
3SW and I-3SE, which included plans for the proposed pedestrian and bicycle
pedestrian/bicycle trial.
Private citizens in the city have also shown their support for the project. Early in the
project review process, persons were invited to public meetings, where information was
presented for the CSAH 14 reconstruction project. Many of the meeting attendees
commented on the need for pedestrian and bicycle facilities in the project corridor and
their concern for safe roadway crossings. The city continues to meet with the local
governments to plan for the CSAH 14 project and also welcomes additional public
comments and questions.
· Willing partners and landowners identified
The general public and the local government support the proposed pedestrian/bicycle trial
as part of the overall CSAH 14 roadway and trail project. The City of Centerville Park and
Recreation Committee support the proposed pedestrian/bicycle trial and trail project. Refer
to the support evidence in Appendices.
3. Impact
A. Bike/Pedestrian Infrastructure
· Fills gaps, overcomes barriers, and/or connects system segments in
pedestrian/bicycle network
There is a substantial gap in the pedestrian/bicycle network in the Centerville. These gaps
are in critical locations. More precisely, these gaps include the link between Rice Creek
Chain of Lakes Regional Park Reserve / Lamotte Park the elementary school crossing CSAH
14. In addition to this link, gaps exist between residential neighborhoods, employment
centers, the downtown, community parks, CSAH 14 and regional parks and trails.
CSAH 14 presents a barrier in the pedestrian/bicycle network. Pedestrians and bicyclists
accept a substantial safety risk crossing from one side of CSAH 14 to the other. The
pedestrian/biCYcle trial linkages will eliminate the barrier that CSAH 14 presents to
pedestrians and bicyclists crossing the roadway.
The proposed project fills these gaps by connecting the local trails to the Rice Creek Chain
of Lakes Regional Park Reserve/ Lamotte Park to the elementary school crossing CSAH 14.
In addition to this link, the proposed project links residential neighborhoods, employment
centers, the downtown, community parks, CSAH 14 and regional parks and trails.
The proposed pedestrian/bicycle trial linkages will provide a missing trail network link for
pedestrians and bicyclists traveling between Centerville, Anoka County and bordering
counties.
3
· Project provides a high-demand facility or program
Centerville is rapidly developing into an employment and residential center contiguous to
I35E. The proposed pedestrian/bicycle trial linkages will be situated in this high-demand
recreational area and will benefit from the proposed pedestrian/bicycle trial. Centerville is
adjacent to Rice Creek Chain of Lakes Regional Park Reserve which has documented
approximately 78,200 visitors per year on the park trails. This annual use estimate was
taken from the Annual Use Estimate of the Metropolitan Regional Parks System for 2004.
A substantial portion of these visitors can be estimated to originate from the greater
metropolitan area.
Use of the proposed pedestrian/bicycle trial links, along with the addition of new trail along
CSAH 14, can only be anticipated to increase based on the improved ability to circulate
between park amenities east and west of CSAH 14. The pedestrian/bicycle trial will also
support trail users along CSAH 14 traveling between residential areas and employment
centers.
· Provides/supports multimodal transportation
The pedestrian/bicycle trial linkage project will support multimodal transportation by
providing an alternative to motorized vehicle circulation within the city, the Rice Creek
Chain of Lakes Regional Park Reserve and between the residential areas and employment
centers along CSAH 14. The safety and improved access proVided by the
pedestrian/bicycle trial will also promote the pedestrian and bicycle use of existing and
future City and County trails in exchange for motorized vehicle use.
· Addresses safety concerns
The proposed pedestrian/bicycle trial linkages address safety concerns on CSAH 14
between I-35W and I-35E which carries high volumes of traffic at posted speed limits as
high as of 45 miles per hour (mph) and can present an unsafe condition for motorized and
non-motorized travelers. Currently, traffic volumes of approximately 6,000 vehicles per
day, are experienced along the portion of CSAH 14 near the pedestrian/bicycle trial
linkages. In 2030, the anticipated daily traffic volumes for this same area are anticipated
to be 13,300 vehicles per day. The opportunity for motorized/non-motorized vehicle
conflict is substantial without the proposed pedestrian/bicycle trial linkages.
B. Bike/Ped Programs
For the proposed project, it is appropriate to respond to A. (Bike/Ped Infrastructure) but not
appropriate to respond to B. (Bike/Ped Programs).
4
4. Context
Applicant community's/agency's demonstrated commitment to and experience
in bike/pedestrian facilities and programs
The city has demonstrated their commitment to and experience in bike/pedestrian facilities
and programs, with the abundance of trails provided throughout the city. Consistent with
the city park and trail plan and the Rice Creek Chain of Lake Regional Park Reserve -
Master Plan, the city continues to demonstrate it's commitment to recreation and
transportation trail facilities through the planning and implementation of these facilities as
part of roadway projects and as part of the transition of park property from passive use to
active use.
· Commitment to operation and maintenance
The City of Centerville ensures that trail facilities are properly operated and maintained
either by direct responsibility. The city has provided a letter of support and commitment to
operation and maintenance for this project.
Attention to other facilities
The proposed pedestrian/bicycle trial linkages have been planned as part the downtown
redevelopment and the CSAH 14: 1-35W to 1-35E reconstruction project mindful of other
facilities in the area including trail plans for CSAH 14 west of 1-35W and recognizing the
trail resources available in Washington County, east of 1-35E. At a local level, the trail
takes advantage of the Rice Creek Chain of Lakes Regional Park Reserve amenities,
including trails, the Centerville's local trails and sidewalks.
The pedestrian/bicycle trial linkages will also provide an enhanced connection to transit
facilities. The CSAH 14 corridor currently serves two commuter bus routes for Metro
Transit. Reconstruction plans for the 1-35E interchange to the east include a new park-
and-ride in the southeast quadrant of the interchange. Transit service in this area
currently connects to a large transit hub located near the junction of TH 242/CSAH 14 and
US 10. From here, Centerville residents have access to the rest of the Twin Cities
metropolitan area.
Project compatibility with surrounding land uses / management/
facilities
The project is compatible with surrounding land uses, including the Rice Creek Chain of
Lakes Regional Park Reserve, residential areas, the City of Centerville elementary school
and existing and planned retail, commercial and industrial land uses in Centerville.
Pedestrians and bicyclists will have the opportunity to safely travel to, from and within the
city, the Rice Creek Chain of Lakes Regional Park Reserve, to connect to transit facilities
and to travel between employment centers and residential areas with the construction of
the pedestrian/bicycle trial linkages.
The proposed pedestrian/bicycle trial linkages are consistent with the management of the
city trail system. The pedestrian/bicycle trial will also complement the large regional park
with designated active areas (including recreational and educational areas) and passive
areas for natural preservation. The overall trail use will be consistent with the City of
Centerville's intended use for the area.
5
The pedestrian/bicycle trial will be compatible with planned trail facilities in the city by
providing an un-met need for a safe and continuous trail system.
5. Relationship between Categories
· What is the relationship to the Scenic and Environmental group?
The proposed project is related to the Scenic and Environmental group due to its location
within and access to the Rice Creek Chain of Lakes Regional Park Reserve and Clearwater
Creek. The pedestrian/bicycle trial linkage will provide easy access from the future CSAH
14 trail to community and park resources.
The Clearwater Creek! Rice Creek Chain of Lakes Regional Park Reserve contain significant
native wildlife habitat as identified by the Minnesota Department of Natural Resources.
Native plant and animal life abounds. Park visitors may see muskrats, red fox, grey & red
squirrel, woodchuck, weasel, deer, resident birds such as pheasant and pileated
woodpeckers, and a variety of migratory waterfowl. Habitats are rich and varied and
include heavily wooded areas, wetlands, prairie, lakes, flood plains, and open fields. Park
visitors can view wildlife from the interpretive Wargo Nature Center or by using the easily
accessible self-guided trails within the park.
The overall project area is also known for its numerous water resources including Peltier
Lake and Centerville Lake. Species known to inhabit the area include blandings turtles,
blue heron and bald eagles.
What is the relationship to the Historic and Archaeological group?
The proposed pedestrian/bicycle trial linkage is related to the Historic and Archaeological
group because of its connection to the CSAH 14 trail, which will cross areas of significant
archaeological history in the Rice Creek Chain of Lakes Regional Park Reserve. More
precisely, a segment of the CSAH trail from the park entrance to 1-35E is known for its
archaeological history including a remaining Native American burial mound. Study of the
area's archaeological resources is ongoing and may further identify archaeological
resources and opportunities for the park to use the resources for educational purposes.
General/Integrative Criteria
1. Relationship to Intermodal/Multimodal Transportation System
a. The proposed project will be related to surface transportation through its association with
motorized traffic and its ability to directly improve safety by reducing conflicts between
motorized and non-motorized vehicles.
The pedestrian/bicycle trial linkages that cross CSAH 14 are currently experiencing volumes
of approximately 6,000 vehicles per day. These volumes are anticipated to double by 2030.
The pedestrian/bicycle trial linkages will provide safe crossings and therefore reduce the
potential for motorized/non-motorized vehicle conflicts along the high- volume roadway.
The pedestrian/bicycle trial linkages are also related to surface transportation through its
connection with the County walkways/bikeways. The pedestrian/bicycle trial linkages and the
overall trail system contribute to the areas multi-modal transportation system by providing a
pathway for pedestrians and bicyclists. The proposed project will improve circulation and
access between the existing and future planned trails in the City of Centerville, Anoka County
6
and Washington County, including the City of Hugo. The pedestrian/bicycle trial linkages will
also as part of the city trail system and provide a connection between residential areas and
employment centers.
b. The proposed pedestrian/bicycle trial linkage project will function as a component and
enhancement of the transportation system due to its ability to provide a safe crossing of
CSAH 14 for pedestrians and bicyclists and its ability to reduce conflicts/accidents between
motorized and non-motorized travelers. CSAH 14 has and will continue to experience
increased traffic volumes which pose a safety concern for pedestrians and bicyclists wishing
to cross from one side of the park to the other. The implementation of pedestrian/bicycle
trial linkages along CSAH 14 will increase travel efficiency and safety by reducing the
potential for conflicts between motorized and non-motorized travelers. Many modes of
transportation will have enhanced ability to appreciate the area's natural scenery and access
to the park. Pedestrians and bicyclists will also be encouraged to use the local and County
trail systems because of the safety improvement.
The proposed project will benefit users of the transportation system and multiple modes of
transportation by increasing pedestrian and bicycle safety which should in turn support the
use of alternative travel modes to the car, between recreational, residential and work
locations in Anoka County and beyond. While pedestrians and bicyclists will benefit from the
conflict-free crossing, motorists will also have a reduced risk of hitting a pedestrian or
bicyclist.
2. Extent of Public Benefit from the Project
The proposed pedestrian/bicycle trial linkages will provide more than a local benefit. Trail
users throughout the city and County will experience benefits from the pedestrian/bicycle
trial linkages due to its key contribution to the Regional Trail corridor.
Trail users traveling between Centerville, Lino Lakes, Anoka and Washington Counties,
including travel on the vast system of Washington County trails immediately east of the CSAH
14/I-35E interchange, will benefit from the proposed pedestrian/bicycle trial linkages. From
the City of Hugo in Washington County, trail users will eventually be able to travel as far
north as Duluth, Minnesota.
While the local trail systems provide a vast array of opportunities for pedestrians and
bicyclists to circulate to/from the local area, the pedestrian/bicycle trial also benefits those
wishing to visit the area to use non-motorized amenities. Many opportunities are available
today for such use in the Rice Creek.Chain of Lakes Regional Park Reserve plus future plans
for lake access and a fishing pier. In 2004, it was estimated that approximately 78,200
visitors used the Rice Creek Chain of Lakes Regional Park Reserve trails in this area. This
estimate was taken from year-round usage. A substantial portion of these visitors can be
estimated to originate from areas beyond the local area.
The draw to visit the Centerville area for its environmental resources is immense with the
parks and trails providing the most significant native wildlife habitat in the metropolitan area.
A visitor has the opportunity to encounter muskrats, red fox, grey & red squirrel, woodchuck,
weasel, deer, resident birds such as pheasant and pileated woodpeckers, and a variety of
migratory waterfowl in their varying habitat including heavily wooded areas, wetlands,
prairie, lakes, flood plains, and open fields. Visitors can also visit the interpretive Wargo
Nature Center or take a self-guided tour to learn more about the wildlife and habitat in the
area. The existence of an intact Native American burial mound along the CSAH 14 also
7
allows trail users the opportunity to recognize the archaeological history of this area laden
with lakes.
The overall public safety benefit of the pedestrian/bicycle trial linkages must also be
recognized. At least three modes of transportation will have a reduced chance of conflict
with the addition of the pedestrian/bicycle trial. Pedestrians and bicyclists will be able to
safely cross CSAH 14 from one side to the other and motorists will have a reduced chance of
hitting these pedestrians and bicyclists while they are doing so.
3. Development Framework Implementation
a. Employment, Housing and Transportation Integration
The Metropolitan Council's 2030 Regional Development Framework identifies Centerville as a
"developing community". Therefore, following are responses consistent with an urban area
project.
1) a development with an interconnected system of local streets, pedestrian, and
bicycle facilities.
The pedestrian/bicycle trial linkages, while located in the City of Centerville, will also connects
via the CSAH 14 trail system to the to the interconnected system of local streets in the City of
Lino Lakes and county roads in Anoka County. The pedestrian/bicycle trial linkages in
association with the CSAH 14 trail will also interconnect with the system of trails in the Rice
Creek Chain of Lakes Regional Park Reserve and the local in the Cities of Centerville and Lino
Lakes. Land uses in the immediate vicinity of the pedestrian/bicycle trial linkage will be
provided a safe connection to downtown Centerville (to the east) and the developing portions
of Centerville. Centerville is currently experiencing rapid planning for the development of
currently vacant or undeveloped land. The pedestrian/bicycle trial linkages will benefit
circulation within the city and complement the existing and planned local street systems.
2) a neighborhood revitalization area.
The proposed pedestrian/bicycle trial linkage will serve the downtown revitalization area in
Centerville. The City has received two Community Development Block Grants and created a
tax increment financing district to revitalize downtown Centerville at CSAH 14 and Centerville
Road. Together with the City sidewalk system, the pedestrian/bicycle trial linkages and the
trail along CSAH 14 will provide a connection to this area.
3) a redevelopment area of increased intensification and integrated land uses.
The proposed pedestrian/bicycle trial linkages in association with the CSAH 14 trail will reach
a redevelopment area in Centerville. The City has received two Community Development
Block Grants and created a tax increment financing district to revitalize the redevelopment
area (downtown Centerville) at CSAH 14 and Centerville Road. Land uses in the
redevelopment area, whether residential, commercial or retail, will be enhanced by the
access to/from the CSAH 14 trail and associated pedestrian/bicycle trial linkages.
8
4) an existing or proposed center of economic development.
The proposed pedestrian/bicycle trial linkages in association with the CSAH 14 trail will reach
the City of Centerville which is currently experiencing the development of vacant land along
CSAH 14. The City views this development as an expansion of the existing economic center.
5) a center of development on a transit way or a high volume transit facility.
The trail along CSAH 14 and the associated pedestrian/bicycle trial linkages will benefit
development along a high-volume transit way. The transit service along the 1- 35E corridor
reaches into the downtowns of Minneapolis and St. Paul as well as the greater Metropolitan
Area. Transit demand for this area is only anticipated to increase with current development
plans for Centerville. As identified by the Metropolitan Council, the City of Centerville is a
"developing" city.
6) a brownfield revitalization project.
The project will not serve or benefit a brownfield revitalization area.
7) Access between housing and employment.
The pedestrian/bicycle trial linkages in association with the CSAH 14 trail will proVide access
between the area's residential land uses, which are primarily comprised of single family
homes, and employment. As the City of Centerville responses to increased housing demands
in the Twin Cities metropolitan area, including an increased demand for life-cycle housing,
the trail and associated pedestrian/bicycle trial linkages will provide a connection between
housing and employment centers in downtown Centerville and along the 1-35E corridor. The
connection to the 1-35E corridor also provides a connection between housing and
employment, including employment in a broader segment of the Twin Cities metropolitan
area.
8) Access to existing or planned affordable or life-cycle housing development.
Access to existing or planned affordable or life-cycle housing development will be met with
the proposed project. The City of Centerville has the opportunity to respond to the housing
demand with the development of vacant land just beyond Main Street (CSAH 14) in
downtown Centerville.
4. Maturity of the Project Concept
The proposed project has developed to the stage of preliminary design with plans being
coordinated with the 2006 to 2007 construction plans for CSAH 14. A preliminary design for
the pedestrian/bicycle trial linkages, have been prepared by the City of Centerville. The
design for the pedestrian/bicycle trial linkages have been reviewed by the city's park and
recreation committee as well as the city council.
9
Appendix K
Project Implementation Schedule
1 Project Scope
Stake Holders have been identified
~ Meetings or contract with Stake Holders have occurred
2 Layout and Preliminary Plan
Identified Alternatives
Selected Alternatives
_ Layout or Preliminary Plan started
~ Layout or Preliminary Plan completed
Anticipated date or date of completion
3 Environmental Documentation
EIS
x
EA
PM
Document Status
X Document not started
Document in progress, environmental impacts identified
_ Document submitted to State Aid for review (date submitted )
Document approved (need copy of signed cover sheet)
Anticipated date or date of completion
4 R/W
X No R/W required
R/W required, parcels not identified
R/W required, parcels identified
R/W has been required
Anticipated date or date of completion
5 Construction Documents/Plans
~ Construction plans have not been started
_ Construction plans in progress
Anticipated date or date of completion
_ Construction plans completed/approved
6 Letting
Anticipated Letting Date
Aug-09
10
Appendices
Appendix 1 - Maps
Project Map
Centerville Parks and Trails Map
Rice Creek Chain of Lakes Regional Park Reserve Map
Lino Lakes Parks and Trails Map
Appendix 2 - Support Materials
Appendix 3 - Redevelopment & Revitalization Plans
Livable Communities Demonstration Account Project
Tax Increment Financing District 1-6 (Downtown Redevelopment)
11
Appendix 1
Maps
Project Map
Centerville Parks and Trails Map
Rice Creek Chain of Lakes Regional Park Reserve Map
Uno Lakes Parks and Trails Map
12
Appendix 2
Support Materials
13
COUNTY OF ANOKA
Public Services Division
HIGHWAY DEPARTMENT
1440 BUNKER LAKE BLVD. NW, ANDOVER, MINNESOTA 55304
(763) 862-4200 FAX (763) 862-4201
RECEIVED
Jut. 0 7 l005
07/0512005
Mr. Dallas Larson, City Manager
City of Centerville
1880 Main Street
Centerville, MN 55038
RE: CSAH 14 (MAIN ST) TRANSPORTATION ENHANCEMENTS
Dear Mr. Larson:
The County has been informed that the City of Centerville will submit a federal application for funds
to improve the transportation enhancements along CSAH 14 (Main St) from Lakeland Circle to
CSAH 21 (Centerville Rd) and CSAH 21 from CSAH 14 (Main St) to Heritage St. Anoka County is
the agency with jurisdiction on CSAH 14 and CSAH 21.
The County has been working with the City ofCenterville and surrounding communities to address
the need for roadway improvements to the CSAH 14 corridor. As part of the scheduled
improvements for CSAH 14 between 1-35E and 1-35W, this project will include trail connections and
sidewalks through the City of Centerville.
The proposed project will help enhance the overall quality of improvement to the CSAH 14 corridor.
. The County would support any transportation enhancements in respect to County policies and
guidelines to help improve the areas overall aesthetic, i.e. lighting, landscaping and scenic
beatification.
Therefore, Anoka County supports this proposed project for federal funding and supports the
application for funds during the current solicitation process. We believe this is an excellent
candidate for Transportation Enhancement funds and look forward to its inclusion in the program.
Sincerely,
Doug as W. Fischer, P.E.
Anoka County Engineer
.
June 28, 2005
RECEIVED
JUN 3 !J 2005
Mary Capra, Mayor
City of CentervilIe
1880 Main Street
Centerville, MN 55038
RE: ENHANCEMENT GRANT
CSAH 14
Dear Mayor Capra:
The City of Lino Lakes is wTiting this letter in regards to this year's federal funding
solicitation. We have been informed that Centerville will be submitting an application
for the enhancement grant funds for street lighting and related items in conjunction with
reconstruction of CSAH 14 by Anoka County.
This letter is in support of the project and for Centerville to pursue federal funding. The
City of Lino Lakes and the City of Centerville will continue to coordinate their efforts in
improving the areas transportation issues. We feel this project will help address safety
and mobility issues occurring in the area. Attached is a certified copy of Resolution No.
05-84, approved by the City Council on June 27, 2005, supporting the application.
If you have any further question in regards to the project on the cities end, please fell free
to contact us.
Sincerely,
~~
John Bergeson
Mayor, City of Lino Lakes
Enclosure
600 Town Center Parkway. Lino Lakes, ;'v\innesota 55014-1182
Phone: 651-9fJ2-2400 · Fax: 651-t)g2-24Y9 · TOO: 651-982-2410
.
Parks & Recreation Committee
Meeting Minutes August 3, 2005
PARKS AND RECREATION COMMITTEE
MEETING MINUTES
Wednesday, August 3,2005 - 6:00 p.m.
Pursuant to due call and notice thereof, the Parks and Recreation Committee of the City of Centerville
held the regularly scheduled meeting on August 3, 2005, at City Hall, 1880 Main Street.
Present:
Committee Member Suzanne Seeley
Committee Member Kathy Peil
Committee Member Mr. Kevin Amundsen
M[ill@~~[J@\YJ@@]
Absent:
Chairperson Tedd Peterson
Vice-Chairperson Wayne LeBlanc
Committee Member Linda Merkel
Council:
Absent - City Council Work Session being held at the same time.
Staff:
Kim Stephan
I. CALL TO ORDER
1. Roll Call
Committee Member Peil called the August 3, 2005 Parks & Recreation Committee Meeting to
order at 6:40 p.m.
II. SET AGENDA
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
set the August 3, 2005 Parks & Recreation Committee Agenda as is. All in favor. Motion
carried unanimously.
IV. APPEARANCES
.
Mr. John Meyer, Finance Director, made an appearance to discuss a Federal Transportation
Enhancement Fund Application Draft with the committee. The committee discussed the
advantages of the sidewalk connections being proposed by the grant and the concern that these
sidewalks/trails tie in to the existing trail plan. Committee Member Peil questioned whether the
outcome wi11line up with the trail extensions planned on the St. Genevieve property. Mr. Meyer
assured the committee that the Parks & Recreation Committee's Trail Plan was reviewed when
the grant application was drafted and the final outcome would eventually connect all the trails
10f5
Parks & Recreation Committee
Meeting Minutes August 3, 2005
and sidewalks as proposed. Mr. Meyer did state however, that the sidewalk connection on the
east side of Centerville Road from Heritage Street to the sidewalk in front of Chauncey Barett
Gardens will probably not be possible due to the drainage ditch located on that property and the
steep ditch involved. Committee Member Peil asked for the time frame on the grant application.
Mr. Meyer stated it was due to be submitted by August 19, 2005 and would be going before City
Council at the next scheduled City Council Meeting. The decision process is lengthy and it
would probably be six (6) months before a decision was made by the Grant Committee. Mr.
Meyer also stated that the funds would not be available until 2009. One of the issues in the
City's favor is that this particular grant application connects all the trail systems, as well as the
proposed County Road 14 trail and the regional trail.
Motion was made by Committee Member Seeley, seconded by Committee Member Peil to
recommend to City Council accepting the Federal Transportation Enhancement Fund
Application Draft as presented to the Parks & Recreation Committee as presented by Mr.
John Meyer, Finance Director. All in favor. Motion carried unanimously.
IV. CONSIDERATION OF MINUTES
Consideration of Julv 6. 2005 Parks and Recreation Committee Meeting Minutes
Motion was made by Committee Member Peil, seconded by Committee Member Seeley to
approve the July 6, 2005 Parks & Recreation Committee Meeting Minutes as is. All in
favor. Motion carried unanimously.
VI. COMMITTEE BUSINESS
Oath of Office - Ms. Linda Merkel & Mr. Kevin Amundsen
Committee Member Amundsen was sworn in as a Parks & Recreation Committee Member. Ms.
Linda Merkel was not present.
2006 Budget
The Committee looked at previous budget information supplied by Vice-Chairperson L~Blanc
and briefly discussed the modifications that will need to be modified before submitting the
budget to City Council. Due to the absence of Chairperson Peterson and Vice-Chairperson
LeBlanc, the majority of the items need to be tabled until the full committee is present.
Chairperson Peterson discussed the budget prior to leaving on vacation with Committee Member
Peil who shared his input with the committee. The concern is the Parks & Recreation Committee
has limited funds available to them in upcoming years with the city nearing being built out and
the end of Park Dedication Fees. With the possible purchase of the property at 1601 LaMotte
Drive, the renovation of Tracie McBride Memorial Park when the old water tower comes down,
the addition of trail connections on the St. Genevieve property and connecting the Pheasant
Marsh, 3rd Addition Trail to Center Street and the desire to have a play structure at Laurie
LaMotte Memorial Park, the committee feels it needs to request funs from the General Fund.
The committee has not receiver, nor requested funds from the General Funds in 3-4 years.
20f5
City of Centerville
Council Meeting Minutes
August 10,2005
2. American Tank Services, DBA Holte Contracting - Pay Estimate #3 and Reduce
Retainage, Pond & Ditch Improvements $11,1 10.56
Motion by Council Member Terway, seconded by Council Member Lakso, to
approve payment to American Tank Services in the amount of $9.435.70. All in
favor. Motion carried unanimously.
3. Dresel Contracting - Pay Estimate #9 and Reduce Retainage, 2004 Utility &
Street Improvements $29,304.61
Council discussed the project and expressed concern that the rain garden has not been
completed.
Motion by Council Member Lee. seconded by Council Member Terway.to approve
payment to Dresel Contractine: in the amount of $24.304.61. All in favor. Motion
carried unanimously.
4. Draft Federal Transportation Enhancement Fund Application
Motion by Council Member Terway. seconded by Council Member Paar. to
approve the Federal Transportation Enhancement Fund Application as presented
by the Finance Director. All in favor. Motion carried unanimously.
5. Sedona Townhomes, LLC Request for Letter of Credit Reduction
Motion by Council Member Lee. seconded by Council Member Lakso. to approve
the reduction in letter of credit as requested and recommended by City Ene:ineer
and the City Administrator. All in favor. Motion carried unanimously.
6. Dock Installation on Drainage Ponds - League of MN Cities Insurance Trust
Memo
CouIl;cil discussed the potentialliability the City would face should there be an accident
or injury on a City pond and agreed that all docks must be removed.
The City Attorney suggested requiring a natural buffer of non-mowed vegetation around
the ponds to discourage anyone from playing near them. He also said the City has the
option of fencing but it has not been the policy to do so.
City Attorney Hoeft said from a policy standpoint the policy is that the City does not
fence the drainage ponds first, because of the costs and maintenance of doing so and,
secondly, because the ponds are not of a design or nature that really raise the concerns of
the type of dangers that might exist for animals or small children.
Page 3 of8
Appendix 3
Redevelopment & Revitalization Plans
Livable Communities Demonstration Account Project
Tax Increment Financing District 1-6 (Downtown Redevelopment)
14